TP48200B-N20A6 & N20B1 V300R001 Quick Installation Guide Issue 04 Date 2013-01-09 HUAWEI TECHNOLOGIES CO., LTD.

TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

Embed Size (px)

DESCRIPTION

A guide for installation of Huawei PS TP48200B

Citation preview

Page 1: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1 V300R001

Quick Installation Guide

Issue 04

Date 2013-01-09

HUAWEI TECHNOLOGIES CO., LTD.

Page 2: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

i

Copyright © Huawei Technologies Co., Ltd. 2013. All rights reserved.

No part of this document may be reproduced or transmitted in any form or by any means without prior

written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

All other trademarks and trade names mentioned in this document are the property of their respective

holders.

Notice

The purchased products, services and features are stipulated by the contract made between Huawei and

the customer. All or part of the products, services and features described in this document may not be

within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,

information, and recommendations in this document are provided "AS IS" without warranties, guarantees or

representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the

preparation of this document to ensure accuracy of the contents, but all statements, information, and

recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.

Address: Huawei Industrial Base

Bantian, Longgang

Shenzhen 518129

People's Republic of China

Website: http://www.huawei.com

Email: [email protected]

Page 3: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide About This Document

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

ii

About This Document

Purpose

This document describes the TP48200B-N20A6 & TP48200B-N20B1 in terms of its structure,

components, installation, and commissioning.

Intended Audience

This document is intended for:

Installation and commissioning engineers

Technical support engineers

Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol Description

Alerts you to a high risk hazard that could, if not avoided, result in

serious injury or death.

Alerts you to a medium or low risk hazard that could, if not

avoided, result in moderate or minor injury.

Alerts you to a potentially hazardous situation that could, if not

avoided, result in equipment damage, data loss, performance

deterioration, or unanticipated results.

Provides a tip that may help you solve a problem or save time.

Provides additional information to emphasize or supplement

important points in the main text.

Page 4: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide About This Document

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

iii

Change History

Changes between document issues are cumulative. The latest document issue contains all the

changes made in earlier issues.

Issue 04 (2013-01-09)

Set battery fuse break alarm "Enable/Disable" status is added.

Issue 03 (2012-11-24)

This issue is the third official release, which incorporates the following changes:

The paper size changes from A3 to A4.

Issue 02 (2012-08-24)

This issue is the second official release, which incorporates the following changes:

Chapter 7 Installing Cables

The method for monitoring the battery middle point voltage is added.

Chapter 8 System Commissioning

The method for associating dry contacts with alarms is added, and power-on and

commissioning procedures are modified.

Issue 01 (2012-06-20)

This issue is the first official release.

Page 5: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide Contents

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

iv

Contents

About This Document .................................................................................................................... ii

1 Safety Precautions ......................................................................................................................... 1

1.1 Health and Safety ............................................................................................................................................. 1

1.1.1 Overview ................................................................................................................................................. 1

1.1.2 Electrical Safety ...................................................................................................................................... 3

1.1.3 Inflammable Environment ...................................................................................................................... 4

1.1.4 Battery ..................................................................................................................................................... 4

1.1.5 Working at Heights ................................................................................................................................. 6

1.1.6 Using Ladders ......................................................................................................................................... 7

1.1.7 Mechanical Safety ................................................................................................................................... 7

1.1.8 Bundling Signal Cables ........................................................................................................................... 8

1.2 Equipment Safety ............................................................................................................................................. 9

1.2.1 Electricity Safety ..................................................................................................................................... 9

1.2.2 Electrostatic Discharge............................................................................................................................ 9

1.2.3 Laying Cables ....................................................................................................................................... 10

2 Installation Preparations ........................................................................................................... 11

2.1 Tools ............................................................................................................................................................... 11

2.2 Unpacking and Check .................................................................................................................................... 12

2.3 Precautions ..................................................................................................................................................... 12

2.4 Installation Clearance Requirements .............................................................................................................. 12

3 Configuration ............................................................................................................................... 13

4 Installing the Cabinet ................................................................................................................. 16

4.1 Scenarios 1: Installing the Cabinet on the Ground ......................................................................................... 16

4.1.1 Marking the Installation Holes of Cabinet Based on the Marking-off Plate ......................................... 16

4.1.2 Drilling Holes and Installing Expansion Sleeves .................................................................................. 16

4.1.3 Securing the Cabinet ............................................................................................................................. 17

4.1.4 (Optional) Installing the IP21 Top Cover .............................................................................................. 18

4.2 Scenarios 2: Installing the Cabinet on the ESD Floor .................................................................................... 19

4.2.1 Marking Installation Holes of the Support Based on the Marking-off Plate ......................................... 19

4.2.2 Drilling Holes and Installing Expansion Sleeves .................................................................................. 19

4.2.3 Assembling the Support ........................................................................................................................ 20

Page 6: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide Contents

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

v

4.2.4 Installing the Support ............................................................................................................................ 21

4.2.5 Securing the Cabinet ............................................................................................................................. 22

4.2.6 (Optional) Installing the IP21 Top Cover .............................................................................................. 24

5 Cable Routing .............................................................................................................................. 25

6 Installing a PGND Cable ........................................................................................................... 27

7 Installing Components............................................................................................................... 29

7.1 Installing Rectifiers ........................................................................................................................................ 29

8 Installing Cables ......................................................................................................................... 31

8.1 Installing Signal Cables and Communication Cables ..................................................................................... 31

8.1.1 UIM02C ................................................................................................................................................ 31

8.1.2 Installing Dry Contacts Signal Cables .................................................................................................. 31

8.1.3 Installing Boolean Value Signal Cables ................................................................................................ 32

8.1.4 Installing Communications Cables ....................................................................................................... 32

8.2 Installing Power Cables .................................................................................................................................. 32

8.2.1 Installing DC Output Cables ................................................................................................................. 32

8.2.2 Installing Batteries ................................................................................................................................ 33

8.2.3 Installing AC Input Cables .................................................................................................................... 35

9 System Commissioning ............................................................................................................. 37

9.1 Installation Verification .................................................................................................................................. 37

9.2 Powering On and Commissioning .................................................................................................................. 37

9.2.1 Setting Parameters ................................................................................................................................ 37

9.3 Powering On................................................................................................................................................... 41

A Prepare Terminal ........................................................................................................................ 43

B UIM02C Pin Definition ............................................................................................................. 44

Page 7: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

1

1 Safety Precautions

1.1 Health and Safety

1.1.1 Overview

Introduction

This section describes the safety precautions you must take before installing or maintaining

Huawei equipment.

To ensure safety of humans and the equipment, pay attention to the safety symbols on the

equipment and all the safety instructions in this document.

The "NOTE", "CAUTION", and "WARNING" marks in other documents do not

represent all the safety instructions. They are only supplements to the safety instructions.

Installation and maintenance personnel must understand basic safety precautions to avoid

hazards.

When operating Huawei equipment, in addition to following the general precautions in

this document, follow the specific safety instructions given by Huawei.

Only trained and qualified personnel are allowed to install, operate, and maintain Huawei

equipment.

Local Safety Regulations

When operating Huawei equipment, you must follow the local laws and regulations. The

safety instructions in this document are only supplements to the local laws and regulations.

General Requirements

To minimize risk of personal injury and damage to equipment, read and follow all the

precautions in this document before performing any installation or maintenance.

Ensure that the instructions provided in this document are followed completely. This section

also provides guidelines for selecting the measuring and testing devices.

Installation The device (or system) must be installed in an access-controlled location.

The device can be mounted only on concrete or non-combustible surfaces.

Page 8: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

2

The device must be fixed securely on the floor or to other immovable objects such as

walls and mounting racks before operation.

When installing the unit, always make the ground connection first and disconnect it at

the end.

Do not block the ventilation while the device is operating. Keep a minimum distance of 5

cm between the device and the wall or other objects that may block the ventilation.

Tighten the thumbscrews by using a tool after initial installation and subsequent access

to the panel.

Ground Do not damage the ground conductor or operate the device in the absence of a properly

installed ground conductor. Conduct the electrical inspection carefully.

The device (or system) must be connected permanently to the protection ground before

an operation. The cross-sectional area of the protective ground conductor must be at least

10 mm2.

Power Supply For AC-supplied models: The device applies to TN, TT, or IT power system.

For DC-supplied models: Reinforced insulation or double insulation must be provided to

isolate the DC source from the AC mains supply.

For DC-supplied model: The device applies to DC power source that complies with the

Safety Extra-Low Voltage (SELV) requirements in IEC 60950-1 based safety standards.

Prepared conductors are connected to the terminal block, and only the appropriate

AWG/Type of wire is secured with the lug terminals.

Human Safety Do not operate the device or cables during lightning strikes.

Remove the AC power connector when there is lightning. Do not use fixed terminals or

touch terminals or antenna connectors when there is lightning.

To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to

telecommunication network voltage (TNV) circuits.

Move or lift the chassis by holding its lower edge. Do not hold the handles on certain

modules such as power supply, fans, and boards because they cannot support the weight

of the device.

At least two persons are required to lift the chassis. When lifting it, keep your back

straight and move stably.

Do not wear jewelry or watches when you operate the device.

Operator Only qualified professional personnel are allowed to install, configure, operate, and

disassemble the device.

Only the personnel authenticated or authorized by Huawei are allowed to replace or

change the device of the parts of the device (including the software).

Any fault or error that might cause safety problems must be reported immediately to a

supervisor.

Only qualified personnel are allowed to remove or disable the safety facilities and to

troubleshoot and maintain the device.

Page 9: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

3

1.1.2 Electrical Safety

High Voltage

The high voltage power supply provides power for the device operation. Direct or indirect

contact (through damp objects) with high voltage and AC mains supply may result in fatal

danger.

During the installation of the AC power supply facility, follow the local safety

regulations. The personnel who install the AC facility must be qualified to perform high

voltage and AC operations.

Do not wear conductive articles, such as watches, hand chains, bracelets, and rings

during the operation.

When water is found in the rack or the rack is damp, switch off the power supply

immediately.

When the operation is performed in a damp environment, make sure that the device is

dry.

Non-standard and improper high voltage operations may result in fire and electric shock.

Therefore, you must abide by the local rules and regulations when bridging and wiring AC

cables. Only qualified personnel are allowed to perform high voltage and AC operations.

Before powering on a device, ground the device. Otherwise, personal injury or device damage

may be caused by high leakage current.

Tools

Dedicated tools must be used during high voltage and AC operations. Avoid using ordinary

tools.

Page 10: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

4

High Electrical Leakage

Ground the device before powering it on. Otherwise, personal injury or device damage may

be caused by high leakage current.

If a "high electrical leakage" tag is present on the power terminal of the device, you must

ground the device before powering it on.

Power Cable

Do not install or remove power cables when the device is on. Transient contact between the

core of the power cable and the conductor may generate electric arcs or sparks, which may

cause fire or hurt human eyes.

Before installing or removing the power cable, turn off the power switch.

Before connecting a power cable, check that the label on the power cable is correct.

1.1.3 Inflammable Environment

Operating the electrical device in an inflammable environment can be fatal.

Do not place the device in an environment that has inflammable and explosive air or gas. Do

not perform any operation in this environment.

1.1.4 Battery

Storage Battery

Before operating storage batteries, carefully read the safety precautions for battery handling

and connection.

Page 11: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

5

Improper handling of storage batteries causes hazards.

When operating storage batteries, avoid short circuit and overflow or leakage of the

electrolyte. Electrolyte overflow may damage the device. It will corrode metal parts and

circuit boards, and ultimately damage the device and cause short circuit of circuit boards.

Basic Precautions

Before installing and maintaining the battery, note the following:

Do not wear metal articles such as wristwatch, hand chain, bracelet, and ring.

Use special insulation tools.

Take care to protect your eyes when operating the device.

Wear rubber gloves and a protective coat in case of electrolyte overflow.

When handling a storage battery, ensure that its electrodes are upward. Leaning or

reversing the storage battery is prohibited.

Short Circuit

Battery short circuit may cause human injuries. Although the voltage of ordinary batteries is

low, the instantaneous high current caused by the short circuit releases a great deal of energy.

There is danger of explosion if the battery is incorrectly replaced. Therefore, replace the

battery only with the same or equivalent type recommended by the manufacturer.

Keep away metal objects, which may cause battery short circuit, from batteries. If metal

objects must be used, first disconnect the batteries in use before performing any other

operations.

Hazardous Gas

Page 12: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

6

Do not use unsealed lead acid storage batteries. Lead acid storage batteries must be placed

horizontally and stably to prevent the batteries from releasing flammable gas, which may

cause fire or erode the device.

Lead acid storage batteries in use emit flammable gas. Therefore, ventilation and

fireproofing measures must be taken at the sites where lead acid storage batteries are used.

Battery Temperature

If a battery overheats, the battery may be deformed or damaged, and the electrolyte may

overflow.

When the temperature of the battery is higher than 60℃, check the battery for electrolyte

overflow. If the electrolyte overflows, absorb and counteract the electrolyte immediately.

Battery Leakage

When the electrolyte overflows, absorb and counteract the electrolyte immediately.

When moving or handling a battery whose electrolyte leaks, note that the leaking electrolyte

may hurt human bodies. When you find the electrolyte leaks, use the following substances to

counteract and absorb the leaking electrolyte:

Sodium bicarbonate (baking soda): NaHCO3

Sodium carbonate (soda): Na2CO3

Select a substance to counteract and absorb the leaking electrolyte according to the

instructions of the battery manufacturer.

1.1.5 Working at Heights

Avoid object falling when you work at heights.

When working at heights, fulfill the following requirements:

Only trained personnel can work at heights.

Page 13: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

7

Prevent the devices and tools that you carry from falling down.

Take safety and protection measures, for example, wear a helm and safety belt.

Wear warm clothes when working at heights in a cold region.

Before working at heights, check that all the lifting facilities are in good condition.

1.1.6 Using Ladders

Checking a Ladder Before using a ladder, check whether the ladder is damaged. Only the ladder in good

condition can be used.

Before using a ladder, you should know the maximum weight capacity of the ladder.

Avoid overweighing the ladder.

Placing a Ladder

The recommended gradient of ladders is 75 degrees. You can measure the gradient of the

ladder with an angle square or your arms. When using a ladder, ensure that the wider feet of

the ladder are downward, or take protection measures for the ladder feet to prevent the ladder

from sliding. Ensure that the ladder is placed securely.

Climbing Up a Ladder

When climbing up a ladder, note the following:

Ensure that the center of gravity of your body does not deviate from the edges of the two

long sides.

To minimize the risk of falling, hold your balance on the ladder before any operation.

Do not climb higher than the fourth rung of the ladder (counted from up to down).

If you want to climb up a roof, ensure that the ladder top is at least one meter higher than

the roof.

1.1.7 Mechanical Safety

Drilling Holes

Do not drill the cabinet at will. Drilling holes without complying with the requirements affects

the electromagnetic shielding performance of the cabinet and damages the cables inside the

cabinet. In addition, if the scraps caused by drilling enter the cabinet, the printed circuit

boards (PCBs) may be short circuited.

Before you drill a hole in the cabinet, wear insulated gloves and remove the internal

cables from the cabinet.

Wear an eye protector when drilling holes. This is to prevent your eyes from being

injured by the splashing metal scraps.

Ensure that the scraps caused by drilling do not enter the cabinet.

Page 14: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

8

Drilling holes without complying with the requirements affects the electromagnetic

shielding performance of the cabinet.

After drilling, clean the metal scraps immediately.

Sharp Objects

Before you hold or carry a device, wear protective gloves to avoid getting injured by sharp

edges of the device.

Handling Fans

When handling fans, note the following:

When replacing a component, place the component, screws, and tools in a safe place.

Otherwise, if any of them fall into the operating fans, the fans may be damaged.

When replacing a component near fans, do not insert your fingers or boards into the

operating fans until the fans are switched off and stops running.

Lifting Heavy Objects

When heavy objects are being lifted, do not stand or walk under the cantilever or the lifted

object.

1.1.8 Bundling Signal Cables

Do not bundle signal cables with high current cables or high voltage cables.

Maintain a minimum space of 150 mm between adjacent ties.

CAUTION

Page 15: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

9

1.2 Equipment Safety

1.2.1 Electricity Safety

High Electrical Leakage

If the "high electrical leakage" tag is present on the power terminal of the device, you must

ground the device before powering it on.

1.2.2 Electrostatic Discharge

The static electricity generated by human bodies may damage the electrostatic-sensitive

components on boards, for example, the large-scale integrated (LSI) circuits.

Human body movement, friction between human bodies and clothes, friction between shoes

and floors, or handling of plastic articles causes static electromagnetic fields on human bodies.

These static electromagnetic fields cannot be eliminated until the static is discharged.

To prevent electrostatic-sensitive components from being damaged by the static on human

bodies, you must wear a well-grounded ESD wrist strap when touching the device or handling

boards or application-specific integrated circuits (ASICs).

Figure 1-1 shows how to wear an ESD wrist strap.

Figure 1-1 Wearing an ESD wrist strap

Page 16: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 1 Safety Precautions

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

10

1.2.3 Laying Cables

When the temperature is very low, violent strike or vibration may damage the cable sheathing.

To ensure safety, comply with the following requirements:

Cables can be laid or installed only when the temperature is higher than 0℃.

Before laying cables which have been stored in a temperature lower than 0℃, move the

cables to an environment of the ambient temperature and store them at the ambient

temperature for at least 24 hours.

Handle cables with caution, especially at a low temperature. Do not drop the cables

directly from the vehicle.

Page 17: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 2 Installation Preparations

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

11

2 Installation Preparations

2.1 Tools

Table 2-1shows the tools that must be obtained before installation.

Table 2-1 Tools

Page 18: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 2 Installation Preparations

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

12

2.2 Unpacking and Check

Step 1 Unpack the carton.

Step 2 Check whether the cabinet is intact. If not, contact the local office.

Step 3 Check whether the fittings are complete. The fittings include a marking-off template, and a

material package.

Rectifiers and batteries are delivered separately.

----End

2.3 Precautions Do not bind PGND cables together with signal cables. Leave certain distance between

them to reduce the interruption.Bind AC power cables, DC power cables, signal cables,

and communications cables separately.

In this manual, the equipment interior is for reference only.

The cable colors in the manual are for reference only. The colors vary depending on the

countries and regions.

2.4 Installation Clearance Requirements

Figure 2-1 shows the installation clearance requirements.

Figure 2-1 Installation clearance requirements

NOTE

Page 19: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 3 Configuration

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

13

3 Configuration

Specifications

Table 3-1 Specifications

Category Specifications

Dimensions (H x W x D) 2000 mm x 600 mm x 600 mm

(78.74 in. x 23.62 in. x 23.62 in.)

Weight ≤ 120 kg (without rectifiers and batteries)

Page 20: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 3 Configuration

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

14

Interior of the Cabinet

Figure 3-1 Interior of the TP48200B-N20A6

(1) Battery switch (2) Battery circuit breaker (3) Site monitoring unit (SMU)

(4) Space for rectifiers (5) Space for batteries (6) Battery rack

(7) RTN+ busbar (8) Positive direct current (DC)

output circuit breaker

(9) Ground bar

(10) Alternating current (AC)

input circuit breaker

(11) User interface module (UIM)

Page 21: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 3 Configuration

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

15

Figure 3-2 Interior of the TP48200B- N20B1

(1) Battery switch (2) Battery circuit breaker (3) Site monitoring unit (SMU)

(4) power supply unit (PSU) (5) Space for batteries (6) Battery rack

(7) RTN+ busbar (8) Positive direct current (DC)

output circuit breaker

(9) Ground bar

(10) Alternating current (AC)

input circuit breaker

(11) User interface module (UIM)

Page 22: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

16

4 Installing the Cabinet

This chapter describes the procedures for installing the cabinet in two scenarios.

4.1 Scenarios 1: Installing the Cabinet on the Ground

4.1.1 Marking the Installation Holes of Cabinet Based on the Marking-off Plate

Mark the position of the cabinet based on the delivered marking-off plate to confirm the

positions of the expansion bolts (A hole), as shown in Figure 4-1.

Figure 4-1 Marking the installation holes

(1) Marking-off plate (2) Concrete pad (3) Installation hole

4.1.2 Drilling Holes and Installing Expansion Sleeves

Drill holes and install expansion sleeves as shown in Figure 4-2.

Step 1 Use a hammer drill bit to drill holes with a depth ranging from 52 mm (2.05 in.) to 60 mm

(2.36 in.).

Step 2 Tighten the expansion bolts slightly and place one vertically into each hole. Pound the expansion bolt with a rubber mallet until it goes all the way into the hole.

Page 23: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

17

Step 3 Fasten the expansion bolt clockwise until the nut is firmly inserted into the expansion tube.

Step 4 Turn the expansion bolt counterclockwise and remove the expansion bolt, spring washer and

flat washer in turn.

Figure 4-2 Drilling holes and installing expansion sleeves

(1) Expansion bolt(M12) (2) Spring washer (3) Flat washer

(4) Expansion sleeve (5) Concrete pad

----End

4.1.3 Securing the Cabinet

Step 1 Align the mounting holes of the cabinet with the expansion bolt holes on the concrete pad.

Step 2 Fasten the expansion bolts to secure the cabinet.

Figure 4-3 Securing the cabinet

----End

Page 24: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

18

4.1.4 (Optional) Installing the IP21 Top Cover

If the cabinet is required to be protected to IP21, install an IP21 top cover. To install the IP21

top cover, perform the following steps:

Step 1 Install side panels, as shown in Figure 4-4.

Figure 4-4 Installing side panels

Step 2 Secure the side panels onto the cabinet top and install the cable tray, as shown in Figure 4-5.

Figure 4-5 Securing the side panels and the cable tray

Page 25: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

19

Install the IP21 top cover after the cables are installed.

----End

4.2 Scenarios 2: Installing the Cabinet on the ESD Floor

4.2.1 Marking Installation Holes of the Support Based on the Marking-off Plate

Mark the position of the support based on the delivered marking-off plate to confirm the

positions of the expansion bolts (A hole), as shown in Figure 4-6.

Figure 4-6 Marking the installation holes

(1) Marking-off plate (2) Concrete pad (3) Installation hole

4.2.2 Drilling Holes and Installing Expansion Sleeves

Drill holes and install expansion sleeves as shown in Figure 4-2.

Step 1 Use a hammer drill bit to drill holes with a depth ranging from 52 mm (2.05 in.) to 60 mm

(2.36 in.).

Step 2 Tighten the expansion bolts slightly and place one vertically into each hole. Pound the

expansion bolt with a rubber mallet until it goes all the way into the hole.

Step 3 Fasten the expansion bolt clockwise until the nut is firmly inserted into the expansion tube.

Step 4 Turn the expansion bolt counterclockwise and remove the expansion bolt, spring washer and

flat washer in turn.

CAUTION

Page 26: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

20

Figure 4-7 Drilling holes and installing expansion sleeves

(1) Expansion bolt(M12) (2) Spring washer (3) Flat washer

(4) Expansion sleeve (5) Concrete pad

----End

4.2.3 Assembling the Support

Adjusting the Support Height

Step 1 Use a ruler to measure the distance between the concrete pad and the upper surface of the

antistatic floor.

Step 2 Adjust the height of the support based on the measurement result.

Step 3 Partially tighten the height locking bolts on both sides.

Figure 4-8 Adjusting the support height

----End

Page 27: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

21

Assembling and Leveling the Support

Step 1 Adjust the telescopic rod based on the cabinet width until the scale indicating the cabinet

width is displayed.

Step 2 Use a torque socket to secure the six M8x20 screw assemblies on the telescopic rods to 13 N•m.

Step 3 Assemble the telescopic rod and support using eight M8x20 screw assemblies and ensure that

the protruding side of the guide rail faces outwards. Then tighten all screw assemblies using a

torque socket to a torque of 13 N•m.

Step 4 Use a level to check the levelness of the support. If the support is not horizontal, loosen the

bolt and slightly adjust the support till it is level.

Step 5 Use a torque socket to secure all the bolts that are used to fix the height to 45 N•m.

Figure 4-9 Assembling and leveling the support

----End

4.2.4 Installing the Support

Installing the support, as shown in Figure 4-10.

Step 1 Install the expansion bolt.

Step 2 Check the support levelness by using a level.

Step 3 If the support is not level, place shims under the support.

Step 4 Use a torque socket to fasten the four expansive bolts to 45 N•m.

Page 28: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

22

Figure 4-10 Installing the support

----End

4.2.5 Securing the Cabinet

Securing the Cabinet

Step 1 Place the cabinet on the supports, and align the installation holes of the cabinet with the holes

of the supports.

Step 2 Fit the spring washer, flat washer and insulation covering on the four M12x40 bolts. Insert

them into the installation holes and tighten the bolts a bit, but do not fasten them.

Step 3 Lift one side of the cabinet and insert the insulation plate under the cabinet, Insert another

insulation plate under the other side of the cabinet. Ensure that the gaps properly lock the

bolts.

Page 29: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

23

Figure 4-11 Securing the cabinet

----End

Installing Front and Rear Pallets

After testing the cabinet insulating proper, install front and rear pallets on the support.

Fix the floor support bracket on the support by using the M12x25 combination screw.

Figure 4-12 Installing front and rear pallets

NOTE

Page 30: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 4 Installing the Cabinet

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

24

4.2.6 (Optional) Installing the IP21 Top Cover

If the cabinet is required to be protected to IP21, install an IP21 top cover. To install the IP21

top cover, perform the following steps:

Step 1 Install side panels, as shown in Figure 4-13.

Figure 4-13 Installing side panels

Step 2 Secure the side panels onto the cabinet top and install the cable tray, as shown in Figure 4-14.

Figure 4-14 Securing the side panels and the cable tray

Install the IP21 top cover after the cables are installed.

----End

CAUTION

Page 31: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 5 Cable Routing

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

25

5 Cable Routing

The Ways to Route Cables

Select any of the following ways to route cables based on the cable bundle cross-sectional area:

If the total cross-sectional area of a cable bundle is less than the area of a rodent-proof mesh, cut a

hole in the mesh or reduce the mesh size for cable routing.

If the total cross-sectional area of all bundles of cables is greater than or equal to the area of a

rodent-proof mesh, remove the mesh for cable routing.

If the total cross-sectional area of all bundles of cables is greater than the total area of all

rodent-proof meshes, remove the top cover for cable routing.

Figure 5-1 The position of the rodent-proof mesh

(1) Rodent-proof mesh

(Optional) Requirements for Routing Cables Through the IP21 Top Cover

Bind the cables to the cable tray above the IP21 top cover, as shown in Figure 5-2.

NOTE

Page 32: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 5 Cable Routing

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

26

Place the lowest point of the cables outside the cabinet to avoid rain dropping into the cabinet.

Figure 5-2 Requirements for routing cables through the IP21 top cover

CAUTION

Page 33: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 6 Installing a PGND Cable

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

27

6 Installing a PGND Cable

The PGND cable is used to connect PGND screws on the cabinet and the ground busbar

outside the cabinet to ensure proper grounding of the cabinet.

Install the PGND cable of the TP48200B-N20A6 is shown in Figure 6-1.

Figure 6-1 Installing the PGND cable of the TP48200B-N20A6

(1) Ground bar for the cabinet (2) Ground bar for the site

Page 34: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 6 Installing a PGND Cable

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

28

Install the PGND cable of the TP48200B-N20B1 is shown in Figure 6-2.

Figure 6-2 Installing the PGND cable of the TP48200B- N20B1

(1) Ground bar for the cabinet (2) Ground bar for the site

Page 35: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 7 Installing Components

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

29

7 Installing Components

7.1 Installing Rectifiers

The rated output current of each rectifier is 50 A. The number of rectifiers depends on actual

capacity requirements.

Installing Rectifiers of the TP48200B-N20A6

To install a rectifier refer to Figure 7-1.

Step 1 Remove the bolts from the handle. Ensure that the module handle is open.

Step 2 Pull handle out.

Step 3 Gently push the rectifier into the related slot along the guide rail.

Step 4 Push the handle upwards, lock the handle.

Step 5 Tighten the bolts in the handle and secure the handle.

Figure 7-1 Installing rectifiers of the TP48200B-N20A6

----End

Page 36: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 7 Installing Components

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

30

Installing Rectifiers of the TP48200B- N20B1

To install a rectifier refer to Figure 7-2.

Step 1 Push the locking latch towards the left.

Step 2 Pull the handle downwards.

Step 3 Gently push the rectifier into the related slot along the guide rail.

Step 4 Push the handle upwards and lock the handle.

Step 5 Push the locking latch towards the right and secure the handle.

Figure 7-2 Installing rectifiers of the TP48200B- N20B1

----End

Page 37: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

31

8 Installing Cables

8.1 Installing Signal Cables and Communication Cables

8.1.1 UIM02C The UIM02C provides eight dry contact outputs, six Boolean value inputs, and seven ports for

connecting to the smoke sensor, door status sensor, water sensor, ambient temperature and

humidity sensor, and so on.

Appearance

Figure 8-1 UIM02C panel

8.1.2 Installing Dry Contacts Signal Cables

Install dry contacts signal cables, as shown in Figure 8-2.

Figure 8-2 Installing dry contacts signal cables

(1) White Contact plate (2) Dry contact

Page 38: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

32

8.1.3 Installing Boolean Value Signal Cables

Connect Boolean value signal cables to the UIM02C ports as required. For the UIM02C port

description, see Table B-1 in Appendix B.

8.1.4 Installing Communications Cables

When in-band monitoring is required, connect the RS485/RS232 port on the SMU to the

communications equipment over a cable with an RJ45 connector. When out-of-band

monitoring is required, connect the FE port on the SMU to the communications equipment

over a cable with an RJ45 connector, as shown in Figure 8-3.

Figure 8-3 port on the SMU

RS485/RS232 port is protected by a security mechanism.

8.2 Installing Power Cables

Before installing power cables, ensure that all circuit breakers to the OFF position.

8.2.1 Installing DC Output Cables

Install DC output power cables for the TP48200B-N20A6. Connect the load cable to the

corresponding circuit breaker based on the load capacity, as shwon in Figure 8-4.

NOTE

DANGER

Page 39: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

33

Figure 8-4 Installing DC output cables of the TP48200B-N20A6.

(1) Primary load (2) Secondary load

Install DC output power cables for the TP48200B-N20B1. Connect the load cable to the

corresponding circuit breaker based on the load capacity, as shwon in Figure 8-5.

Figure 8-5 Installing DC output cables of the TP48200B-N20B1.

(1) Primary load (2) Secondary load

8.2.2 Installing Batteries

Page 40: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

34

All the tools used, such as a screwdriver, must be insulated to prevent the batteries from

being burned and to ensure personal safety.

Before installing batteries, ensure that the circuit breakers of the batteries to the OFF

position.

During the installation, avoid short circuits or reverse connections between the positive

and negative poles of the batteries.

Step 1 Install each battery in order, as shown in Figure 8-6.

Figure 8-6 Installing each battery in order

Step 2 Install the copper bars, the signal cables for monitoring the middle point voltage of the battery

string and power cables, as shown in Figure 8-7.

Connect negative power cables and then positive power cables for the batteries.

CAUTION

Page 41: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

35

Figure 8-7 Installing the copper bars between the batteries, cables for detecting the battery middle

point voltage, and power cables.

----End

8.2.3 Installing AC Input Cables

Install three-phase AC input cables of the TP48200B-N20A6 and TP48200B-N20B1 refer to

Figure 8-8.

Figure 8-8 Installing three-phase AC input cables of the TP48200B-N20A6 and

TP48200B-N20B1.

(1) ACDB

Page 42: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 8 Installing Cables

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

36

The AC input of the TP48200B-N20A6 and TP48200B-N20B1 is three phase by default. If

the AC input is single phase, short the three ports of AC input circuit breaker using two cables

as shown in Figure 8-9.

Figure 8-9 Installing single-phase AC input cables of the TP48200B-N20A6 and

TP48200B-N20B1

(1) ACDB (2)Short cables

(Optional) Installing the IP21 Top Cover

Figure 8-10 Installing the IP21 top cover

Page 43: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

37

9 System Commissioning

9.1 Installation Verification

After installation, verify that:

The cabinet is installed properly and the cables are connected properly. (Cables fastened

by screws are not easily removable.)

Cables are arranged neatly and bound properly by using cable ties.

The battery is connected properly and battery terminals cannot be connected reversely.

Check for short circuits between the live wires, between the live wire and the ground

cable, between the live wire and the neutral wire, between the RTN+ and the –48 V

busbar. Rectify short circuits before powering on the power system.

9.2 Powering On and Commissioning

9.2.1 Setting Parameters

Figure 9-1 SMU02B panel

(1) Running status indicator (2) Minor alarm indicator (3)Major alarm indicator

Page 44: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

38

(4) Liquid crystal display

(LCD)

(5) FE (6) Locking latch

(7) Four buttons

(10) Hold hands

(8) USB (Reserved) (9) RS485/RS232

USB port is protected by a security mechanism.

If the Run indicator (green) on the SMU02B panel is blinking and the LCD is on, the SMU02B is

powered on successfully.

Button Description

Button description of SMU panel as shown in Table 9-1

Table 9-1 Button description of SMU panel

Button Name Description

"▲"or"▼" "up"or"down" Allows you to view menu items and set the value of

a menu item by pressing ▲ or ▼.

" " "Cancel" Returns to the previous menu without saving the

settings of the current menu item.

" " "Enter" Enters the main menu from the standby screen,

enters a submenu from the main menu, or saves the

settings of a submenu item.

After a menu is displayed, the standby screen is displayed and the LCD screen becomes dark if you

do not press any button within 5 minutes.

You need to log in again if you do not press any button with 8 minutes.

The preset username is admin and the preset password is 001.

Setting Parameters

Step 1 Measure the voltage across the input ports of AC input circuit breakers. The voltage must

range from 200 V to 240 V. The rated voltage is 220 V. If not, ask professionals to rectify the

fault.

Step 2 Switch the AC input circuit breaker to the ON position, measure the voltage between L wiring

and N wiring terminal. The voltage must range from 200 V to 240 V. The rated voltage is 220

V.

Step 3 Set the NetEco Main IP, NetEco Bak IP, NetEco Port, LUI Language and Set Time Zone

according to actual conditions.

Step 4 Set the Qty of Battery, Rated Capacity, Set Date and Set Time according to actual

conditions. (Always set Qty of Battery to 1 and set Rated Capacity to the total capacity of all

battery strings.)

Step 5 Set the IP Address, Subnet Mask and Default Gateway according to actual conditions.

NOTE

NOTE

Page 45: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

39

Table 9-2 Parameter settings

Main Menu

Second-Level Menu

Third-Level Menu

Forth-Level Menu

Default Value

Settings Comm Para NetEco Main IP - -

NetEco Bak IP - -

NetEco Port - 31220

Host Comm Addr 0

Comm Baudrate 9600

System Para LUI Language - ENGLISH

Set Time Zone - GMT +08:00

Quick

Settings

Qty of Battery - - 1

Rated

Capacity

- - 150Ah

Set Date - - -

Set Time - - -

IP Address - - 192.168.0.10

Subnet Mask - - 255.255.255.0

Default

Gateway

- - 192.168.0.1

Step 6 Set battery fuse break alarm "Enable/Disable" status。

----End

Table 9-3 Battery fuse break alarm "Enable/Disable" status

Main Menu

Second-Level Menu

Third-Level Menu

Fourth-Level Menu Set Value

Settings Alarm Setting Site Summary Battery Fuse1 Break Enable battery fuse

blown alarms for

the branches with

batteries, and

disable battery fuse

blown alarms for

the branches

without batteries.

Battery Fuse2 Break

Battery Fuse3 Break

Battery Fuse4 Break

Battery Fuse5 Break

Battery Fuse6 Break

Battery Fuse7 Break

Battery Fuse8 Break

Page 46: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

40

Main Menu

Second-Level Menu

Third-Level Menu

Fourth-Level Menu Set Value

Battery Fuse9 Break

Battery Fuse10 Break

Battery Fuse11 Break

Battery Fuse12 Break

You can set parameters to modify the default mode of the Boolean value input ports and the dry contact

output ports, as shown in Table 9-4.

Table 9-4 Modifying the default mode of the Boolean value input ports and the dry contact output

ports

Main Menu Second-Level Menu Third-Level Menu Default Value Settings

Site Summary DI1Alarm Close

DI2 Alarm Close

DI3 Alarm Close

DI4 Alarm Close

DI5 Alarm Close

DI6 Alarm Close

DO1 Alarm Act Close

DO2 Alarm Act Close

DO3 Alarm Act Close

DO4 Alarm Act Close

DO5 Alarm Act Close

DO6 Alarm Act Close

DO7 Alarm Act Close

DO8 Alarm Act Close

You can set parameters to modify the related relay of the alarm. For example, set Battery1 Lost to DO8,

as shown in Table 9-5.

NOTE

NOTE

Page 47: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

41

Table 9-5 Setting Battery1 Lost to DO8

Main Menu

Second-Level Menu

Third-Level Menu

Forth-Level Menu

Default Value

Set Value

Settings Alarm Setting Batt Summ Battery1 Lost None DO8

----End

9.3 Powering On

To avoid damaging batteries, switch the battery circuit breaker to the ON positions only after

correctly setting the battery parameters on the SMU.

Step 1 Switch the AC input circuit breakers to the OFF positions.

Step 2 Switch the battery circuit breakers in the PDU to the ON positions.

Step 3 Switch the AC input circuit breakers to the ON positions.

Step 4 Check whether the voltage between the RTN+ busbar and DC output terminal are the same as

the battery voltage and the voltage displayed on the monitoring unit. If not, ask professionals

to rectify the fault.

Step 5 Check whether the run indicator of rectifiers is normal. If not, ask local professionals.

Step 6 Switch the LLVD and BLVD branches to the ON positions.

Step 7 Measure whether the voltage between RTN+ and the DC output terminal. The voltage must

range from 42 V to 58 V. The rated voltage is 53.5 V. Check whether the loads work normally.

If the loads work abnormally, rectify the fault according to the relevant user guides.

Step 8 Switch all circuit breakers as required.

Step 9 Check whether the element management system (EMS) can receive the information from the

power system. If not, check whether the IP address is set correctly.

Step 10 Observe the operation of the power system for 15 minutes. If no alarms are generated, and

current/voltage parameters of the battery and loads are set properly, then lock the door to the

cabinet, give the key of the cabinet door to the customer, and clean the site before leaving.

----End

CAUTION

Page 48: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide 9 System Commissioning

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

42

To make the system run properly, flip the battery switch to the NORMAL position.

To power on the battery forcibly, flip the battery switch to the BAT ON position.

Figure 9-2 The position of switch

CAUTION

Page 49: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide A Prepare Terminal

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

43

A Prepare Terminal

Prepare Terminal

Cut cables to a length suitable for the actual cable route, and then add OT terminals or cord

end terminals to each end of the cables, as shown in Figure A-1and Figure A-2.

Figure A-1 Prepare OT terminals

Figure A-2 Prepare cord end terminals

Page 50: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide B UIM02C Pin Definition

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

44

B UIM02C Pin Definition

Appearance

Figure B-1 UIM02C panel

Port Description

Table B-1 UIM02C port description

Port Type Silkscreen Description Default Mode

Sensor ports TEM_HUM Temperature and humidity

sensor

-

WATER Water sensor -

TEMP1 Reserved -

TEMP2 Reserved -

GATE Door status sensor -

SMOKE Smoke sensor -

BTEMP Battery temperature sensor -

Boolean value

input ports

DIN1 Boolean value input 1 Close: alarm

Open: normal

DIN2 Boolean value input 2 Close: alarm

Open: normal

Page 51: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide B UIM02C Pin Definition

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

45

Port Type Silkscreen Description Default Mode

DIN3 Boolean value input 3 Close: alarm

Open: normal

DIN4 Boolean value input 4 Close: alarm

Open: normal

DIN5 Boolean value input 5 Open: alarm

Close: normal

DIN6 Boolean value input 6 Close: alarm

Open: normal

Dry contact

output ports

ALM1 AC power failure alarm Close: alarm

Open: normal

ALM2 DC undervoltage alarm or DC

overvoltage alarm

Close: alarm

Open: normal

ALM3 Rectifier faults alarm, rectifier

protect alarm, or communication

faults alarm

Close: alarm

Open: normal

ALM4 SPD failure alarm Close: alarm

Open: normal

ALM5 Fuse burn-out alarm Close: alarm

Open: normal

ALM6 Battery temperature alarms Close: alarm

Open: normal

ALM7 Alarm7 Close: alarm

Open: normal

ALM8 Alarm8 Close: alarm

Open: normal

Communication

Port

COM RS485

Pin Definition

Table B-2 Pin Definition

Silk Screen Pin Pin definition

WATER 1 12 V

2 WATER

3 GND

Page 52: TP48200B-N20A6 & N20B1 Quick Installation Guide (V300R001_04)

TP48200B-N20A6 & N20B1

Quick Installation Guide B UIM02C Pin Definition

Issue 04 (2013-01-09) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

46

Silk Screen Pin Pin definition

4 -

TEMHUM 1 12 V

2 ENV_TEMP

3 12 V

4 ENV_HUM

TEMP1 1 TEMP1

2 GND

TEMP2 1 TEMP2

2 GND

GATE 1 DIN7+

2 JTD7

SMOKE 1 12 V

2 Smoke

BTEMP 1 Btemp1

2 12 V