225
East Leppington Precinct Prepared for Department of Planning and Infrastructure Page 53 East Leppington Precinct APPENDIX B SIDRA SUMMARIES

Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

East Leppington Precinct

Prepared for Department of Planning and Infrastructure Page 53

East Leppington Precinct

APPENDIX

BSIDRA SUMMARIES

Page 2: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 5 3.5 0.028 53.4 LOS D 0.3 2.0 0.76 0.65 24.5

2 T 28 3.5 0.079 57.1 LOS E 1.8 12.9 0.86 0.63 22.6

3 R 90 3.5 0.587 74.8 LOS F 6.4 46.1 0.95 0.77 19.9

Approach 123 3.5 0.587 69.9 LOS E 6.4 46.1 0.92 0.73 20.6

East: Camden Valley Way (E)

24 L 39 3.5 0.052 11.5 LOS A 0.4 2.5 0.13 0.62 45.8

25 T 1145 3.5 0.429 22.6 LOS B 14.8 106.6 0.53 0.46 35.9

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1192 3.5 0.429 22.7 LOS B 14.8 106.6 0.52 0.47 35.9

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 12 3.5 0.034 56.4 LOS D 0.8 5.4 0.85 0.59 22.8

9 R 214 3.5 0.826 86.1 LOS F 17.5 125.8 1.00 0.92 18.0

Approach 234 3.5 0.826 83.5 LOS F 17.5 125.8 0.98 0.89 18.4

West: Camden Valley Way (W)

30 L 244 3.5 0.236 12.1 LOS A 2.6 19.0 0.15 0.64 45.3

31 T 2192 3.5 0.838 30.5 LOS C 45.5 328.0 0.82 0.75 31.3

32 R 2 3.5 0.030 90.6 LOS F 0.2 1.1 0.97 0.61 17.3

Approach 2438 3.5 0.838 28.7 LOS C 45.5 328.0 0.75 0.74 32.3

All Vehicles 3987 3.5 0.838 31.4 LOS C 45.5 328.0 0.70 0.67 31.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.6 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:40 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 3: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, D Phase Timing Results

Phase A B C D

Green Time (sec) 6 77 23 30

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 83 29 36

Phase Split 8 % 52 % 18 % 23 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:40 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 4: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 96 3.5 0.331 49.2 LOS D 5.3 38.3 0.76 0.75 25.7

2 T 161 3.5 0.252 62.2 LOS E 5.5 39.4 0.91 0.71 21.4

3 R 245 3.5 0.906 102.9 LOS F 10.9 78.7 1.00 1.03 15.9

Approach 502 3.5 0.906 79.6 LOS F 10.9 78.7 0.92 0.88 18.8

East: Camden Valley Way (NE)

4 L 398 3.5 0.410 17.0 LOS B 8.2 59.4 0.29 0.69 41.1

5 T 875 3.5 0.467 21.8 LOS B 16.5 119.0 0.53 0.47 36.3

6 R 75 3.5 0.555 95.4 LOS F 3.1 22.2 1.00 0.74 16.8

Approach 1348 3.5 0.555 24.5 LOS B 16.5 119.0 0.49 0.55 35.2

North: Ingleburn Rd (NW)

7 L 79 3.5 0.248 58.7 LOS E 4.8 34.8 0.83 0.76 23.2

8 T 203 3.5 0.317 63.0 LOS E 7.0 50.3 0.92 0.73 21.3

9 R 81 3.5 0.300 85.5 LOS F 3.1 22.3 0.98 0.74 18.1

Approach 363 3.5 0.317 67.1 LOS E 7.0 50.3 0.92 0.74 20.8

West: Camden Valley Way (SW)

10 L 120 3.5 0.098 10.7 LOS A 0.9 6.6 0.11 0.63 46.6

11 T 2076 3.5 0.962 47.5 LOS D 90.1 649.6 0.98 1.04 25.0

12 R 189 3.5 0.466 80.8 LOS F 6.9 49.6 0.96 0.78 18.8

Approach 2385 3.5 0.962 48.3 LOS D 90.1 649.6 0.93 1.00 24.9

All Vehicles 4598 3.5 0.962 46.2 LOS D 90.1 649.6 0.80 0.83 25.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.6 LOS D 0.1 0.1 0.62 0.62

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.6 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:49:48 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 5: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, D Phase Timing Results

Phase A A1 B C D

Green Time (sec) 6 6 79 12 27

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 12 85 18 33

Phase Split 8 % 8 % 53 % 11 % 21 %

Page 6: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:49:48 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 7: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 112 3.5 0.478 67.0 LOS E 12.9 92.7 0.92 0.83 21.4

2 T 77 3.5 0.478 58.7 LOS E 12.9 92.7 0.92 0.77 21.6

3 R 155 3.5 1.000 3 74.1 LOS F 11.3 81.6 0.97 0.81 19.7

Approach 344 3.5 1.000 68.4 LOS E 12.9 92.7 0.95 0.81 20.6

East: Camden Valley Way (NE)

4 L 72 3.5 0.422 14.0 LOS A 7.9 56.6 0.21 0.98 44.1

5 T 974 3.5 0.422 5.7 LOS A 7.9 57.0 0.21 0.19 50.8

6 R 12 3.5 0.178 93.4 LOS F 1.0 6.9 0.99 0.68 16.8

Approach 1058 3.5 0.422 7.3 LOS A 7.9 57.0 0.22 0.25 49.2

North: Heath Rd (NW)

7 L 12 3.5 0.108 64.1 LOS E 2.5 18.2 0.85 0.78 22.3

8 T 28 3.5 0.108 55.8 LOS D 2.5 18.2 0.85 0.64 22.6

9 R 40 3.5 0.260 80.2 LOS F 2.9 21.2 0.95 0.75 18.7

Approach 80 3.5 0.260 69.3 LOS E 2.9 21.2 0.90 0.72 20.4

West: Camden Valley Way (SW)

10 L 87 3.5 0.921 24.1 LOS B 61.5 443.2 0.71 1.00 37.9

11 T 2202 3.5 0.921 15.7 LOS B 61.6 444.1 0.71 0.69 39.9

12 R 48 3.5 0.710 97.7 LOS F 4.0 28.9 1.00 0.79 16.2

Approach 2337 3.5 0.921 17.7 LOS B 61.6 444.1 0.71 0.71 38.6

All Vehicles 3819 3.5 1.000 20.5 LOS B 61.6 444.1 0.60 0.59 37.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 62.1 LOS F 0.2 0.2 0.88 0.88

P5 Across N approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P7 Across W approach 53 62.1 LOS F 0.2 0.2 0.88 0.88

All Pedestrians 212 37.1 LOS D 0.63 0.63

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 8: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 6 105 31

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 12 111 37

Phase Split 8 % 69 % 23 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 9: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.342 8.4 LOS A 1.0 7.0 0.15 0.64 48.9

3 R 39 3.5 0.082 73.8 LOS F 1.3 9.6 0.91 0.71 19.9

Approach 153 3.5 0.342 25.1 LOS B 1.3 9.6 0.35 0.66 35.7

East: Camden Valley Way (NE)

4 L 17 3.5 0.011 7.9 LOS A 0.0 0.3 0.05 0.61 49.5

5 T 1209 3.5 0.447 2.0 LOS A 4.0 28.9 0.09 0.09 56.3

Approach 1226 3.5 0.447 2.1 LOS A 4.0 28.9 0.09 0.09 56.2

West: Camden Valley Way (SW)

11 T 2422 3.5 0.804 2.7 LOS A 19.5 140.6 0.23 0.22 54.6

12 R 48 3.5 0.393 92.8 LOS F 2.5 17.8 0.99 0.71 16.9

Approach 2471 3.5 0.804 4.5 LOS A 19.5 140.6 0.25 0.23 52.3

All Vehicles 3849 3.5 0.804 4.6 LOS A 19.5 140.6 0.20 0.20 52.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 9.8 LOS A 0.1 0.1 0.35 0.35

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 52.7 LOS E 0.76 0.76

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 10: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 114 21

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 120 27

Phase Split 8 % 75 % 17 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 11: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2021 AM Peak Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 151 3.5 0.234 4.0 LOS A 1.4 10.3 0.35 0.37 51.2

6 R 137 3.5 0.234 12.0 LOS A 1.4 10.3 0.35 0.75 46.5

Approach 288 3.5 0.234 7.8 LOS A 1.4 10.3 0.35 0.55 48.7

North: Denham Court Road (N)

7 L 633 3.5 0.525 7.0 LOS A 4.2 30.2 0.67 0.63 48.1

9 R 127 3.5 0.170 14.0 LOS A 0.9 6.5 0.56 0.74 44.5

Approach 760 3.5 0.525 8.2 LOS A 4.2 30.2 0.65 0.65 47.4

West: Precinct (W)

10 L 297 3.5 0.506 5.7 LOS A 4.0 29.1 0.46 0.51 50.1

11 T 352 3.5 0.506 4.4 LOS A 4.0 29.1 0.46 0.42 50.6

Approach 649 3.5 0.506 5.0 LOS A 4.0 29.1 0.46 0.46 50.4

All Vehicles 1697 3.5 0.525 6.9 LOS A 4.2 30.2 0.53 0.56 48.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:12:20 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 12: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 2 3.5 0.011 53.1 LOS D 0.1 0.8 0.76 0.62 24.6

2 T 12 3.5 0.034 56.4 LOS D 0.8 5.4 0.85 0.59 22.8

3 R 39 3.5 0.266 79.1 LOS F 2.8 20.4 0.95 0.74 19.1

Approach 53 3.5 0.266 72.9 LOS F 2.8 20.4 0.92 0.70 20.0

East: Camden Valley Way (E)

24 L 90 3.5 0.121 11.6 LOS A 0.9 6.1 0.13 0.63 45.7

25 T 2550 3.5 0.910 36.4 LOS C 62.8 452.5 0.90 0.88 28.7

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 2648 3.5 0.910 35.7 LOS C 62.8 452.5 0.87 0.87 29.0

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 28 3.5 0.079 57.1 LOS E 1.8 12.9 0.86 0.63 22.6

9 R 175 3.5 0.914 101.9 LOS F 15.8 113.6 1.00 1.04 16.0

Approach 211 3.5 0.914 94.1 LOS F 15.8 113.6 0.97 0.97 16.8

West: Camden Valley Way (W)

30 L 160 3.5 0.153 11.8 LOS A 1.6 11.6 0.14 0.64 45.5

31 T 1091 3.5 0.378 17.8 LOS B 11.8 85.4 0.45 0.39 39.2

32 R 5 3.5 0.074 91.7 LOS F 0.4 2.8 0.98 0.65 17.2

Approach 1256 3.5 0.378 17.3 LOS B 11.8 85.4 0.41 0.42 39.7

All Vehicles 4168 3.5 0.914 33.6 LOS C 62.8 452.5 0.74 0.74 30.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 48.9 LOS E 0.75 0.75

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 13: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, D Phase Timing Results

Phase A B C D

Green Time (sec) 6 83 17 30

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 89 23 36

Phase Split 8 % 56 % 14 % 23 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 14: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 103 3.5 0.390 59.5 LOS E 6.4 46.1 0.84 0.77 23.0

2 T 195 3.5 0.303 62.8 LOS E 6.7 48.2 0.92 0.73 21.3

3 R 226 3.5 0.998 145.0 LOS F 12.3 89.0 1.00 1.22 12.2

Approach 524 3.5 0.998 97.6 LOS F 12.3 89.0 0.94 0.95 16.3

East: Camden Valley Way (NE)

4 L 297 3.5 0.241 11.0 LOS A 2.6 19.1 0.13 0.64 46.3

5 T 2231 3.5 1.007 87.4 LOS F 128.3 925.3 1.00 1.26 17.1

6 R 164 3.5 0.453 82.5 LOS F 6.1 43.6 0.97 0.77 18.6

Approach 2692 3.5 1.007 78.7 LOS F 128.3 925.3 0.90 1.16 18.5

North: Ingleburn Rd (NW)

7 L 83 3.5 0.241 50.4 LOS D 4.6 33.4 0.76 0.75 25.4

8 T 231 3.5 0.359 63.5 LOS E 8.0 57.7 0.93 0.75 21.1

9 R 65 3.5 0.287 87.7 LOS F 2.5 18.2 0.99 0.73 17.8

Approach 379 3.5 0.359 64.8 LOS E 8.0 57.7 0.90 0.74 21.2

West: Camden Valley Way (SW)

10 L 74 3.5 0.070 14.3 LOS A 1.0 7.5 0.20 0.64 43.3

11 T 934 3.5 0.472 19.0 LOS B 16.3 117.7 0.49 0.44 38.2

12 R 125 3.5 0.920 105.6 LOS F 5.6 40.1 1.00 0.95 15.6

Approach 1133 3.5 0.920 28.3 LOS B 16.3 117.7 0.53 0.51 33.1

All Vehicles 4728 3.5 1.007 67.6 LOS E 128.3 925.3 0.82 0.95 20.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 23.1 LOS C 0.1 0.1 0.54 0.54

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:49:27 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 15: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, D Phase Timing Results

Phase A A1 B C D

Green Time (sec) 6 4 83 10 27

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 10 89 16 33

Phase Split 8 % 6 % 56 % 10 % 21 %

Page 16: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:49:27 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 17: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 48 3.5 0.311 76.0 LOS F 5.4 39.0 0.94 0.78 19.7

2 T 28 3.5 0.311 67.7 LOS E 5.4 39.0 0.94 0.74 19.8

3 R 72 3.5 0.603 89.4 LOS F 5.7 41.3 1.00 0.79 17.3

Approach 148 3.5 0.603 81.0 LOS F 5.7 41.3 0.97 0.77 18.5

East: Camden Valley Way (NE)

4 L 167 3.5 0.900 13.5 LOS A 37.6 271.2 0.46 0.98 45.3

5 T 2213 3.5 0.900 5.2 LOS A 37.9 273.1 0.46 0.43 50.3

6 R 18 3.5 0.133 84.6 LOS F 1.3 9.5 0.94 0.71 18.0

Approach 2398 3.5 0.900 6.4 LOS A 37.9 273.1 0.46 0.47 49.3

North: Heath Rd (NW)

7 L 13 3.5 0.361 79.3 LOS F 5.7 41.1 0.96 0.79 19.4

8 T 65 3.5 0.361 71.0 LOS F 5.7 41.1 0.96 0.75 19.6

9 R 84 3.5 0.696 91.1 LOS F 6.8 49.1 1.00 0.82 17.1

Approach 162 3.5 0.696 82.1 LOS F 6.8 49.1 0.98 0.79 18.2

West: Camden Valley Way (SW)

10 L 70 3.5 0.425 11.1 LOS A 4.7 34.0 0.12 1.00 46.5

11 T 1054 3.5 0.425 2.7 LOS A 4.7 34.2 0.12 0.11 55.1

12 R 112 3.5 0.829 94.2 LOS F 9.3 66.8 1.00 0.87 16.7

Approach 1236 3.5 0.829 11.5 LOS A 9.3 66.8 0.20 0.23 45.2

All Vehicles 3944 3.5 0.900 13.9 LOS A 37.9 273.1 0.42 0.42 42.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 9.5 LOS A 0.1 0.1 0.34 0.34

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 9.5 LOS A 0.1 0.1 0.34 0.34

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 41.8 LOS E 0.65 0.65

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 18: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 12 112 18

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 18 118 24

Phase Split 11 % 74 % 15 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 19: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.145 22.6 LOS B 1.9 13.9 0.53 0.73 37.2

3 R 17 3.5 0.036 73.0 LOS F 0.6 4.1 0.90 0.68 20.1

Approach 65 3.5 0.145 35.6 LOS C 1.9 13.9 0.62 0.72 30.5

East: Camden Valley Way (NE)

4 L 39 3.5 0.026 8.0 LOS A 0.1 0.8 0.05 0.61 49.4

5 T 2529 3.5 0.936 10.8 LOS A 50.7 365.8 0.50 0.50 44.6

Approach 2568 3.5 0.936 10.8 LOS A 50.7 365.8 0.49 0.50 44.6

West: Camden Valley Way (SW)

11 T 1277 3.5 0.424 1.5 LOS A 4.0 29.2 0.09 0.08 57.1

12 R 114 3.5 0.923 101.7 LOS F 6.5 46.7 1.00 0.89 15.8

Approach 1391 3.5 0.923 9.7 LOS A 6.5 46.7 0.17 0.15 47.1

All Vehicles 4024 3.5 0.936 10.8 LOS A 50.7 365.8 0.38 0.38 45.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 9.8 LOS A 0.1 0.1 0.35 0.35

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 52.7 LOS E 0.76 0.76

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:11:45 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 20: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 114 21

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 120 27

Phase Split 8 % 75 % 17 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:11:45 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 21: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2021 PM Peak Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 352 3.5 0.668 7.2 LOS A 7.1 51.0 0.76 0.71 47.3

6 R 367 3.5 0.668 15.1 LOS B 7.1 51.0 0.76 0.85 44.6

Approach 719 3.5 0.668 11.2 LOS A 7.1 51.0 0.76 0.78 45.8

North: Denham Court Road (N)

7 L 287 3.5 0.228 5.7 LOS A 1.4 10.2 0.37 0.48 50.2

9 R 297 3.5 0.213 11.9 LOS A 1.3 9.5 0.36 0.63 45.3

Approach 584 3.5 0.228 8.8 LOS A 1.4 10.2 0.37 0.56 47.5

West: Precinct (W)

10 L 127 3.5 0.296 7.0 LOS A 1.9 13.9 0.62 0.62 49.0

11 T 151 3.5 0.296 5.6 LOS A 1.9 13.9 0.62 0.54 49.2

Approach 278 3.5 0.296 6.2 LOS A 1.9 13.9 0.62 0.58 49.1

All Vehicles 1581 3.5 0.668 9.5 LOS A 7.1 51.0 0.59 0.66 46.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:12:28 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 22: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 AM Camden Valley Wy/Denham Ct Rd (Amended)

Camden Valley Way / Denham Court Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 96 3.5 0.320 46.1 LOS D 5.1 36.8 0.73 0.74 26.7

2 T 161 3.5 0.225 59.2 LOS E 5.3 38.3 0.89 0.70 22.1

3 R 245 3.5 0.983 132.8 LOS F 12.8 92.0 1.00 1.20 13.1

Approach 502 3.5 0.983 92.6 LOS F 12.8 92.0 0.91 0.95 16.9

East: Camden Valley Way (NE)

4 L 398 3.5 0.442 19.3 LOS B 9.7 69.6 0.34 0.70 39.4

5 T 875 3.5 0.357 22.1 LOS B 11.7 84.4 0.50 0.43 36.2

6 R 75 3.5 0.552 95.3 LOS F 3.1 22.2 1.00 0.74 16.8

Approach 1348 3.5 0.552 25.4 LOS B 11.7 84.4 0.48 0.53 34.8

North: Ingleburn Rd (NW)

7 L 79 3.5 0.242 56.1 LOS D 4.7 33.9 0.81 0.75 23.8

8 T 203 3.5 0.284 60.0 LOS E 6.8 49.0 0.90 0.72 21.9

9 R 81 3.5 0.325 86.8 LOS F 3.1 22.5 0.99 0.74 17.9

Approach 363 3.5 0.325 65.1 LOS E 6.8 49.0 0.90 0.73 21.2

West: Camden Valley Way (SW)

10 L 120 3.5 0.100 11.7 LOS A 1.2 8.4 0.14 0.63 45.6

11 T 2076 3.5 0.979 61.8 LOS E 101.0 727.9 1.00 1.13 21.5

12 R 189 3.5 0.439 79.4 LOS F 6.8 49.0 0.95 0.78 19.1

Approach 2385 3.5 0.979 60.6 LOS E 101.0 727.9 0.95 1.07 21.8

All Vehicles 4598 3.5 0.983 54.1 LOS D 101.0 727.9 0.81 0.87 23.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 33.2 LOS D 0.2 0.2 0.64 0.64

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 25.3 LOS C 0.1 0.1 0.56 0.56

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 51.7 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:49:11 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 23: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 AM Camden Valley Wy/Denham Ct Rd (Amended)

Camden Valley Way / Denham Court Road 2021 AM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, D Phase Timing Results

Phase A A1 B C D

Green Time (sec) 6 7 76 11 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 13 82 17 36

Phase Split 8 % 8 % 51 % 11 % 23 %

Page 24: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:49:11 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 25: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2021 PM Camden Valley Wy/Denham Ct Rd (Amended)

Camden Valley Way / Denham Court Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 103 3.5 0.375 55.1 LOS D 6.1 44.0 0.81 0.76 24.1

2 T 195 3.5 0.264 58.8 LOS E 6.4 46.5 0.89 0.71 22.2

3 R 226 3.5 0.768 90.8 LOS F 9.2 66.5 1.00 0.87 17.4

Approach 524 3.5 0.768 71.9 LOS F 9.2 66.5 0.92 0.79 20.1

East: Camden Valley Way (NE)

4 L 297 3.5 0.253 12.6 LOS A 3.6 26.0 0.17 0.65 44.8

5 T 2231 3.5 0.811 22.4 LOS B 43.0 310.3 0.71 0.65 35.6

6 R 164 3.5 0.483 83.8 LOS F 6.1 44.2 0.97 0.77 18.4

Approach 2692 3.5 0.811 25.1 LOS B 43.0 310.3 0.66 0.66 34.4

North: Ingleburn Rd (NW)

7 L 83 3.5 0.238 48.8 LOS D 4.5 32.8 0.75 0.74 25.9

8 T 231 3.5 0.323 60.5 LOS E 7.8 56.2 0.91 0.73 21.8

9 R 65 3.5 0.239 84.9 LOS F 2.5 17.8 0.98 0.73 18.2

Approach 379 3.5 0.323 62.1 LOS E 7.8 56.2 0.89 0.73 21.8

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 15.7 LOS B 1.2 8.5 0.22 0.65 42.2

11 T 934 3.5 0.502 23.0 LOS B 18.6 133.8 0.56 0.50 35.5

12 R 125 3.5 0.788 97.0 LOS F 5.2 37.8 1.00 0.84 16.6

Approach 1133 3.5 0.788 30.7 LOS C 18.6 133.8 0.59 0.55 31.8

All Vehicles 4728 3.5 0.811 34.6 LOS C 43.0 310.3 0.69 0.65 30.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 31.9 LOS D 0.2 0.2 0.63 0.63

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 51.5 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:50:16 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

� �

Page 26: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2021 PM Camden Valley Wy/Denham Ct Rd (Amended)

Camden Valley Way / Denham Court Road 2021 PM Peak Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 7 2 78 12 0 30

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 13 8 84 18 1 36

Phase Split 8 % 5 % 53 % 11 % 1 % 23 %

Page 27: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:50:16 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2021 Intersection Analysis.sip 8000955, CARDNO, ENTERPRISE

Page 28: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (1.5% growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 72 3.5 0.207 59.0 LOS E 4.8 34.3 0.89 0.69 21.9

3 R 162 3.5 1.000 3 72.6 LOS F 11.3 81.6 0.98 0.81 20.2

Approach 265 3.5 1.000 66.8 LOS E 11.3 81.6 0.93 0.76 21.1

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1248 3.5 0.501 29.2 LOS C 18.8 135.4 0.63 0.56 32.2

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1336 3.5 0.501 28.5 LOS C 18.8 135.4 0.60 0.56 32.6

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.577 86.7 LOS F 3.5 25.5 1.00 0.76 17.0

9 R 217 3.5 0.577 74.1 LOS F 14.0 100.6 0.97 0.82 20.0

Approach 246 3.5 0.577 74.5 LOS F 14.0 100.6 0.96 0.81 19.8

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2396 3.5 0.962 68.8 LOS E 74.8 539.3 1.00 1.10 20.1

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 2658 3.5 0.962 63.6 LOS E 74.8 539.3 0.92 1.05 21.2

All Vehicles 4505 3.5 1.000 54.0 LOS D 74.8 539.3 0.83 0.88 23.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 31.3 LOS D 0.2 0.2 0.63 0.63

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 31.3 LOS D 0.2 0.2 0.63 0.63

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 52.7 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:30:56 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 29: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (1.5% growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 70 30 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 76 36 0 36

Phase Split 8 % 48 % 23 % 0 % 23 %

Page 30: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:30:56 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 31: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 157 3.5 0.511 45.4 LOS D 8.4 60.7 0.74 0.76 26.9

2 T 214 3.5 0.251 54.4 LOS D 6.8 49.1 0.86 0.69 23.3

3 R 319 3.5 0.787 87.3 LOS F 12.9 92.9 1.00 0.89 17.9

Approach 690 3.5 0.787 67.6 LOS E 12.9 92.9 0.90 0.80 21.0

East: Camden Valley Way (NE)

4 L 451 3.5 0.668 26.7 LOS B 18.9 136.3 0.59 0.77 34.8

5 T 960 3.5 0.386 32.1 LOS C 16.6 119.5 0.72 0.63 30.7

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1486 3.5 0.668 33.7 LOS C 18.9 136.3 0.70 0.68 30.5

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 236 3.5 0.311 58.6 LOS E 7.8 56.5 0.90 0.72 22.2

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 396 3.5 0.311 62.7 LOS E 7.8 56.5 0.89 0.73 21.7

West: Camden Valley Way (SW)

10 L 120 3.5 0.107 20.2 LOS B 3.6 26.3 0.43 0.70 38.8

11 T 2227 3.5 0.783 34.7 LOS C 46.7 336.8 0.89 0.82 29.4

12 R 226 3.5 0.627 84.3 LOS F 8.7 63.0 1.00 0.80 18.3

Approach 2573 3.5 0.783 38.4 LOS C 46.7 336.8 0.88 0.81 28.2

All Vehicles 5145 3.5 0.787 42.8 LOS D 46.7 336.8 0.83 0.76 26.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 36.5 LOS D 0.2 0.2 0.68 0.68

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.7 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:54:52 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 32: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 70 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 76 20 4 38

Phase Split 8 % 6 % 48 % 13 % 3 % 24 %

Page 33: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:54:52 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 34: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.327 46.0 LOS D 12.2 88.0 0.76 0.83 26.8

2 T 81 3.5 0.327 37.7 LOS C 12.2 88.0 0.76 0.64 27.6

3 R 167 3.5 0.882 67.4 LOS E 11.3 81.6 0.86 0.88 21.1

Approach 390 3.5 0.882 53.5 LOS D 12.2 88.0 0.80 0.81 24.1

East: Camden Valley Way (NE)

4 L 72 3.5 0.456 39.2 LOS C 20.7 149.0 0.73 0.91 29.9

5 T 1125 3.5 0.456 30.9 LOS C 20.9 150.4 0.73 0.65 31.2

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1219 3.5 0.456 32.5 LOS C 20.9 150.4 0.74 0.66 30.6

North: Heath Rd (NW)

7 L 17 3.5 0.078 44.2 LOS D 2.6 18.9 0.69 0.81 27.8

8 T 35 3.5 0.078 35.9 LOS C 2.6 18.9 0.69 0.54 28.8

9 R 40 3.5 0.235 55.8 LOS D 2.4 17.0 0.79 0.74 23.7

Approach 92 3.5 0.235 46.0 LOS D 2.6 18.9 0.74 0.68 26.2

West: Camden Valley Way (SW)

10 L 87 3.5 0.875 49.5 LOS D 58.9 425.0 0.97 0.95 26.6

11 T 2398 3.5 0.875 41.1 LOS C 59.2 426.7 0.97 0.92 26.9

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 2546 3.5 0.875 42.5 LOS D 59.2 426.7 0.97 0.91 26.6

All Vehicles 4247 3.5 0.882 40.8 LOS C 59.2 426.7 0.88 0.83 27.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P3 Across E approach 53 46.5 LOS E 0.2 0.2 0.76 0.76

P5 Across N approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P7 Across W approach 53 46.5 LOS E 0.2 0.2 0.76 0.76

All Pedestrians 212 35.9 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:30:57 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 35: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 74 56

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 80 62

Phase Split 8 % 4 % 50 % 39 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:30:57 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 36: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.324 10.2 LOS A 1.7 12.6 0.25 0.66 47.0

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.324 24.9 LOS B 1.7 12.6 0.41 0.68 35.8

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1406 3.5 0.370 12.2 LOS A 15.7 112.9 0.47 0.43 43.4

Approach 1423 3.5 0.370 12.2 LOS A 15.7 112.9 0.47 0.43 43.5

West: Camden Valley Way (SW)

11 T 2649 3.5 0.616 9.3 LOS A 30.6 220.4 0.50 0.46 46.0

12 R 48 3.5 0.341 90.9 LOS F 2.4 17.6 1.00 0.72 17.2

Approach 2698 3.5 0.616 10.8 LOS A 30.6 220.4 0.51 0.47 44.7

All Vehicles 4274 3.5 0.616 11.7 LOS A 30.6 220.4 0.49 0.46 43.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.4 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.2 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:30:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 37: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 8 107 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 14 113 33

Phase Split 9 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:30:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 38: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 AM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.281 4.4 LOS A 1.8 13.0 0.44 0.42 50.3

6 R 147 3.5 0.281 12.4 LOS A 1.8 13.0 0.44 0.77 46.4

Approach 323 3.5 0.281 8.0 LOS A 1.8 13.0 0.44 0.58 48.3

North: Denham Court Road (N)

7 L 681 3.5 0.600 8.3 LOS A 5.8 42.1 0.78 0.76 47.4

9 R 182 3.5 0.252 14.6 LOS B 1.5 10.5 0.63 0.78 44.1

Approach 863 3.5 0.600 9.6 LOS A 5.8 42.1 0.75 0.77 46.6

West: Precinct (W)

10 L 424 3.5 0.651 6.1 LOS A 6.5 47.2 0.59 0.54 49.2

11 T 410 3.5 0.651 4.7 LOS A 6.5 47.2 0.59 0.46 49.4

Approach 834 3.5 0.651 5.4 LOS A 6.5 47.2 0.59 0.50 49.3

All Vehicles 2020 3.5 0.651 7.6 LOS A 6.5 47.2 0.63 0.63 48.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:10:52 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 39: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.789 95.6 LOS F 6.7 48.3 1.00 0.88 16.7

Approach 114 3.5 0.789 83.7 LOS F 6.7 48.3 0.95 0.81 18.3

East: Camden Valley Way (E)

24 L 186 3.5 0.298 14.6 LOS B 2.5 17.7 0.22 0.65 43.0

25 T 2782 3.5 0.899 28.6 LOS C 59.9 432.1 0.86 0.83 32.1

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 2976 3.5 0.899 27.9 LOS B 59.9 432.1 0.82 0.82 32.5

North: Cowpasture Road (N)

7 L 8 3.5 0.068 50.4 LOS D 0.4 3.1 0.74 0.65 25.4

8 T 48 3.5 0.828 87.5 LOS F 9.0 64.9 1.00 0.93 16.9

9 R 180 3.5 0.828 94.3 LOS F 10.2 73.2 1.00 0.93 17.0

Approach 236 3.5 0.828 91.4 LOS F 10.2 73.2 0.99 0.92 17.1

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1190 3.5 0.385 15.3 LOS B 11.5 83.1 0.41 0.36 41.0

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1384 3.5 0.459 16.7 LOS B 11.5 83.1 0.39 0.40 40.2

All Vehicles 4710 3.5 0.899 29.1 LOS C 59.9 432.1 0.71 0.70 32.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 21.5 LOS C 0.1 0.1 0.52 0.52

P11 Across E approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

P5 Across N approach 53 21.5 LOS C 0.1 0.1 0.52 0.52

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.9 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:30:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 40: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 87 9 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 93 15 4 36

Phase Split 8 % 58 % 9 % 3 % 23 %

Page 41: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:30:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 42: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 134 3.5 0.462 50.2 LOS D 7.6 54.7 0.78 0.76 25.4

2 T 227 3.5 0.274 55.6 LOS D 7.3 52.8 0.88 0.71 23.0

3 R 267 3.5 0.846 94.4 LOS F 11.3 81.3 1.00 0.95 16.9

Approach 628 3.5 0.846 70.9 LOS F 11.3 81.3 0.91 0.82 20.3

East: Camden Valley Way (NE)

4 L 375 3.5 0.523 22.6 LOS B 13.5 97.3 0.51 0.74 37.3

5 T 2394 3.5 0.841 36.5 LOS C 52.8 380.6 0.94 0.86 28.7

6 R 164 3.5 0.404 80.1 LOS F 6.1 43.8 0.97 0.78 19.0

Approach 2933 3.5 0.841 37.1 LOS C 52.8 380.6 0.88 0.84 28.7

North: Ingleburn Rd (NW)

7 L 84 3.5 0.231 45.1 LOS D 4.4 31.6 0.72 0.74 27.0

8 T 289 3.5 0.381 59.6 LOS E 9.8 70.4 0.91 0.75 22.0

9 R 64 3.5 0.258 86.2 LOS F 2.5 17.7 0.98 0.73 18.1

Approach 437 3.5 0.381 60.7 LOS E 9.8 70.4 0.89 0.74 22.1

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 24.8 LOS B 2.6 18.7 0.49 0.70 35.9

11 T 1023 3.5 0.400 31.1 LOS C 17.5 126.1 0.72 0.63 31.2

12 R 188 3.5 0.834 96.8 LOS F 8.0 57.5 1.00 0.92 16.6

Approach 1285 3.5 0.834 40.4 LOS C 17.5 126.1 0.75 0.67 27.8

All Vehicles 5283 3.5 0.846 43.9 LOS D 52.8 380.6 0.85 0.79 26.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 35.1 LOS D 0.2 0.2 0.66 0.66

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.6 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:55:32 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 43: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 10 2 72 11 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 16 8 78 17 3 38

Phase Split 10 % 5 % 49 % 11 % 2 % 24 %

Page 44: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:55:32 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 45: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.855 42.5 LOS C 56.2 405.6 0.93 0.93 28.9

5 T 2410 3.5 0.855 34.0 LOS C 56.7 408.7 0.93 0.87 29.5

6 R 23 3.5 0.137 62.5 LOS E 1.4 10.3 0.84 0.71 22.1

Approach 2600 3.5 0.855 34.8 LOS C 56.7 408.7 0.93 0.87 29.4

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.425 32.2 LOS C 19.6 141.2 0.65 0.92 33.0

11 T 1210 3.5 0.425 23.9 LOS B 19.8 142.4 0.65 0.58 34.8

12 R 142 3.5 0.856 83.2 LOS F 11.2 80.4 0.91 0.94 18.3

Approach 1422 3.5 0.856 30.2 LOS C 19.8 142.4 0.68 0.63 31.8

All Vehicles 4378 3.5 0.856 36.6 LOS C 56.7 408.7 0.85 0.78 28.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 21.0 LOS C 0.1 0.1 0.51 0.51

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 21.0 LOS C 0.1 0.1 0.51 0.51

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 47.6 LOS E 0.74 0.74

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:30:59 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 46: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 33 85 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 39 91 30

Phase Split 24 % 57 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:30:59 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 47: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.137 23.6 LOS B 1.9 14.0 0.53 0.73 36.6

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.137 34.7 LOS C 1.9 14.0 0.62 0.71 30.9

East: Camden Valley Way (NE)

4 L 39 3.5 0.031 8.3 LOS A 0.2 1.8 0.12 0.62 49.0

5 T 2764 3.5 0.733 18.6 LOS B 46.0 332.0 0.72 0.67 37.9

Approach 2803 3.5 0.733 18.5 LOS B 46.0 332.0 0.71 0.67 38.1

West: Camden Valley Way (SW)

11 T 1478 3.5 0.343 6.7 LOS A 12.3 88.5 0.36 0.32 49.2

12 R 114 3.5 0.713 92.7 LOS F 5.9 42.8 1.00 0.80 17.0

Approach 1592 3.5 0.713 12.8 LOS A 12.3 88.5 0.40 0.35 43.3

All Vehicles 4460 3.5 0.733 16.7 LOS B 46.0 332.0 0.60 0.56 39.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.8 LOS B 0.1 0.1 0.40 0.40

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.4 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 4:31:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 48: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 9 106 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 15 112 33

Phase Split 9 % 70 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 4:31:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 49: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 PM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.850 15.6 LOS B 15.8 114.3 1.00 1.16 40.9

6 R 395 3.5 0.850 23.6 LOS B 15.8 114.3 1.00 1.16 38.8

Approach 805 3.5 0.850 19.5 LOS B 15.8 114.3 1.00 1.16 39.8

North: Denham Court Road (N)

7 L 309 3.5 0.263 5.9 LOS A 1.7 12.2 0.43 0.51 49.8

9 R 424 3.5 0.309 12.1 LOS A 2.1 15.5 0.43 0.64 45.0

Approach 733 3.5 0.309 9.5 LOS A 2.1 15.5 0.43 0.59 46.8

West: Precinct (W)

10 L 182 3.5 0.402 7.4 LOS A 2.9 21.1 0.72 0.66 48.4

11 T 176 3.5 0.402 6.0 LOS A 2.9 21.1 0.72 0.58 48.3

Approach 358 3.5 0.402 6.7 LOS A 2.9 21.1 0.72 0.62 48.4

All Vehicles 1896 3.5 0.850 13.2 LOS A 15.8 114.3 0.73 0.84 43.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:11:00 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 50: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 77 3.5 0.222 59.2 LOS E 5.1 36.9 0.89 0.70 21.8

3 R 157 3.5 1.000 3 74.6 LOS F 11.3 81.6 0.97 0.80 19.9

Approach 265 3.5 1.000 67.8 LOS E 11.3 81.6 0.93 0.76 20.9

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1321 3.5 0.502 26.1 LOS B 18.7 135.0 0.60 0.53 33.8

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1409 3.5 0.502 25.6 LOS B 18.7 135.0 0.57 0.54 34.1

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.694 91.6 LOS F 3.0 21.6 1.00 0.80 16.4

9 R 217 3.5 0.694 78.4 LOS F 15.2 109.8 1.00 0.84 19.3

Approach 246 3.5 0.694 78.7 LOS F 15.2 109.8 0.99 0.83 19.1

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2532 3.5 0.962 64.6 LOS E 78.2 563.5 1.00 1.09 20.9

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 2794 3.5 0.962 60.1 LOS E 78.2 563.5 0.92 1.05 21.9

All Vehicles 4714 3.5 1.000 51.2 LOS D 78.2 563.5 0.82 0.87 24.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 51.5 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:10:21 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 51: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, C, C, C1, D Output Sequence: A, C, C, C1, D Phase Timing Results

Phase A C C C1 D

Green Time (sec) 6 74 26 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 80 32 0 36

Phase Split 8 % 50 % 20 % 0 % 23 %

Page 52: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:21 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 53: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 160 3.5 0.526 46.2 LOS D 8.7 62.6 0.75 0.77 26.7

2 T 216 3.5 0.260 55.4 LOS D 6.9 50.1 0.87 0.70 23.0

3 R 324 3.5 0.799 88.0 LOS F 13.2 94.9 1.00 0.90 17.8

Approach 700 3.5 0.799 68.4 LOS E 13.2 94.9 0.90 0.81 20.8

East: Camden Valley Way (NE)

4 L 476 3.5 0.705 27.4 LOS B 20.3 146.7 0.61 0.78 34.5

5 T 1018 3.5 0.409 32.5 LOS C 17.8 128.3 0.73 0.64 30.5

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1569 3.5 0.705 34.0 LOS C 20.3 146.7 0.71 0.69 30.4

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 247 3.5 0.326 58.8 LOS E 8.2 59.4 0.90 0.73 22.2

9 R 81 3.5 0.240 81.4 LOS F 3.0 21.6 0.96 0.74 18.8

Approach 407 3.5 0.326 62.5 LOS E 8.2 59.4 0.89 0.74 21.8

West: Camden Valley Way (SW)

10 L 120 3.5 0.105 19.8 LOS B 3.6 25.9 0.42 0.70 39.1

11 T 2367 3.5 0.832 36.2 LOS C 51.8 373.2 0.93 0.86 28.8

12 R 238 3.5 0.660 85.0 LOS F 9.3 66.9 1.00 0.82 18.2

Approach 2725 3.5 0.832 39.7 LOS C 51.8 373.2 0.91 0.84 27.7

All Vehicles 5401 3.5 0.832 43.5 LOS D 51.8 373.2 0.85 0.79 26.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 36.5 LOS D 0.2 0.2 0.68 0.68

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 53.0 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:57:51 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 54: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 70 15 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 76 21 3 38

Phase Split 8 % 6 % 48 % 13 % 2 % 24 %

Page 55: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:57:51 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 56: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.345 48.4 LOS D 12.6 90.8 0.78 0.83 26.1

2 T 81 3.5 0.345 40.1 LOS C 12.6 90.8 0.78 0.66 26.8

3 R 167 3.5 0.909 68.3 LOS E 11.3 81.6 0.89 0.87 20.9

Approach 390 3.5 0.909 55.2 LOS D 12.6 90.8 0.83 0.81 23.7

East: Camden Valley Way (NE)

4 L 72 3.5 0.463 37.5 LOS C 21.4 154.1 0.72 0.91 30.6

5 T 1192 3.5 0.463 29.2 LOS C 21.6 155.5 0.72 0.64 32.0

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1286 3.5 0.463 30.8 LOS C 21.6 155.5 0.72 0.65 31.4

North: Heath Rd (NW)

7 L 17 3.5 0.083 46.3 LOS D 2.7 19.5 0.71 0.81 27.0

8 T 35 3.5 0.083 38.0 LOS C 2.7 19.5 0.71 0.55 28.0

9 R 40 3.5 0.242 59.2 LOS E 2.4 17.6 0.82 0.74 22.9

Approach 92 3.5 0.242 48.8 LOS D 2.7 19.5 0.76 0.68 25.4

West: Camden Valley Way (SW)

10 L 87 3.5 0.898 52.0 LOS D 66.0 475.7 0.98 0.97 25.8

11 T 2558 3.5 0.898 43.6 LOS D 66.2 477.4 0.98 0.95 26.1

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 2706 3.5 0.898 44.8 LOS D 66.2 477.4 0.98 0.95 25.8

All Vehicles 4474 3.5 0.909 41.8 LOS C 66.2 477.4 0.89 0.85 27.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 25.3 LOS C 0.1 0.1 0.56 0.56

P3 Across E approach 53 48.8 LOS E 0.2 0.2 0.78 0.78

P5 Across N approach 53 22.1 LOS C 0.1 0.1 0.53 0.53

P7 Across W approach 53 48.8 LOS E 0.2 0.2 0.78 0.78

All Pedestrians 212 36.3 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:10:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 57: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 77 53

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 83 59

Phase Split 8 % 4 % 52 % 37 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 58: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 77 53

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 83 59

Phase Split 8 % 4 % 52 % 37 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 59: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 AM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 60: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 AM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.289 4.4 LOS A 1.9 13.5 0.44 0.42 50.3

6 R 157 3.5 0.289 12.4 LOS A 1.9 13.5 0.44 0.76 46.3

Approach 333 3.5 0.289 8.2 LOS A 1.9 13.5 0.44 0.58 48.2

North: Denham Court Road (N)

7 L 728 3.5 0.642 8.9 LOS A 6.9 49.7 0.81 0.80 47.2

9 R 182 3.5 0.259 14.7 LOS B 1.5 10.8 0.64 0.79 44.0

Approach 910 3.5 0.642 10.0 LOS A 6.9 49.7 0.78 0.80 46.5

West: Precinct (W)

10 L 424 3.5 0.660 6.2 LOS A 6.7 48.0 0.61 0.55 49.0

11 T 410 3.5 0.660 4.9 LOS A 6.7 48.0 0.61 0.47 49.2

Approach 834 3.5 0.660 5.5 LOS A 6.7 48.0 0.61 0.51 49.1

All Vehicles 2077 3.5 0.660 7.9 LOS A 6.9 49.7 0.66 0.65 47.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:11:20 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 61: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.789 95.6 LOS F 6.7 48.3 1.00 0.88 16.7

Approach 114 3.5 0.789 83.7 LOS F 6.7 48.3 0.95 0.81 18.3

East: Camden Valley Way (E)

24 L 186 3.5 0.276 13.6 LOS A 2.2 15.7 0.20 0.65 43.9

25 T 2945 3.5 0.930 34.6 LOS C 71.9 518.2 0.91 0.91 29.4

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3139 3.5 0.930 33.5 LOS C 71.9 518.2 0.87 0.90 30.0

North: Cowpasture Road (N)

7 L 8 3.5 0.069 52.0 LOS D 0.4 3.2 0.75 0.65 24.9

8 T 48 3.5 1.055 213.0 LOS F 13.6 98.0 1.00 1.35 8.6

9 R 180 3.5 1.055 219.9 LOS F 18.3 131.7 1.00 1.39 8.6

Approach 236 3.5 1.055 212.8 LOS F 18.3 131.7 0.99 1.36 8.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1260 3.5 0.398 14.2 LOS A 11.7 84.6 0.39 0.35 42.0

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1454 3.5 0.459 15.7 LOS B 11.7 84.6 0.38 0.39 41.0

All Vehicles 4943 3.5 1.055 38.0 LOS C 71.9 518.2 0.73 0.77 28.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P11 Across E approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

P5 Across N approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.8 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:10:24 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 62: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 89 9 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 95 15 2 36

Phase Split 8 % 59 % 9 % 1 % 23 %

Page 63: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:24 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 64: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 140 3.5 0.479 49.6 LOS D 7.9 56.8 0.77 0.77 25.6

2 T 237 3.5 0.278 54.8 LOS D 7.6 54.8 0.87 0.70 23.2

3 R 278 3.5 0.881 97.9 LOS F 12.1 86.9 1.00 1.00 16.5

Approach 655 3.5 0.881 72.0 LOS F 12.1 86.9 0.91 0.84 20.1

East: Camden Valley Way (NE)

4 L 384 3.5 0.536 22.7 LOS B 13.9 100.3 0.51 0.74 37.2

5 T 2545 3.5 0.895 45.2 LOS D 63.9 461.0 0.98 0.95 25.7

6 R 164 3.5 0.428 81.3 LOS F 6.1 44.2 0.98 0.78 18.8

Approach 3093 3.5 0.895 44.3 LOS D 63.9 461.0 0.92 0.92 26.2

North: Ingleburn Rd (NW)

7 L 84 3.5 0.233 45.8 LOS D 4.4 31.9 0.72 0.74 26.8

8 T 296 3.5 0.390 59.7 LOS E 10.0 72.2 0.92 0.75 22.0

9 R 65 3.5 0.289 87.7 LOS F 2.5 18.2 0.99 0.73 17.8

Approach 445 3.5 0.390 61.2 LOS E 10.0 72.2 0.89 0.74 22.0

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 24.8 LOS B 2.6 18.7 0.49 0.70 35.9

11 T 1086 3.5 0.418 30.8 LOS C 18.6 134.2 0.72 0.63 31.3

12 R 193 3.5 0.857 98.3 LOS F 8.3 59.7 1.00 0.95 16.4

Approach 1353 3.5 0.857 40.1 LOS C 18.6 134.2 0.75 0.68 27.8

All Vehicles 5546 3.5 0.895 47.9 LOS D 63.9 461.0 0.88 0.84 25.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 34.5 LOS D 0.2 0.2 0.66 0.66

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.2 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:58:40 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 65: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 10 1 73 10 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 16 7 79 16 4 38

Phase Split 10 % 4 % 49 % 10 % 3 % 24 %

Page 66: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:58:40 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 67: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.878 43.7 LOS D 62.3 449.1 0.95 0.95 28.4

5 T 2571 3.5 0.878 35.2 LOS C 62.7 452.0 0.95 0.89 29.0

6 R 23 3.5 0.141 65.3 LOS E 1.5 10.6 0.85 0.71 21.5

Approach 2761 3.5 0.878 36.0 LOS C 62.7 452.0 0.95 0.90 28.9

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.433 30.7 LOS C 20.2 145.7 0.64 0.93 33.7

11 T 1283 3.5 0.433 22.4 LOS B 20.4 146.8 0.64 0.57 35.7

12 R 142 3.5 0.877 85.8 LOS F 11.3 81.6 0.93 0.93 17.9

Approach 1495 3.5 0.877 28.8 LOS C 20.4 146.8 0.66 0.62 32.5

All Vehicles 4612 3.5 0.878 36.6 LOS C 62.7 452.0 0.86 0.80 28.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 19.5 LOS B 0.1 0.1 0.49 0.49

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 19.5 LOS B 0.1 0.1 0.49 0.49

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.8 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:10:25 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 68: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 30 88 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 36 94 30

Phase Split 23 % 59 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:25 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 69: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.138 27.1 LOS B 2.1 15.3 0.57 0.73 34.6

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.138 37.4 LOS C 2.1 15.3 0.65 0.72 29.8

East: Camden Valley Way (NE)

4 L 39 3.5 0.031 8.3 LOS A 0.2 1.8 0.12 0.62 49.0

5 T 2947 3.5 0.782 19.9 LOS B 52.4 377.8 0.76 0.72 37.0

Approach 2986 3.5 0.782 19.7 LOS B 52.4 377.8 0.76 0.72 37.2

West: Camden Valley Way (SW)

11 T 1560 3.5 0.363 6.8 LOS A 13.2 95.3 0.36 0.33 49.0

12 R 114 3.5 0.713 92.7 LOS F 5.9 42.8 1.00 0.80 17.0

Approach 1674 3.5 0.713 12.7 LOS A 13.2 95.3 0.41 0.36 43.4

All Vehicles 4725 3.5 0.782 17.5 LOS B 52.4 377.8 0.63 0.59 39.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.8 LOS B 0.1 0.1 0.40 0.40

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.4 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:10:25 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 70: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (3pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 9 106 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 15 112 33

Phase Split 9 % 70 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:10:25 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 71: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 PM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.877 17.8 LOS B 18.5 133.1 1.00 1.22 39.3

6 R 422 3.5 0.877 25.7 LOS B 18.5 133.1 1.00 1.22 37.5

Approach 832 3.5 0.877 21.8 LOS B 18.5 133.1 1.00 1.22 38.3

North: Denham Court Road (N)

7 L 330 3.5 0.278 5.9 LOS A 1.8 13.1 0.44 0.51 49.7

9 R 424 3.5 0.309 12.1 LOS A 2.2 15.6 0.43 0.64 45.0

Approach 754 3.5 0.309 9.4 LOS A 2.2 15.6 0.43 0.58 46.8

West: Precinct (W)

10 L 182 3.5 0.414 7.6 LOS A 3.0 21.9 0.74 0.68 48.2

11 T 176 3.5 0.414 6.2 LOS A 3.0 21.9 0.74 0.60 48.1

Approach 358 3.5 0.414 6.9 LOS A 3.0 21.9 0.74 0.64 48.2

All Vehicles 1944 3.5 0.877 14.2 LOS A 18.5 133.1 0.73 0.87 42.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:11:27 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 72: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (4.4% growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 81 3.5 0.233 59.3 LOS E 5.4 38.8 0.89 0.70 21.8

3 R 153 3.5 1.000 3 77.6 LOS F 11.3 81.6 0.99 0.80 19.4

Approach 265 3.5 1.000 69.3 LOS E 11.3 81.6 0.93 0.76 20.5

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1390 3.5 0.508 23.9 LOS B 18.8 135.8 0.57 0.51 35.0

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1478 3.5 0.508 23.6 LOS B 18.8 135.8 0.55 0.52 35.3

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.778 94.1 LOS F 3.2 23.0 1.00 0.84 16.1

9 R 217 3.5 0.778 84.3 LOS F 15.9 114.8 1.00 0.88 18.3

Approach 246 3.5 0.778 84.1 LOS F 15.9 114.8 0.99 0.87 18.3

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2659 3.5 0.971 67.8 LOS E 85.2 614.6 1.00 1.12 20.3

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 2921 3.5 0.971 63.2 LOS E 85.2 614.6 0.93 1.07 21.3

All Vehicles 4910 3.5 1.000 52.6 LOS D 85.2 614.6 0.82 0.88 23.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.6 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:40 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 73: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 AM Peak (4.4% growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 77 23 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 83 29 0 36

Phase Split 8 % 52 % 18 % 0 % 23 %

Page 74: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:40 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 75: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 162 3.5 0.532 46.2 LOS D 8.8 63.4 0.75 0.77 26.7

2 T 218 3.5 0.263 55.4 LOS D 7.0 50.6 0.87 0.70 23.0

3 R 330 3.5 0.862 93.6 LOS F 14.0 101.0 1.00 0.96 17.0

Approach 710 3.5 0.862 71.1 LOS F 14.0 101.0 0.90 0.84 20.3

East: Camden Valley Way (NE)

4 L 498 3.5 0.738 28.7 LOS C 21.6 156.1 0.65 0.79 33.8

5 T 1073 3.5 0.425 32.2 LOS C 18.8 135.3 0.73 0.64 30.7

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1646 3.5 0.738 34.0 LOS C 21.6 156.1 0.72 0.69 30.4

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 257 3.5 0.339 59.0 LOS E 8.6 62.0 0.90 0.73 22.1

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 417 3.5 0.339 62.7 LOS E 8.6 62.0 0.90 0.74 21.7

West: Camden Valley Way (SW)

10 L 120 3.5 0.105 19.8 LOS B 3.6 25.9 0.42 0.70 39.1

11 T 2498 3.5 0.867 39.0 LOS C 57.8 417.1 0.96 0.90 27.7

12 R 250 3.5 0.694 85.8 LOS F 9.8 70.9 1.00 0.83 18.1

Approach 2868 3.5 0.867 42.2 LOS C 57.8 417.1 0.94 0.88 26.8

All Vehicles 5641 3.5 0.867 45.0 LOS D 57.8 417.1 0.87 0.81 26.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 35.8 LOS D 0.2 0.2 0.67 0.67

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 29.4 LOS C 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.6 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 9:59:35 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 76: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 71 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 77 20 3 38

Phase Split 8 % 6 % 48 % 13 % 2 % 24 %

Page 77: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 9:59:35 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 78: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.357 50.0 LOS D 12.8 92.6 0.80 0.83 25.6

2 T 81 3.5 0.357 41.7 LOS C 12.8 92.6 0.80 0.68 26.2

3 R 167 3.5 0.925 68.6 LOS E 11.3 81.6 0.90 0.86 20.8

Approach 390 3.5 0.925 56.3 LOS D 12.8 92.6 0.84 0.81 23.4

East: Camden Valley Way (NE)

4 L 72 3.5 0.474 36.5 LOS C 22.2 160.2 0.71 0.92 31.0

5 T 1255 3.5 0.474 28.2 LOS B 22.4 161.5 0.71 0.63 32.5

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1349 3.5 0.474 29.7 LOS C 22.4 161.5 0.72 0.65 31.9

North: Heath Rd (NW)

7 L 17 3.5 0.086 47.8 LOS D 2.8 19.9 0.73 0.81 26.6

8 T 35 3.5 0.086 39.5 LOS C 2.8 19.9 0.73 0.56 27.4

9 R 40 3.5 0.246 61.0 LOS E 2.5 18.0 0.83 0.74 22.5

Approach 92 3.5 0.246 50.4 LOS D 2.8 19.9 0.77 0.69 24.9

West: Camden Valley Way (SW)

10 L 87 3.5 0.926 59.4 LOS E 76.6 552.4 1.00 1.01 23.7

11 T 2708 3.5 0.926 51.0 LOS D 76.9 554.2 1.00 1.01 24.0

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 2856 3.5 0.926 52.0 LOS D 76.9 554.2 1.00 1.01 23.8

All Vehicles 4687 3.5 0.926 45.9 LOS D 76.9 554.2 0.90 0.88 25.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 24.2 LOS C 0.1 0.1 0.55 0.55

P3 Across E approach 53 50.4 LOS E 0.2 0.2 0.79 0.79

P5 Across N approach 53 21.0 LOS C 0.1 0.1 0.51 0.51

P7 Across W approach 53 50.4 LOS E 0.2 0.2 0.79 0.79

All Pedestrians 212 36.5 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:41 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 79: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 79 51

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 85 57

Phase Split 8 % 4 % 53 % 36 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:41 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 80: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 AM Peak (4.4c growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.324 10.9 LOS A 2.0 14.6 0.28 0.67 46.4

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.324 25.3 LOS B 2.0 14.6 0.43 0.68 35.6

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1555 3.5 0.405 12.2 LOS A 17.6 126.8 0.48 0.44 43.4

Approach 1572 3.5 0.405 12.1 LOS A 17.6 126.8 0.48 0.44 43.5

West: Camden Valley Way (SW)

11 T 2988 3.5 0.694 10.5 LOS A 38.8 280.0 0.56 0.53 44.7

12 R 48 3.5 0.390 92.7 LOS F 2.5 17.9 1.00 0.71 16.9

Approach 3037 3.5 0.694 11.8 LOS A 38.8 280.0 0.57 0.53 43.5

All Vehicles 4761 3.5 0.694 12.3 LOS A 38.8 280.0 0.53 0.51 43.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 81: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 AM Peak (4.4c growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 82: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 AM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.314 4.5 LOS A 2.1 15.0 0.45 0.43 50.1

6 R 187 3.5 0.314 12.4 LOS A 2.1 15.0 0.45 0.75 46.2

Approach 363 3.5 0.314 8.5 LOS A 2.1 15.0 0.45 0.59 47.9

North: Denham Court Road (N)

7 L 772 3.5 0.685 9.5 LOS A 8.2 58.8 0.85 0.84 46.9

9 R 182 3.5 0.261 14.7 LOS B 1.5 11.0 0.65 0.79 44.0

Approach 954 3.5 0.685 10.5 LOS A 8.2 58.8 0.81 0.83 46.3

West: Precinct (W)

10 L 424 3.5 0.685 6.6 LOS A 7.0 50.4 0.68 0.58 48.6

11 T 410 3.5 0.685 5.2 LOS A 7.0 50.4 0.68 0.50 48.6

Approach 834 3.5 0.685 5.9 LOS A 7.0 50.4 0.68 0.54 48.6

All Vehicles 2151 3.5 0.685 8.4 LOS A 8.2 58.8 0.70 0.68 47.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:11:47 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 83: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.789 95.6 LOS F 6.7 48.3 1.00 0.88 16.7

Approach 114 3.5 0.789 83.7 LOS F 6.7 48.3 0.95 0.81 18.3

East: Camden Valley Way (E)

24 L 186 3.5 0.276 13.6 LOS A 2.2 15.7 0.20 0.65 43.9

25 T 3097 3.5 0.978 61.8 LOS E 100.4 723.8 1.00 1.13 21.5

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3291 3.5 0.978 59.1 LOS E 100.4 723.8 0.95 1.10 22.1

North: Cowpasture Road (N)

7 L 8 3.5 0.069 52.0 LOS D 0.4 3.2 0.75 0.65 24.9

8 T 48 3.5 1.055 213.0 LOS F 13.6 98.0 1.00 1.35 8.6

9 R 180 3.5 1.055 219.9 LOS F 18.3 131.7 1.00 1.39 8.6

Approach 236 3.5 1.055 212.8 LOS F 18.3 131.7 0.99 1.36 8.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1325 3.5 0.419 14.5 LOS A 12.6 91.0 0.40 0.36 41.8

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1519 3.5 0.459 15.8 LOS B 12.6 91.0 0.39 0.40 40.9

All Vehicles 5160 3.5 1.055 53.9 LOS D 100.4 723.8 0.79 0.90 23.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P11 Across E approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

P5 Across N approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.8 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 84: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 89 9 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 95 15 2 36

Phase Split 8 % 59 % 9 % 1 % 23 %

Page 85: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:42 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 86: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 145 3.5 0.496 49.7 LOS D 8.2 59.1 0.78 0.77 25.6

2 T 247 3.5 0.289 55.0 LOS D 7.9 57.3 0.87 0.71 23.1

3 R 289 3.5 0.916 103.7 LOS F 13.0 94.0 1.00 1.06 15.8

Approach 681 3.5 0.916 74.6 LOS F 13.0 94.0 0.91 0.87 19.6

East: Camden Valley Way (NE)

4 L 393 3.5 0.548 22.8 LOS B 14.3 103.3 0.52 0.75 37.2

5 T 2683 3.5 0.943 62.9 LOS E 80.4 580.0 1.00 1.06 21.2

6 R 164 3.5 0.428 81.3 LOS F 6.1 44.2 0.98 0.78 18.8

Approach 3240 3.5 0.943 58.9 LOS E 80.4 580.0 0.94 1.01 22.3

North: Ingleburn Rd (NW)

7 L 84 3.5 0.233 45.8 LOS D 4.4 31.9 0.72 0.74 26.8

8 T 303 3.5 0.399 59.9 LOS E 10.3 74.1 0.92 0.75 21.9

9 R 65 3.5 0.289 87.7 LOS F 2.5 18.2 0.99 0.73 17.8

Approach 452 3.5 0.399 61.3 LOS E 10.3 74.1 0.89 0.75 22.0

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 24.8 LOS B 2.6 18.7 0.49 0.70 35.9

11 T 1145 3.5 0.441 31.2 LOS C 19.9 143.3 0.73 0.64 31.1

12 R 198 3.5 0.879 100.3 LOS F 8.6 62.1 1.00 0.98 16.2

Approach 1417 3.5 0.879 40.6 LOS C 19.9 143.3 0.76 0.69 27.7

All Vehicles 5790 3.5 0.943 56.4 LOS D 80.4 580.0 0.89 0.89 23.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 34.5 LOS D 0.2 0.2 0.66 0.66

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.2 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 11:04:34 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 87: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 10 1 73 10 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 16 7 79 16 4 38

Phase Split 10 % 4 % 49 % 10 % 3 % 24 %

Page 88: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 11:04:34 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 89: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.895 45.0 LOS D 68.3 492.6 0.96 0.96 28.0

5 T 2722 3.5 0.895 36.5 LOS C 68.7 495.5 0.96 0.92 28.5

6 R 23 3.5 0.144 68.1 LOS E 1.5 10.8 0.87 0.71 20.9

Approach 2912 3.5 0.895 37.2 LOS C 68.7 495.5 0.96 0.92 28.4

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.441 29.2 LOS C 20.7 149.1 0.62 0.93 34.5

11 T 1352 3.5 0.441 20.9 LOS B 20.8 150.2 0.62 0.56 36.6

12 R 142 3.5 0.899 86.6 LOS F 11.3 81.6 0.95 0.92 17.8

Approach 1564 3.5 0.899 27.2 LOS B 20.8 150.2 0.65 0.60 33.3

All Vehicles 4832 3.5 0.899 36.7 LOS C 68.7 495.5 0.86 0.81 28.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 18.1 LOS B 0.1 0.1 0.48 0.48

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 18.1 LOS B 0.1 0.1 0.48 0.48

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.1 LOS E 0.72 0.72

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 90: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 27 91 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 33 97 30

Phase Split 21 % 61 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 91: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.140 30.4 LOS C 2.3 16.4 0.61 0.74 32.9

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.140 39.8 LOS C 2.3 16.4 0.68 0.72 28.9

East: Camden Valley Way (NE)

4 L 39 3.5 0.030 8.2 LOS A 0.2 1.7 0.11 0.62 49.1

5 T 3119 3.5 0.820 20.4 LOS B 58.1 418.6 0.80 0.75 36.6

Approach 3158 3.5 0.820 20.3 LOS B 58.1 418.6 0.79 0.75 36.7

West: Camden Valley Way (SW)

11 T 1636 3.5 0.380 7.0 LOS A 14.1 101.9 0.37 0.34 48.9

12 R 114 3.5 0.802 95.6 LOS F 6.1 44.0 1.00 0.83 16.6

Approach 1749 3.5 0.802 12.7 LOS A 14.1 101.9 0.41 0.37 43.4

All Vehicles 4973 3.5 0.820 17.9 LOS B 58.1 418.6 0.66 0.62 38.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.4 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.2 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 92: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2026 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2026 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 8 107 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 14 113 33

Phase Split 9 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:43 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 93: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2026 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2026 PM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.903 20.7 LOS B 21.8 157.5 1.00 1.31 37.4

6 R 448 3.5 0.903 28.6 LOS C 21.8 157.5 1.00 1.31 35.9

Approach 858 3.5 0.903 24.8 LOS B 21.8 157.5 1.00 1.31 36.5

North: Denham Court Road (N)

7 L 350 3.5 0.292 5.9 LOS A 2.0 14.1 0.44 0.51 49.7

9 R 424 3.5 0.309 12.1 LOS A 2.2 15.6 0.43 0.64 45.0

Approach 774 3.5 0.309 9.3 LOS A 2.2 15.6 0.44 0.58 46.9

West: Precinct (W)

10 L 182 3.5 0.425 7.8 LOS A 3.2 22.7 0.76 0.70 48.1

11 T 176 3.5 0.425 6.4 LOS A 3.2 22.7 0.76 0.62 47.9

Approach 358 3.5 0.425 7.1 LOS A 3.2 22.7 0.76 0.66 48.0

All Vehicles 1990 3.5 0.903 15.6 LOS B 21.8 157.5 0.74 0.91 41.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:11:54 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2026 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 94: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 77 3.5 0.222 59.2 LOS E 5.1 36.9 0.89 0.70 21.8

3 R 157 3.5 1.000 3 74.6 LOS F 11.3 81.6 0.97 0.80 19.9

Approach 265 3.5 1.000 67.8 LOS E 11.3 81.6 0.93 0.76 20.9

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1321 3.5 0.502 26.1 LOS B 18.7 135.0 0.60 0.53 33.8

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1409 3.5 0.502 25.6 LOS B 18.7 135.0 0.57 0.54 34.1

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.694 91.6 LOS F 3.0 21.6 1.00 0.80 16.4

9 R 217 3.5 0.694 78.4 LOS F 15.2 109.8 1.00 0.84 19.3

Approach 246 3.5 0.694 78.7 LOS F 15.2 109.8 0.99 0.83 19.1

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2532 3.5 0.962 64.6 LOS E 78.2 563.5 1.00 1.09 20.9

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 2794 3.5 0.962 60.1 LOS E 78.2 563.5 0.92 1.05 21.9

All Vehicles 4714 3.5 1.000 51.2 LOS D 78.2 563.5 0.82 0.87 24.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 51.5 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 95: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 74 26 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 80 32 0 36

Phase Split 8 % 50 % 20 % 0 % 23 %

Page 96: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 97: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 160 3.5 0.526 46.2 LOS D 8.7 62.6 0.75 0.77 26.7

2 T 216 3.5 0.260 55.4 LOS D 6.9 50.1 0.87 0.70 23.0

3 R 324 3.5 0.799 88.0 LOS F 13.2 94.9 1.00 0.90 17.8

Approach 700 3.5 0.799 68.4 LOS E 13.2 94.9 0.90 0.81 20.8

East: Camden Valley Way (NE)

4 L 476 3.5 0.705 27.4 LOS B 20.3 146.7 0.61 0.78 34.5

5 T 1018 3.5 0.409 32.5 LOS C 17.8 128.3 0.73 0.64 30.5

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1569 3.5 0.705 34.0 LOS C 20.3 146.7 0.71 0.69 30.4

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 247 3.5 0.326 58.8 LOS E 8.2 59.4 0.90 0.73 22.2

9 R 81 3.5 0.240 81.4 LOS F 3.0 21.6 0.96 0.74 18.8

Approach 407 3.5 0.326 62.5 LOS E 8.2 59.4 0.89 0.74 21.8

West: Camden Valley Way (SW)

10 L 120 3.5 0.105 19.8 LOS B 3.6 25.9 0.42 0.70 39.1

11 T 2367 3.5 0.832 36.2 LOS C 51.8 373.2 0.93 0.86 28.8

12 R 238 3.5 0.660 85.0 LOS F 9.3 66.9 1.00 0.82 18.2

Approach 2725 3.5 0.832 39.7 LOS C 51.8 373.2 0.91 0.84 27.7

All Vehicles 5401 3.5 0.832 43.5 LOS D 51.8 373.2 0.85 0.79 26.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 36.5 LOS D 0.2 0.2 0.68 0.68

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 53.0 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:05:26 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 98: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 70 15 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 76 21 3 38

Phase Split 8 % 6 % 48 % 13 % 2 % 24 %

Page 99: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:05:26 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 100: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.345 48.4 LOS D 12.6 90.8 0.78 0.83 26.1

2 T 81 3.5 0.345 40.1 LOS C 12.6 90.8 0.78 0.66 26.8

3 R 167 3.5 0.909 68.3 LOS E 11.3 81.6 0.89 0.87 20.9

Approach 390 3.5 0.909 55.2 LOS D 12.6 90.8 0.83 0.81 23.7

East: Camden Valley Way (NE)

4 L 72 3.5 0.463 37.5 LOS C 21.4 154.1 0.72 0.91 30.6

5 T 1192 3.5 0.463 29.2 LOS C 21.6 155.5 0.72 0.64 32.0

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1286 3.5 0.463 30.8 LOS C 21.6 155.5 0.72 0.65 31.4

North: Heath Rd (NW)

7 L 17 3.5 0.083 46.3 LOS D 2.7 19.5 0.71 0.81 27.0

8 T 35 3.5 0.083 38.0 LOS C 2.7 19.5 0.71 0.55 28.0

9 R 40 3.5 0.242 59.2 LOS E 2.4 17.6 0.82 0.74 22.9

Approach 92 3.5 0.242 48.8 LOS D 2.7 19.5 0.76 0.68 25.4

West: Camden Valley Way (SW)

10 L 87 3.5 0.898 52.0 LOS D 66.0 475.7 0.98 0.97 25.8

11 T 2558 3.5 0.898 43.6 LOS D 66.2 477.4 0.98 0.95 26.1

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 2706 3.5 0.898 44.8 LOS D 66.2 477.4 0.98 0.95 25.8

All Vehicles 4474 3.5 0.909 41.8 LOS C 66.2 477.4 0.89 0.85 27.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 25.3 LOS C 0.1 0.1 0.56 0.56

P3 Across E approach 53 48.8 LOS E 0.2 0.2 0.78 0.78

P5 Across N approach 53 22.1 LOS C 0.1 0.1 0.53 0.53

P7 Across W approach 53 48.8 LOS E 0.2 0.2 0.78 0.78

All Pedestrians 212 36.3 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:01 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 101: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 77 53

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 83 59

Phase Split 8 % 4 % 52 % 37 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:01 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 102: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.324 10.5 LOS A 1.9 13.6 0.26 0.67 46.7

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.324 25.1 LOS B 1.9 13.6 0.42 0.68 35.7

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1483 3.5 0.386 12.0 LOS A 16.5 118.9 0.47 0.43 43.6

Approach 1500 3.5 0.386 11.9 LOS A 16.5 118.9 0.47 0.43 43.7

West: Camden Valley Way (SW)

11 T 2824 3.5 0.656 9.9 LOS A 34.6 249.4 0.53 0.50 45.3

12 R 48 3.5 0.390 92.7 LOS F 2.5 17.9 1.00 0.71 16.9

Approach 2873 3.5 0.656 11.3 LOS A 34.6 249.4 0.54 0.50 44.1

All Vehicles 4525 3.5 0.656 12.0 LOS A 34.6 249.4 0.51 0.48 43.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:01 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 103: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:01 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 104: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 AM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.289 4.4 LOS A 1.9 13.5 0.44 0.42 50.3

6 R 157 3.5 0.289 12.4 LOS A 1.9 13.5 0.44 0.76 46.3

Approach 333 3.5 0.289 8.2 LOS A 1.9 13.5 0.44 0.58 48.2

North: Denham Court Road (N)

7 L 728 3.5 0.642 8.9 LOS A 6.9 49.7 0.81 0.80 47.2

9 R 182 3.5 0.259 14.7 LOS B 1.5 10.8 0.64 0.79 44.0

Approach 910 3.5 0.642 10.0 LOS A 6.9 49.7 0.78 0.80 46.5

West: Precinct (W)

10 L 424 3.5 0.660 6.2 LOS A 6.7 48.0 0.61 0.55 49.0

11 T 410 3.5 0.660 4.9 LOS A 6.7 48.0 0.61 0.47 49.2

Approach 834 3.5 0.660 5.5 LOS A 6.7 48.0 0.61 0.51 49.1

All Vehicles 2077 3.5 0.660 7.9 LOS A 6.9 49.7 0.66 0.65 47.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:05:43 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 105: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.789 95.6 LOS F 6.7 48.3 1.00 0.88 16.7

Approach 114 3.5 0.789 83.7 LOS F 6.7 48.3 0.95 0.81 18.3

East: Camden Valley Way (E)

24 L 186 3.5 0.276 13.6 LOS A 2.2 15.7 0.20 0.65 43.9

25 T 2945 3.5 0.930 34.6 LOS C 71.9 518.2 0.91 0.91 29.4

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3139 3.5 0.930 33.5 LOS C 71.9 518.2 0.87 0.90 30.0

North: Cowpasture Road (N)

7 L 8 3.5 0.069 52.0 LOS D 0.4 3.2 0.75 0.65 24.9

8 T 48 3.5 1.055 213.0 LOS F 13.6 98.0 1.00 1.35 8.6

9 R 180 3.5 1.055 219.9 LOS F 18.3 131.7 1.00 1.39 8.6

Approach 236 3.5 1.055 212.8 LOS F 18.3 131.7 0.99 1.36 8.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1260 3.5 0.398 14.2 LOS A 11.7 84.6 0.39 0.35 42.0

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1454 3.5 0.459 15.7 LOS B 11.7 84.6 0.38 0.39 41.0

All Vehicles 4943 3.5 1.055 38.0 LOS C 71.9 518.2 0.73 0.77 28.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P11 Across E approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

P5 Across N approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.8 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:03 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 106: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 89 9 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 95 15 2 36

Phase Split 8 % 59 % 9 % 1 % 23 %

Page 107: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:03 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 108: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 140 3.5 0.479 49.6 LOS D 7.9 56.8 0.77 0.77 25.6

2 T 237 3.5 0.278 54.8 LOS D 7.6 54.8 0.87 0.70 23.2

3 R 278 3.5 0.881 97.9 LOS F 12.1 86.9 1.00 1.00 16.5

Approach 655 3.5 0.881 72.0 LOS F 12.1 86.9 0.91 0.84 20.1

East: Camden Valley Way (NE)

4 L 384 3.5 0.536 22.7 LOS B 13.9 100.3 0.51 0.74 37.2

5 T 2545 3.5 0.895 45.2 LOS D 63.9 461.0 0.98 0.95 25.7

6 R 164 3.5 0.428 81.3 LOS F 6.1 44.2 0.98 0.78 18.8

Approach 3093 3.5 0.895 44.3 LOS D 63.9 461.0 0.92 0.92 26.2

North: Ingleburn Rd (NW)

7 L 84 3.5 0.233 45.8 LOS D 4.4 31.9 0.72 0.74 26.8

8 T 296 3.5 0.390 59.7 LOS E 10.0 72.2 0.92 0.75 22.0

9 R 64 3.5 0.284 87.6 LOS F 2.5 17.9 0.99 0.73 17.8

Approach 444 3.5 0.390 61.1 LOS E 10.0 72.2 0.89 0.74 22.0

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 24.8 LOS B 2.6 18.7 0.49 0.70 35.9

11 T 1086 3.5 0.418 30.8 LOS C 18.6 134.2 0.72 0.63 31.3

12 R 193 3.5 0.857 98.3 LOS F 8.3 59.7 1.00 0.95 16.4

Approach 1353 3.5 0.857 40.1 LOS C 18.6 134.2 0.75 0.68 27.8

All Vehicles 5545 3.5 0.895 47.9 LOS D 63.9 461.0 0.88 0.84 25.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 34.5 LOS D 0.2 0.2 0.66 0.66

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.2 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:06:05 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 109: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 10 1 73 10 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 16 7 79 16 4 38

Phase Split 10 % 4 % 49 % 10 % 3 % 24 %

Page 110: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:06:05 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 111: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.878 43.7 LOS D 62.3 449.1 0.95 0.95 28.4

5 T 2571 3.5 0.878 35.2 LOS C 62.7 452.0 0.95 0.89 29.0

6 R 23 3.5 0.141 65.3 LOS E 1.5 10.6 0.85 0.71 21.5

Approach 2761 3.5 0.878 36.0 LOS C 62.7 452.0 0.95 0.90 28.9

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.433 30.7 LOS C 20.2 145.7 0.64 0.93 33.7

11 T 1283 3.5 0.433 22.4 LOS B 20.4 146.8 0.64 0.57 35.7

12 R 142 3.5 0.877 85.8 LOS F 11.3 81.6 0.93 0.93 17.9

Approach 1495 3.5 0.877 28.8 LOS C 20.4 146.8 0.66 0.62 32.5

All Vehicles 4612 3.5 0.878 36.6 LOS C 62.7 452.0 0.86 0.80 28.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 19.5 LOS B 0.1 0.1 0.49 0.49

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 19.5 LOS B 0.1 0.1 0.49 0.49

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.8 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 112: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 30 88 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 36 94 30

Phase Split 23 % 59 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 113: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.138 27.1 LOS B 2.1 15.3 0.57 0.73 34.6

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.138 37.4 LOS C 2.1 15.3 0.65 0.72 29.8

East: Camden Valley Way (NE)

4 L 39 3.5 0.031 8.3 LOS A 0.2 1.8 0.12 0.62 49.0

5 T 2947 3.5 0.782 19.9 LOS B 52.4 377.8 0.76 0.72 37.0

Approach 2986 3.5 0.782 19.7 LOS B 52.4 377.8 0.76 0.72 37.2

West: Camden Valley Way (SW)

11 T 1560 3.5 0.363 6.8 LOS A 13.2 95.3 0.36 0.33 49.0

12 R 114 3.5 0.713 92.7 LOS F 5.9 42.8 1.00 0.80 17.0

Approach 1674 3.5 0.713 12.7 LOS A 13.2 95.3 0.41 0.36 43.4

All Vehicles 4725 3.5 0.782 17.5 LOS B 52.4 377.8 0.63 0.59 39.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.8 LOS B 0.1 0.1 0.40 0.40

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.4 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:09:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 114: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 9 106 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 15 112 33

Phase Split 9 % 70 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:09:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 115: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 PM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.877 17.8 LOS B 18.5 133.1 1.00 1.22 39.3

6 R 422 3.5 0.877 25.7 LOS B 18.5 133.1 1.00 1.22 37.5

Approach 832 3.5 0.877 21.8 LOS B 18.5 133.1 1.00 1.22 38.3

North: Denham Court Road (N)

7 L 330 3.5 0.278 5.9 LOS A 1.8 13.1 0.44 0.51 49.7

9 R 424 3.5 0.309 12.1 LOS A 2.2 15.6 0.43 0.64 45.0

Approach 754 3.5 0.309 9.4 LOS A 2.2 15.6 0.43 0.58 46.8

West: Precinct (W)

10 L 182 3.5 0.414 7.6 LOS A 3.0 21.9 0.74 0.68 48.2

11 T 176 3.5 0.414 6.2 LOS A 3.0 21.9 0.74 0.60 48.1

Approach 358 3.5 0.414 6.9 LOS A 3.0 21.9 0.74 0.64 48.2

All Vehicles 1944 3.5 0.877 14.2 LOS A 18.5 133.1 0.73 0.87 42.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:06:20 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 116: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 84 3.5 0.241 59.4 LOS E 5.6 40.1 0.89 0.71 21.8

3 R 150 3.5 1.000 3 79.9 LOS F 11.3 81.6 1.00 0.81 19.0

Approach 265 3.5 1.000 70.4 LOS E 11.3 81.6 0.94 0.76 20.3

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1469 3.5 0.523 22.6 LOS B 19.5 140.7 0.56 0.50 35.8

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1557 3.5 0.523 22.4 LOS B 19.5 140.7 0.54 0.51 36.0

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.843 96.8 LOS F 3.4 24.7 1.00 0.89 15.8

9 R 217 3.5 0.843 90.3 LOS F 16.6 119.4 1.00 0.93 17.4

Approach 246 3.5 0.843 89.7 LOS F 16.6 119.4 0.99 0.92 17.5

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2805 3.5 0.998 91.6 LOS F 104.5 753.4 1.00 1.23 16.6

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 3067 3.5 0.998 85.2 LOS F 104.5 753.4 0.93 1.18 17.5

All Vehicles 5135 3.5 1.000 65.6 LOS E 104.5 753.4 0.82 0.94 20.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 25.9 LOS C 0.1 0.1 0.57 0.57

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 25.9 LOS C 0.1 0.1 0.57 0.57

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:18 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 117: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, C, C, C1, D Output Sequence: A, C, C, C1, D Phase Timing Results

Phase A C C C1 D

Green Time (sec) 6 79 21 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 85 27 0 36

Phase Split 8 % 53 % 17 % 0 % 23 %

Page 118: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:18 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 119: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 165 3.5 0.542 46.3 LOS D 9.0 64.7 0.75 0.77 26.6

2 T 220 3.5 0.265 55.5 LOS D 7.1 51.1 0.87 0.70 23.0

3 R 335 3.5 0.875 95.1 LOS F 14.4 103.8 1.00 0.98 16.8

Approach 720 3.5 0.875 71.8 LOS F 14.4 103.8 0.90 0.85 20.2

East: Camden Valley Way (NE)

4 L 524 3.5 0.776 30.3 LOS C 23.2 167.6 0.70 0.81 33.0

5 T 1136 3.5 0.450 32.6 LOS C 20.2 145.3 0.75 0.66 30.5

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1735 3.5 0.776 34.6 LOS C 23.2 167.6 0.74 0.70 30.1

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 268 3.5 0.353 59.2 LOS E 9.0 64.8 0.91 0.74 22.1

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 428 3.5 0.353 62.8 LOS E 9.0 64.8 0.90 0.74 21.7

West: Camden Valley Way (SW)

10 L 120 3.5 0.105 19.8 LOS B 3.6 25.9 0.42 0.70 39.1

11 T 2648 3.5 0.919 51.6 LOS D 72.0 518.8 1.00 1.01 23.8

12 R 263 3.5 0.730 86.8 LOS F 10.5 75.4 1.00 0.85 17.9

Approach 3031 3.5 0.919 53.4 LOS D 72.0 518.8 0.98 0.98 23.5

All Vehicles 5914 3.5 0.919 50.8 LOS D 72.0 518.8 0.89 0.87 24.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 35.8 LOS D 0.2 0.2 0.67 0.67

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 29.4 LOS C 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.6 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:06:54 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 120: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 71 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 77 20 3 38

Phase Split 8 % 6 % 48 % 13 % 2 % 24 %

Page 121: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:06:54 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 122: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.378 52.5 LOS D 13.2 95.4 0.82 0.83 24.9

2 T 81 3.5 0.378 44.2 LOS D 13.2 95.4 0.82 0.69 25.4

3 R 167 3.5 0.948 69.0 LOS E 11.3 81.6 0.93 0.85 20.7

Approach 390 3.5 0.948 57.8 LOS E 13.2 95.4 0.86 0.81 23.0

East: Camden Valley Way (NE)

4 L 72 3.5 0.475 34.2 LOS C 22.6 162.9 0.69 0.92 32.1

5 T 1326 3.5 0.475 25.9 LOS B 22.8 164.2 0.69 0.61 33.7

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1420 3.5 0.475 27.4 LOS B 22.8 164.2 0.69 0.63 33.1

North: Heath Rd (NW)

7 L 17 3.5 0.091 50.1 LOS D 2.8 20.5 0.75 0.81 25.9

8 T 35 3.5 0.091 41.8 LOS C 2.8 20.5 0.75 0.58 26.6

9 R 40 3.5 0.253 64.6 LOS E 2.6 18.6 0.86 0.75 21.7

Approach 92 3.5 0.253 53.3 LOS D 2.8 20.5 0.80 0.69 24.1

West: Camden Valley Way (SW)

10 L 87 3.5 0.949 68.3 LOS E 89.1 642.3 1.00 1.06 21.7

11 T 2879 3.5 0.949 59.9 LOS E 89.4 644.3 1.00 1.06 21.8

12 R 61 3.5 0.492 88.8 LOS F 4.8 34.5 1.00 0.76 17.4

Approach 3027 3.5 0.949 60.7 LOS E 89.4 644.3 1.00 1.06 21.7

All Vehicles 4929 3.5 0.949 50.7 LOS D 89.4 644.3 0.90 0.91 24.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 22.1 LOS C 0.1 0.1 0.53 0.53

P3 Across E approach 53 52.8 LOS E 0.2 0.2 0.81 0.81

P5 Across N approach 53 19.5 LOS B 0.1 0.1 0.49 0.49

P7 Across W approach 53 52.8 LOS E 0.2 0.2 0.81 0.81

All Pedestrians 212 36.8 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 123: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 83 48

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 5 89 54

Phase Split 8 % 3 % 56 % 34 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 124: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.324 11.5 LOS A 2.3 16.4 0.30 0.68 45.7

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.324 25.8 LOS B 2.3 16.4 0.45 0.69 35.3

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1637 3.5 0.426 12.4 LOS A 18.9 136.3 0.49 0.45 43.2

Approach 1654 3.5 0.426 12.4 LOS A 18.9 136.3 0.49 0.45 43.2

West: Camden Valley Way (SW)

11 T 3176 3.5 0.738 11.3 LOS A 44.4 319.8 0.60 0.57 43.8

12 R 48 3.5 0.390 92.7 LOS F 2.5 17.9 1.00 0.71 16.9

Approach 3224 3.5 0.738 12.5 LOS A 44.4 319.8 0.61 0.57 42.8

All Vehicles 5031 3.5 0.738 12.9 LOS A 44.4 319.8 0.57 0.54 42.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 125: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 126: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 AM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.307 4.4 LOS A 2.0 14.5 0.45 0.42 50.2

6 R 178 3.5 0.307 12.4 LOS A 2.0 14.5 0.45 0.75 46.2

Approach 354 3.5 0.307 8.4 LOS A 2.0 14.5 0.45 0.59 48.0

North: Denham Court Road (N)

7 L 823 3.5 0.727 10.3 LOS A 9.6 69.2 0.89 0.88 46.7

9 R 182 3.5 0.261 14.7 LOS B 1.5 10.9 0.65 0.79 44.0

Approach 1005 3.5 0.727 11.1 LOS A 9.6 69.2 0.84 0.86 46.2

West: Precinct (W)

10 L 424 3.5 0.677 6.5 LOS A 6.9 49.7 0.66 0.57 48.7

11 T 410 3.5 0.677 5.1 LOS A 6.9 49.7 0.66 0.49 48.8

Approach 834 3.5 0.677 5.8 LOS A 6.9 49.7 0.66 0.53 48.8

All Vehicles 2193 3.5 0.727 8.7 LOS A 9.6 69.2 0.71 0.69 47.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:07:07 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 127: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.888 102.7 LOS F 7.0 50.7 1.00 0.98 15.9

Approach 114 3.5 0.888 88.7 LOS F 7.0 50.7 0.95 0.88 17.5

East: Camden Valley Way (E)

24 L 186 3.5 0.287 14.1 LOS A 2.3 16.7 0.21 0.65 43.5

25 T 3271 3.5 1.033 128.3 LOS F 142.7 1029.0 1.00 1.43 13.0

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3465 3.5 1.033 122.1 LOS F 142.7 1029.0 0.96 1.39 13.5

North: Cowpasture Road (N)

7 L 8 3.5 0.069 51.2 LOS D 0.4 3.2 0.75 0.65 25.2

8 T 48 3.5 1.054 211.2 LOS F 13.5 97.7 1.00 1.35 8.6

9 R 180 3.5 1.054 218.1 LOS F 18.2 130.9 1.00 1.39 8.7

Approach 236 3.5 1.054 211.1 LOS F 18.2 130.9 0.99 1.36 8.9

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1400 3.5 0.442 14.7 LOS B 13.7 98.6 0.41 0.37 41.5

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1594 3.5 0.459 16.0 LOS B 13.7 98.6 0.40 0.40 40.7

All Vehicles 5409 3.5 1.054 94.0 LOS F 142.7 1029.0 0.79 1.08 16.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P11 Across E approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

P5 Across N approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.6 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 128: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 89 8 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 95 14 3 36

Phase Split 8 % 59 % 9 % 2 % 23 %

Page 129: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:20 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 130: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 151 3.5 0.521 50.7 LOS D 8.6 62.3 0.79 0.77 25.3

2 T 258 3.5 0.302 55.2 LOS D 8.3 60.0 0.88 0.71 23.1

3 R 301 3.5 0.954 115.8 LOS F 14.6 105.1 1.00 1.15 14.6

Approach 710 3.5 0.954 79.9 LOS F 14.6 105.1 0.91 0.91 18.7

East: Camden Valley Way (NE)

4 L 402 3.5 0.555 22.4 LOS B 14.5 104.6 0.51 0.74 37.4

5 T 2849 3.5 0.989 98.4 LOS F 106.2 765.6 1.00 1.23 15.8

6 R 164 3.5 0.455 82.5 LOS F 6.2 44.6 0.99 0.78 18.6

Approach 3415 3.5 0.989 88.7 LOS F 106.2 765.6 0.94 1.15 17.1

North: Ingleburn Rd (NW)

7 L 84 3.5 0.235 46.6 LOS D 4.5 32.3 0.73 0.74 26.6

8 T 311 3.5 0.410 60.0 LOS E 10.6 76.2 0.92 0.75 21.9

9 R 65 3.5 0.289 87.7 LOS F 2.5 18.2 0.99 0.73 17.8

Approach 460 3.5 0.410 61.5 LOS E 10.6 76.2 0.90 0.75 21.9

West: Camden Valley Way (SW)

10 L 74 3.5 0.073 24.3 LOS B 2.6 18.4 0.48 0.70 36.2

11 T 1212 3.5 0.461 31.0 LOS C 21.1 152.2 0.73 0.65 31.2

12 R 203 3.5 1.001 147.9 LOS F 11.2 80.6 1.00 1.21 12.0

Approach 1489 3.5 1.001 46.6 LOS D 21.1 152.2 0.76 0.73 25.7

All Vehicles 6074 3.5 1.001 75.3 LOS F 106.2 765.6 0.89 0.99 19.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 29.4 LOS C 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 33.8 LOS D 0.2 0.2 0.65 0.65

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 51.9 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:07:33 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 131: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 9 1 74 10 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 15 7 80 16 4 38

Phase Split 9 % 4 % 50 % 10 % 3 % 24 %

Page 132: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:07:33 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 133: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.507 82.8 LOS F 5.5 39.3 0.98 0.78 18.3

Approach 168 3.5 0.507 74.0 LOS F 6.6 47.2 0.94 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.918 49.1 LOS D 77.7 560.4 0.98 0.99 26.6

5 T 2894 3.5 0.918 40.5 LOS C 78.1 563.4 0.98 0.97 27.1

6 R 23 3.5 0.147 71.1 LOS F 1.5 11.1 0.89 0.71 20.3

Approach 3084 3.5 0.918 41.2 LOS C 78.1 563.4 0.98 0.97 27.0

North: Heath Rd (NW)

7 L 13 3.5 0.329 73.4 LOS F 6.6 47.4 0.93 0.81 20.5

8 T 81 3.5 0.329 65.0 LOS E 6.6 47.4 0.93 0.74 20.7

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 178 3.5 0.593 74.5 LOS F 6.6 47.4 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.450 27.7 LOS B 21.2 153.2 0.61 0.94 35.3

11 T 1430 3.5 0.450 19.4 LOS B 21.4 154.3 0.61 0.54 37.6

12 R 142 3.5 0.922 87.4 LOS F 11.3 81.6 0.97 0.89 17.6

Approach 1642 3.5 0.922 25.7 LOS B 21.4 154.3 0.64 0.59 34.2

All Vehicles 5072 3.5 0.922 38.4 LOS C 78.1 563.4 0.87 0.83 28.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 16.7 LOS B 0.1 0.1 0.46 0.46

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 16.7 LOS B 0.1 0.1 0.46 0.46

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 45.4 LOS E 0.71 0.71

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:21 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 134: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 24 94 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 30 100 30

Phase Split 19 % 63 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:21 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 135: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.141 35.5 LOS C 2.5 17.7 0.66 0.74 30.6

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.141 43.6 LOS D 2.5 17.7 0.71 0.73 27.5

East: Camden Valley Way (NE)

4 L 39 3.5 0.030 8.2 LOS A 0.2 1.7 0.11 0.62 49.1

5 T 3315 3.5 0.871 22.1 LOS B 66.8 481.6 0.87 0.82 35.5

Approach 3354 3.5 0.871 21.9 LOS B 66.8 481.6 0.86 0.82 35.6

West: Camden Valley Way (SW)

11 T 1723 3.5 0.400 7.1 LOS A 15.2 109.7 0.38 0.34 48.7

12 R 114 3.5 0.802 95.6 LOS F 6.1 44.0 1.00 0.83 16.6

Approach 1837 3.5 0.802 12.6 LOS A 15.2 109.7 0.42 0.37 43.5

All Vehicles 5256 3.5 0.871 18.9 LOS B 66.8 481.6 0.70 0.66 37.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.4 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.2 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:08:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 136: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak [3.0pc Growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 8 107 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 14 113 33

Phase Split 9 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:08:22 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 137: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 PM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.931 25.7 LOS B 27.3 196.6 1.00 1.46 34.4

6 R 477 3.5 0.931 33.6 LOS C 27.3 196.6 1.00 1.46 33.4

Approach 887 3.5 0.931 29.9 LOS C 27.3 196.6 1.00 1.46 33.8

North: Denham Court Road (N)

7 L 373 3.5 0.308 5.9 LOS A 2.1 15.2 0.45 0.51 49.6

9 R 424 3.5 0.310 12.1 LOS A 2.2 15.7 0.43 0.64 45.0

Approach 797 3.5 0.310 9.2 LOS A 2.2 15.7 0.44 0.58 46.9

West: Precinct (W)

10 L 182 3.5 0.439 8.0 LOS A 3.3 23.7 0.79 0.72 47.9

11 T 176 3.5 0.439 6.7 LOS A 3.3 23.7 0.79 0.64 47.7

Approach 358 3.5 0.439 7.4 LOS A 3.3 23.7 0.79 0.68 47.8

All Vehicles 2042 3.5 0.931 17.9 LOS B 27.3 196.6 0.74 0.98 40.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:07:47 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 138: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 90 3.5 0.260 59.7 LOS E 6.0 43.3 0.90 0.71 21.7

3 R 144 3.5 1.000 3 85.8 LOS F 11.3 81.6 1.00 0.80 18.1

Approach 265 3.5 1.000 73.2 LOS F 11.3 81.6 0.94 0.76 19.8

East: Camden Valley Way (E)

24 L 80 3.5 0.112 12.0 LOS A 0.8 5.8 0.14 0.63 45.4

25 T 1607 3.5 0.544 20.0 LOS B 20.2 146.0 0.53 0.48 37.4

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1695 3.5 0.544 20.0 LOS B 20.2 146.0 0.52 0.49 37.5

North: Cowpasture Road (N)

7 L 8 3.5 0.070 52.8 LOS D 0.4 3.2 0.76 0.65 24.7

8 T 21 3.5 1.004 144.7 LOS F 5.1 36.7 1.00 1.12 11.7

9 R 217 3.5 1.004 153.2 LOS F 22.2 159.9 1.00 1.25 11.7

Approach 246 3.5 1.004 149.2 LOS F 22.2 159.9 0.99 1.22 11.9

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 3059 3.5 1.036 137.9 LOS F 135.4 976.3 1.00 1.45 12.3

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 3321 3.5 1.036 128.3 LOS F 135.4 976.3 0.94 1.39 13.0

All Vehicles 5527 3.5 1.036 93.4 LOS F 135.4 976.3 0.81 1.08 16.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P11 Across E approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 48.6 LOS E 0.75 0.75

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:41 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 139: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 83 16 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 89 22 1 36

Phase Split 8 % 56 % 14 % 1 % 23 %

Page 140: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:41 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 141: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 171 3.5 0.567 47.2 LOS D 9.4 68.1 0.76 0.77 26.3

2 T 224 3.5 0.278 56.5 LOS D 7.3 52.5 0.88 0.71 22.7

3 R 345 3.5 0.957 116.7 LOS F 16.9 121.9 1.00 1.15 14.5

Approach 740 3.5 0.957 82.4 LOS F 16.9 121.9 0.91 0.93 18.4

East: Camden Valley Way (NE)

4 L 570 3.5 0.845 39.6 LOS C 29.5 212.5 0.79 0.87 29.0

5 T 1245 3.5 0.486 32.7 LOS C 22.4 161.3 0.76 0.67 30.4

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1890 3.5 0.845 37.3 LOS C 29.5 212.5 0.78 0.73 29.0

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 289 3.5 0.381 59.6 LOS E 9.8 70.4 0.91 0.75 22.0

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 449 3.5 0.381 62.8 LOS E 9.8 70.4 0.90 0.75 21.6

West: Camden Valley Way (SW)

10 L 120 3.5 0.104 19.4 LOS B 3.5 25.4 0.41 0.69 39.4

11 T 2909 3.5 0.998 107.3 LOS F 113.1 815.8 1.00 1.27 14.8

12 R 286 3.5 0.793 89.4 LOS F 11.7 84.1 1.00 0.89 17.6

Approach 3315 3.5 0.998 102.6 LOS F 113.1 815.8 0.98 1.22 15.4

All Vehicles 6394 3.5 0.998 78.2 LOS F 113.1 815.8 0.91 1.01 18.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 35.1 LOS D 0.2 0.2 0.66 0.66

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P7 Across W approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

All Pedestrians 212 52.6 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:09:09 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 142: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 72 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 78 20 2 38

Phase Split 8 % 6 % 49 % 13 % 1 % 24 %

Page 143: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:09:09 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 144: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.478 61.6 LOS E 14.9 107.4 0.90 0.84 22.6

2 T 85 3.5 0.478 53.3 LOS D 14.9 107.4 0.90 0.76 22.9

3 R 163 3.5 1.000 3 70.7 LOS F 11.3 81.6 0.97 0.82 20.4

Approach 390 3.5 1.000 63.5 LOS E 14.9 107.4 0.93 0.81 21.7

East: Camden Valley Way (NE)

4 L 72 3.5 0.467 29.1 LOS C 22.4 161.3 0.63 0.94 34.6

5 T 1452 3.5 0.467 20.7 LOS B 22.5 162.5 0.63 0.56 36.7

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1546 3.5 0.467 22.2 LOS B 22.5 162.5 0.63 0.58 36.0

North: Heath Rd (NW)

7 L 17 3.5 0.115 58.3 LOS E 3.1 22.5 0.81 0.80 23.6

8 T 35 3.5 0.115 50.0 LOS D 3.1 22.5 0.81 0.63 24.1

9 R 40 3.5 0.274 75.8 LOS F 2.8 20.5 0.93 0.75 19.5

Approach 92 3.5 0.274 62.7 LOS E 3.1 22.5 0.86 0.71 21.8

West: Camden Valley Way (SW)

10 L 87 3.5 0.938 53.7 LOS D 89.2 643.1 1.00 1.02 25.3

11 T 3178 3.5 0.938 45.3 LOS D 89.4 644.6 1.00 1.01 25.6

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 3326 3.5 0.938 46.2 LOS D 89.4 644.6 1.00 1.01 25.4

All Vehicles 5354 3.5 1.000 40.8 LOS C 89.4 644.6 0.88 0.87 27.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 17.6 LOS B 0.1 0.1 0.47 0.47

P3 Across E approach 53 61.3 LOS F 0.2 0.2 0.88 0.88

P5 Across N approach 53 14.9 LOS B 0.1 0.1 0.43 0.43

P7 Across W approach 53 61.3 LOS F 0.2 0.2 0.88 0.88

All Pedestrians 212 38.7 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 145: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 92 38

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 98 44

Phase Split 8 % 4 % 61 % 28 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 146: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.327 12.4 LOS A 2.6 19.0 0.34 0.69 44.9

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.327 26.5 LOS B 2.6 19.0 0.48 0.70 34.9

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1780 3.5 0.459 12.4 LOS A 20.9 150.7 0.50 0.46 43.2

Approach 1797 3.5 0.459 12.3 LOS A 20.9 150.7 0.50 0.46 43.2

West: Camden Valley Way (SW)

11 T 3504 3.5 0.814 13.0 LOS A 56.3 406.1 0.70 0.66 42.1

12 R 48 3.5 0.455 94.6 LOS F 2.5 18.2 1.00 0.71 16.7

Approach 3553 3.5 0.814 14.1 LOS A 56.3 406.1 0.70 0.66 41.3

All Vehicles 5502 3.5 0.814 13.9 LOS A 56.3 406.1 0.63 0.60 41.7

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 11.6 LOS B 0.1 0.1 0.38 0.38

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 147: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 6 109 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 12 115 33

Phase Split 8 % 72 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 148: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 AM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.322 4.5 LOS A 2.2 15.5 0.46 0.43 50.1

6 R 197 3.5 0.322 12.4 LOS A 2.2 15.5 0.46 0.75 46.2

Approach 373 3.5 0.322 8.7 LOS A 2.2 15.5 0.46 0.60 47.8

North: Denham Court Road (N)

7 L 912 3.5 0.807 12.5 LOS A 13.4 96.8 0.97 0.98 44.8

9 R 182 3.5 0.262 14.7 LOS B 1.5 11.0 0.65 0.79 44.0

Approach 1094 3.5 0.807 12.8 LOS A 13.4 96.8 0.92 0.95 44.7

West: Precinct (W)

10 L 424 3.5 0.693 6.9 LOS A 7.3 52.9 0.70 0.62 48.5

11 T 410 3.5 0.693 5.5 LOS A 7.3 52.9 0.70 0.54 48.4

Approach 834 3.5 0.693 6.2 LOS A 7.3 52.9 0.70 0.58 48.5

All Vehicles 2301 3.5 0.807 9.8 LOS A 13.4 96.8 0.76 0.76 46.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:09:22 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 149: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.888 102.7 LOS F 7.0 50.7 1.00 0.98 15.9

Approach 114 3.5 0.888 88.7 LOS F 7.0 50.7 0.95 0.88 17.5

East: Camden Valley Way (E)

24 L 186 3.5 0.276 13.6 LOS A 2.2 15.7 0.20 0.65 43.9

25 T 3575 3.5 1.117 264.5 LOS F 216.8 1562.8 1.00 2.00 7.2

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3769 3.5 1.117 251.8 LOS F 216.8 1562.8 0.96 1.93 7.5

North: Cowpasture Road (N)

7 L 8 3.5 0.069 52.0 LOS D 0.4 3.2 0.75 0.65 24.9

8 T 48 3.5 1.256 560.3 LOS F 22.1 159.3 1.00 1.79 3.6

9 R 180 3.5 1.256 566.1 LOS F 36.0 259.3 1.00 1.97 3.7

Approach 236 3.5 1.256 547.5 LOS F 36.0 259.3 0.99 1.89 3.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1530 3.5 0.478 14.5 LOS A 15.2 109.3 0.42 0.38 41.7

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1724 3.5 0.478 15.7 LOS B 15.2 109.3 0.40 0.41 40.9

All Vehicles 5843 3.5 1.256 190.9 LOS F 216.8 1562.8 0.80 1.46 9.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P11 Across E approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

P5 Across N approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.6 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 150: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 90 8 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 96 14 2 36

Phase Split 8 % 60 % 9 % 1 % 23 %

Page 151: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:44 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 152: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 162 3.5 0.559 51.0 LOS D 9.3 67.4 0.79 0.77 25.2

2 T 300 3.5 0.353 55.9 LOS D 9.9 71.1 0.89 0.73 22.8

3 R 299 3.5 1.020 170.4 LOS F 18.1 130.3 1.00 1.33 10.7

Approach 761 3.5 1.020 99.8 LOS F 18.1 130.3 0.91 0.97 16.0

East: Camden Valley Way (NE)

4 L 420 3.5 0.580 22.5 LOS B 15.4 110.7 0.52 0.75 37.3

5 T 3133 3.5 1.074 218.3 LOS F 168.6 1215.3 1.00 1.75 8.5

6 R 164 3.5 0.485 83.8 LOS F 6.3 45.1 0.99 0.78 18.4

Approach 3717 3.5 1.074 190.2 LOS F 168.6 1215.3 0.95 1.60 9.5

North: Ingleburn Rd (NW)

7 L 84 3.5 0.237 47.3 LOS D 4.5 32.6 0.74 0.74 26.3

8 T 324 3.5 0.427 60.2 LOS E 11.1 79.7 0.92 0.76 21.9

9 R 65 3.5 0.321 89.2 LOS F 2.6 18.4 1.00 0.73 17.6

Approach 473 3.5 0.427 61.9 LOS E 11.1 79.7 0.90 0.75 21.8

West: Camden Valley Way (SW)

10 L 74 3.5 0.072 23.9 LOS B 2.5 18.2 0.47 0.70 36.5

11 T 1330 3.5 0.492 30.3 LOS C 23.2 167.5 0.74 0.65 31.5

12 R 212 3.5 1.046 204.8 LOS F 14.1 101.9 1.00 1.34 9.2

Approach 1616 3.5 1.046 52.9 LOS D 23.2 167.5 0.76 0.75 23.9

All Vehicles 6567 3.5 1.074 136.7 LOS F 168.6 1215.3 0.89 1.25 12.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 32.5 LOS D 0.2 0.2 0.64 0.64

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 51.4 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:09:46 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 153: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 9 0 76 9 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 15 6 82 15 4 38

Phase Split 9 % 4 % 51 % 9 % 3 % 24 %

Page 154: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:09:46 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 155: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.957 64.4 LOS E 101.3 730.6 1.00 1.06 22.5

5 T 3195 3.5 0.957 55.8 LOS D 101.8 734.0 1.00 1.07 22.7

6 R 23 3.5 0.154 76.4 LOS F 1.6 11.6 0.93 0.71 19.4

Approach 3385 3.5 0.957 56.4 LOS D 101.8 734.0 1.00 1.06 22.7

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.466 25.5 LOS B 22.1 159.5 0.58 0.95 36.6

11 T 1566 3.5 0.466 17.1 LOS B 22.3 160.6 0.58 0.52 39.2

12 R 142 3.5 0.961 88.2 LOS F 11.3 81.6 1.00 0.85 17.5

Approach 1778 3.5 0.961 23.1 LOS B 22.3 160.6 0.61 0.57 35.6

All Vehicles 5519 3.5 0.961 46.8 LOS D 101.8 734.0 0.87 0.88 25.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 14.5 LOS B 0.1 0.1 0.43 0.43

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 14.5 LOS B 0.1 0.1 0.43 0.43

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 44.3 LOS E 0.69 0.69

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:45 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 156: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 19 99 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 25 105 30

Phase Split 16 % 66 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:45 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 157: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.145 47.2 LOS D 2.8 20.2 0.74 0.74 26.3

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.145 52.3 LOS D 2.8 20.2 0.77 0.72 24.8

East: Camden Valley Way (NE)

4 L 39 3.5 0.029 8.2 LOS A 0.2 1.5 0.11 0.62 49.2

5 T 3658 3.5 0.952 44.2 LOS D 103.0 742.3 1.00 1.04 26.0

Approach 3697 3.5 0.952 43.8 LOS D 103.0 742.3 0.99 1.03 26.1

West: Camden Valley Way (SW)

11 T 1877 3.5 0.436 7.4 LOS A 17.2 124.3 0.39 0.36 48.3

12 R 114 3.5 0.916 102.7 LOS F 6.5 47.0 1.00 0.91 15.7

Approach 1991 3.5 0.916 12.9 LOS A 17.2 124.3 0.43 0.39 43.2

All Vehicles 5753 3.5 0.952 33.2 LOS C 103.0 742.3 0.79 0.81 30.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:46 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 158: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2031 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2031 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:46 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 159: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2031 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2031 PM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.983 46.7 LOS D 46.0 331.6 1.00 2.02 25.9

6 R 529 3.5 0.983 54.6 LOS D 46.0 331.6 1.00 2.02 25.9

Approach 939 3.5 0.983 51.2 LOS D 46.0 331.6 1.00 2.02 25.9

North: Denham Court Road (N)

7 L 413 3.5 0.337 5.9 LOS A 2.4 17.3 0.46 0.52 49.5

9 R 424 3.5 0.310 12.1 LOS A 2.2 15.9 0.44 0.64 45.0

Approach 837 3.5 0.337 9.0 LOS A 2.4 17.3 0.45 0.58 47.0

West: Precinct (W)

10 L 182 3.5 0.470 8.9 LOS A 3.7 26.7 0.83 0.82 47.7

11 T 176 3.5 0.470 7.5 LOS A 3.7 26.7 0.83 0.74 47.4

Approach 358 3.5 0.470 8.2 LOS A 3.7 26.7 0.83 0.78 47.5

All Vehicles 2134 3.5 0.983 27.4 LOS B 46.0 331.6 0.76 1.25 34.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:10:03 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2031 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 160: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 83 3.5 0.237 59.4 LOS E 5.5 39.4 0.89 0.70 21.8

3 R 151 3.5 1.000 3 78.7 LOS F 11.3 81.6 0.99 0.80 19.2

Approach 265 3.5 1.000 69.9 LOS E 11.3 81.6 0.94 0.76 20.4

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1395 3.5 0.503 23.1 LOS B 18.5 133.3 0.56 0.50 35.5

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1483 3.5 0.503 22.8 LOS B 18.5 133.3 0.54 0.51 35.8

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 0.809 95.2 LOS F 3.3 23.8 1.00 0.86 16.0

9 R 217 3.5 0.809 86.9 LOS F 16.2 116.8 1.00 0.90 17.9

Approach 246 3.5 0.809 86.5 LOS F 16.2 116.8 0.99 0.89 17.9

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 2669 3.5 0.962 60.7 LOS E 81.5 587.4 1.00 1.09 21.7

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 2931 3.5 0.962 56.7 LOS E 81.5 587.4 0.93 1.05 22.7

All Vehicles 4925 3.5 1.000 48.7 LOS D 81.5 587.4 0.81 0.86 24.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 26.5 LOS C 0.1 0.1 0.58 0.58

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 26.5 LOS C 0.1 0.1 0.58 0.58

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 50.3 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:03 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 161: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 78 22 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 84 28 0 36

Phase Split 8 % 53 % 18 % 0 % 23 %

Page 162: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:03 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 163: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 162 3.5 0.532 46.2 LOS D 8.8 63.4 0.75 0.77 26.7

2 T 218 3.5 0.263 55.4 LOS D 7.0 50.6 0.87 0.70 23.0

3 R 330 3.5 0.862 93.6 LOS F 14.0 101.0 1.00 0.96 17.0

Approach 710 3.5 0.862 71.1 LOS F 14.0 101.0 0.90 0.84 20.3

East: Camden Valley Way (NE)

4 L 500 3.5 0.741 28.8 LOS C 21.8 156.9 0.66 0.79 33.7

5 T 1077 3.5 0.427 32.2 LOS C 18.9 135.9 0.74 0.64 30.7

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1652 3.5 0.741 34.1 LOS C 21.8 156.9 0.72 0.69 30.3

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 258 3.5 0.340 59.0 LOS E 8.6 62.2 0.90 0.73 22.1

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 418 3.5 0.340 62.7 LOS E 8.6 62.2 0.90 0.74 21.7

West: Camden Valley Way (SW)

10 L 120 3.5 0.105 19.8 LOS B 3.6 25.9 0.42 0.70 39.1

11 T 2507 3.5 0.870 39.5 LOS C 58.5 421.9 0.96 0.90 27.5

12 R 251 3.5 0.696 85.9 LOS F 9.9 71.2 1.00 0.83 18.1

Approach 2878 3.5 0.870 42.7 LOS D 58.5 421.9 0.94 0.89 26.6

All Vehicles 5658 3.5 0.870 45.2 LOS D 58.5 421.9 0.87 0.81 26.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 35.8 LOS D 0.2 0.2 0.67 0.67

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 29.4 LOS C 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.6 LOS E 0.80 0.80

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:13:03 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 164: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 71 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 77 20 3 38

Phase Split 8 % 6 % 48 % 13 % 2 % 24 %

Page 165: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:13:03 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 166: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.357 50.0 LOS D 12.8 92.6 0.80 0.83 25.6

2 T 81 3.5 0.357 41.7 LOS C 12.8 92.6 0.80 0.68 26.2

3 R 167 3.5 0.925 68.6 LOS E 11.3 81.6 0.90 0.86 20.8

Approach 390 3.5 0.925 56.3 LOS D 12.8 92.6 0.84 0.81 23.4

East: Camden Valley Way (NE)

4 L 72 3.5 0.475 36.5 LOS C 22.3 160.8 0.71 0.92 31.0

5 T 1259 3.5 0.475 28.2 LOS B 22.5 162.1 0.71 0.63 32.4

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1353 3.5 0.475 29.7 LOS C 22.5 162.1 0.72 0.65 31.9

North: Heath Rd (NW)

7 L 17 3.5 0.086 47.8 LOS D 2.8 19.9 0.73 0.81 26.6

8 T 35 3.5 0.086 39.5 LOS C 2.8 19.9 0.73 0.56 27.4

9 R 40 3.5 0.246 61.0 LOS E 2.5 18.0 0.83 0.74 22.5

Approach 92 3.5 0.246 50.4 LOS D 2.8 19.9 0.77 0.69 24.9

West: Camden Valley Way (SW)

10 L 87 3.5 0.930 60.9 LOS E 78.1 562.9 1.00 1.02 23.4

11 T 2719 3.5 0.930 52.5 LOS D 78.3 564.8 1.00 1.02 23.6

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 2867 3.5 0.930 53.5 LOS D 78.3 564.8 1.00 1.01 23.4

All Vehicles 4702 3.5 0.930 46.8 LOS D 78.3 564.8 0.90 0.89 25.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 24.2 LOS C 0.1 0.1 0.55 0.55

P3 Across E approach 53 50.4 LOS E 0.2 0.2 0.79 0.79

P5 Across N approach 53 21.0 LOS C 0.1 0.1 0.51 0.51

P7 Across W approach 53 50.4 LOS E 0.2 0.2 0.79 0.79

All Pedestrians 212 36.5 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 167: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 79 51

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 85 57

Phase Split 8 % 4 % 53 % 36 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 168: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.324 10.9 LOS A 2.0 14.6 0.28 0.67 46.4

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.324 25.3 LOS B 2.0 14.6 0.43 0.68 35.6

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1560 3.5 0.406 12.2 LOS A 17.7 127.4 0.48 0.44 43.4

Approach 1577 3.5 0.406 12.1 LOS A 17.7 127.4 0.48 0.44 43.5

West: Camden Valley Way (SW)

11 T 3000 3.5 0.697 10.5 LOS A 39.2 282.3 0.56 0.53 44.6

12 R 48 3.5 0.390 92.7 LOS F 2.5 17.9 1.00 0.71 16.9

Approach 3048 3.5 0.697 11.8 LOS A 39.2 282.3 0.57 0.53 43.5

All Vehicles 4778 3.5 0.697 12.4 LOS A 39.2 282.3 0.54 0.51 43.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 169: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 170: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 AM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.300 4.4 LOS A 1.9 14.0 0.45 0.42 50.2

6 R 167 3.5 0.300 12.4 LOS A 1.9 14.0 0.45 0.76 46.3

Approach 343 3.5 0.300 8.3 LOS A 1.9 14.0 0.45 0.59 48.1

North: Denham Court Road (N)

7 L 775 3.5 0.712 10.0 LOS A 8.5 61.1 0.85 0.85 47.0

9 R 182 3.5 0.271 14.7 LOS B 1.5 10.9 0.64 0.79 44.0

Approach 957 3.5 0.712 10.9 LOS A 8.5 61.1 0.81 0.84 46.3

West: Precinct (W)

10 L 424 3.5 0.673 6.3 LOS A 6.8 48.8 0.63 0.56 48.9

11 T 410 3.5 0.673 5.0 LOS A 6.8 48.8 0.63 0.48 49.0

Approach 834 3.5 0.673 5.7 LOS A 6.8 48.8 0.63 0.52 48.9

All Vehicles 2134 3.5 0.712 8.4 LOS A 8.5 61.1 0.68 0.68 47.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:13:17 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 171: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.710 92.3 LOS F 6.5 47.1 1.00 0.83 17.2

Approach 114 3.5 0.710 81.4 LOS F 6.5 47.1 0.95 0.77 18.6

East: Camden Valley Way (E)

24 L 186 3.5 0.265 13.2 LOS A 2.0 14.7 0.18 0.65 44.3

25 T 3108 3.5 0.982 64.9 LOS E 103.1 743.0 1.00 1.14 20.8

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3302 3.5 0.982 62.0 LOS E 103.1 743.0 0.95 1.11 21.5

North: Cowpasture Road (N)

7 L 8 3.5 0.070 52.8 LOS D 0.4 3.2 0.76 0.65 24.7

8 T 48 3.5 1.056 215.0 LOS F 13.7 98.4 1.00 1.36 8.5

9 R 180 3.5 1.056 221.9 LOS F 18.4 132.6 1.00 1.40 8.6

Approach 236 3.5 1.056 214.8 LOS F 18.4 132.6 0.99 1.36 8.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1330 3.5 0.420 14.5 LOS A 12.7 91.5 0.40 0.36 41.8

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1524 3.5 0.459 15.8 LOS B 12.7 91.5 0.39 0.40 40.9

All Vehicles 5176 3.5 1.056 55.8 LOS D 103.1 743.0 0.79 0.91 23.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P11 Across E approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 20.5 LOS C 0.1 0.1 0.51 0.51

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 47.1 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 172: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 89 10 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 95 16 1 36

Phase Split 8 % 59 % 10 % 1 % 23 %

Page 173: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:04 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 174: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 145 3.5 0.496 49.7 LOS D 8.2 59.1 0.78 0.77 25.6

2 T 248 3.5 0.291 55.0 LOS D 8.0 57.5 0.87 0.71 23.1

3 R 290 3.5 0.919 104.5 LOS F 13.1 94.8 1.00 1.07 15.7

Approach 683 3.5 0.919 74.9 LOS F 13.1 94.8 0.91 0.87 19.6

East: Camden Valley Way (NE)

4 L 393 3.5 0.548 22.8 LOS B 14.3 103.3 0.52 0.75 37.2

5 T 2677 3.5 0.941 61.7 LOS E 79.5 573.5 1.00 1.06 21.5

6 R 164 3.5 0.428 81.3 LOS F 6.1 44.2 0.98 0.78 18.8

Approach 3234 3.5 0.941 58.0 LOS E 79.5 573.5 0.94 1.00 22.5

North: Ingleburn Rd (NW)

7 L 84 3.5 0.233 45.8 LOS D 4.4 31.9 0.72 0.74 26.8

8 T 304 3.5 0.401 59.9 LOS E 10.3 74.4 0.92 0.75 21.9

9 R 65 3.5 0.289 87.7 LOS F 2.5 18.2 0.99 0.73 17.8

Approach 453 3.5 0.401 61.3 LOS E 10.3 74.4 0.89 0.75 21.9

West: Camden Valley Way (SW)

10 L 74 3.5 0.074 24.8 LOS B 2.6 18.7 0.49 0.70 35.9

11 T 1149 3.5 0.443 31.3 LOS C 20.0 144.0 0.73 0.64 31.1

12 R 198 3.5 0.879 100.3 LOS F 8.6 62.1 1.00 0.98 16.2

Approach 1421 3.5 0.879 40.6 LOS C 20.0 144.0 0.76 0.69 27.7

All Vehicles 5791 3.5 0.941 56.0 LOS D 79.5 573.5 0.89 0.89 23.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 34.5 LOS D 0.2 0.2 0.66 0.66

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 52.2 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 11:19:15 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 175: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 10 1 73 10 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 16 7 79 16 4 38

Phase Split 10 % 4 % 49 % 10 % 3 % 24 %

Page 176: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 11:19:15 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 177: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.899 45.8 LOS D 69.4 500.5 0.96 0.96 27.7

5 T 2733 3.5 0.899 37.3 LOS C 69.8 503.4 0.96 0.93 28.2

6 R 23 3.5 0.144 68.1 LOS E 1.5 10.8 0.87 0.71 20.9

Approach 2923 3.5 0.899 38.0 LOS C 69.8 503.4 0.96 0.93 28.1

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.442 29.2 LOS C 20.8 149.8 0.62 0.93 34.5

11 T 1357 3.5 0.442 20.9 LOS B 20.9 150.9 0.62 0.56 36.6

12 R 142 3.5 0.899 86.6 LOS F 11.3 81.6 0.95 0.92 17.8

Approach 1569 3.5 0.899 27.2 LOS B 20.9 150.9 0.65 0.61 33.3

All Vehicles 4848 3.5 0.899 37.2 LOS C 69.8 503.4 0.86 0.81 28.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 18.1 LOS B 0.1 0.1 0.48 0.48

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 18.1 LOS B 0.1 0.1 0.48 0.48

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.1 LOS E 0.72 0.72

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:05 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 178: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 27 91 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 33 97 30

Phase Split 21 % 61 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:05 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 179: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.140 30.4 LOS C 2.3 16.4 0.61 0.74 32.9

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.140 39.8 LOS C 2.3 16.4 0.68 0.72 28.9

East: Camden Valley Way (NE)

4 L 39 3.5 0.030 8.2 LOS A 0.2 1.7 0.11 0.62 49.1

5 T 3132 3.5 0.823 20.5 LOS B 58.6 422.3 0.81 0.76 36.5

Approach 3171 3.5 0.823 20.4 LOS B 58.6 422.3 0.80 0.76 36.7

West: Camden Valley Way (SW)

11 T 1642 3.5 0.382 7.0 LOS A 14.2 102.4 0.37 0.34 48.9

12 R 114 3.5 0.802 95.6 LOS F 6.1 44.0 1.00 0.83 16.6

Approach 1756 3.5 0.802 12.7 LOS A 14.2 102.4 0.41 0.37 43.4

All Vehicles 4992 3.5 0.823 17.9 LOS B 58.6 422.3 0.66 0.62 38.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.4 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.2 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:05:05 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 180: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak (1.5pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 8 107 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 14 113 33

Phase Split 9 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:05:05 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 181: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 PM Peak (1.5pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.911 21.9 LOS B 23.0 165.5 1.00 1.35 36.6

6 R 450 3.5 0.911 29.9 LOS C 23.0 165.5 1.00 1.35 35.2

Approach 860 3.5 0.911 26.1 LOS B 23.0 165.5 1.00 1.35 35.8

North: Denham Court Road (N)

7 L 352 3.5 0.310 5.9 LOS A 2.0 14.2 0.44 0.51 49.7

9 R 424 3.5 0.326 12.1 LOS A 2.2 15.7 0.43 0.64 45.0

Approach 776 3.5 0.326 9.3 LOS A 2.2 15.7 0.44 0.58 46.9

West: Precinct (W)

10 L 182 3.5 0.429 7.8 LOS A 3.2 22.8 0.76 0.70 48.1

11 T 176 3.5 0.429 6.5 LOS A 3.2 22.8 0.76 0.62 47.9

Approach 358 3.5 0.429 7.1 LOS A 3.2 22.8 0.76 0.66 48.0

All Vehicles 1994 3.5 0.911 16.1 LOS B 23.0 165.5 0.74 0.93 41.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:13:50 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (1.5pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 182: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 89 3.5 0.256 59.6 LOS E 5.9 42.7 0.90 0.71 21.7

3 R 145 3.5 1.000 3 84.6 LOS F 11.3 81.6 1.00 0.80 18.3

Approach 265 3.5 1.000 72.7 LOS F 11.3 81.6 0.94 0.76 19.9

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1616 3.5 0.547 20.1 LOS B 20.4 147.3 0.54 0.48 37.4

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1704 3.5 0.547 20.0 LOS B 20.4 147.3 0.52 0.49 37.5

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 1.004 144.7 LOS F 5.1 36.7 1.00 1.12 11.7

9 R 217 3.5 1.004 153.2 LOS F 22.2 159.9 1.00 1.25 11.7

Approach 246 3.5 1.004 149.2 LOS F 22.2 159.9 0.99 1.22 11.9

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 3077 3.5 1.042 147.1 LOS F 139.9 1008.9 1.00 1.49 11.7

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 3339 3.5 1.042 136.8 LOS F 139.9 1008.9 0.94 1.43 12.4

All Vehicles 5554 3.5 1.042 98.5 LOS F 139.9 1008.9 0.81 1.10 15.9

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 23.7 LOS C 0.1 0.1 0.54 0.54

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 48.9 LOS E 0.75 0.75

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:14 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 183: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, C, C, C1, D Output Sequence: A, C, C, C1, D Phase Timing Results

Phase A C C C1 D

Green Time (sec) 6 83 17 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 89 23 0 36

Phase Split 8 % 56 % 14 % 0 % 23 %

Page 184: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:14 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 185: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 171 3.5 0.567 47.2 LOS D 9.4 68.1 0.76 0.77 26.3

2 T 224 3.5 0.278 56.5 LOS D 7.3 52.5 0.88 0.71 22.7

3 R 346 3.5 0.960 118.1 LOS F 17.1 123.2 1.00 1.15 14.3

Approach 741 3.5 0.960 83.1 LOS F 17.1 123.2 0.91 0.93 18.3

East: Camden Valley Way (NE)

4 L 573 3.5 0.849 40.6 LOS C 30.0 216.6 0.80 0.87 28.6

5 T 1253 3.5 0.489 32.8 LOS C 22.6 162.7 0.76 0.67 30.4

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 1901 3.5 0.849 37.6 LOS C 30.0 216.6 0.78 0.73 28.9

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 290 3.5 0.382 59.6 LOS E 9.8 70.6 0.91 0.75 22.0

9 R 81 3.5 0.257 82.7 LOS F 3.0 21.8 0.97 0.74 18.6

Approach 450 3.5 0.382 62.9 LOS E 9.8 70.6 0.90 0.75 21.6

West: Camden Valley Way (SW)

10 L 120 3.5 0.104 19.4 LOS B 3.5 25.4 0.41 0.69 39.4

11 T 2928 3.5 1.004 115.1 LOS F 117.4 846.7 1.00 1.31 14.1

12 R 288 3.5 0.799 89.7 LOS F 11.8 84.9 1.00 0.90 17.5

Approach 3336 3.5 1.004 109.4 LOS F 117.4 846.7 0.98 1.25 14.7

All Vehicles 6428 3.5 1.004 81.9 LOS F 117.4 846.7 0.91 1.02 18.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 35.1 LOS D 0.2 0.2 0.66 0.66

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P7 Across W approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

All Pedestrians 212 52.6 LOS E 0.79 0.79

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:14:22 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 186: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 72 14 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 78 20 2 38

Phase Split 8 % 6 % 49 % 13 % 1 % 24 %

Page 187: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:14:22 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 188: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.492 62.6 LOS E 15.1 109.0 0.90 0.84 22.3

2 T 87 3.5 0.492 54.3 LOS D 15.1 109.0 0.90 0.76 22.6

3 R 161 3.5 1.000 3 71.2 LOS F 11.3 81.6 0.97 0.82 20.3

Approach 390 3.5 1.000 64.3 LOS E 15.1 109.0 0.93 0.81 21.5

East: Camden Valley Way (NE)

4 L 72 3.5 0.465 28.5 LOS B 22.2 160.2 0.62 0.94 34.9

5 T 1461 3.5 0.465 20.2 LOS B 22.4 161.4 0.62 0.56 37.1

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1555 3.5 0.465 21.6 LOS B 22.4 161.4 0.62 0.58 36.3

North: Heath Rd (NW)

7 L 17 3.5 0.118 59.2 LOS E 3.1 22.7 0.82 0.79 23.4

8 T 35 3.5 0.118 50.9 LOS D 3.1 22.7 0.82 0.63 23.9

9 R 40 3.5 0.277 76.9 LOS F 2.9 20.7 0.93 0.75 19.3

Approach 92 3.5 0.277 63.7 LOS E 3.1 22.7 0.87 0.71 21.6

West: Camden Valley Way (SW)

10 L 87 3.5 0.935 51.3 LOS D 87.9 633.6 0.99 1.01 26.1

11 T 3200 3.5 0.935 42.8 LOS D 88.1 635.1 0.99 1.00 26.3

12 R 61 3.5 0.451 87.3 LOS F 4.7 34.1 1.00 0.76 17.7

Approach 3348 3.5 0.935 43.9 LOS D 88.1 635.1 0.99 1.00 26.1

All Vehicles 5385 3.5 1.000 39.3 LOS C 88.1 635.1 0.88 0.86 27.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 17.1 LOS B 0.1 0.1 0.46 0.46

P3 Across E approach 53 62.1 LOS F 0.2 0.2 0.88 0.88

P5 Across N approach 53 14.5 LOS B 0.1 0.1 0.43 0.43

P7 Across W approach 53 62.1 LOS F 0.2 0.2 0.88 0.88

All Pedestrians 212 39.0 LOS D 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:17 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 189: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 93 37

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 6 99 43

Phase Split 8 % 4 % 62 % 27 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:17 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 190: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.327 12.5 LOS A 2.7 19.2 0.35 0.70 44.9

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.327 26.5 LOS B 2.7 19.2 0.48 0.70 34.9

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 1791 3.5 0.462 12.4 LOS A 21.1 152.0 0.50 0.46 43.2

Approach 1807 3.5 0.462 12.4 LOS A 21.1 152.0 0.50 0.46 43.2

West: Camden Valley Way (SW)

11 T 3527 3.5 0.820 13.1 LOS A 57.3 413.2 0.70 0.67 42.0

12 R 48 3.5 0.455 94.6 LOS F 2.5 18.2 1.00 0.71 16.7

Approach 3576 3.5 0.820 14.2 LOS A 57.3 413.2 0.71 0.67 41.2

All Vehicles 5536 3.5 0.820 13.9 LOS A 57.3 413.2 0.63 0.60 41.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 11.6 LOS B 0.1 0.1 0.38 0.38

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:17 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 191: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 6 109 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 12 115 33

Phase Split 8 % 72 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:17 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 192: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 AM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.323 4.5 LOS A 2.2 15.6 0.46 0.43 50.0

6 R 198 3.5 0.323 12.4 LOS A 2.2 15.6 0.46 0.75 46.2

Approach 374 3.5 0.323 8.7 LOS A 2.2 15.6 0.46 0.60 47.8

North: Denham Court Road (N)

7 L 918 3.5 0.812 12.7 LOS A 13.8 99.2 0.98 0.99 44.6

9 R 182 3.5 0.262 14.7 LOS B 1.5 11.0 0.65 0.79 44.0

Approach 1100 3.5 0.812 13.0 LOS A 13.8 99.2 0.92 0.96 44.5

West: Precinct (W)

10 L 424 3.5 0.694 6.9 LOS A 7.4 53.2 0.70 0.62 48.5

11 T 410 3.5 0.694 5.5 LOS A 7.4 53.2 0.70 0.54 48.4

Approach 834 3.5 0.694 6.2 LOS A 7.4 53.2 0.70 0.58 48.5

All Vehicles 2308 3.5 0.812 9.9 LOS A 13.8 99.2 0.77 0.76 46.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:14:38 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 193: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.888 102.7 LOS F 7.0 50.7 1.00 0.98 15.9

Approach 114 3.5 0.888 88.7 LOS F 7.0 50.7 0.95 0.88 17.5

East: Camden Valley Way (E)

24 L 186 3.5 0.276 13.6 LOS A 2.2 15.7 0.20 0.65 43.9

25 T 3597 3.5 1.124 276.5 LOS F 223.0 1608.0 1.00 2.05 6.9

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 3791 3.5 1.124 263.2 LOS F 223.0 1608.0 0.96 1.97 7.2

North: Cowpasture Road (N)

7 L 8 3.5 0.069 52.0 LOS D 0.4 3.2 0.75 0.65 24.9

8 T 48 3.5 1.256 560.6 LOS F 22.1 159.3 1.00 1.79 3.6

9 R 180 3.5 1.256 566.4 LOS F 36.0 259.4 1.00 1.97 3.7

Approach 236 3.5 1.256 547.8 LOS F 36.0 259.4 0.99 1.89 3.8

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1539 3.5 0.481 14.5 LOS B 15.3 110.3 0.42 0.38 41.7

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1733 3.5 0.481 15.7 LOS B 15.3 110.3 0.41 0.41 40.9

All Vehicles 5874 3.5 1.256 198.2 LOS F 223.0 1608.0 0.80 1.49 9.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P11 Across E approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

P5 Across N approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 46.6 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:18 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 194: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 90 8 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 96 14 2 36

Phase Split 8 % 60 % 9 % 1 % 23 %

Page 195: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:18 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 196: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 163 3.5 0.563 51.0 LOS D 9.4 67.8 0.79 0.78 25.2

2 T 303 3.5 0.357 56.0 LOS D 10.0 71.9 0.89 0.73 22.8

3 R 299 3.5 1.020 170.4 LOS F 18.1 130.3 1.00 1.33 10.7

Approach 765 3.5 1.020 99.6 LOS F 18.1 130.3 0.91 0.97 16.0

East: Camden Valley Way (NE)

4 L 421 3.5 0.581 22.6 LOS B 15.4 111.1 0.52 0.75 37.3

5 T 3153 3.5 1.081 229.5 LOS F 174.0 1254.5 1.00 1.80 8.1

6 R 164 3.5 0.485 83.8 LOS F 6.3 45.1 0.99 0.78 18.4

Approach 3738 3.5 1.081 199.8 LOS F 174.0 1254.5 0.95 1.64 9.1

North: Ingleburn Rd (NW)

7 L 84 3.5 0.237 47.3 LOS D 4.5 32.6 0.74 0.74 26.3

8 T 325 3.5 0.428 60.3 LOS E 11.1 80.0 0.92 0.76 21.8

9 R 65 3.5 0.321 89.2 LOS F 2.6 18.4 1.00 0.73 17.6

Approach 474 3.5 0.428 61.9 LOS E 11.1 80.0 0.90 0.75 21.8

West: Camden Valley Way (SW)

10 L 74 3.5 0.072 23.9 LOS B 2.5 18.2 0.47 0.70 36.5

11 T 1339 3.5 0.495 30.4 LOS C 23.4 169.0 0.74 0.66 31.4

12 R 213 3.5 1.050 212.2 LOS F 14.5 104.6 1.00 1.35 8.9

Approach 1626 3.5 1.050 53.9 LOS D 23.4 169.0 0.76 0.75 23.7

All Vehicles 6603 3.5 1.081 142.4 LOS F 174.0 1254.5 0.89 1.28 12.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 28.8 LOS C 0.1 0.1 0.60 0.60

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 32.5 LOS D 0.2 0.2 0.64 0.64

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 51.4 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:15:00 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 197: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 9 0 76 9 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 15 6 82 15 4 38

Phase Split 9 % 4 % 51 % 9 % 3 % 24 %

Page 198: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:15:00 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 199: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.305 70.4 LOS E 6.6 47.2 0.92 0.79 20.7

2 T 35 3.5 0.305 62.1 LOS E 6.6 47.2 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.2 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 0.963 68.8 LOS E 105.5 760.6 1.00 1.08 21.5

5 T 3216 3.5 0.963 60.2 LOS E 106.0 764.2 1.00 1.09 21.7

6 R 23 3.5 0.154 76.4 LOS F 1.6 11.6 0.93 0.71 19.4

Approach 3406 3.5 0.963 60.8 LOS E 106.0 764.2 1.00 1.08 21.7

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.4 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.469 25.5 LOS B 22.3 160.9 0.58 0.95 36.6

11 T 1576 3.5 0.469 17.2 LOS B 22.5 162.0 0.58 0.52 39.2

12 R 142 3.5 0.961 88.2 LOS F 11.3 81.6 1.00 0.85 17.5

Approach 1788 3.5 0.961 23.1 LOS B 22.5 162.0 0.61 0.57 35.6

All Vehicles 5550 3.5 0.963 49.5 LOS D 106.0 764.2 0.87 0.90 24.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 14.5 LOS B 0.1 0.1 0.43 0.43

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 14.5 LOS B 0.1 0.1 0.43 0.43

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 44.3 LOS E 0.69 0.69

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:19 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 200: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 19 99 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 25 105 30

Phase Split 16 % 66 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:19 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 201: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.145 48.4 LOS D 2.8 20.3 0.75 0.73 26.0

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.145 53.2 LOS D 2.8 20.3 0.78 0.72 24.6

East: Camden Valley Way (NE)

4 L 39 3.5 0.029 8.2 LOS A 0.2 1.5 0.11 0.62 49.2

5 T 3682 3.5 0.959 48.5 LOS D 107.8 777.6 1.00 1.06 24.7

Approach 3721 3.5 0.959 48.1 LOS D 107.8 777.6 0.99 1.05 24.8

West: Camden Valley Way (SW)

11 T 1887 3.5 0.439 7.4 LOS A 17.4 125.4 0.40 0.36 48.3

12 R 114 3.5 0.916 102.7 LOS F 6.5 47.0 1.00 0.91 15.7

Approach 2001 3.5 0.916 12.8 LOS A 17.4 125.4 0.43 0.39 43.2

All Vehicles 5787 3.5 0.959 35.9 LOS C 107.8 777.6 0.79 0.82 29.1

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.1 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:19 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 202: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak [3pc growth] Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 7 108 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 13 114 33

Phase Split 8 % 71 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:19 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 203: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 PM Peak (3.0pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.875 18.0 LOS B 21.0 151.7 1.00 1.20 39.1

6 R 532 3.5 0.875 25.9 LOS B 21.0 151.7 1.00 1.20 37.3

Approach 942 3.5 0.875 22.4 LOS B 21.0 151.7 1.00 1.20 38.0

North: Denham Court Road (N)

7 L 416 3.5 0.339 5.9 LOS A 2.4 17.5 0.47 0.52 49.5

9 R 424 3.5 0.310 12.1 LOS A 2.2 16.0 0.44 0.64 45.0

Approach 840 3.5 0.339 9.0 LOS A 2.4 17.5 0.45 0.58 47.0

West: Precinct (W)

10 L 182 3.5 0.407 8.3 LOS A 3.4 24.9 0.85 0.74 47.5

11 T 176 3.5 0.407 6.9 LOS A 3.4 24.9 0.85 0.67 47.2

Approach 358 3.5 0.407 7.6 LOS A 3.4 24.9 0.85 0.71 47.4

All Vehicles 2140 3.5 0.875 14.7 LOS B 21.0 151.7 0.76 0.87 42.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 11:23:52 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (3pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 204: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 31 3.5 0.172 54.5 LOS D 1.8 12.9 0.78 0.71 24.2

2 T 92 3.5 0.264 59.8 LOS E 6.1 44.0 0.90 0.71 21.6

3 R 142 3.5 1.000 3 87.1 LOS F 11.3 81.6 1.00 0.80 17.9

Approach 265 3.5 1.000 73.8 LOS F 11.3 81.6 0.94 0.76 19.7

East: Camden Valley Way (E)

24 L 80 3.5 0.108 11.6 LOS A 0.7 5.4 0.13 0.63 45.7

25 T 1823 3.5 0.603 19.5 LOS B 23.6 170.5 0.55 0.50 37.7

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 1911 3.5 0.603 19.5 LOS B 23.6 170.5 0.54 0.51 37.8

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 21 3.5 1.096 280.3 LOS F 8.7 62.8 1.00 1.31 6.8

9 R 217 3.5 1.096 286.3 LOS F 30.7 221.2 1.00 1.55 6.9

Approach 246 3.5 1.096 278.2 LOS F 30.7 221.2 0.99 1.50 7.0

West: Camden Valley Way (W)

30 L 249 3.5 0.241 12.1 LOS A 2.7 19.5 0.15 0.64 45.3

31 T 3458 3.5 1.144 315.5 LOS F 227.9 1643.3 1.00 2.18 6.1

32 R 13 3.5 0.192 93.0 LOS F 1.0 7.4 0.99 0.68 17.0

Approach 3720 3.5 1.144 294.4 LOS F 227.9 1643.3 0.94 2.07 6.5

All Vehicles 6142 3.5 1.144 198.7 LOS F 227.9 1643.3 0.82 1.50 9.2

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 22.6 LOS C 0.1 0.1 0.53 0.53

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 22.6 LOS C 0.1 0.1 0.53 0.53

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 48.3 LOS E 0.75 0.75

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:56 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 205: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 85 15 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 91 21 0 36

Phase Split 8 % 57 % 13 % 0 % 23 %

Page 206: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:56 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 207: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 179 3.5 0.593 47.4 LOS D 9.9 71.6 0.77 0.77 26.3

2 T 293 3.5 0.367 57.8 LOS E 9.8 70.9 0.90 0.74 22.3

3 R 298 3.5 1.019 169.4 LOS F 18.0 129.8 1.00 1.33 10.8

Approach 770 3.5 1.019 98.6 LOS F 18.0 129.8 0.91 0.97 16.1

East: Camden Valley Way (NE)

4 L 641 3.5 0.950 44.0 LOS D 34.0 244.8 0.95 0.91 27.4

5 T 1418 3.5 0.532 31.7 LOS C 25.6 184.6 0.76 0.68 30.8

6 R 75 3.5 0.555 95.3 LOS F 3.1 22.3 1.00 0.74 16.8

Approach 2134 3.5 0.950 37.7 LOS C 34.0 244.8 0.83 0.75 28.9

North: Ingleburn Rd (NW)

7 L 79 3.5 0.239 54.4 LOS D 4.6 33.3 0.80 0.75 24.3

8 T 321 3.5 0.423 60.2 LOS E 10.9 78.9 0.92 0.76 21.9

9 R 81 3.5 0.327 86.8 LOS F 3.1 22.5 0.99 0.74 18.0

Approach 481 3.5 0.423 63.7 LOS E 10.9 78.9 0.91 0.75 21.4

West: Camden Valley Way (SW)

10 L 120 3.5 0.104 19.4 LOS B 3.5 25.4 0.41 0.69 39.4

11 T 3321 3.5 1.099 257.1 LOS F 195.0 1405.7 1.00 1.91 7.4

12 R 322 3.5 0.893 98.5 LOS F 14.1 101.8 1.00 1.01 16.4

Approach 3763 3.5 1.099 235.9 LOS F 195.0 1405.7 0.98 1.80 7.9

All Vehicles 7148 3.5 1.099 150.4 LOS F 195.0 1405.7 0.92 1.33 11.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 33.2 LOS D 0.2 0.2 0.64 0.64

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P7 Across W approach 53 72.2 LOS F 0.2 0.2 0.95 0.95

All Pedestrians 212 51.6 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:15:51 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 208: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 6 4 75 11 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 12 10 81 17 2 38

Phase Split 8 % 6 % 51 % 11 % 1 % 24 %

Page 209: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:15:51 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 210: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 142 3.5 0.659 72.1 LOS F 17.3 124.8 0.98 0.84 20.4

2 T 98 3.5 0.659 63.8 LOS E 17.3 124.8 0.98 0.82 20.5

3 R 150 3.5 1.000 3 78.2 LOS F 11.3 81.6 1.00 0.82 19.1

Approach 390 3.5 1.000 72.4 LOS F 17.3 124.8 0.98 0.83 19.9

East: Camden Valley Way (NE)

4 L 72 3.5 0.471 23.6 LOS B 22.2 159.9 0.55 0.95 37.8

5 T 1648 3.5 0.471 15.3 LOS B 22.3 161.0 0.55 0.50 40.6

6 R 22 3.5 0.325 94.4 LOS F 1.8 12.9 1.00 0.71 16.7

Approach 1742 3.5 0.471 16.6 LOS B 22.3 161.0 0.56 0.52 39.8

North: Heath Rd (NW)

7 L 17 3.5 0.154 67.5 LOS E 3.4 24.6 0.88 0.78 21.5

8 T 35 3.5 0.154 59.2 LOS E 3.4 24.6 0.88 0.67 21.8

9 R 40 3.5 0.410 89.9 LOS F 3.2 22.8 1.00 0.74 17.3

Approach 92 3.5 0.410 74.1 LOS F 3.4 24.6 0.93 0.72 19.6

West: Camden Valley Way (SW)

10 L 87 3.5 0.974 69.4 LOS E 120.4 868.3 1.00 1.10 21.4

11 T 3648 3.5 0.974 60.9 LOS E 120.7 870.1 1.00 1.11 21.6

12 R 61 3.5 0.492 88.8 LOS F 4.8 34.5 1.00 0.76 17.4

Approach 3796 3.5 0.974 61.6 LOS E 120.7 870.1 1.00 1.10 21.5

All Vehicles 6020 3.5 1.000 49.5 LOS D 120.7 870.1 0.87 0.91 24.6

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

3 x = 1.00 due to short lane. Refer to the Lane Summary report for information about excess flow and related conditions.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.8 LOS B 0.1 0.1 0.40 0.40

P3 Across E approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

P5 Across N approach 53 10.9 LOS B 0.1 0.1 0.37 0.37

P7 Across W approach 53 70.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 41.1 LOS E 0.66 0.66

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 211: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C Output Sequence: A, A1, B, C Phase Timing Results

Phase A A1 B C

Green Time (sec) 6 0 103 28

Yellow Time (sec) 4 4 4 4

All-Red Time (sec) 2 2 2 2

Phase Time (sec) 12 5 109 34

Phase Split 8 % 3 % 68 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 212: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 114 3.5 0.327 14.8 LOS B 3.5 25.1 0.43 0.72 42.9

3 R 39 3.5 0.071 67.6 LOS E 1.4 10.2 0.87 0.71 21.1

Approach 153 3.5 0.327 28.2 LOS B 3.5 25.1 0.55 0.72 34.0

East: Camden Valley Way (NE)

4 L 17 3.5 0.012 8.0 LOS A 0.1 0.5 0.09 0.61 49.3

5 T 2005 3.5 0.517 13.1 LOS A 25.0 180.2 0.53 0.49 42.4

Approach 2022 3.5 0.517 13.1 LOS A 25.0 180.2 0.53 0.49 42.5

West: Camden Valley Way (SW)

11 T 4020 3.5 0.934 22.1 LOS B 90.6 653.4 0.91 0.90 35.4

12 R 48 3.5 0.455 94.6 LOS F 2.5 18.2 1.00 0.71 16.7

Approach 4068 3.5 0.934 23.0 LOS B 90.6 653.4 0.91 0.89 34.9

All Vehicles 6243 3.5 0.934 19.9 LOS B 90.6 653.4 0.78 0.76 37.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 11.6 LOS B 0.1 0.1 0.38 0.38

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 213: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 AM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 AM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 6 109 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 12 115 33

Phase Split 8 % 72 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 214: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 AM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 AM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 176 3.5 0.346 4.5 LOS A 2.4 17.1 0.47 0.43 49.9

6 R 227 3.5 0.346 12.4 LOS A 2.4 17.1 0.47 0.74 46.1

Approach 403 3.5 0.346 9.0 LOS A 2.4 17.1 0.47 0.61 47.6

North: Denham Court Road (N)

7 L 1051 3.5 0.932 22.7 LOS B 28.3 204.3 1.00 1.32 37.1

9 R 182 3.5 0.264 14.7 LOS B 1.6 11.2 0.66 0.79 44.0

Approach 1233 3.5 0.932 21.5 LOS B 28.3 204.3 0.95 1.25 38.0

West: Precinct (W)

10 L 424 3.5 0.718 7.9 LOS A 8.5 61.3 0.76 0.69 48.1

11 T 410 3.5 0.718 6.5 LOS A 8.5 61.3 0.76 0.65 48.0

Approach 834 3.5 0.718 7.2 LOS A 8.5 61.3 0.76 0.67 48.0

All Vehicles 2470 3.5 0.932 14.6 LOS B 28.3 204.3 0.81 0.95 42.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 10:16:06 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 215: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Cowpasture Rd (S)

1 L 13 3.5 0.072 53.8 LOS D 0.7 5.3 0.77 0.68 24.4

2 T 21 3.5 0.059 56.8 LOS E 1.3 9.6 0.85 0.62 22.7

3 R 80 3.5 0.710 92.3 LOS F 6.5 47.1 1.00 0.83 17.2

Approach 114 3.5 0.710 81.4 LOS F 6.5 47.1 0.95 0.77 18.6

East: Camden Valley Way (E)

24 L 186 3.5 0.254 12.7 LOS A 1.9 13.8 0.17 0.64 44.7

25 T 4054 3.5 1.267 529.8 LOS F 356.8 2572.5 1.00 2.91 3.8

26 R 8 3.5 0.118 92.3 LOS F 0.6 4.5 0.98 0.66 17.1

Approach 4248 3.5 1.267 506.3 LOS F 356.8 2572.5 0.96 2.81 4.0

North: Cowpasture Road (N)

7 L 8 3.5 0.071 53.6 LOS D 0.5 3.3 0.76 0.66 24.5

8 T 48 3.5 1.260 567.6 LOS F 22.2 159.8 1.00 1.80 3.6

9 R 180 3.5 1.260 573.3 LOS F 36.4 262.2 1.00 1.98 3.6

Approach 236 3.5 1.260 554.5 LOS F 36.4 262.2 0.99 1.90 3.7

West: Camden Valley Way (W)

30 L 163 3.5 0.156 11.8 LOS A 1.6 11.8 0.14 0.64 45.5

31 T 1734 3.5 0.542 15.2 LOS B 18.6 133.9 0.46 0.41 41.0

32 R 31 3.5 0.459 94.8 LOS F 2.5 18.2 1.00 0.72 16.8

Approach 1928 3.5 0.542 16.2 LOS B 18.6 133.9 0.44 0.44 40.4

All Vehicles 6526 3.5 1.267 355.8 LOS F 356.8 2572.5 0.81 2.04 5.5

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P11 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 20.0 LOS B 0.1 0.1 0.50 0.50

P15 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 47.1 LOS E 0.73 0.73

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 216: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Cowpasture Rd

Camden Valley Way / Cowpasture Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond (phase reduction applied) Input Sequence: A, A1, B, C, C1, D Output Sequence: A, B, C, C1, D Phase Timing Results

Phase A B C C1 D

Green Time (sec) 6 90 10 0 30

Yellow Time (sec) 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2

Phase Time (sec) 12 96 16 0 36

Phase Split 8 % 60 % 10 % 0 % 23 %

Page 217: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:58 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 218: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Denham Court Rd (SE)

1 L 179 3.5 0.624 52.3 LOS D 10.5 76.0 0.81 0.78 24.8

2 T 421 3.5 0.515 59.2 LOS E 14.7 105.8 0.93 0.78 21.9

3 R 242 3.5 1.072 246.2 LOS F 18.1 130.3 1.00 1.44 7.9

Approach 842 3.5 1.072 111.4 LOS F 18.1 130.3 0.93 0.97 14.7

East: Camden Valley Way (NE)

4 L 447 3.5 0.617 22.8 LOS B 16.7 120.2 0.53 0.75 37.1

5 T 3578 3.5 1.184 404.7 LOS F 268.6 1936.9 1.00 2.46 4.9

6 R 164 3.5 0.520 85.1 LOS F 6.3 45.5 1.00 0.78 18.2

Approach 4189 3.5 1.184 351.5 LOS F 268.6 1936.9 0.95 2.21 5.6

North: Ingleburn Rd (NW)

7 L 84 3.5 0.239 48.1 LOS D 4.6 32.9 0.75 0.74 26.1

8 T 346 3.5 0.456 60.7 LOS E 11.9 85.7 0.93 0.77 21.8

9 R 65 3.5 0.412 92.7 LOS F 2.6 18.9 1.00 0.73 17.2

Approach 495 3.5 0.456 62.7 LOS E 11.9 85.7 0.91 0.76 21.6

West: Camden Valley Way (SW)

10 L 74 3.5 0.071 22.9 LOS B 2.4 17.6 0.46 0.69 37.1

11 T 1516 3.5 0.533 28.7 LOS C 26.3 189.8 0.73 0.66 32.2

12 R 227 3.5 1.119 325.9 LOS F 20.2 146.0 1.00 1.56 6.1

Approach 1817 3.5 1.119 65.6 LOS E 26.3 189.8 0.76 0.77 21.0

All Vehicles 7343 3.5 1.184 233.7 LOS F 268.6 1936.9 0.90 1.62 8.0

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 27.0 LOS C 0.1 0.1 0.58 0.58

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 30.0 LOS D 0.1 0.1 0.61 0.61

P7 Across W approach 53 71.3 LOS F 0.2 0.2 0.94 0.94

All Pedestrians 212 50.6 LOS E 0.78 0.78

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Monday, 4 June 2012 10:16:24 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 219: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Denham Ct Rd

Camden Valley Way / Denham Court Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, A1, B, C, C1, D Output Sequence: A, A1, B, C, C1, D Phase Timing Results

Phase A A1 B C C1 D

Green Time (sec) 9 0 80 7 0 32

Yellow Time (sec) 4 4 4 4 4 4

All-Red Time (sec) 2 2 2 2 2 2

Phase Time (sec) 15 5 86 13 3 38

Phase Split 9 % 3 % 54 % 8 % 2 % 24 %

Page 220: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Monday, 4 June 2012 10:16:24 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 221: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: Heath Rd (SE)

1 L 61 3.5 0.306 70.4 LOS E 6.6 47.3 0.92 0.79 20.7

2 T 35 3.5 0.306 62.1 LOS E 6.6 47.3 0.92 0.73 20.9

3 R 72 3.5 0.477 84.0 LOS F 5.5 39.6 0.99 0.78 18.2

Approach 168 3.5 0.477 74.5 LOS F 6.6 47.3 0.95 0.77 19.6

East: Camden Valley Way (NE)

4 L 167 3.5 1.029 141.9 LOS F 169.5 1222.4 1.00 1.40 12.5

5 T 3668 3.5 1.029 133.3 LOS F 170.4 1228.8 1.00 1.42 12.6

6 R 23 3.5 0.157 83.6 LOS F 1.7 12.3 0.96 0.72 18.2

Approach 3858 3.5 1.029 133.4 LOS F 170.4 1228.8 1.00 1.41 12.6

North: Heath Rd (NW)

7 L 23 3.5 0.362 73.7 LOS F 7.3 52.7 0.94 0.81 20.4

8 T 81 3.5 0.362 65.4 LOS E 7.3 52.7 0.94 0.75 20.6

9 R 84 3.5 0.593 83.8 LOS F 6.4 46.5 0.99 0.79 18.2

Approach 188 3.5 0.593 74.6 LOS F 7.3 52.7 0.96 0.77 19.4

West: Camden Valley Way (SW)

10 L 70 3.5 0.496 23.0 LOS B 23.8 171.7 0.55 0.96 38.2

11 T 1780 3.5 0.496 14.7 LOS B 23.9 172.7 0.55 0.50 41.1

12 R 142 3.5 0.970 90.4 LOS F 11.5 83.1 1.00 0.80 17.2

Approach 1992 3.5 0.970 20.4 LOS B 23.9 172.7 0.58 0.54 37.3

All Vehicles 6206 3.5 1.029 93.7 LOS F 170.4 1228.8 0.86 1.10 16.4

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P5 Across N approach 53 12.0 LOS B 0.1 0.1 0.39 0.39

P7 Across W approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 212 43.1 LOS E 0.68 0.68

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:06:59 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 222: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/Heath Rd

Camden Valley Way / Heath Rd 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Diamond Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 13 105 24

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 19 111 30

Phase Split 12 % 69 % 19 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:06:59 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 223: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time)

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

South: St Andrew's Rd (SE)

1 L 48 3.5 0.147 54.3 LOS D 2.9 21.0 0.78 0.69 24.3

3 R 17 3.5 0.031 66.9 LOS E 0.6 4.3 0.86 0.68 21.3

Approach 65 3.5 0.147 57.6 LOS E 2.9 21.0 0.80 0.69 23.4

East: Camden Valley Way (NE)

4 L 39 3.5 0.029 8.1 LOS A 0.2 1.4 0.10 0.62 49.2

5 T 4197 3.5 1.083 216.6 LOS F 232.7 1677.6 1.00 1.79 8.5

Approach 4236 3.5 1.083 214.7 LOS F 232.7 1677.6 0.99 1.78 8.6

West: Camden Valley Way (SW)

11 T 2117 3.5 0.492 7.9 LOS A 20.8 149.7 0.42 0.39 47.7

12 R 114 3.5 1.069 188.4 LOS F 10.6 76.4 1.00 1.11 9.7

Approach 2231 3.5 1.069 17.1 LOS B 20.8 149.7 0.45 0.43 39.8

All Vehicles 6532 3.5 1.083 145.6 LOS F 232.7 1677.6 0.81 1.31 11.8

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

SIDRA Standard Delay Model used.

Movement Performance - Pedestrians

Mov ID

Description Demand

Flow Average

Delay Level of Service

Average Back of Queue Prop. Queued

Effective Stop Rate Pedestrian Distance

ped/h sec ped m per ped

P1 Across S approach 53 11.6 LOS B 0.1 0.1 0.38 0.38

P3 Across E approach 53 74.1 LOS F 0.2 0.2 0.96 0.96

P7 Across W approach 53 73.2 LOS F 0.2 0.2 0.96 0.96

All Pedestrians 159 53.0 LOS E 0.77 0.77

Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)

Pedestrian movement LOS values are based on average delay per pedestrian movement.

Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.

Processed: Thursday, 31 May 2012 3:07:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

� �

Page 224: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

PHASING SUMMARY Site: 2036 PM Camden Valley Wy/St Andrews Rd

Camden Valley Way / St Andrews Road 2036 PM Peak (4.4pc growth) Signals - Fixed Time Cycle Time = 160 seconds (User-Given Cycle Time) Phase times determined by the program Sequence: Two-Phase Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results

Phase A B C

Green Time (sec) 6 109 27

Yellow Time (sec) 4 4 4

All-Red Time (sec) 2 2 2

Phase Time (sec) 12 115 33

Phase Split 8 % 72 % 21 %

Normal Movement Permitted/Opposed

Slip-Lane Movement Opposed Slip-Lane

Stopped Movement Continuous Movement

Turn On Red Undetected Movement

Phase Transition Applied

Processed: Thursday, 31 May 2012 3:07:00 PM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE

Page 225: Traffic Assessment part 3a · ID Description Demand Flow Average Delay Level of Service Average Back of Queue Prop. Queued Effective Pedestrian Distance Stop Rate ped/h sec ped m

MOVEMENT SUMMARY Site: 2036 PM Denham Court Rd/Precinct

Denham Court Road / East Leppington Precinct 2036 PM Peak (4.4pc growth) Roundabout

Movement Performance - Vehicles

Mov ID Turn Demand Flow

HV Deg. Satn Average Delay

Level of Service

95% Back of Queue Prop. Queued

Effective Stop Rate

Average Speed Vehicles Distance

veh/h % v/c sec veh m per veh km/h

East: Denham Court Road (E)

5 T 410 3.5 0.948 31.1 LOS C 36.6 263.6 1.00 1.59 31.7

6 R 609 3.5 0.948 39.0 LOS C 36.6 263.6 1.00 1.59 31.0

Approach 1019 3.5 0.948 35.8 LOS C 36.6 263.6 1.00 1.59 31.2

North: Denham Court Road (N)

7 L 476 3.5 0.348 5.7 LOS A 2.6 18.9 0.46 0.51 49.5

9 R 424 3.5 0.351 12.3 LOS A 2.6 18.5 0.48 0.65 44.8

Approach 900 3.5 0.351 8.8 LOS A 2.6 18.9 0.47 0.58 47.1

West: Precinct (W)

10 L 182 3.5 0.448 9.1 LOS A 3.9 28.3 0.92 0.81 47.2

11 T 176 3.5 0.448 7.7 LOS A 3.9 28.3 0.92 0.75 46.7

Approach 358 3.5 0.448 8.4 LOS A 3.9 28.3 0.92 0.78 46.9

All Vehicles 2277 3.5 0.948 20.8 LOS B 36.6 263.6 0.78 1.06 38.3

Level of Service (LOS) Method: Delay (RTA NSW).

Vehicle movement LOS values are based on average delay per movement

Intersection and Approach LOS values are based on average delay for all vehicle movements.

Roundabout Capacity Model: SIDRA Standard.

SIDRA Standard Delay Model used.

Processed: Monday, 4 June 2012 11:26:07 AM SIDRA INTERSECTION 5.1.11.2079

Copyright © 2000-2011 Akcelik and Associates Pty Ltd www.sidrasolutions.com

Project: N:\Traffic\PROJECTS\Current\600319 East Leppington\Analysis\SIDRA\600319 2036 Intersection Analysis (4.4pc growth).sip 8000955, CARDNO, ENTERPRISE