Towards the Commissioning of J-PARC. J-PARC Controls Group JAEA*(JAERI) & KEK Tadahiko Katoh *Japan Atomic Energy Agency since Oct. 1, 2005. Outline. J-PARC Facilities Control System Construction Schedule Control System Status Photographs. RCS. MR. J-PARC Accelerator Complex. Phase 1. - PowerPoint PPT Presentation

Citation preview

Page 1: Towards the Commissioning of J-PARC

Towards the Commissioning of J-PARC

J-PARC Controls GroupJAEA*(JAERI) & KEK

Tadahiko Katoh

*Japan Atomic Energy Agency since Oct. 1, 2005

Page 2: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 2

Outline

• J-PARC Facilities• Control System• Construction Schedule• Control System Status• Photographs

Page 3: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 3

J-PARC Accelerator ComplexPhase 1

RCS

MR

Page 4: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 4

J-PARC Accelerator ComplexPhase 2

RCS

MR

Page 5: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 5

Parameters of Accelerators

Accelerator Energy Current Repetition

Linac181 MeV

(400 MeV)[600 MeV]

50 mA (peak)

25 Hz[50 Hz]

Rapid Cycling Synchrotron

3 GeV 333 uA 25 Hz

Main Ring Synchrotron

40 GeV[50 GeV]

15 uA1 / 3.64

(Typ.)

( ) : with ACS Linac [ ] : Phase 2

Page 6: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 6

J-PARC Acceleration Timing

Page 7: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 7

J-PARC Control System Configuration

Linac

DTL

SDTL

RFQ

IS

L3BT

RCS

Inj/Ext Vacuum

RF

Magnet Monitor

MR

Inj/Ext Vacuum

RF

Magnet Monitor

3-50BT3NBT

ServersConsoles

Logger

Database

CCR

Page 8: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 8

J-PARC Control Network Configuration

D1

D2

D3

MR

Laboratory Network

SW SW

CCR

Servers and Consoles

FW

Core/Edge Switch

Edge Switch

SW SW

DTQ

Linac1 Linac2Linac3

Linac

SW SW

RCS

Magnet

RFInj/Ext Vacuum

Monitor

SW SW

3NBT

3NBT

SW SW

L3BT

L3BT1L3BT2

SW SW

RCS

Magnet

RFInj/Ext Vacuum

Monitor

Page 9: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 9

3-Layer Model of Control System

Network

Displays

Loggers Archivers Servers

Consoles

Presentation Layer

I/O Controller

VMEbus

Field-bus (Ethernet)

Equipment Control Layer

PLCs

Power Supply

Measuring Instruments

Intelligent Controllers

D/I D/O A/I A/O

Device Interface Layer

Page 10: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 10

Control System Configuration

AcceleratorIOC

HW OSI/O

LinacVME

(~65)VxWorks

Linux

VME ModulesPLC

EMB-LANWE7000

Rapid-Cycling Synchrotron

VME(~25)

VxWorksLinux

VME ModulesPLC

EMB-LAN

Main Ring Synchrotron

VME(~50)

LinuxVxWorks

PLCBPMC

WE7000EMB-LAN

Page 11: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 11

Construction Schedule

2002 2008

DTL@KEK

Neutrino

Hadron

MLF

MR

RCS

Linac

200920072006200520042003FY(Apr.-Mar.)

Building Construction Hardware Production & Installation Beam Tests

Page 12: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 12

Software Development Schedule

Application software

No Beam Commissioning

Basic appl. software

Device drivers / device supports

Beam

Months

-24 -18 -12 -6 0

Test

Test

Test

Page 13: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 13

J-PARC Facility Layout

Linac

RCS

MR

MLF

Hadron

Facility

CCR

Page 14: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 14

Dec. 2005

Apr. 2006

Sep. 2006

Completed

Completed

Main Ring Construction Schedule

Page 15: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 15

Linac Installation

RFQ (installed in July) DTL (installation has started) SDTL (installation will begin in November)

Accelerator TunnelLinac Building (330m long) Klystron Gallery

Page 16: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 16

Linac Control Racks

Page 17: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 17

Linac Control Racks

Page 18: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 18

Materials and LifeSciences Facility

3 . 研究課題と研究施設

Page 19: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 19

Hadron ExperimentalFacility

Page 20: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 20

Neutrino ExperimentalFacility

295 km West

Super Kamiokande

Page 21: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 21

Please Visit ….PO1.001-1 Progress of a Control System for Slow-Extraction Beam Lines at J-PARC

PO1.009-1 Data Acquisition System for J-PARC 3GeV RCS

PO1.024-1 Development of Beam Monitor DAQ System for 3NBT at J-PARC

PO1.061-6 Beam-Monitor Software of the KEK Proton Linac for J-PARC

PO1.065-6 Development of a Portable EPICS Package miniEPICS

PO1.067-7 Development of Ante Mortem System to reduce the Beam Loss in Accelerator

PO2.069-4 Embedded EPICS On MICRO-ITRON/SH4-Based Controllers

PO2.070-5 Recent Development of a Monitoring System for Beam Line Status at the J-PARC Slow-Extraction Beam Line

PO1.080-7 Relational Database System for J-PARC Linac and RCS

PO2.084-5 Recent Activities on VME/Linux-based IOC Applications at KEK

PO1.102-8 Securing the Control System Resources

PO2.059-4 VME Reliability Monitor Board with Embedded EPICS

PO2.063-4 The BPM DAQ System using Fast Waveform Digitizer Based on CPCI-bus

Page 22: Towards the Commissioning of J-PARC

October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 22

Thank You for

Your Attention!