Towards the Commissioning of J-PARC. J-PARC Controls Group JAEA*(JAERI) & KEK Tadahiko Katoh *Japan Atomic Energy Agency since Oct. 1, 2005. Outline. J-PARC Facilities Control System Construction Schedule Control System Status Photographs. RCS. MR. J-PARC Accelerator Complex. Phase 1. - PowerPoint PPT Presentation
Citation preview
Towards the Commissioning of J-PARC
J-PARC Controls GroupJAEA*(JAERI) & KEK
Tadahiko Katoh
*Japan Atomic Energy Agency since Oct. 1, 2005
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 2
Outline
• J-PARC Facilities• Control System• Construction Schedule• Control System Status• Photographs
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 3
J-PARC Accelerator ComplexPhase 1
RCS
MR
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 4
J-PARC Accelerator ComplexPhase 2
RCS
MR
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 5
Parameters of Accelerators
Accelerator Energy Current Repetition
Linac181 MeV
(400 MeV)[600 MeV]
50 mA (peak)
25 Hz[50 Hz]
Rapid Cycling Synchrotron
3 GeV 333 uA 25 Hz
Main Ring Synchrotron
40 GeV[50 GeV]
15 uA1 / 3.64
(Typ.)
( ) : with ACS Linac [ ] : Phase 2
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 6
J-PARC Acceleration Timing
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 7
J-PARC Control System Configuration
Linac
DTL
SDTL
RFQ
IS
L3BT
RCS
Inj/Ext Vacuum
RF
Magnet Monitor
MR
Inj/Ext Vacuum
RF
Magnet Monitor
3-50BT3NBT
ServersConsoles
Logger
Database
CCR
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 8
J-PARC Control Network Configuration
D1
D2
D3
MR
Laboratory Network
SW SW
CCR
Servers and Consoles
FW
Core/Edge Switch
Edge Switch
SW SW
DTQ
Linac1 Linac2Linac3
Linac
SW SW
RCS
Magnet
RFInj/Ext Vacuum
Monitor
SW SW
3NBT
3NBT
SW SW
L3BT
L3BT1L3BT2
SW SW
RCS
Magnet
RFInj/Ext Vacuum
Monitor
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 9
3-Layer Model of Control System
Network
Displays
Loggers Archivers Servers
Consoles
Presentation Layer
I/O Controller
VMEbus
Field-bus (Ethernet)
Equipment Control Layer
PLCs
Power Supply
Measuring Instruments
Intelligent Controllers
D/I D/O A/I A/O
Device Interface Layer
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 10
Control System Configuration
AcceleratorIOC
HW OSI/O
LinacVME
(~65)VxWorks
Linux
VME ModulesPLC
EMB-LANWE7000
Rapid-Cycling Synchrotron
VME(~25)
VxWorksLinux
VME ModulesPLC
EMB-LAN
Main Ring Synchrotron
VME(~50)
LinuxVxWorks
PLCBPMC
WE7000EMB-LAN
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 11
Construction Schedule
2002 2008
DTL@KEK
Neutrino
Hadron
MLF
MR
RCS
Linac
200920072006200520042003FY(Apr.-Mar.)
Building Construction Hardware Production & Installation Beam Tests
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 12
Software Development Schedule
Application software
No Beam Commissioning
Basic appl. software
Device drivers / device supports
Beam
Months
-24 -18 -12 -6 0
Test
Test
Test
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 13
J-PARC Facility Layout
Linac
RCS
MR
MLF
Hadron
Facility
CCR
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 14
Dec. 2005
Apr. 2006
Sep. 2006
Completed
Completed
Main Ring Construction Schedule
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 15
Linac Installation
RFQ (installed in July) DTL (installation has started) SDTL (installation will begin in November)
Accelerator TunnelLinac Building (330m long) Klystron Gallery
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 16
Linac Control Racks
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 17
Linac Control Racks
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 18
Materials and LifeSciences Facility
3 . 研究課題と研究施設
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 19
Hadron ExperimentalFacility
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 20
Neutrino ExperimentalFacility
295 km West
Super Kamiokande
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 21
Please Visit ….PO1.001-1 Progress of a Control System for Slow-Extraction Beam Lines at J-PARC
PO1.009-1 Data Acquisition System for J-PARC 3GeV RCS
PO1.024-1 Development of Beam Monitor DAQ System for 3NBT at J-PARC
PO1.061-6 Beam-Monitor Software of the KEK Proton Linac for J-PARC
PO1.065-6 Development of a Portable EPICS Package miniEPICS
PO1.067-7 Development of Ante Mortem System to reduce the Beam Loss in Accelerator
PO2.069-4 Embedded EPICS On MICRO-ITRON/SH4-Based Controllers
PO2.070-5 Recent Development of a Monitoring System for Beam Line Status at the J-PARC Slow-Extraction Beam Line
PO1.080-7 Relational Database System for J-PARC Linac and RCS
PO2.084-5 Recent Activities on VME/Linux-based IOC Applications at KEK
PO1.102-8 Securing the Control System Resources
PO2.059-4 VME Reliability Monitor Board with Embedded EPICS
PO2.063-4 The BPM DAQ System using Fast Waveform Digitizer Based on CPCI-bus
October 10, 2005 ICALEPCS 2005, Geneva MO3.5-1O - 22
Thank You for