Tracking Utility Performance Using Interconnection Reporting
Gerry BinghamDOER
National Grid
National Grid
This gap suggests a discrepancy in the reporting: Authorizations preceding Sent ISA’s.
NSTAR
NSTAR
What explains the drop in ISA’s? The 12-Point Verification email announced clock stopped until customer affirms requirements.
WMECo
Unitil
National Grid
Not all projects are reported:Numerous Authorized Projects have blanks in the “ISA Sent” field.
NSTAR
WMECo
Unitil