9
Scale Project number Date Drawn by Checked by 1/8" = 1' - 0" 12/31/2019 9:49:48 AM A101 EXISTING 504 - 027 TOWN OF KNIGHTDALE Town Hall CAD 191217 JKP JKP No. Description Date 1/8" = 1'-0" 1 Ground Floor - EXISTING 1 REV1 CHANGES 191001 2 REV2 CHANGES 191023 3 REV3 CHANGES 191024 4 REV4 CHANGES 191031 5 REV5 CHANGES 191209

Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

Scale

Project number

Date

Drawn by

Checked by 1/8" = 1'-0"

12

/31

/20

19 9

:49

:48

AM

A101

EXISTING504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

JKP

No. Description Date

1/8" = 1'-0"1

Ground Floor - EXISTING

1 REV1 CHANGES 191001

2 REV2 CHANGES 191023

3 REV3 CHANGES 191024

4 REV4 CHANGES 191031

5 REV5 CHANGES 191209

Page 2: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

Scale

Project number

Date

Drawn by

Checked by As indicated

12

/31

/20

19 9

:49

:48

AM

A102

DEMO504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

JKP

No. Description Date

1/16" = 1'-0"1

Ground Floor - DEMO

REV1 CHANGES 1910011

2 REV2 CHANGES 191023

3 REV3 CHANGES 191024

4 REV4 CHANGES 191031

5 REV5 CHANGES 191209

1. SALVAGE DOOR, FRAME, AND SIDELIGHT FOR REUSE2. SALVAGE FRAME FOR REUSE3. SALVAGE FRAME AND SIDELIGHT FOR REUSE4. SALVAGE WINDOW FRAME AND GLASS FOR REUSE5. DEMO ACT AND HARD CEILING6. DEMO TILE. LEAVE ACT GRID.7. DEMO ACT IN THESE AREAS.

1

1

2

3

4

3/32" = 1'-0"2

Ground Floor - RCP DEMO

5

6

6 6 6

77 7 7

77

7

77 7 7

Page 3: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

A109 3

1

A109A1092

A108

2

1' -

4"

4

A109

3-5/8" METAL STUD FRAME TO DECKSOUND BATT INSULATION(1) LAYER 5/8" GYP EACH SIDE

3-5/8" METAL STUD FRAME TO 10' AFFSOUND BATT INSULATION(1) LAYER 5/8" GYP EACH SIDE

2-1/2" METAL STUD FRAME TO DECKSOUND BATT INSULATION(1) LAYER 5/8" GYP EACH SIDE

Scale

Project number

Date

Drawn by

Checked by As indicated

12

/31

/20

19 9

:49

:49

AM

A103

NEW CONSTRUCTION504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

JKP

No. Description Date

1/8" = 1'-0"1

Ground Floor - NEW CONSTRUCTION

REV1 CHANGES 1910011

2 REV2 CHANGES 191023

3 REV3 CHANGES 191024

4 REV4 CHANGES 191031

5 REV5 CHANGES 191209

1/4" = 1'-0"WALL SCHEDULE

1

1

1

1. FIRE EXTINGUISHER

Page 4: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

2

2

2

2

9' -

0"

12' - 10"13' - 3 1/8"11' - 8"10' - 11 3/4"

15' -

1 7

/8"

15' - 3 1/4"

18' - 10 3/16"9' -

10"

7' -

11 1

/4"

13' - 0 5/16"10' - 3 5/8"

10' - 4 5/8"

4' -

6"

6' -

10 9

/16"

4' -

6"

14' - 6 1/2"9' - 7"9' - 8"

9' -

10"

4' -

6 5

/16"

6' - 2"

11' -

3 1

3/1

6"

1-HR RATING THIS ROOM

RESILIENT CHANNELWALLS THIS ROOM

BASE CABINETS WITHCOUNTERTOP

5' - 6"

2' -

4"

ADA COUNTERTHIS SIDE

STANDING HEIGHTCOUNTERTOPTHIS SIDE

STOREFRONT TRANSOM6'6" TO 8'6"

IT RACKS TO MOVE HERE

1

A109

4

A109

Scale

Project number

Date

Drawn by

Checked by 1/8" = 1'-0"

12

/31

/20

19 9

:49

:49

AM

A104

NEW CONST. DIMENSIONED504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

JKP

No. Description Date

1/8" = 1'-0"1

Ground Floor - NEW CONSTRUCTION -DIMENSIONED

REV1 CHANGES 1910011

2 REV2 CHANGES 191023

3 REV3 CHANGES 191024

4 REV4 CHANGES 191031

5 REV5 CHANGES 191209

Page 5: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

1

A109

4

A109

Scale

Project number

Date

Drawn by

Checked by 1/8" = 1'-0"

12

/31

/20

19 9

:49

:50

AM

A105

PREVIOUS & NEW COMBINED504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

JKP

No. Description Date

1/8" = 1'-0"1

Ground Floor - ALL

REV1 CHANGES 1910011

2 REV2 CHANGES 191023

3 REV3 CHANGES 191024

4 REV4 CHANGES 191031

5 REV5 CHANGES 191209

Page 6: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

10' AFF

9' AFF

9' AFF 9' AFF9' AFF 9' AFF

9' AFF

9' AFF

9' AFF9' AFF

9' AFF

9' AFF

9' AFF 9' AFF 9' AFF

9' AFF

1

A109

4

A109

Scale

Project number

Date

Drawn by

Checked by 1/8" = 1'-0"

12

/31

/20

19 9

:49

:51

AM

A106

REFLECTED CEILING PLAN504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

Checker

No. Description Date

1/8" = 1'-0"1

Ground Floor - RCP

Page 7: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

Scale

Project number

Date

Drawn by

Checked by

12

/31

/20

19 9

:49

:53

AM

A107

3D PERSPECTIVE VIEWS504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

Checker

No. Description Date

1Entrance Camera

2Inside Reception Office

Page 8: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

Room

101

Room

102

Room

103

Room

104

Room

105

Room

106

Room

107

Room

108

Room

109

Room

110

Room

111

Room

112

Room

113

Room

114

Room

115

Room

116

Room

117

102 103 104

109108 110

111112113

107B

107A

101

105106B

106A

114

115

Scale

Project number

Date

Drawn by

Checked by As indicated

12

/31

/20

19 9

:49

:54

AM

A108

ROOM NUMBERS504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

Author

Checker

No. Description Date

3/32" = 1'-0"1

Ground Floor - RCP

Door Schedule

DoorNumber Size Material Frame Closure Privacy Lock Lockset

Push/Pull

WallStop

PanicDevice Kickplate Threshold

WeatherStripping

SmokeSeal Comments

101 1.75X3070 Solid Core Wood - Full Light HMF K2 Yes

102 1.75X3070 Solid Core Wood HMF/Sidelight K2 Yes SALVAGED DOOR/FRAME - REFINISH

103 1.75X3070 Solid Core Wood HMF/Sidelight K2 Yes

104 1.75X3070 Solid Core Wood HMF/Sidelight K2 Yes EXISTING REFINISH ONLY

105 1.75X3070 Solid Core Wood HMF Yes K1 Yes Yes 1HR RATED DOOR SLAB AND FRAME ASSEMBLY

106A 1.75X3070 Solid Core Wood HMF Yes Yes Yes Yes

106B 1.75X3070 Solid Core Wood HMF Yes

107A 1.75X3070 Solid Core Wood - Full Light HMF Yes Yes Yes Yes

107B 1.75X3070 Solid Core Wood - Full Light HMF Yes K2 No Yes Yes Yes SALAVAGED DOOR/FRAME - REFINISH

108 1.75X3070 Solid Core Wood HMF/Sidelight Yes SALAVAGED DOOR/FRAME - REFINISH

109 1.75X3070 Solid Core Wood HMF/Sidelight Yes No Yes

110 1.75X3070 Solid Core Wood HMF/Sidelight Yes Yes

111 1.75X3070 Solid Core Wood HMF/Sidelight Yes EXISTING REFINISH ONLY

112 1.75X3070 Solid Core Wood HMF/Sidelight Yes EXISTING REFINISH ONLY

113 1.75X3070 Solid Core Wood HMF/Sidelight Yes EXISTING REFINISH ONLY

114 1.75X3070 Solid Core Wood HMF Yes EXISTING REFINISH ONLY

115 1.75X3070 Solid Core Wood - Half Light HMF Yes Yes Yes EXISTING REFINISH ONLY - NEED CLOSURE

116 EXISTING Solid Core Wood - Half Light HMF Yes Yes EXISTING REFINISH ONLY

3/8" = 1'-0"2

Elevation - Door Type A

Page 9: Town Hall CAD A101 · 2019-12-31  · jkp jkp no. description date 1/16" = 1'-0" 1 ground floor - demo 1 rev1 changes 191001 2 rev2 changes 191023 3 rev3 changes 191024 4 rev4 changes

1

A109

1

A109

3-5/8" WALL

STOREFRONT TRANSOM

9' ACT

10' ACT

3-5/8" WALL TO DECK

Scale

Project number

Date

Drawn by

Checked by As indicated

12

/31

/20

19 9

:49

:55

AM

A109

SECTIONS AND ELEVATIONS504-027

TOWN OF KNIGHTDALE

Town Hall CAD191217

JKP

Checker

No. Description Date

3/16" = 1'-0"1

Section - Reception Wall

3/8" = 1'-0"2

Elevation - Reception Office 3/16" = 1'-0"3

Elevation - Lobby

A

BC

D

E

F F F

G

H

J

K

A. OWNER SUPPLIED, CONTRACTOR INSTALLED FILE DRAWERS AND CASH BOXB. TOE KICK, 7" HEIGHTC. FOOT REST 12" HEIGHT, 8" DEPTH, FULL WIDTHD. OPENING FOR ADA SHELFE. OPENING FOR GUEST WINDOWF. STILES TO BE ABLE TO SUPPORT LOCKABLE SHUTTER RAILSG. STANDALONE SHELFH. WOOD PANEL 24" TALL, 6" AFF AT BOTTOM EDGEI. NOT USED

J. WOOD PANEL, 8" TALL, FULL WIDTH AND WRAPPING AROUND. 6" RAISED METAL LETTERINGK. INDOOR "ROOF" WITH METAL COVERING TO MATCH EXISTING EXTERIOR ROOF.

CONTRACTOR TO SUPPLY WOOD BRACING FOR ROOF.

K

1/8" = 1'-0"4

STOREFRONT TRANSOM SECTION