23
Experience of Migration to State of the Art Analysis for Eddy Current Data Mr. Shun-Tung-Ching Shih – Taiwan Power Company Mr. Sou-See Lee – Taiwan Power Company Presented by Tom Bipes – Zetec EPRI SG Workshop July 18-20, 2016

TPC Migration to State of the Art Inspection - Amazon S3€¦ · Experience of Migration to State of the Art Analysis for ... Technology & Integration ... TPC Migration to State of

Embed Size (px)

Citation preview

Experience of Migration to State of the Art Analysis for

Eddy Current Data

Mr. Shun-Tung-Ching Shih – Taiwan Power CompanyMr. Sou-See Lee – Taiwan Power CompanyPresented by Tom Bipes – Zetec

EPRI SG WorkshopJuly 18-20, 2016

History Taipower• Established May 1, 1946• Capacity 41.04 GW (2015)• Mainly Thermal and Nuclear

2

History of ISI in Taiwan• Power plants serviced

CHINSHAN

MAANSHAN(PWR -- 951 MWe × 2)

(BWR4 -- 636 MWe × 2)

KUOSHENG(BWR6 -- 985 MWe × 2)

LUNGMEN(ABWR – 1350 MWe x 2#1 Mothballed #2 under construction)

3

History of ISI in Taiwan• Typical techniques employed

Occasion Works Remark

Usual

NDT for Maintenance requirements

All NPPMaintain ISO 9001 Quality System and NDT Laboratory Accreditation(by TAF)

Other Design Change Works

PSI/ISI

PSI / ISI Program Preparation

All NPP

Piping and Vessel shell Thickness measurement (UT)

Heat Exchanger tubing eddy current testingWelds Radiographic Test (RT)VT-1, PT/MT, MUT and AUT for ISI ScopeSteam Generator tubing eddy current testing

MS NPP onlyNeutron Thimble guide tube eddy current testingReactor Core Control rod Assembly (RCCA) eddy current testing

4

Plant Types of degradation Response

CS

Austenitic (TP304)welds were found IGSCC in recirculation piping system.

Replace 10 riser pipes (SS TP316)

Austenitic (TP304)welds were found IGSCC in non-replaced recirculation piping system after 2nd interval.

Weld Overlaid

Condenser Cu-Ni tube with corrosion Replace all tubes w/Ti

KS

Austenitic (TP304)welds were found IGSCC in recirculation piping system.

Weld Overlaid

Condenser Cu-Ni tube with corrosion Plugged & Replace some tubes

MS AVB Wear, scale blockage, loose parts wear, tube end SCC in SG Plugged, Chemical cleaning

All Vessel / Piping wall thinning Reinforce / replace

5

Technology  & Integration• PC Network Based AQ Software• ZR-100,Machine Vision,MIZ-80iD

6

Technology  & Integration

Heat Exchanger tubes ECT and data Evaluation

Piping AUT S/G mockup, data Evaluation and Management

7

Business Need• Need for migration to PC software

• Old legacy HPUX hardware• Obsolete systems not supporting new inspection products and technologies

• Increase in Productivity• Reduction in process costs• Compatibility with other PC products

8

• Needs in selection process• Widely accepted and commercially available software

• Familiarity for existing operators• Presenting best technologies• Validation of transition

Migration Plan

9

Migration Plan

• Replace Eddynet CDS with RevospECT• Incorporate RevospECT Basic• Customized version of RevospECT PRO• Tuned to specific requirements and specification• Effective Transition Plan

10

Implementation Plan

• Eddynet AQ/AN/DM Implementation• Full PC Based Networked System Integration

• Retired aging HPUX Hardware

• Phased in over several Years• AQ & DM (2013)• AN & DQV (2014)• RevospECT Basic – Current Configuration (2015)

11

AN ‐ Standard view for Bobbin with HIST review

12

AN ‐ Report Editor with HIST and Current 

13

• RevospECT Commercial Software• Basic Vs. Pro Version

• Customized for Customer Needs• Noise Measurement not required• Final Acceptance logic not implemented• HDC (Historic Data Compare) not included

Implementation Plan

14

• RevospECT Basic• Replicated Previous CDS Parameters• Simple User Adjustable Parameters• Increased User Capabilities over CDS

• Productivity – Multiple Cal Groups Simultaneously• Landmarking improvements• Regions Of Interest – no missed overlap• Enhanced Calibration/Validation• Expanded Analyzer Methodology• Simultaneous Reporting of Results (flaws, sludge, dent)

Implementation Plan

15

Well Defined Landmarks

No ROI Gap

16

AUTO AN – Dashboard ScreenImplementation Plan

17

Multiple cal groups simultaneously

Individual cal group interacation

AUTO AN ‐ RevospECT Basic (Replace CDS) for Flaw, dent/bulge, sludge

Implementation Plan

18

• RevospECT Pro• User Modifiable• Full Functionality

• Final Acceptance• Noise Measurement and Monitoring• Historic Data Compare• Other Enhancements and features

Future Possibilities

19

Additional New Capabilities

• RevospECT Pro – Other Applicability• Maanshan RCCA Inspection

• Fully Automated Analysis (Insertion & Retraction)

• Kousheng Condenser Inspections• Large Quantities of Data (60k+ Tube Files)• Automate challenging Analysis Tasks• Consistency of Results

20

New Capabilities

• RevospECT Pro – Other Applicability• Maanshan RCCA Inspection

• Fully Automated Analysis (Insertion & Retraction)

• Kousheng Condenser Inspections• Large Quantities of Data (60k+ Tube Files)• Automate challenging Analysis Tasks• Consistency of Results

• BOP applications at other plants worldwide!

21

Taiwan Power Quote• “With the implementation of Zetec PC products and RevospECT Basic, Taiwan Power was able to smoothly transition from legacy Unix products to state‐of‐the‐art PC products and technology. Realizing this new potential, this technology was also applied to our RCCA and Condenser inspections with great success. We will look for other opportunities to apply Zetec advanced technology.”

22

Summary

• Need for SG Equipment/Process Upgrade• PC Based Acquisition and Data Management• RevospECT Basic Custom Auto Analysis Product• Functionality beyond expectations

• Need for Special ECT Projects• RCCA Inspection Automated• BOP Condenser Inspection Automated• Customization to Utility needs• Reduction in cost, increase in POD and Productivity• Utility Needs exceeded

23