22
1 10th Oct 2005 TP2 and TP3 Parameter Measurement Test Readiness Jonathan King, Sudeep Bhoja, Jeff Rahn, Brian Taylor 10th Oct 2005

TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

110th Oct 2005

TP2 and TP3 Parameter Measurement Test Readiness

Jonathan King, Sudeep Bhoja, Jeff Rahn, Brian Taylor

10th Oct 2005

Page 2: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

210th Oct 2005

Contents

• Tx and Rx Specifications• TP2 Testing

– Tx: Eye Mask OMA, ER, Average Power Encircled Flux (and CPR) RIN (and measured SNR (Tx to Rx)) TWDP

• TP3 Testing – Stressed Eye Generator– Rx: B-B Sensitivity Performance

TP3 Test Waveforms Overload

Aim is to show experimental verification of test procedures & compliance to specifications

Page 3: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

310th Oct 2005

Summary of Major LRM Parameters at TP2 & TP3

>30% inside 5um radius>86% inside 11um radius

Encircled Flux4.7dBTWDP

5x10-5 hits in margin0%Eye Mask Margin-128dBmOMA/HzRIN+0.5dBmMean Power+1.5-4.5dBmTx OMA

CommentsMaxMinTP2 Parameter

TP3 informative waveform-6.5dBm OMAInformative Sensitivity TestTP3 normative waveforms+1.5

+0.5dBm OMAdBm mean

Overload

TP3 normative waveforms-6.5dBm OMAStressed Sensitivity Test+0.5-8.5dBmMean Power+1.5-6.5dBm OMARx OMA Range

CommentsMaxMinTP3 Parameter

Page 4: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

410th Oct 2005

TP2 TestingParameters measured at module level for TP2 Readiness evaluation: • Average launch power, OMA, ER, Jitter, Eye-mask Margin

– Test kit required:• 231 PRBS data source (eg XAUI, self generated), bit trigger• 8x1 8x0 (or similar) data source• Digital Oscilloscope with O-E• Optical power meter

• TWDP– Test kit required:

• 29 Data source, pattern trigger• Digital Oscilloscope with O-E• Computer

• Encircled Flux– Test kit required:

• IR camera or equivalent method

TP2 tests use conventional equipment and established methods

Page 5: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

510th Oct 2005

TP2 Measurement Results

• Typically >4 σ margin to spec • Confirms TP2 specifications are consistent with high volume

manufacture, as required for PAR

11.9-4.5 (min)0.27-1.27Min/coldSMF OMA12.30.25-1.48Nom/nom 7.90.37-1.6Max/hot

3.805.2820.0Min/coldEye Margin %4.14.9720.6Nom/nom NB: 0 hit limit used 4.04.6518.5Max/hot

5.0331.5225.4Nom/nom Jitter p-p, ps8.50.164.41Max/hot13.30.094.31Nom/nom

Min/cold

Max/hotNom/nom Min/cold

Supply,Temp

5.60.38-1.64

6.9

6.56.2

Margin to Spec. σ

3.5

0.5 (max)

Spec

ER, dB

SMF power, dBm

Parameter

0.164.62

0.29-1.350.26-1.12

σAverage

Page 6: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

610th Oct 2005

TP2 Encircled Flux and CPR Testing & Results

Encirc led flux

0102030405060708090

100

1 2 3 4 5 6 7 8 9

%

11um 5um

>30%, 5um

>86%,11um

4.4 σ

4.9 σ2.3 σ

Margin to spec

2dB

86%30%Spec

CPR **

11 um radius5um radiusEncircled Flux

0.25dB0.9dB

2.32%97.3%13.3%60.4%Sigma Average

Encircled Flux:• Non-IEC method used here (scanned SM fibre technique)• Comparison underway with IR camera approach

Page 7: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

710th Oct 2005

TP2 Measurements: RIN

• Test conditions– Nominal: 30oC, nominal module bias, & nominal back-reflection– Stressed: 70oC, low supply (-6%), and 12dB back-reflection

• Nominal Tx OMA -2dBm into SMF– Worst case RIN: -140dB/Hz nominal, -137dB/Hz stressed

-155

-150

-145

-140

-135

-130

-4 -3 -2 -1 0 1 2 3

Nominal RIN1 (dB/Hz)Nominal RIN0 (dB/Hz)Stressed RIN1 (dB/Hz)Stressed RIN0 (dB/Hz)

RIN

(dB

/Hz)

OMA (dBm)

RINdB/Hz

OMA into SMF

Page 8: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

810th Oct 2005

TP2 Measurements: Example of Tx-Rx SNR

• Test condition– TOSA & ROSA: 70oC, low

supply (-6%)• At -2dBm OMA Tx output

power– SNR > 38dBe at -6.5dBm

OMA Rx input

25

30

35

40

45

-14 -12 -10 -8 -6 -4 -2 0 2

-3.9dBm_SMF-3dBm_SMF-2dBm_SMF-1dBm_SMF0dBm_SMF

SNR

(dB

)

OMA (dBm)Received OMA, dBm

LRM spec30dBe

8dBe margin to spec

Page 9: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

910th Oct 2005

TP2: TWDP

• TWDP measurements here used Draft 2.2 stressors, 100/50 TFF/DFE EDC emulation– Normalization of captured waveform to OMA added within code

• 4.7dB test limit, as in Draft 2.2• Needs repeating with latest finite EDC emulation and latest OMA

extraction code

• 10 samples typically >4 σ margin to spec

Max/hotNom/nom Min/cold

Supply,Temp

3.9σ0.074.416.1σ

4.4σ

Margin to Spec.

4.7

Spec

TWDP, dB

Parameter

0.064.310.084.32

σAverage

Page 10: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1010th Oct 2005

TP3 TestingParameters measured at module level for TP3 Readiness Evaluation: • Normative sensitivity tests

– Test kit required:• Stressed eye generator (SEG) with E-O (3.5dB ER, 27dB SNR)• BER detection• Optical power meter

• Overload – Test kit required:

• 29 Data source, pattern trigger• Digital Oscilloscope with O-E• Computer

Page 11: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1110th Oct 2005

TP3 Testing: SEG (Stressed eye generator) for LRM

• Creates a stable, stressed channel that can be used to test and compare receiver performance

• ISI generator is based on TFF plus linear E-O– Avoids issues with long period reflections associated with lumped

element implementations• On board PRBS generation and error detection • Large number of taps permits better fits

– Short period reflections can be compensated for with extra taps– DUT sees accurate stressor

Page 12: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1210th Oct 2005

SEG Block DiagramUSB interface

uC

XAUIbias

T TOSALinearDriverEDC

ExtData

source

ROSA

LAchoice of external

data source

electrical noise source

231-1 PRBS

• Like a transponder, but with EDC in Tx chain, linear driver & E-O• USB interface for easy PC based GUI control• Implements 802.3aq TP3 Test Waveforms; fiber pulse response

emulations are also possible.

Page 13: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1310th Oct 2005

SEG Board Photo

PowerSupplies

USB

TOSAOutput

Bias Tee

Linear Driver

EDC

Page 14: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1410th Oct 2005

SEG: Symmetric Channel

• Blue = SEG fit, Red = Target channel• PIE-D value 3.85 dB

– PIE-D error = +0.03dB• SNR = 30.46dBe

– SNR error = -0.54dBe• ER = 3.6dB

– ER error = +0.1dB• OMA = -3.0 dBm

temporal frequency

Page 15: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1510th Oct 2005

SEG: Pre-cursor Channel

• Blue = SEG fit, Red = Target channel• PIE-D value 4.1 dB

– PIE-D error = +0.06dB• SNR = 30.65dBe

– SNR error = -0.35dBe• ER = 3.63dB

– ER error = +0.13dB• OMA = -2.96dBm

temporal frequency

Page 16: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1610th Oct 2005

SEG: Post-cursor Channel

• Blue = SEG fit, Red = Target channel• PIE-D value 4.2 dB

– PIE-D error = 0.0dB• SNR = 31.66dBe

– SNR error = +0.66dBe• ER = 3.6dB

– ER error = +0.1dB• OMA = -2.99dBm

temporal frequency

Page 17: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1710th Oct 2005

SEG Characteristics*

dH2

dH3

dB/Hz-128-135RINOMA

dBc [4]-<-40

dBc [4]-<-38Transmitter

Linearity

0.08

2e-4

-

16

3.7

-2.6

-1.5

Typ

MSE4e-4-Pulse Response Fit Error

dB0.175-0.175PIE-D Error

dBm0.5-4Average Power

dB-20-Optical Return Loss

Hz100Dynamic Repetition Rate

dB (optical) [3]1715Signal-to-Noise Ratio

dB [2]TBD3.5Extinction Ratio

dBm [2]TBD-4.5OMA

UnitMaxMinItem

[*] Measurements with 62.5µm MCP[2] Max upper bound is determined by linearity requirements.[3] Consistent with IEEE 802.3aq D2.2 [4] 500MHz tone

Page 18: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1810th Oct 2005

SEG: Calibration

• Measure the step response of the channel using a 128 bit square wave

• Calculate the pulse response• Calculate PIE-D using the folded frequency method• Linearity is guaranteed by design bounds• Combination of SNR, ER, goodness of fit, and PIE-D value used to

determine suitability of channel for testing• Procedure iterates until the target SNR and ER are achieved• BER tested on reference RX

Page 19: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

1910th Oct 2005

Test results with SEG

Page 20: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

2010th Oct 2005

Transponder Measurements: 220m (Draft 2.2) Normative Tests

15 units tested over 3 corners: typically >4σ margin to spec

4.5 σ0.72-9.7Min/coldSymmetric4.5 σ0.79-10.1Nom/nom 4.6 σ0.83-10.3Max/hot

4.7 σ0.85-10.5Min/coldPre-cursor6.4 σ0.69-10.9Nom/nom 7.7 σ0.57-10.9Max/hot

Post-cursor

Stressor

8.3 σ0.55-11.1Max/hot7.9 σ0.58-11.2Nom/nom 6.3σ0.64-10.6Min/cold

Margin to spec(-6.5dBm)

σdB

Average sensitivitydBm OMA

Supply/temp.

Page 21: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

2110th Oct 2005

Rx Overload Measurements

• SEG overload test capability recently achieved, enabled with high power cooled DFB used as O-E– Max output +3dBm OMA max (2dBm mean, 6.4dB ER)

>2.6

>2.6

>2.6

Overload dBm OMA(Module)

Min/cold220m Symmetric

3.0Nom/nom

Max/hot

Min/cold220m Pre-cursor

3.6Nom/nom

Max/hot

220m Post-cursor

Stressor

Max/hot3.5Nom/nom

Min/cold

Overload dBm OMA(Engineering test bed)

Corner

Page 22: TP2 and TP3 Parameter Measurement Test Readinessgrouper.ieee.org/groups/802/3/aq/public/oct05/king_1_1005.pdf · Summary of Major LRM Parameters at TP2 & TP3 >30% inside 5um radius

2210th Oct 2005

Summary

• Overview presented of the measurement capabilities & the technical feasibility for many of the 802.3aq 10GBASE-LRM TP2 and TP3 Parameters– Test capabilities for TP2 parameters established– Test capabilities for TP3 parameters established

• Excellent TP2 and TP3 performance and margins demonstrated– Essentially all measurements were completed at the TP2 & TP3 points

connected to implementations complying to different industry MSAmodules

• Supports the practicality and manufacturability of 10GBASE-LRM PMD for the TP2 and TP3 specifications