Reporting for a department function which responsible for overall spectrum of quality management and improvement.

Citation preview

  • Total Quality Management

    Wan Suffian Bin Wan Mansor

    Quarter 1 Report (Feb ~Apr 15)

  • Regional Best Power System Solution Provider

    Report Outline

    1. QMS Program Updates

    2. Quality Assurance & Control

    2.1 Status of CA and PA

    2.2 New Procedure

    2.3 Equipment Calibration Status

    2.4 Incoming Product Quality

    2.5 In-process Product Quality

    2.6 Outgoing Product Quality

    2.7 Control of Nonconforming Material

    3. ADP Status

  • Regional Best Power System Solution Provider

    1. QMS Program Update

    No QMS Program No. of

    Milestone

    No. of

    milestone

    should

    start

    Milestone Status Remark

    Started Completed

    1 Quality

    Environment (5S)

    11 4 1. Review 5S

    Policy and

    Objectives

    Set the direction of 5S

    activity

    2. Define roles &

    responsibility for

    5S structure

    To ensure each

    committee understand

    their roles and responsibility

    3. Review 5S Audit

    Evaluation

    Criteria -

    4. Main Committee

    Meeting

    1st meeting 22/4/15.

    Participation 44.4%.

    2 SIRIM

    Recertification

    11 3 1. Reply SIRIM NCR -

    2. Prepare and

    submit evidence

    for SIRIM NCR

    In-progress. To submit

    1st week of June

    3. Establish/review

    procedure -

    3 My Idea (Employee

    Suggestion

    Scheme)

    8 0 - - - Start 1st milestone end

    of May 2015

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.1 Status of CA and PA

    No Corrective Actions Source Deadline Responsibility Implementation

    Status

    Remark

    1 Review customer satisfaction

    survey WI

    Internal Audit 6/3/2015 Nadia Not started

    Coaching by WSM

    2 Establish WI for tendering

    performance data analysis

    Internal Audit 6/3/2015 Noorhayati Not started

    Coaching by WSM

    3 Establish WI for Training Need

    Analysis

    Internal Audit 25/3/2015 Noraini Not started

    Coaching by WSM

    4 Improve Training Effectiveness

    Evaluation form

    Internal Audit 9/3/2015 Noraini

    Done Need to review the

    effectiveness of change

    5 Establish Design procedure SIRIM Audit 29/5/2015 Wan Suffian

    Not started -

    6 Brief all employee involved in

    Purchased Material Receiving &

    Inspection procedure

    SIRIM Audit 17/4/2015

    Al-Hafiz Done -

    7 Revise Control of Document

    procedure

    SIRIM Audit 11/5/2015 Wan Suffian In-progress -

    8 Set planned interval for Project

    Monthly Meeting which is on the

    2nd week of every month

    SIRIM Audit 14/4/2015

    Hamdan Not started

    Coaching by WSM

    9 Establish Monthly Project Status

    Report which is in-line with Project

    Quality Plan

    SIRIM Audit 30/4/2015

    Hamdan Not started

    -

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.2 New Procedure

    No new procedure established.

  • Regional Best Power System Solution Provider R

    EP

    AIR

    No Equipment Problem Action Findings

    Remark

    1 -NIL-

    2 -NIL-

    2. Quality Assurance and Control

    2.3 Equipment Maintenance

    Testing Equipment

    PU

    RC

    HA

    SE

    No Equipment/Accessories Reason for Purchase Quantity

    1 -NIL-

    2 -NIL-

    3 -NIL-

    CA

    LIB

    RA

    TE

    No Equipment Cost

    (RM) Quantity

    1 DIGITAL EARTH TESTER 160.00 1

    2 DIGITAL MULTIMETER FLUKE 110.00 2

    3 DIGITAL CLAMP METER 120.00 1

    4 AC/DC INSULATION TESTER 200.00 1

    5 DIGITAL CALIPER 35.00 1

    TOTAL + GST(6%) 662.50

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.4 In-coming Product Quality

    267

    83.7% 79.3%

    29.8%

    8.3% 0.0% 0.0%

    4.9%

    40.4%

    0

    50

    100

    150

    200

    250

    300

    350

    400

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Sept '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15

    Qu

    an

    tity

    Rec

    eiv

    ed

    Rate

    , %

    Month

    In-coming Enclosure Defective Rate Trend

    Project Supplier Problem Qty

    (defect) Counter Measure

    RCB

    (1556/2014)

    Detik

    Kreatif

    Pre-punch holes for nameplate at

    front door did not match with

    nameplate size. 72

    Install longer nameplate to

    cover holes .

    KTPC

    Paint coating thickness below 60m

    at door and roof. 36 Change door and roof.

    Inner door scratch and bending 20 Change inner door

    RCB details:

    50 Units from KTPC 217 Units from Detik Kreatif

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.4 In-coming Product Quality

    0 0 0 0 0

    18

    3.2%

    11.2%

    6.8%

    0.0%

    05101520253035404550

    0%2%4%6%8%

    10%12%14%16%18%20%

    Aug '14 Sept '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mac '15 Apr '15

    Qu

    an

    tity

    Re

    ce

    ive

    d

    % R

    ati

    o

    Month

    In-coming Annunciator Defective Rate Trend

    0 0 0 0 0 0 0.0%

    25.6%

    05101520253035404550

    0.0%

    5.0%

    10.0%

    15.0%

    20.0%

    25.0%

    30.0%

    Aug '14 Sept '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mac '15 Apr '15

    Qu

    an

    tity

    Rec

    eiv

    ed

    % R

    ati

    o

    Month

    Illuminated Push Button Defective Rate Trend

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.5 In-process Product Quality

    Month

    Rela

    y

    Rela

    y b

    ase

    Cam

    Rota

    ry

    Sw

    itch

    Ann

    un

    cia

    tor

    Illu

    min

    ate

    d p

    ush

    butt

    on

    C

    ha

    ng

    e O

    ve

    r

    Sw

    itch

    Lig

    ht In

    dic

    ato

    r

    AU

    X C

    on

    tact

    Lam

    p b

    ulb

    Am

    me

    ter

    Enclo

    sure

    Sem

    aph

    ore

    Tra

    nsd

    uce

    r

    Feb 15 0 0 0 0 0 0 0 0 0 0 0 0 0

    Mar 15 2 1 2 0 0 0 0 0 0 0 9 0 0

    Apr 15 6 1 0 1 0 0 0 0 0 0 3 2 1

    Q1 15 8 2 2 1 0 0 0 0 0 0 12 2 1

    68

    13

    0

    14 14

    28

    0

    10

    20

    30

    40

    50

    60

    70

    80

    Q3'14

    Q4'14

    Feb'15

    Mar'15

    Apr'15

    Q1'15

    Qu

    an

    tity

    Month

    Material Defect during In-Process Trend

    Item Supplier Problem Qty

    RCB Enclosure Internal Earthings stud broken 3

    Annunciator 14W Datmeltech Hang 1

    Relay 541 Alstom Relay always booting 1

    Semaphore TMS Indicator not

    functioning 2

    Relay 1P & 2P Schneider Not functioning 5

    Transducer TMS Output nor accurate 1

    Base relay Schneider Screw loose at

    terminal 14 1

    Highlights

    Earthings stud broken while tighten the nut.

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.6 From Site Product Quality

    Q1-2015

    Defect

    PPU/SSU

    Total PPU Pinji

    Lane

    PPU

    Bangunan

    MAS baru

    PPU

    33/11kV

    Bangsar

    South

    PMU

    Cheras

    Jaya

    SSU Lion

    Eco

    PPU

    Hospital

    Rehab

    SSU IDP

    Pengerang

    COMPONENT FAULTY

    Annunciator - - - 14 - - - 14

    Relay - - - - - - 2 2

    Resistor - - 1 - 1 - - 2

    Bulb - - 1 - - - - 1

    Trip link - - - 4 - 1 - 5

    Isolator switch - - - - 1 - - 1

    Terminal block - - - - - 1 - 1

    Heater - - - 1 - - 1

    WRONG LABEL - - - - - 1 - 1

    MISSING LABEL/NAME PLATE 1 1 8 4 6 - - 18

    MISS COMPONENT

    Terminal block - - - - 2 - - 2

    Comb link 1 - 12 - - - - 12

    Bulb - 12 - - - - - 12

    DRAWING RELATED 1 1 - 1 - - 2

    3 13 23 23 11 3 2 74

    Bulb sent

    separately

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.6 From Site Product Quality

    Month

    Category

    Wro

    ng

    Lab

    el

    Mis

    sin

    g L

    ab

    e/

    Nam

    e P

    late

    Co

    mp

    on

    en

    t

    Fau

    lty

    Lo

    ose

    Wir

    e

    Mis

    s W

    irin

    g

    Dra

    win

    g

    Rela

    ted

    Mis

    s

    Co

    mp

    on

    en

    t**

    Q3 14 17 15 33 15 8 25 4

    Q4 14 7 12 30 0 0 2 10

    Feb 15 0 9 2 0 0 2 10

    Mar 15 1 9 27 0 0 0 4

    Apr 15 0 2 1 0 0 1 13

    Q1 15 1 20 30 0 0 3 27

    117

    61

    23

    41

    17

    81

    0

    20

    40

    60

    80

    100

    120

    140

    Q3 '14 Q4 '14 Feb'15

    Mar'15

    Apr'15

    Q1 '15

    No

    . o

    f D

    efe

    ct

    Month

    Defect from Site Trend

    ** Miss component category includes

    accessories

    Highlights

    Components Faulty category give the highest defective numbers for 3 consecutive quarter.

    Miss Component category trend is increasing. Missing bulb from PPU Bangunan

    Mas Baru is avoidable.

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.7 Control of Nonconforming Material

    ITEM QTY

    Transduser Amp 1

    Illuminated Push Button 5

    Base relay 4

    Selector Switch 8

    Discrepancy Switch 2

    Relay MVAX 1

    Indicator Bulb 1

    Semaphore 2

    Contactor Siemens 1

    Tranducer Datamax DMT-AL 3

    Resistor SR25 4KOJ 1

    Buzzer 5

    CT 3

    Tranducer DMT-R3U 1

    Power Supply Unit 1

    Contactor LS 1

    Relay P541 1

    Relay 1P & 2P 10

    Trip Counter 1

    Annunciator 2

    Terminal Block 3

    TOTAL 57

    ITEM QTY

    Magnetic counter 1

    Ammeter 2

    TOTAL 3

    ITEM QTY

    Resistor 25W 2KJ 38

    Relay Kuep 5

    Pilot Lamp 1

    Resistor SR25 1K5J 1

    Heater vitar 1

    Fuse link 1

    Lamp Holder 19

    Bulb Philip 18W 12

    Relay RSB 1A120BD 1

    Relay RSB 2A080BD 3

    Resistor 25W 2KJ 1

    TOTAL 83

    Supplier repair without cost

    Supplier repair with cost

    In-house repair

    In-house reuse

    Scrap

    Category

    Highlights

    Sending 5 unit of Relay MCAG14 to United Kingdom

    (UK) (total weight = 20kg) cost

    Matrix RM805.00 + RM103.22

    (insurance) using DHL.

    Sending 4 unit of Relay P541 & P542 to Singapore, cost Matrix

    RM 751.20 include insurance

    RM 94.00 using Nationwide

    Express

    ITEM QTY

    Relay MCAG 14 5

    Relay P541 3

    Relay P542 1

    TOTAL 9

  • Regional Best Power System Solution Provider

    2. Quality Assurance and Control

    2.7 Control of Nonconforming Material

    Disposal of Compact Fluorescent Light

    A 11W CFL bulb contains 2mg

    mercury and this will be go up in

    accordance with the bulb size Malaysia Regulation do not state that

    household need to

    properly dispose their

    CFL.

    No proper disposal and collection system

    available in Malaysia.

    Current initiative taken by IKEA Damansara

    for CFL processing

    before sending to

    Kualiti Alam

    PROPOSAL:

    1. Expanding the scope of Matrixs CSR by: 1) Provide a collection bin to collect

    used bulb.

    2) Encourage Matrixs employee to bring their used bulb from home to

    be disposed together.

    3) Send bulb to collection center at

    IKEA once reach certain quantity.

    or

    2. Collect all bulb in a sealed plastic bag to

    prevent dispersion of mercury and

    dispose in general waste bin.

  • Regional Best Power System Solution Provider

    3. ADP Status

    C1: EFFICIENT AND EFFECTIVE WORK

    # OF URGENT CALIBRATION

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 0 0 0 0 0 0 0 0 0 0 0

    Actual 1 1

    Definition Frequency of TQM members has to send or take test/measuring equipment on their own instead of by the service provider in a month.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Study the calibration scheduling

    and criticality for product testing of

    every measuring equipment.

    Done - Al-Hafiz 30/4

    30/4

    Upgrade MPSSB-QMS-WI-002-01

    Calibration Control of Measuring

    and Monitoring Equipment WI into

    Procedure

    In-

    progress

    Started. Al-Hafiz 29/5 29/5

    Action Items / Initiatives

    Details

    1.5

    8.7

    0

    0.5

    1

    1.5

    0

    5

    10

    Mar Apr

    No. Loss of

    manhour

    Month

    Loss of manhour

    Frequency

  • Regional Best Power System Solution Provider

    3. ADP Status

    C1: EFFICIENT AND EFFECTIVE WORK

    % OF DEFECT

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 10% 10% 10% 10% 10% 5% 5% 5% 5% 5% 5%

    Actual 24.0% 11.8%

    Definition The % of product defect at site from Wrong Label plus Missing Label category. The formula is (Wrong label quantity + Missing label quantity)/ Total defects x 100.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Develop before FAT physical

    inspection check sheet.

    Done Check sheet for CRP 33kV

    panel.

    Abd

    Hafiz

    28/2 28/2

    Establish before FAT physical

    inspection WI.

    Not

    started

    - Abd

    Hafiz

    30/3 15/5

    Obtain NIOSH-TNB safety passport

    for site investigation.

    Not

    started

    Need to confirm with HR on the

    training schedule.

    Abd

    Hafiz

    8/5 8/5

    Action Items / Initiatives

    Details

    17

    7 1

    15 12

    20

    0

    10

    20

    30

    Q3 '14 Q4 '14 Q1 '15

    Qu

    an

    tity

    Wrong Label

    Missing Label

    Moving Forward

    1. Study which and type of label that have high

    number of missing.

    2. Identify the causes of missing label.

  • Regional Best Power System Solution Provider

    3. ADP Status

    C1: EFFICIENT AND EFFECTIVE WORK

    # OF DEFECTIVE MATERIAL DURING PRODUCT TESTING

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 0 0 0 0 0 0 0 0 0 0 0

    Actual 2 10

    Definition The # of material found defective during assembly undetected during incoming inspection. Monitoring of this parameter will help to improve incoming inspection activity.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Establish incoming inspection WI

    for A-eberle AVR.

    In-

    progress

    Repaired AVR from Germany

    arrived used to develop WI.

    Al-Hafiz 30/4 30/4

    Review annunciator incoming

    inspection method.

    Not

    started

    Annunciator hang during in-

    house product testing.

    Annunciator has passed

    incoming inspection.

    Abd

    Hafiz

    29/5 29/5

    Action Items / Initiatives

    Details

    Defective materials: 1) 1 unit annunciator

    2) 1 unit relay P541 (Alstom)

    3) 2 units semaphore

    4) 1 units transducer

    5) 5 units relay 1P and 2P (Schneider)

    Moving Forward

    1. Revisit incoming inspection for transducer.

    2. Develop incoming inspection for semaphore .

  • Regional Best Power System Solution Provider

    3. ADP Status

    C1: EFFICIENT AND EFFECTIVE WORK

    % OF CORRECTIVE ACTIONS IMPLEMENTED

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 55 55 70 70 70 85 85 85 100 100 100

    Actual 11.1 22.2

    Definition Corrective actions identified after root cause analysis. It is one of improvement approach as stated in QMS ISO9001. The more corrective actions implemented the better quality system will be.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Scheduled follow up session with

    PIC responsible for corrective

    actions implementation.

    In-

    progress

    Follow up session need to be

    made for CAR issued during

    internal audit and NCR received

    from SIRIM.

    Wan

    Suffian

    28/2 15/5

    Provide guidance and coaching to

    the PIC responsible for corrective

    actions implementation.

    Not

    started

    Guidance and coaching will be

    based on scheduled session.

    Wan

    Suffian

    31/12 31/12

    Action Items / Initiatives

    Details

    As stated in section 2.1 Status of Corrective Actions

  • Regional Best Power System Solution Provider

    3. ADP Status

    I1: DOCUMENT AND IMPROVE WORK FLOW

    # OF PROCEDURE ESTABLISHED

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 0 1 1 0 1 1 1 0 1 0 0

    Actual 0 0

    Definition The number of procedure established inline with business processes to spell out the WHAT to do.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Identify already available work flow

    which documented in Work

    Instruction.

    Done - Wan

    Suffian

    23/2 23/2

    Conduct workshop to review

    workflow with process owner and

    involved person.

    Not

    started

    - Wan

    Suffian

    9/10 9/10

    Perform audit to assess the

    effectiveness of work processes.

    Not

    started

    - Wan

    Suffian

    31/12 31/12

    Action Items / Initiatives

    Details

    Swim lane for Control of Nonconforming Product process completed. The write up of the procedure is in progress.

  • Regional Best Power System Solution Provider

    3. ADP Status

    I2: IMPROVE MANAGEMENT OF INFORMATION & KNOWLEDGE

    # OF DATA REQUIRED COMPLETE WITH DEFINITION

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 1 1 1 1 1 1 1 1 1 1 1

    Actual 0 0

    Definition The few data identified will able to show the companys level of goals and objectives achievement based on target set during business planning.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Study the organizations goals and objectives.

    Completed - Wan

    Suffian

    30/4 30/4

    Benchmark with other Baldrige

    Winner for common data.

    Not started - Wan

    Suffian

    30/4 30/6

    Develop mechanism to collect data. Not started - Wan

    Suffian

    30/4 30/6

    Action Items / Initiatives

    Details

    Added Meeting Frequency as one of the data required for monitoring as commented by MD in last monthly meeting. Total no of data required for monitoring is 10.

  • Regional Best Power System Solution Provider

    3. ADP Status

    I2: IMPROVE MANAGEMENT OF INFORMATION & KNOWLEDGE

    FREQUENCY OF DATA UPDATE TO ALL EMPLOYEE

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 1 1 1 1 1 1 1 1 1 1 1

    Actual 4 4

    Definition The data sharing is an explicit method of information and knowledge sharing

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Install information boards at easily

    seen location.

    Not

    started

    Location identified beside 5S

    main board.

    Al-Hafiz 1/4 31/5

    Install LCD screen at strategic

    location.

    In

    progress

    LED screen surveyed. Cost

    estimated RM1,500.

    Al-Hafiz 31/5 31/5

    Upload all monthly report into the

    company server.

    Done Uploaded report for March 2015

    at Matrixinfo folder.

    Wan

    Suffian

    31/5 31/5

    Action Items / Initiatives

    Details

    -

  • Regional Best Power System Solution Provider

    3. ADP Status

    I2: IMPROVE MANAGEMENT OF INFORMATION & KNOWLEDGE

    FREQUENCY OF KNOWLEDGE SHARING

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target - - 1 1 1 1 1 1 1 1 1

    Actual - -

    Definition Explicit knowledge sharing where a person attended an external course or training came back and share on what he/she has learnt with the rest of the employee.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Propose reward and recognition for

    employees effort who share their knowledge and employees who

    attend the session.

    Not

    started

    - Wan

    Suffian

    28/3 15/5

    Prepare one year schedule for

    knowledge sharing session.

    In

    progress

    Schedule share knowledge

    session up to October 2015.

    Noraini 9/3 4/5

    Upload all presentation material

    into the company server for

    reference.

    Not

    started

    - Noraini 31/1/16 31/1/16

    Action Items / Initiatives

    Details

    First session for knowledge sharing will commence on May

  • Regional Best Power System Solution Provider

    3. ADP Status

    I4: ESTABLISH AND IMPROVE PROCESS MEASUREMENT

    % OF MEASURE ESTABLISHED

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target 30% 30% 50% 50% 50% 70% 70% 70% 90% 90% 90%

    Actual 15% 20%

    Definition Current Total number of processes in Product Realization is 20. Measured process get better control.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Search measures from kpi library

    website.

    Not

    started

    - Wan

    Suffian

    30/4 30/4

    Perform trial for each measures to

    ensure its appropriateness.

    Not

    started

    - Wan

    Suffian

    31/1/16 31/1/16

    Action Items / Initiatives

    Details

    Incoming inspection 3 days after material received FAT No. of FAT pass/fail Product Assembly Assembly lead time (e.g. CRP = 2 weeks) Purchasing % orders arrived on time = (Number of order arrived on time and in full) / (Total number of orders) x 100%

  • Regional Best Power System Solution Provider

    3. ADP Status

    I5: CREATE SAFETY AND HEALTH AWARENESS

    # OF SECTION COMPLIED

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target - 1 - - 1 - - 1 - - 1

    Actual - 0

    Definition The number of applicable section in OSHA,1994 whether in Act or their Regulations complied.

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Establish legal and other

    requirements register.

    In-

    progress

    Incomplete by trainee. Wan

    Suffian

    31/5 30/6

    Establish Safety & Health

    Committee.

    In-

    progress

    Proposal prepared by Al-Miqdad.

    In the process of reviewing.

    Wan

    Suffian

    10/4 31/5

    Action Items / Initiatives

    Details

    -

  • Regional Best Power System Solution Provider

    3. ADP Status

    L1: INCULCATE A3 THINKING

    # OF REPORTS/PROPOSALS FOLLOW PDCA APPROACH

    Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Target - 1 - 1 1 - 1 1 - 1 -

    Actual - 0

    Definition A report/proposal follow PDCA approach shows that the person preparing it is fully understand : 1) a problem that he/she is trying to solve, 2) program or project propose for review and approval

    S

    t

    a

    t

    u

    s

    U

    p

    d

    a

    t

    e

    s

    Initiatives Status Status Description Owner Original

    Due Date

    Current

    Due Date

    Standardize the report/proposal

    format.

    In-

    progress

    Need to review the format

    prepared by Al-Hafiz

    Al-Hafiz 1/5 30/6

    Conduct training on preparing

    report and proposal using PDCA

    approach

    In-

    progress

    - Wan

    Suffian

    16/6 16/6

    Post actual sample of report and

    proposal on information board for

    everybodys reference.

    In-

    progress

    - Wan

    Suffian

    25/12 25/12

    Action Items / Initiatives