167
TPS COMMISSIONING Laurence Court University of Texas MD Anderson Cancer Center 4/3/2017 1

TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Embed Size (px)

Citation preview

Page 1: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

TPS COMMISSIONINGLaurence Court

University of Texas MD Anderson Cancer Center

4/3/2017 1

Page 2: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Conflicts of interest

• Court receives funding from NIH, CPIRT, Varian and Elekta

4/3/2017 2

Page 3: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• Manufacturer manuals (Varian, Elekta,….)

• Khan, Physics of Radiation Therapy and similar

• IAEA reports

• AAPM MPPG5, TG106, TG119 and others (e.g. TG53)

Resources – your first task is to understand the algorithm and commissioning measurements

34/3/2017

Page 4: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Introduction

4/3/2017 4

Page 5: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Commissioning

• “bring (something newly produced, such as a factory or machine) into working condition”

• Acceptance

• Commissioning• Collect data about the treatment device – functionality

and beam data – and import into the TPS

• Create a calculation model

• Verify that everything works correctly• Dose calculations

• Other functionality

4/3/2017 5

Page 6: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Importance of correct TPS commissioning• Quality of Plan delivery depends on the accuracy

that the RTP system models the linac dosimetriccharacteristics

• Clinical outcomes depend on dose delivered which in turn depends on how accurately the RTP was benchmarked against the linac commissioning data

4/3/2017 6

Page 7: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

An incident from the Lessons learned from Accidental Exposures in radiotherapy, IAEA

4/3/2017 7

Page 8: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

From: World Health Organization, Radiotherapy Risk Profile, 20084/3/2017 8

Page 9: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 9

Page 10: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Acceptance Testing(happens before commissioning)

4/3/2017 10

Page 11: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Acceptance Testing

• Acceptance testing is performed by the physicist to ensure that the machine meets the product specifications and the purchase agreement.

• These tests are conducted according to the acceptance testing procedure agreed on between the manufacturer’s representative and the facility physicist.

• They can include a lot of functionality tests (can you calculate dose)

• They do not mean that the system is ready do use, or ready to correctly calculate patient doses

• After Acceptance, detailed beam data is needed to characterize the beam

4/3/2017 11

Page 12: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

AAPM TG534/3/2017 12

Page 13: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Example acceptance tests (Eclipse)

4/3/2017 13

Page 14: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Example Eclipse acceptance checklist4/3/2017 14

Page 15: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Example linac acceptance test• Photon Energy (100 SSD, 10x10 fs, depth of 10 cm in water)

• Deviation from stated value ± 3%, ± 3 mm

4/3/2017 15

Page 16: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Commissioning process

4/3/2017 16

Page 17: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

AAPM MEDICAL PHYSICS PRACTICE GUIDELINE # 5: Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams

• “practice guidelines”

• summary of what the AAPM considers prudent practice for what a clinical medical physics should do with respect to dose algorithm commissioning and validation

• Goals: • Summarize the minimum requirements for TPS dose

algorithm commissioning (including validation) and QA in a clinical setting

• Provide guidance on typical achievable tolerances and evaluation criteria for clinical implementation

4/3/2017 17

Page 18: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 18

Another chance to review the data

Page 19: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Machine description data

4/3/2017 19

Page 20: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Use forms and guidelines from the TPS manufacturer when available

4/3/2017 20

Page 21: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

From: Eclipse photon and electron algorithm guide 13.64/3/2017 21

Page 22: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Eclipse4/3/2017 22

Page 23: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Agility BLD • Agility is the Head of the linac, that contains all of the BLDs

Elekta Agililty BLD, from Elekta Clinical Mode Instructions for Use4/3/2017 23

Page 24: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 24

Page 25: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 25Collect all the information, then start to enter it in

Page 26: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 26

Page 27: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 27

Page 28: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 28

Page 29: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 29

Page 30: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Agility Diaphragms / Jaws• Elekta calls them Diaphragms

• Varian and Pinnacle call them Jaws

• Elekta allows them to move during a dynamic treatment

• Elekta has only one pair of Diaphragms• The MLCs replace the other pair of diaphragms

• MLCs are much thicker than Varian’s ( < 0.5% transmission + Leakage)

• Pinnacle handles this by assuming that the MLCs replace the diaphragms

• The “missing” jaws will still show up in the plan. But won’t be used.

4/3/2017 30

Page 31: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Beam data

4/3/2017 31

Page 32: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 32

Page 33: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Beam data requirements

• TPS data requirements are similar• but are vendor specific

• Also depend on the dose calculation algorithm

• Vendors generally provide good guidelines on what is needed for their TPS – sometimes some interpretation is needed.

• Follow their guidelines for what data is necessary, including measurement conditions

• For IMRT/VMAT, modeling of MLC is crucial

4/3/2017 33

Page 34: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

TG106 ‘typical commissioning measurements’

• Have a folder for each beam

• Label each file with the full data: “18MV 15deg in, 10x10 profile” etc.

344/3/2017

Page 35: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Pinnacle Minimum Data Requirements

Per Photon Energy:

19 PDDS

117 Profiles

14 Factors

PDD - jaw defined field size Profiles - jaw defined field size

Field Size Depth Field Size Depths Direction

5x5 5x5

10x10 10x10

20x20 20x20

30x30 30x30

40x40 40x40

20x5 20x5

5x20 5x20

PDD - MLC defined field size (jaws at 20x20) Profiles - MLC defined field size (jaws at 20x20)

Field Size Depth Field Size Depths Direction

2x2 2x2

3x3 3x3

5x5 5x5

10x10 10x10

15x15 15x15

Wedge PDD - MLC defined field size (jaws at 20x20) Wedge Profiles - MLC defined field size (jaws at 20x20)

Field Size Depth Field Size Depth Direction

5x5 5x5

10x10 10x10

15x15 15x15

20x20 20x20

40x30 40x30

Output Factors Wedge Factors

Field Size Field Size

2x2 2x2

5x5 5x5

10x10 10x10

20x20 20x20

30x30 30x30

40x40 40x30

0-25cm

dmax

5cm

10cm

20cm

inplane &

crossplane

inplane &

crossplane

inplane(all)

&

crossplane

(10cm only)

dmax

5cm

10cm

20cm

dmax

5cm

10cm

20cm

0-25cm

0-25cm

4/3/2017 35

Page 36: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Beam measurement data (Eclipse)4/3/2017 36

Page 37: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Mandatory vs. optional

Table based on Eclipse (Varian) requirements4/3/2017 37

Page 38: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data needed for Elekta TPS (Monaco, XiO)

4/3/2017 38

Page 39: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Monaco Data Requirements

From: Monaco Photon Beam Data Requirements etc4/3/2017 39

Page 40: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Electron density measurements

• MPPG5a recommends CT scanner-specific calibration curves• If you have more than one CT scanner, at least verify whether a single curve will do

4/3/2017 40

Page 41: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Experimental details

4/3/2017 41

Page 42: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

424/3/2017

Page 43: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG54/3/2017 43

Page 44: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG54/3/2017 44

Page 45: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Find center of the chamber

454/3/2017

Page 46: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Check setup

46

• Axis alignment (all directions) – can impact profiles

• Tank tilt (figure from TG106)

• Gantry tilt

4/3/2017

Page 47: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Beam Profiles Chamber orientation

4/3/2017 47

Page 48: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Electron measurements can be particularly sensitive to scanning parameters

• Tank scanning parameters –speed and undersampling can give suboptimal data, especially for low energy electron beams (TG106)

• High scanning speed can cause ripples so scanning probe sees varying depths

• If small volume ion chamber is used, then slower speeds can help smooth out statistical variations in signal

• Delay time: can be useful to delay time between subsequent points to avoid ripple effects

TG106484/3/2017

Page 49: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

494/3/2017

Page 50: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 50

Page 51: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data Review

4/3/2017 51

Page 52: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data Review

• Review data before and after entry into the planning system

1. Check for potential setup and measurement errors prior to importing data to TPS• Inverse square• Beam divergence• Expected changes with field size• PDDs

2. Compare data to reference dataset• Do for as much of the data as possible – not just PDDs

3. Re-evaluate data after entering into TPS• Check for import problems, mirroring of data, smoothing

4/3/2017 52

Page 53: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Use a second datasource• Data should be checked

against an independent source whenever possible• BJR-25

• Machine standard data

• Spot checks by an independent physicist (with independent equipment)

4/3/2017 53

Page 54: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

0.985

0.990

0.995

1.000

1.005

1.010

0 5 10 15 20 25 30 35

Rat

io o

f m

eas

ure

d P

DD

to

BJR

-25

(1

0 M

V)

Depth (cm)

10 MV PDD measured/BJR25 (machine 1)

4x4

5x5

6x6

8x8

10x10

12x12

15x15

20x20

25x25

30x30

35x35

40x40

4/3/2017 54

Page 55: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

0.960

0.965

0.970

0.975

0.980

0.985

0.990

0.995

1.000

1.005

0 5 10 15 20 25 30 35

Rat

io o

f m

eas

ure

d P

DD

to

BJR

-25

(1

0 M

V)

Depth (cm)

10 MV PDD measured/BJR25 (machine 2)

5x5

10x10

20x20

30x30

4/3/2017 55

Page 56: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data processing

4/3/2017 56

Page 57: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 57

Page 58: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Preparing Data for Modeling• Want our model to be based on good data.

• Measured Data has a certain amount of “noise”.

• Smoothing the data can remove noise• Care must be taken not to over-smooth the data

• This can alter how the data represents the beam

(Your data should not look as noisy as this!)

4/3/2017 58

Page 59: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data processing for wedges data (TG106)• Orientations – can

compromise data entry (TG106)

• Signal saturation –signal varies significantly from toe to heel of the wedges, so examine profiles for evidence of this.

• Over smoothing data can degrade the data –review the data and use common sense.

594/3/2017

Page 60: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Beam modelingApproaches:

• Do-it-yourself

• Vendor creates the models based on customer data

• Vendor provides pre-configured model

4/3/2017 60

Page 61: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Pinnacle Modeling Process• Measured Data is imported into the Pinnacle Physics Tool

• Pinnacle AutoModeling Scripts guide you through Modeling.• The AutoModeling is run

• The resulting Model is analyzed visually and quantitatively

• Adjustments are made and the automodeling may be repeated

• Similar to optimizing an IMRT Plan

4/3/2017 61

Page 62: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Pinnacle Modeling Process

4/3/2017 62

Page 63: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Pinnacle Modeling Process

4/3/2017 63

Page 64: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Pinnacle Modeling Process

4/3/2017 64

Page 65: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Eclipse

4/3/2017 65First review the data to ensure it was properly imported

Page 66: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Calculate beam data in Eclipse

4/3/2017 66

Page 67: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Analysis in Eclipse

4/3/2017 67

Page 68: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Use pre-configured data?

4/3/2017 68

Page 69: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Varian can provide golden beam dta, but with caveats:

Warning from Eclipse manual4/3/2017 69

Page 70: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• I am a big fan of pre-configured data, if available

• You do still need to verify the TPS calculations

• At a minimum, standard beam data is great for sanity checks

• You also have to decide this yourselves

4/3/2017 70

Page 71: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MLC measurements

4/3/2017 71

Page 72: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Good starting point for understanding different MLCs

4/3/2017 72

Page 73: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• First measure leaf transmission following vendor recommendations4/3/2017 73

- Leaf transmission (inter-leaf and intra-leaf)- Dynamic Leaf Gap (leaf edges)- Tongue and Grove effect

Page 74: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Rounded leaf ends• For single focus MLCs a rounded leaf end is used to maintain

approximately the same penumbra size as the leaf moves off axis

• This causes the light field to be offset with respect the projected leaf motion

4/3/2017 74

Page 75: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MLC offset table

• The MLC motions on single focused MLCs are not constant as a function of off-axis distance

• On Varian machines the offset is calculated to make the light field always agree with the position programed in the MLC controller

• On the Elekta machine the offset is calculated to make the 50% radiation line match the position programed in the MLC controller

• Some TPS require that these offset tables are entered into the TPS for proper calculation of dose (e.g. Pinnacle)

• Be careful that you understand and follow the vendor’s specifications

• Some TPS (e.g. Eclipse) have already included these offsets – and they are not editable by the user.

4/3/2017 75

Page 76: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Interpretation of the MLC position in Pinnacle4/3/2017 76

Page 77: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MLC offset table

Varian (from manufacturer) Elekta(empirically determined)

Should be a physical set of parameters stored in the MLC controllerNeeds to be verified against measurementsCan be used as a “tuning parameter” in beam modeling

4/3/2017 77

Page 78: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 78

Page 79: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Dynamic leaf gap (Eclipse)

Based on a slide by Ke Sheng4/3/2017 79

Page 80: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Based on a slide by Ke Sheng4/3/2017 80

Page 81: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Dose calculations are sensitive to DLG setting

Figure from Szpala et al, JACMP 15(2), 67-84, 2014

Also see Keilar et al, Med Phys 39(10), 6360-6371, 2012 for similar results

Note: reduction in DLG has a similar effect to reduction in leaf transmission

4/3/2017 81

Page 82: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Impact of DLG error reduced for larger MLC slits

Szpala et al, JACMP 15(2), 67-84, 20144/3/2017 82

Page 83: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

DLG used in calc: 2.3mm

T&G extensions

4/3/2017 83

Page 84: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 84

Page 85: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

DLG summary

• More segments with large gaps and small T&G extensions (i.e. large fields) increases the dose agreement

• Measuring DLG is a good starting point, but need additional IMRT or VMAT data to finetune

• Should review data after initial experience to see if additional fine tuning is needed.

4/3/2017 85

Page 86: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Calculation ValidationRepeat for each individual beam

4/3/2017 86

Page 87: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 87

Page 88: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5a spreadsheet available on github

• https://github.com/Open-Source-Medical-Devices/MPPG4/3/2017 88

Page 89: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5a profile comparison toolhttps://github.com/Open-Source-Medical-Devices/MPPG

4/3/2017 89

Page 90: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5: Basic condition tolerances

4/3/2017 90

Page 91: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 91

Page 92: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 92

Page 93: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 93

Page 94: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Example 1: Basic Photon Test: 5.5 Large MLC

4/3/2017 94

Page 95: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• This report contains a very extensive set of tests

954/3/2017

Page 96: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• 9cm x 9cm 45deg (Co) or 60deg (LINAC) wedge. Dose calculated at central axis and ±2.5cm. Depths: 1,3,5,10,15,20,25,35cm

964/3/2017

Page 97: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Type and optional tests include more complicated geometries:

• Asymmetric open half and quarter wedged fields (LINACs only).

974/3/2017

Page 98: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 98

Page 99: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Test 6.2. Heterogeneity correction

4/3/2017 99

Page 100: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

100

(end-to-end treatment planning tests)

4/3/2017

Page 101: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• IAEA examples are with this CIRS phantom

• Any appropriate phantom can be used (IAEA Technical Report Series No. 430)

http://www.cirsinc.com/products/all/12/imrt-thorax-phantom/

1014/3/2017

Page 102: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• Create plan (2Gy to reference point)

• Check with manual MU/time calculation

• Position phantom

• Treat (with ionization chamber at reference point)

• Repeat 3+ times

• Compare measured and calculated values (3% criterea)

• Repeat for each dose calculation algorithm

X

1024/3/2017

Page 103: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

X

1034/3/2017

Page 104: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

VMAT/IMRT

4/3/2017 104

Page 105: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 105

Page 106: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Some additional settings in the TPS. E.g. Dose Rate in Pinnacle

• In the Pinnacle beam Model– We will underestimate the maximum dose rate:

• Ensures the Pinnacle VMAT plans will not violate machine capabilities

• Because we want to use one Pinnacle model for both of our Versa’s– We will use the lesser of the two maximum dose rates

• VMAT delivery– Elekta will take the Pinnacle generated plan from Mosaiq, and calculate a way

to deliver it as fast as it can.

– Because machines will have different dose rates, the VMAT plan delivered will be slightly different for each.

– Uses continuously variable dose rate• 256 bins between max dose rate and about 37 MU/min

4/3/2017 106

Page 107: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5 VMAT.IMRT test summary

4/3/2017 107

Page 108: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 108

Page 109: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5: Test 7.2. Small MLC-defined field

MLC examples downloadable from GITHUB4/3/2017 109

Page 110: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• Test suite, instructions and spreadsheets: http://www.aapm.org/pubs/tg119/default.asp

Ezzell et al, Med Phys 36(11), 5359-5373, 2009 (also downloadable from the above link)

Series of downloadable tests:

MPPG5 recommends these

4/3/2017 110

Page 111: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Ezzell et al, Med Phys 36(11), 5359-5373, 2009 4/3/2017 111

Page 112: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Ezzell et al, Med Phys 36(11), 5359-5373, 2009 4/3/2017 112

Page 113: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Functionality review

4/3/2017 113

Page 114: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Functionality checks

• The TPS performs many non-dosimetric functions –need to verify• (includes “is the license turned on?”)

• Import (images etc)

• Export (to R&V – Mosaiq etc)

• Dataset management + presentation

• Coordinate systems

• Image generation (DRRs)

• DVH calculation……..

• Much of this may be in the acceptance document

• Good information source: IAEA documents and TG53

4/3/2017 114

Page 115: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Checking display and other software functionality

IAEA TRS 4304/3/2017 115

Page 116: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Independent verification

4/3/2017 116

Page 117: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

What sort of events can happen?

One way to categorize event:• Events that involve individual patients• Events that are related to equipment,

and affect many patients• Commissioning• Change in machine function

The Role of Independent Dosimetry Audits in Patient

Safety

4/3/2017 117

Page 118: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• The IAEA report has many more examples of these types of

events that affect many patients

An Example:

4/3/2017 118

Page 119: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

IAEA Safety Reports Series No.17. Lessons learned from accidental exposures in radiotherapy1194/3/2017

Page 120: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• Inter-comparison of all 64 UK centers

• Organized by 15 regional coordinators who took equipment and made measurements with a local physicist

• Central axis measurements (5cm depth, 5, 10, 15cm fields)

• Dose at 5 points in a phantom

• 5% difference seen for 9 centers

• 25% difference seen for 1 center

Thwaites et al, PMB 1992: 37;445-61.

First Comprehensive UK Audit (1987-91):

4/3/2017 120

Page 121: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• The purpose of independent audits is to aim for consistent treatments (between centers)

• Many different approaches:• On-site visits by an auditing body (e.g. IAEA, IROC, other

national institutions)

• Remote audits – dosimeters sent by post

• Virtual audits – remote evaluation of dosimetry, planning data

• Voluntary “buddy visit” audits (especially when introducing new treatment techniques)

Independent Dosimetry Audits:

4/3/2017 121

Page 122: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 122

Page 123: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• Anthropomorphic shape

• Water filled

• Plastic inserts containing targets and organs at risk (heterogeneity)

• Point dose (TLD) and planar (radiochromic film) dosimeters

• Purpose is to evaluate the complete treatment process: (imaging to planning to delivery)

0

2

4

6

8

-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6Distance (cm)

Do

se

(G

y)

RPC Film Institution values AAA

RightLeft

PTV

IROC-Houston Lung Phantom

4/3/2017 123

Page 124: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

IROC-Houston Phantom –example results for the H/N phantom

4/3/2017 124

Page 125: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

IROC-Houston Phantom – example results for the H/N phantom

4/3/2017 125

Page 126: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• 1139 irradiations, 763 institutions

Molineu et al, Med Phys 40(2) 022101-1, 2013 4/3/2017 126

Page 127: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Mo

line

uet

al,

Med

Ph

ys 4

0(2

) 0

22

10

1-1

, 20

13

4/3/2017 127

Page 128: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 128

Page 129: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

• The purpose of independent audits is to aim for consistent treatments (between centers)

• Much (published) evidence independent audits can prevent mistreatment of many patients

• Many different ways to achieve independent audits

Audit Summary:

4/3/2017 129

Page 130: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a

So where are we?

4/3/2017 130

Page 131: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

ElectronsMPPG5

TG25

TG70

4/3/2017 131

Page 132: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Commissioning data exampleseMC in Eclipse

For each electron energy:

• Profile in air for NO CONE

• PDD in water for NO CONE

• Absolute dose in water for NO CONE

• PDD in water for each cone

• Absolute dose in water for each cone

132

Diamond:

4/3/2017

Page 133: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Decide on calculation parameters (Eclipse)

1334/3/2017

Page 134: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Calculation parameters

1344/3/2017

Page 135: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Example data table for Diamond

6MeV

cone: 6 6 6 6 10 15 20 25

SSD/FS 2 3 4 6 10 15 20 25

100 100 1 1 1 1 1 1 1 1

105 105 0.779769 0.898332 0.945715 0.961729 0.986681 0.990248 0.992925 0.993341

110 110 0.581114 0.775123 0.88404 0.919613 0.965417 0.976786 0.986224 0.987967

115 115 0.440675 0.656516 0.812396 0.878801 0.952642 0.966392 0.979013 0.983869

120 120 0.341656 0.549858 0.73287 0.831277 0.932387 0.954826 0.969782 0.976696

4/3/2017 135

Page 136: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Evaluation of eMC (and datasheets)• 25 cutouts + 5 open cones

• 5 electron energies

• 100 and 110cm SSD (to check calculations)

• Absolute dose (water phantom, solid water)

• Relative dose distributions (water phantom)

• 30 x 5 x 2 = 300 output measurements

• Same number (or subset) of relative dose distributions (2D)

1364/3/2017

Page 137: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 137

Page 138: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 138

Page 139: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

More data reviewA good idea

We’ve done a lot of measurements and comparisons – how do they look? Why not have another review…..

It’s another chance to catch any issues….

4/3/2017 139

Page 140: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Data Quality

• What is wrong with this 6X model (Varian truebeam)

4/3/2017 140

Page 141: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 141

Page 142: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 142

Page 143: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 143

Page 144: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 144

Page 145: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

How was the problem detected

• IMRT QA had poor results for highly modulated fields

• A bad electrometer was found being used for the IMRT QA• Caused random spurious IMRT results that made it had

to detect the trend with modulation

• IMRT QA was compared running the same plans on the new truebeam and our existing 2100 machines• It was noted that the measurements matched but the

calculations did not• We did a parameter by parameter check between the

two models

4/3/2017 145

Page 146: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 146

Page 147: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

What happened

• New Linac – no previous history on this type of machine

• New model water scanner• Had history with the manufacture/software• No history with the new electrometer

• New physicist • Physics group that had previously managed TPS system left

over the course of a few years• Physicist who took was very prominent and experienced but

not with TPS modeling• Another new physicist then took over during the acceptance

testing of our 2nd truebeam.

4/3/2017 147

Page 148: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

What happened technically

• New electrometer on the scanning system was an in-room design which had a relatively high background signal

• Chamber used for all scanning was a 0.04 cc chamber that has been used in the past as a universal scanning chamber

• Inside the field the noise was trivial and not easily detected

• Outside the field the noise was misinterpreted as a higher jaw/MLC transmission

4/3/2017 148

Page 149: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Commissioning Report

4/3/2017 149

Page 150: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 150

Page 151: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Commissioning report

• TG-106 recommendations

4/3/2017 151

Page 152: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Dose Algorithm Commissioning Inventory (MPPG5)

4/3/2017 152

Page 153: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

An example4/3/2017 153

Page 154: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

4/3/2017 154

Page 155: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

TPS QA

4/3/2017 155

Page 156: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a4/3/2017 156

Page 157: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5: QA recommendations

• Annually or after major TPS upgrades

• Reference plans should be selected at the time of commissioning and then recalculated for routine QA comparison.

• Photons: representative plans for 3D and IMRT/VMAT, from validation tests

• Electrons: for each energy use a heterogeneous dataset with reasonable surface curvature.

• No new measurements required!

• The routine QA re-calculation should agree with the reference dose calculation to within 1%/1mm. A complete re-commissioning (including validation) may be required if more significant deviations are observed

(AAPM TG53 can also be a useful resource)4/3/2017 157

Page 158: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Hand calculation data

4/3/2017 158

Page 159: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Hand Calc vs TPS data

• The machine databook may require different data than the TPS• Example Output factors for Pinnacle are at 10 cm depth

vs at Dmax(or Dreference) for most hand calculation systems

• Wedge factors for hand calc need to be a function of FS and depth (Dr. Court will discuss)

• Hand calc data should not be derived from the TPS• Loss of independence

• This includes data for secondary software calculation systems (ie RadCalc)

4/3/2017 159

Page 160: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Hand Calc Data (TG-45)

The following are needed for the calculation of the number of monitor units required to deliver a prescribed absorbed dose at a point at a given depth along the central ray of a square or rectangular beam in a unit density medium

4/3/2017 160

Page 161: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Output (Scp) vs FS at Dmax and 10 cm

0.80

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

0 5 10 15 20 25 30 35 40

Ou

tpu

t Fa

cto

r (N

orm

aliz

ed

to

10

x10

)

Side of a Square Field (cm)

10 cm

Dmax

4/3/2017 161

Page 162: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Planning the commissioning process

4/3/2017 162

Page 163: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Plan your measurements

• Create a list for Hand calc

• Create a list for TPS

• Include time for auditing

• If possible work in teams • One person taking data• One person auditing and processing the data

• Have a spare day every few days of data taking for problem solving/investigation

• Use caution with trainees• Ensure you know the equipment before letting them “help”• Spot check any data generated without direct supervision

4/3/2017 163

Page 164: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Time Required• Beam Scanning

• A day per photon energy

• Extra scanning can take additional time• Not used for modeling, but useful data

• Relative Output Factors• Half a day per photon energy

• Data Smoothing• About a day or more per

energy

• Pinnacle Modeling• A week per photon energy

4/3/2017 164

Page 165: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Verification• The Model is used Compute dose distributions that are

compared to measurement• TLDs: In-house and/or RPC

• Must read TLDs

• 24 hours for in-house TLDs, Weeks for RPC TLDs

• IMRT / VMAT QA Measurements - Days• Must generate a plan for several CTs / phantoms

• And take measurements

• RPC Phantoms – Days to Weeks• Simulate phantom

• Generate a plan

• Setup Phantom and Deliver plan

• Send to RPC for analysis

• Direct comparison with data - Days• Must generate and export data from Pinnacle

• Comparison in a manual process

4/3/2017 165

Page 166: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

MPPG5 time estimates (4 photon energies, 5 electron energies)

4/3/2017 166

Page 167: TPS COMMISSIONING - International Centre for Theoretical ...indico.ictp.it/event/7955/session/6/contribution/43/material/slides/0.pdf · 1. Check for potential setup and measurement

Figure from MPPG5a

Final slide

4/3/2017 167