TOWN OF THOMPSON REQUEST FOR PROPOSALS (RFP) Preliminary Engineering for Buckley Hill Road Bridges The Town of Thompson is seeking written proposals from qualified bridge engineering firms to perform preliminary surveying, engineering and cost estimating for two bridges to enable the Town to apply for the CONNDOT Local Bridge Program. The Town of Thompson, Connecticut will receive sealed proposals for engineering services until 12:00 PM Local Time on Wednesday March 24, 2021 in the Selectmen’s Office, Town Hall, 815 Riverside Drive, North Grosvenordale, CT 06255. Proposals must be in a sealed envelope clearly marked Preliminary Engineering Proposal for Buckley Hill Road Bridges”. The Town of Thompson, will be using the web page https://www.thompsonct.org/bids on the Town’s web site as a method of getting all pertinent information out on the project. All addendum and any addition information will be placed on the web page. Any questions or problems with the web page should be directed to Kelley Genest, 860-923-9561, [email protected]. The Town reserves the right to reject any and all proposals or any part thereof, to waive defects in the same, or to accept any proposal or any part thereof deemed to be in the best interest of the Town of Thompson, Connecticut. An Affirmative Action/Equal Opportunity Employer. Minority/Women’s Business Enterprises are encouraged to apply. By: Amy St. Onge Title: First Selectman

TOWN OF THOMPSON REQUEST FOR PROPOSALS (RFP)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

TOWN OF THOMPSON

REQUEST FOR PROPOSALS (RFP)

Preliminary Engineering for Buckley Hill Road Bridges

The Town of Thompson is seeking written proposals from qualified bridge engineering firms to perform preliminary surveying, engineering and cost estimating for two bridges to enable the Town to apply for the CONNDOT Local Bridge Program. The Town of Thompson, Connecticut will receive sealed proposals for engineering services until 12:00 PM Local Time on Wednesday March 24, 2021 in the Selectmen’s Office, Town Hall, 815 Riverside Drive, North Grosvenordale, CT 06255. Proposals must be in a sealed envelope clearly marked “Preliminary Engineering Proposal for Buckley Hill Road Bridges”. The Town of Thompson, will be using the web page https://www.thompsonct.org/bids on the Town’s web site as a method of getting all pertinent information out on the project. All addendum and any addition information will be placed on the web page. Any questions or problems with the web page should be directed to Kelley Genest, 860-923-9561, [email protected]. The Town reserves the right to reject any and all proposals or any part thereof, to waive defects in the same, or to accept any proposal or any part thereof deemed to be in the best interest of the Town of Thompson, Connecticut. An Affirmative Action/Equal Opportunity Employer. Minority/Women’s Business Enterprises are encouraged to apply. By: Amy St. Onge

Title: First Selectman

REQUEST FOR PROPOSALS (RFP)

TOWN OF THOMPSON

PRELIMINARY ENGINEERING FOR BUCKLEY HILL ROAD BRIDGES

TABLE OF CONTENTS

A. PROJECT DESCRIPTION

B. SCOPE OF SERVICES

C. QUALIFICATIONS

D. FACTORS FOR EVALUATION

E. EVALUATION OF PROPOSALS AND AWARD

F. KEY DATES

G. TERMS AND CONDITIONS

H. INSURANCE REQUIREMENTS

I. PROPOSAL SUBMISSION REQUIREMENTS

J. QUESTIONS AND AMENDMENTS

ATTACHMENTS

Fee Proposal Form

Proposal Scoresheet

REQUEST FOR PROPOSALS (RFP)

TOWN OF THOMPSON

Preliminary Engineering for Buckley Hill Road Bridges

A. PROJECT DESCRIPTION

Thompson is seeking a qualified bridge engineering firm to assist the Town in applying to the CONNDOT Local Bridge Program for the following two bridges. The selected firm will be responsible for the Preliminary Applications including all attachments such as the narrative, preliminary cost figures, and preliminary plans and specifications. The goal is to perform just the amount of preliminary engineering to enable the Town to submit a thorough application package that will have a high likelihood of being funded and a realistic construction cost estimate. The work is anticipated to be funded in the FY 21/22 budget so the consultant’s work contract shall not be signed prior to July 1, 2021. The two bridges are:

03949 Buckley Hill Road over the French River 03950 Buckley Hill Road over the French River Canal

Consultants should also be aware that a large historic mill renovation at 815 Riverside Drive is proposed. When the project is complete it will result in adding 300 new apartments plus retail space in close proximity of these bridges. Therefore, it is anticipated that vehicular and pedestrian traffic will significantly increase. In addition, a redesign of the intersection of Buckley Hill Road and Riverside Drive (Route 12) is desired by the Town which could affect the vertical alignment as well as the width of Buckley Hill Road. This information should be considered when evaluating repair or replacement options.

B. SCOPE OF SERVICES

1. Review available CONNDOT/Town reports and drawings.

2. Inspect the bridges and assess the current condition of the bridge, stream channel,

and associated roadway.

3. Evaluate alternatives for repair or replacement and meet with the Town to discuss them.

4. Make a presentation to board of selectmen to describe the Local Bridge Program process and alternates.

5. Prepare conceptual plans and sections illustrating chosen alternates.

6. Prepare Preliminary Cost Figures as required by the application including Preliminary

Engineering Fees, Rights-of-way Cost, Municipally Owned Utility Relocation Costs,

Estimated Construction Costs, and Construction Engineering.

7. Provide the description of project scope for both bridges including narrative and

conceptual/preliminary plans.

8. Optional: Complete a topographic survey, with property lines indicated to Class B,

as appropriate to fully document existing conditions and prepare existing conditions

plans of the structures (Class T-2, NAD 83, NAVD 88, by Licensed Connecticut Land

Surveyor)

C. QUALIFICATIONS

1. Firm must provide industry standard or higher quality services while maintaining a focus

on providing a cost-effective service to the Town.

2. Firm must have a proven track record in providing these types of services for similarly

sized municipal governments in Connecticut.

3. Firm must be familiar with, qualified, and properly licensed in the State of Connecticut

to perform its obligation under this proposal in compliance with all applicable Federal

and State of Connecticut laws and regulations, statutes and policies and affirmative

action and equal opportunity employment practices.

4. Firm should be prepared to demonstrate their experience working with CONNDOT and

the Local Bridge Program.

D. FACTORS FOR EVALUATION

The Selection Process will evaluate, and rank Firms based on the following factors. The

Proposal Scoresheet is attached.

1. Proposal Impressions – completeness/customization for the project/attention

to detail

2. Experience with CONNDOT and the Local Bridge Program and Bridge

Inspection

3. Experience of key personnel and sub-contractors

4. Technical competence and experience

5. Proposed Fee

6. References (Quality and Performance of past services on similar projects)

E. EVALUATION OF PROPOSALS AND AWARD

1. The Town will assemble a proposal review team consisting of a minimum of 4 individuals, two of which will include the First Selectman and Director of Public Works. The team will evaluate and rank the firms and will make a recommendation of contract award to the Board of Selectmen based upon the criteria outlined in this RFP and a

ranking system developed by the Town. If deemed necessary, the Town reserves the right to arrange for on-line interviews/oral presentations as part of the selection process, which invitations for interviews may involve a short-listing of the proposals received.

2. The Town reserves the right to accept all or any part of a proposal, reject all proposals, and waive any informalities or non-material deficiencies in a proposal. It shall be understood that the award made by the Town of Thompson shall be final and conclusive without recourse or appeal by the remaining Firms.

3. The successful respondent shall assume sole responsibility for the complete project as

required by this RFP. Respondents who intend to subcontract one or more elements of this project to other firms/individuals shall identify those work elements to be subcontracted and the firm/individual subcontractor. All subcontractors shall be identified, and to the extent necessary, their qualifications shall be provided. Subcontractors shall not be substituted, nor any portions of the contract assigned to other parties without the written consent of the Town of Thompson.

4. The selected Firm shall be fully responsible to the Town of Thompson for the

performance, deliverables, acts, and omissions of its sub-consultants and persons directly or indirectly employed thereby.

5. The selected Firm will be expected to execute a standard contract for professional services as approved by the Town of Thompson.

F. KEY DATES

RFP Advertised: February 17, 2021

Requests for Information Due March 3, 2021

Responses/Addendum Posted March 10, 2021

RFP Submissions Due March 24, 2021

RFP Evaluations April 2021

Notice of Award Sent May 2021

Review of Contract June 2021

Contract Execution July 1, 2021

It is anticipated that the contracted services as described in this RFP shall be completed within

six (6) months of award unless an extension of time is agreed upon by the Town of Thompson

and the Consultant.

G. TERMS AND CONDITIONS

1. The Town of Thompson, in its sole discretion, reserves the right to clarify, modify,

amend or terminate this RFP, prior to the due date and time, if it is deemed to be in the

best interest of the Town of Thompson. The Town of Thompson reserves the right to

decide not to consider any or all of the firms submitting information in response to this

request.

2. The Town of Thompson reserves the right to accept or reject any and all responses to

the RFP, or any part thereof, and to waive any informalities and/or technicalities that are

deemed to be in the best interest of the Town of Thompson, and to advertise new

proposals, and to make awards as may be in the best interest of the Town of

Thompson.

3. All costs incurred in the preparation and presentation of the RFP shall be wholly

absorbed by the respondent.

4. Any materials submitted, shall become the property of the Town of Thompson. The

proposals will not be returned to the proposers.

5. All information submitted in a proposal or in response to a request for additional

information is subject to disclosure under the Connecticut Freedom of Information

Act. Proposers are encouraged not to include in their proposals any information

which is proprietary, a trade secret, or otherwise confidential. All materials associated

with this procurement process are subject to the terms of state laws defining

freedom of information and privacy, and all rules, regulations and interpretations

resulting from those laws.

6. By responding, the proposers implicitly state that: their proposal has not been made in

connection with any other competing firm submitting a separate response to this RFP; is

in all respects fair; and has been submitted without collusion or fraud.

7. By submitting a proposal, each proposer represents that it has thoroughly examined and

become familiar with the scope of work outlined in this RFP, and it is capable of

performing the work to achieve the Town’s objectives. Each proposer shall visit the site,

examine the areas and thoroughly familiarize itself with all conditions of the property

before preparing its proposal.

8. Any successful firm is prohibited from assigning, transferring, conveying, subletting, or

otherwise disposing of this agreement of its rights, title, or interest therein or its power

to execute such an agreement to any other person, company, or corporation without

prior consent and written approval from the Town of Thompson.

9. The Town of Thompson may terminate any contract(s), in whole or in part, resulting

from this process at any time for: cause, default or negligence on the part of the

respondent; or if the respondent fails, in the opinion of the Town of Thompson, to meet

the general terms and conditions of any resulting contract or to provide a level of service

that is deemed to be in the best interest of the Town of Thompson.

H. INSURANCE REQUIREMENTS – Town of Thompson Projects

Contractor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name Town of Thompson as an Additional Insured on a primary and non-contributory basis to all policies, except Workers Compensation. All policies should also include a Waiver of Subrogation. The Additional Insured Endorsement shall be written on ISO Form 2010 and 2037 or its equivalent and shall include coverage for Products/Completed Operations after the work is complete.

Insurance shall be written with Carriers approved in the State of Connecticut. In addition, all Carriers are subject to approval by Town of Thompson.

(Minimum Limits)

General Liability Each Occurrence General Aggregate

Products/Completed Operations Aggregate

$1,000,000

$2,000,000 $2,000,000

Auto Liability Combined Single Limit Each Accident

$1,000,000 $1,000,000

Umbrella (Excess Liability)

Each Occurrence Aggregate

$5,000,000 $5,000,000

Professional Liability Each Occurrence

$5,000,000

If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of this contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the contract for two (2) years from the completion date.

Workers’ Compensation and WC Statutory Limits Employers’ Liability EL Each Accident $100,000

EL Disease Each Employee $100,000 EL Disease Policy Limit $500,000

Original, completed Certificates of Insurance must be presented to the Town of Thompson to contract issuance. Contractor agrees to provide replacement/renewal certificates at least 30 days prior to the expiration date of the policies. Should any of the above described policies be cancelled, limits reduced or coverage altered, 30 days written notice must be given to the Town.

I. PROPOSAL SUBMISSION REQUIREMENTS

The Town of Thompson, Connecticut will receive sealed proposals for engineering services until

12:00 PM Local Time on Wednesday March 24, 2021 in the Selectmen’s Office, Town Hall, 815

Riverside Drive, North Grosvenordale, CT 06255. Proposals must be in a sealed envelope clearly

marked “Preliminary Engineering Proposal for Buckley Hill Road Bridges” Firms shall

provide one (1) signed original, four (4) copies of all materials and a CD or Flash Drive

containing an exact copy of the requested materials in PDF format.

The Town will not accept submissions by e-mail or fax. Proposers are solely responsible for ensuring timely delivery. The Town will NOT accept late proposals.

Proposals may be withdrawn personally or in writing provided that the Town receives the

withdrawal prior to the time and date the proposals are scheduled to be opened. Proposals are

considered valid, and may not be withdrawn, cancelled or modified, for six (6) months after

the opening date, to give the Town sufficient time to review the proposals, investigate the

proposers’ qualifications, and execute a binding contract with the successful proposer.

An authorized person representing the legal entity of the proposer must sign the Proposal

Form and all other forms included in this RFP.

Proposals shall include the following:

1. Cover Letter

Firms shall provide a one-page Cover Letter addressed to Amy St. Onge, First Selectman, signed

by an authorized principal or agent of the Firm. The letter shall provide an overview of the

proposal, as well as the name, title, phone number, and email address of the person to whom

questions concerning the submission may be directed.

2. History and Resumes

The Firm shall include a brief history of the company including: Firm Size(s) and Organization,

Length of time in business, Services offered, Experience with bridge inspection and the

CONNDOT Local Bridge Program, and Resumes of Key Personnel assigned to the Project. The

Lead Project Manager must be a Professional Engineer, licensed in the State of Connecticut.

3. Scope of Services

The Firm shall provide a detailed Scope of Work which outlines the various services they will

provide for the project. Any services not specifically mentioned in the RFP, but which are

necessary to ensure that the intent of the scope of services is met shall be included in the

proposal.

4. Key Issues, Experience, and Ability to Perform

Proposers shall include examples of previous work on similar projects to demonstrate their

understanding and familiarity with projects of this type.

5. References

Provide at least three (3) references of projects completed in the last five (5) years that are

similar to the proposed Scope of Services. Include: Dates of contract duration; services

performed and associated fees; Name, Address, Phone Number, and email address of Client

which may be contacted to verify submitted information.

6. Past Claims or Disputes

Indicate any claims, disputes or arbitration proceedings, including actions by any governmental

agency, that have occurred over the past five (5) years. Indicate who they were with, the

nature of the claim, dispute or arbitration proceeding, the outcome and/or current status.

7. Certificate of Insurance Indicating all required coverage indicated

8. Fee Proposal Form Filled out Completely with Original Signatures

9. Include a Schedule of all-inclusive hourly rates for each individual assigned to the

project. These rates will be used as a basis for any additional services requested.

J. Questions and Amendments

Questions concerning the process and procedures applicable to this RFP are to be submitted

in writing and directed to Kelley Genest, Assistant to the Selectman, by email to

[email protected]

Proposers are prohibited from contacting any other Town employee, officer or official

concerning this RFP. A proposer’s failure to comply with this requirement may result in

disqualification.

The appropriate Town representative listed above must receive any questions from proposers

no later than fourteen (14) days before the proposal opening date. That representative will

confirm receipt of a proposer’s questions by e-mail. The Town will answer all written questions

by issuing one or more addenda, which shall be a part of this RFP and the resulting Contract,

containing all questions received as provided for above and decisions regarding same.

At least seven (7) calendar days prior to proposal opening, the Town will post any addenda

on the Town’s https://www.thompsonct.org/bids Each proposer is responsible for

checking the website to determine if the Town has issued any addenda and, if so,

to complete its proposal in accordance with the RFP as modified by the addenda.

No oral statement of the Town, including oral statements by the Town representatives

listed above, shall be effective to waive, change or otherwise modify any of the provisions

of this RFP, and no proposer shall rely on any alleged oral statement.

FEE PROPOSAL FORM

1.1 PROPOSAL INFORMATION

A. Proposer: ____________________________________________________.

B. Project Name: PRELIMINARY ENGINEERING FOR BUCKLEY HILL ROAD BRIDGES

C. Project Location: Buckley Hill Road

D. Owner: Town of Thompson

1.2 CERTIFICATIONS AND BASE BID

A. Base Bid:

The undersigned Proposer, having carefully examined the Procurement and Contracting

Requirements, Conditions of the Contract, and all subsequent Addenda, as prepared by The

Town of Thompson, having visited the site, and being familiar with all conditions and

requirements of the Work, hereby agrees to furnish all services necessary to complete the

design of the above-named project, according to the requirements of the Procurement and

Contracting Documents, for the stipulated sum of:

1. ________________________________________________ Dollars

($______________________)

1.3 SUBCONTRACTORS AND SUPPLIERS

A. The following companies shall execute subcontracts for the portions of the Work

indicated:

1.________________________________________________________

2.________________________________________________________

3.________________________________________________________

4.________________________________________________________

1.4 ACKNOWLEDGEMENT OF ADDENDA

A. The undersigned Proposer acknowledges receipt of and use of the following Addenda in

the preparation of this Bid:

1. Addendum No. 1, dated ____________________.

2. Addendum No. 2, dated ____________________.

3. Addendum No. 3, dated ____________________.

1.5 CONTRACTOR'S LICENSE

A. The undersigned further states that it is a duly licensed firm, for the type(s) of work

proposed, in the State of Connecticut, and that all fees, permits, etc., pursuant to

submitting this proposal have been paid in full.

1.6 SUBMISSION OF BID

A. Respectfully submitted this ____ day of ____________, 2021.

B. Submitted By:_______________________________________(Name of bidding

firm or corporation).

C. Authorize Signature:__________________________________(Handwritten signature)

D. Signed By:___________________________________________(Type or print name)

E. Title:________________________________(Owner/Partner/President/Vice President)

F. Witness By:_________________________________________(Handwritten signature)

G. Attest:___________________________________________(Handwritten signature)

H. By:________________________________________________(Type or print name)

I. Title:________________________________(Corporate Secretary or Assistant

Secretary).

J. Street Address:__________________________________________________________

K. City, State, Zip:_________________________________________________________

L. Phone:_________________________________________________________________

M. License No.:____________________________________________________________

N. Federal ID No.:____________________________________(Affix Corporate Seal Here)

Proposal Scoresheet

for

RFP/RFQ for Preliminary Engineering for Buckley Hill Road Bridges

Name of Consultant_________________________________________________

Base Bid Amount

Signature of Reviewer_________________________________________________

Criteria Points Score Comments

Proposal Impressions –

completeness/customization for the

project/attention to detail

10

Experience with CONNDOT and

Local Bridge Program and Bridge

Inspection

20

Experience of key personnel and

subcontractors

15

Technical Competence and

experience

15

Proposed Fee 20

References (Quality and

Performance of past services on

similar Projects)

20

Total 100