SooKook Corporation
Total solution of energy
CONTENTS
I. Company Profile
VI. Experience
II. Business Field
III. Major Fabrication Facilities
3
Address 441, Taejeon-Dong, Gwangju-Si, Gyeonggi-Do, Korea
Establishment (Year) 21st January 1982
Type of Business Engineering, Manufacturing, Supervision, Construction and
Commissioning of Energy Plant
Number of Officers and Staff 140 Persons (as of Jan. 2012)
Total Equity Capital
(2011) KRW 26,217,000,000.-(USD 23.8 Million)
Annual Turnover (2011) KRW 45,000,000,000.-(USD 41 Million)
Technical Collaboration
Partners Standardkessel (Germany), NFK (Japan), PFP (Iran)
I. Company Profile
4
I. Company Profile
1. LAND AREA : 9,300 ㎡
2. BUIDING AREA : 5,100 ㎡
3. MAJOR WORKS : BOILER, PRESSURE PART, VESSEL, STEEL FABRICATION
4. ADDRESS : 242-2, SHINNUNG-RI, SEOUN-MYEON, ANSEONG-SI, GYEONGGI-DO, KOREA
TEL : 031-671-7911 FAX : 031-671-7915
ANSEONG FACTORY
5
I. Company Profile
GWANGJU FACTORY
1. LAND AREA : 3,650 ㎡
2. BUIDING AREA : 3,500 ㎡
3. MAJOR WORKS :
Combustion System and
Burner with Instrumentation
4. ADDRESS :
441, Taejeon-dong, Gwangju-si,
Gyeonggi-do, Korea
Tel. : 031-798-7711
Fax. : 031-798-7705
6
I. Company Profile
ICHEON FACTOR
1. LAND AREA : 8,100 ㎡
2. BUIDING AREA : 3,200 ㎡
3. MAJOR WORKS :
Package Burner & Combustion Equipment
4. ADDRESS :
345-4, Suhari, Shindun-myeon, Icheon-si,
Gyeonggi-do, Korea
Tel : 031-631-3400
Fax : 031-631-2730
7
I. Company Profile – Financial Statements
YEAR 2009년도 2010년도 2011년도
Total Assets / 총자산 328 442 356
Debts / 부채 145 231 94
Equity Capital / 자본총액
183 211 262
Annual Turnover / 매출액
357 363 450
Net Profit
/ 당기순이익 23.8 27.9 55.8
(단 위 : 억원 / unit : 100 Million KRW)
8
I. Company Profile – Overseas Cooperation Partners
Company Nationality Items
Standardkessel
GmbH Germany Heat Recovery Steam Generator (HRSG)
NFK Japan Burners for packaged boilers
Burners for incinerator
UNIGAS Italy Low Nox Burners
Burners for packaged boiler
HOTWORK U.K. Burners for industrial boilers
Burners for various furnaces
9
I. Company Profile – Quality Certification-ASME
Manufacture and assembly
of power boiler Manufacture of pressure
vessels Fabrication and assembly
of power piping
CEO Jong Tae Lee
COMBUSTION EQUIP. DIVISION
President Jae Yun Park
ENERGY PLANT DIVISION
President Tae Ho Ha
GWANGJU FACTORY ANSEONG FACTORY
ADMINISTRATION
DIVISION
R&D
Engineering
Manufacturing
QA / QC
Sales
A/S
Manufacturing
Detail Engineering
Engineering
Procurement
Sales
Commissioning
Manufacturing
A/S
ACCOUNTS
Human Resources
General Affairs
ICHEON FACTORY
QA / QC
I. Company Profile – Organization
10
I. Company Profile – Man Power
No. Section Energy Plant
Division
Combustion
Equip. Div. Total
1.
Design &
Engineering Team
Basic design 4 3 7
Mechanical 10 6 16
Electrical & Ins. 5 5
Piping 2 2 4
2. Sales Team 6 12 18
3. Quality Management 3 3 6
4. Project Management 6 2 8
5. Supervision & After-Sales Service 12 12
6. Producing Management 10 5 15
7. Procurement 6 6
Total 97
11
12
II. Business Field
Heat Recovery
Steam
or
Hot Water generator
Solid Fuel Fired
Boiler (Bagasse, Rice
Husk, Waste Wood,
Palm Waste, RPF,
RDF, Coal)
1
2
3 4
6 5 7
8 9
11 10
12
13
II. Business Field
- Gas/Oil Fired Boiler
- Waste Heat Boiler
- Deaerator
- Steam Accumulator
- Superheater
14
II. Business Field
Combustion Equipment
- Low Nox Gas/Oil Burner for Boiler
- Burner for Ind. Furnace
- Waste Liquid & Gas Burner
- LFG Burner
- Steel Mill Facilities
15
II. Business Field
Instrument and Control System
- Field Instrument
- BMS & ACC Control System
- Instrument and MCC Panel
- DCS, M(H)MI System
16
III. Major Fabrication Facilities
PRESSURE PART FABRICATION SHOP
17
III. Major Fabrication Facilities
RADIAL
DRILLING M/C
18
III. Major Fabrication Facilities
BENDING ROLLER
19
III. Major Fabrication Facilities
SHOT & PAINTING ROOM
20
III. Major Fabrication Facilities
PIPE & TUBE
BENDING M/C
TUBE
SWAGING M/C
21
III. Major Fabrication Facilities
MEMBRANE PANEL
WELDING M/C
22
III. Major Fabrication Facilities
BURNER ASSEMBLY SHOP
23
III. Major Fabrication Facilities
COMBUSTION TEST FURNACE & BOILER
POTENTIAL BALANCING TEST OF FAN WHEEL
24
POIC Biomass Power Plant
Project Site Palm Oil Industrial Complex in Malaysia
Project Name POIC Biomass Co-generation Power Plant
Steam Condition 52 Ton/hr x 63 kg/cm2g x 433 ℃
Power Output 25 MW
Fuel EFB 80% + PKS 20% (Empty Fruit Bunches + Palm Kernel Shell)
Scope Boiler Island
VI. Experience
25
Biomass (RPF) Fired Power Boiler
Project Site Hansol Biomass Co-generation Power Plant
Location Hansol Paper Mill in Korea
Steam Condition 52 Ton/hr x 45 kg/cm2g x 400 ℃
Fuel RPF 100% (Refuse Plastic Fuel)
Scope Boiler Proper
VI. Experience
26
7.3MW KTH Biomass Power Plant
Project Site South Central Kalimantan in Indonesia
Project Name 7.3MW KTH Biomass Fired Power Plant
Steam Condition 32.8 Ton/hr x 45 kg/cm2a x 440 ℃
Power Output 7.3 MW
Fuel Bark 100%
Scope Boiler Island
VI. Experience
1
2
3
4
6 5
7
8 9
11 10
12
27
HRSG FOR STEEL MILL SINTERING PLANT
Client Hyundai Steel Mill in Korea • Heat Source Sinter Cooler Exhaust Gas Gas Flow Rate: 720,000 N㎥/hr Inlet Gas Temp.: Max. 350 ℃
Steam Condition 35 tons/hr x 20 kg/cm2g x 230 ℃
Completion in 2009
Scope Turn Key Base, 2 units
VI. Experience
28
STEEL MILL BY-PRODUCT GAS FIRED BOILER
Client Hyundai Steel Mill in Korea
Steam Condition 60 Ton /hr x 20 kg/cm2 g x 230 ℃
Fuel COG (Coke Oven Gas) LDG (L. D. Converter Gas) LNG (Liquefied Natural Gas)
Scope Turn Key Plant
Completion in 2009
VI. Experience
29
STEEL MILL BY-PRODUCT GAS FIRED BOILER
Client
Hyundai Steel Mill in Korea
Steam Parameter
50 Ton /hr x 10 kg/cm2g x 183 ℃
Fuel
BFG (Blast Furnace Gas)
Scope
Turn Key Plant
Completion in 2011
VI. Experience
30
Heat Recovery Steam Generator for Co-Gen. Power Plant
VI. Experience
Type
Finned Water Tube, Natural
Circulation, 2-drum, Bottom Support
Steam Parameter
15 tons/hr x 20 kg/cm2g x 230 ℃
Gas Turbine : 5MW, KHI GPB 70 GT
Client
Century Paper Mill in Pakistan
31
HEAT RECOVERY HOT WATER GENERATOR
VI. Experience
Location of Heat Exchanger
Between Existing HRSG and Stack
Total No. Built : 20 units
Total Heat Duty : 145 Gcal/hr
1st
Heat Recovery
Location of Heat Exchanger
Stack Inside
Total No. Built : 8 units
Total Heat Duty : 40 Gcal/hr
2nd Heat Recovery
32
HEAT RECOVERY HOT WATER GENERATOR
VI. Experience
Location of Heat Exchanger
Between Existing HRSG
and Stack
Total No. Built : 9 units
Total Heat Duty : 60 Gcal/hr
33
Heat Recovery Hot Oil Heater for Organic Rankine Cycle
VI. Experience
Heat Source
- Cement Kiln Exhaust Gas
Gas Flow Rate: 370,000 N㎥/hr
Inlet Gas Temp.: Max. 300 ℃
Type
Finned Tube Multy Loop Type
Heat Duty : 16.6 Gcal/hr
Client : ASIA Cement, 2005
34
HEAT RECOVERY STEAM SUPERHEATER for SULFUR PLANT
VI. Experience
Client LS-NIKKO in Korea
Steam Parameter 70 Ton /hr x 52.5 kg/cm2g x 428 ℃
Heat Source Process Gas of Sulfur Plant
Type Shop Assembled, Horizontal, Multi Loops
Completion in 2009
35
OTHERS – PRESSURE and NON-PRESSURE
VI. Experience
FLARE STACK FOR
FINEX PROCESS GAS
ID 1.6 m x H 85 m
STEAM ACCUMULATOR
200 m3, 3 UNITS
TUNDISH PREHEATER
FOR STEEL WORKS
SooKook Corporation
■ ICHEON FACTORY
345-4, Suha-ri, shindun-myeon, Icheon-si, Gyeonggi-do, KOREA
Tel : +82-31-631-3400 Fax : +82-31-631-2730
■ GWANGJU FACTORY
441, Taejeon-Dong, Gwangju-si, Gyeonggi-do, KOREA
Tel : +82-31-798-7711 Fax : +82-31-798-7705
■ ANSEONG FACTORY
224-2, Shinnung-ri, Seoun-myeon, Anseong-si, Gyeonggi-do, KOREA
Tel : +82-31-671-7911 Fax : +82-31-671-7915
■ Web Site : http://www.sookook.co.kr
SOOKOOK CORPORATION (株) 水 國
July, 2012
LIST of REFERENCE (ENERGY PLANT DIVISION)
: : MAJOR DELIVERY LIST
I. INDUSTRIAL BOILER
II. HRSG (Heat Recovery Steam Generator)
III. HRW/OG (Heat Recovery Water/Oil Generator)
IV. BIOMASS FIRED BOILER
VI. DEAERATOR
VII. STEAM ACCUMULATOR
V. ECONOMIZER
VIII. OTHERS
No. CUSTOMER
( SITE )
CAPACITY
FUEL Q'TY SPECIFICATION YEAR OF DELIVERY
EVA.
ton/h
r
PRESS.
kg/㎠
.G
1 HYUNDAI MOTOR
(NAMYANGMAN / KOREA) 8 10 LNG 1
TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER
2002
2
KOREA UNIVERSITY HOSPITAL
(GURO, SEOUL) 2 7 LNG 2 TYPE : FIRE TUBE TYPE BOILER 2003
3 KIA MOTOR
(GWANG JU / KOREA) 20 10 LNG 1
TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER
2003
4 KIA MOTOR
(GWANG JU / KOREA) 10 10 LNG 2
TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER
2003
5 ILJINPHARM COMPANY (HWASUNG / KOREA)
2 10 LNG 1 TYPE : FIRE TUBE TYPE BOILER 2004
6
DAEHAN PRINTING & PUBLISHING
(SUNGNAM / KOREA) 5 10 LNG 1 TYPE : FIRE TUBE TYPE BOILER 2004
7 HYUNDAI MOTOR
(NAMYANGMAN / KOREA) 15 10 LNG 1 TYPE : WATER TUBE TYPE BOILER 2006
8 HYUNDAI STEEL
(DANGJIN/ KOREA) 60 17
LNG, COG, LDG
1
TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : S/H,
ECONOMIZER, DEAERATOR, STACK, etc.
2008
9 HYUNDAI STEEL
(DANGJIN/ KOREA) 50 17 LNG 2
TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : S/H,
ECONOMIZER, DEAERATOR, STACK, etc.
2008
10 HYUNDAI STEEL
(DANGJIN/ KOREA) 50 10 BFG, COG 1 TYPE : WATER TUBE TYPE BOILER 2011
I. INDUSTRIAL BOILER
No. CUSTOMER
( SITE )
CAPACITY
Q'TY SPECIFICATION YEAR OF DELIVERY
EVA.
ton/h
r
PRESS.
kg/
㎠.G
1
CENTURY PAPER & MILL COMPANY
/ HYUNDAI ENGINEERING (PAKISTAN)
14.65 16 4
GAS TURBINE : KHI GPB 70GT GAS TURBINE OUTPUT : 5MW TYPE : SINGLE PRESSURE, 2-DRUM, NATURAL CIRCULATION, BOTTOM SUPPORT, SOLID FINNED TUBE, HORIZONTAL TYPE STEAM TEMPERATURE : 230℃ AT S/H OUTLET
2007
2 HYUN DAI STEEL (DANGJIN/KOREA)
35 17 2
HEAT SOURCE : SINTER COOLER EXH. HOT AIR AIR FLOW : 720,000 Nm3/HR HOT AIR TEMP : 300 ℃ STEAM TEMPERATURE : 230℃ AT S/H OUTLET
2008
3
POSCO POWER / KOPEC
(INCHEON / KOREA) 2.7 14 6
HEAT SOURCE : TURBINE COOLING AIR AIR FLOW : 62,380 kg/hr TYPE : KETTLE TYPE BOILER
2008
4 HYUN DAI STEEL (DANGJIN/KOREA)
40 18 2
HEAT SOURCE : SINTER COOLER EXH. HOT AIR AIR FLOW : 720,000 Nm3/HR HOT AIR TEMP : MAX. 350 ℃ STEAM TEMPERATURE : 230℃ AT S/H OUTLET
2013
II. HRSG (Heat Recovery Steam Generator)
No. CUSTOMER
( SITE ) Q‘TY SPECIFICATION
YEAR OF DELIVERY
1 ASIA CEMENT
(JECHEON / KOREA) 1
HEAT RECOVERY HOT OIL HEATER HEAT SOURCE : KILN EXHAUST GAS GAS FLOW : 370,000 Nm3/HR GAS TEMP. : 300℃ TYPE : FINNED TUBE MULTI LOOP, VERTICAL GAS PASS HEAT DUTY : 16.6 GCAL/HR HOT OIL OUTLET TEMP. : 229.5℃
2005
2
KOREA SOUTH-EAST POWER
(SUNGNAM / KOREA) 8
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 9.5 GCAL/HR HOT WATER OUTLET TEMP. : 100℃
2006
3
GS-Power CO., LTD. / KOPEC
(ANYANG /KOREA) 4
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 4.25 GCAL/HR HOT WATER OUTLET TEMP. : 90.4℃
2007
4
GS-Power CO., LTD. / KOPEC
(BUCHEON/KOREA) 3
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 105MW TYPE : ERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 6.3 GCAL/HR HOT WATER OUTLET TEMP. : 95℃
2007
5 KOREA WEST POWER (INCHEON/KOREA)
8
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 170MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 9.6 GCAL/HR HOT WATER OUTLET TEMP. : 98℃
2008
6
KOREA SOUTH-EAST POWER
(SUNGNAM/KOREA) 5
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 4.2 GCAL/HR HOT WATER OUTLET TEMP. : 88℃
2009
7
KOREA EAST-WEST POWER
(ILSAN / KOREA) 6
HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 105MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 7.7 GCAL/HR HOT WATER OUTLET TEMP. : 90.7℃
2009
III. HRW/OG (Heat Recovery Hot Water/Oil Generator)
No. CUSTOMER/C
LIENT PROJECT NAME
Q'TY
SPECIFICATION YEAR OF DELIVERY
1
STX HEAVY INDUSTRY Co., Ltd./ KOREA
MIDLAND POWER Co.,
Ltd.
POIC BIOMASS
CHP POWER PROJECT
IN MALAYSIA
2
Type : 2-Drum, Natural Circulation, Bottom Support, Water Tube Type Fuel : EFB(Empty Fruit Bunches) 80% PKS(Palm Kernel Shell) 20% Combustion Type : Reciprocating Step-Grate Stoker Steam Capacity : 51,450 kg/hr Steam Pressure : 63 kg/cm2 g Steam Temperature : 438℃
2011
2
HANSOL EME Co., Ltd./ HYUNDAI HEAVY
INDUSTRY / SUNGWON ECONERGY
Co., Ltd KOREA
HANSOL PAPER
JANGHANG RPF BOILER PROJECT
2
Type : 2-Drum, Natural Circulation, Bottom Support, Water Tube Type Fuel : RPF Combustion Type : Rotary Kiln and Grate Combination Steam Capacity : 53,000 kg/hr Steam Pressure : 47.5 kg/cm2 g Steam Temperature : 400℃
2011
3 DOHWA
ENGINEERING
Co., Ltd.
KTH BIOMASS
FIRED POWER
PLANT IN INDONESIA
1
Type : 1-Drum, Natural Calculation, Water tube type Fuel : Bark Steam Capacity : 32.79 t/h Steam Pressure : 45kg/cm2a Steam Temperature : 440℃
2012
IV. BIOMASS FIRED BOILER
No. CUSTOMER
( SITE )
BOILER SPEC.
Q'TY SPECIFICATION YEAR OF DELIVERY E
VA.
ton/h
r
PRESS.
kg/
㎠.G
1 KIA MOTOR
(ASAN / KOREA ) 20~50 10 10 TYPE : FINNED TUBE MULTI LOOP TYPE 1999
2 RHODIA KOREA
(ULSAN / KOREA) 20 10 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2000
3 KIA MOTOR
(GWANG JU / KOREA) 10~40 10 8 TYPE : FINNED TUBE MULTI LOOP TYPE 2002~2003
4
HYUNDAI MOTOR (NAMYANGMAN /
KOREA) 8 10 3 TYPE : FINNED TUBE MULTI LOOP TYPE 2002
5 KIA MOTOR
(GWANG JU / KOREA) 20 10 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2003~2005
6
KEPCO E&C (YOUNGDONG /
KOREA) 590 175 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2011
7 KEPCO E&C
(DONGHAE / KOREA) 693 179 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2011
V. ECONOMIZER
VI. DEAERATOR
No. CUSTOMER
( SITE )
CAPACITY
Q'TY TYPE SPECIFICATION
YEAR O
F
DELIV
ERY
FLO
W
ton/h
r
PRESS.
kg/㎠
.g
TEM
P.
℃
1
CENTURY PAPER & MILL COMPANY
/ HYUNDAI ENGINEERING (PAKISTAN)
60 2.13 135 1 SPRAY &
TRAY WATER STORAGE
VOLUME :10m3 2006
2 DOOSAN MECATEC (GUNSAN / KOREA)
253 4.5 154 2 SPRAY &
TRAY WATER STORAGE
VOLUME : 43m3 2007
3 HYUNDAI STEEL
(DANGJIN/ KOREA)
60 0.2 105 1 SPRA & TRAY
WATER STORAGE VOLUME :12m3
2008
4 HYUNDAI STEEL
(DANGJIN / KOREA) 35 0.2 105 2
SPRAY & TRAY
WATER STORAGE VOLUME : 10m3
2009
5 DOOSAN MECATEC (YEOSOO / KOREA)
958 4.15 152 2 SPRAY &
TRAY WATER STORAGE
VOLUME : 160m3 2009
6
STX HEAVY INDUSTRY
(MALAYSIA) 115 4.08 151.7 1
SPRAY & TRAY
WATER STORAGE VOLUME : 21m3
2010
7
HANSOL EME (JANGHWANG /
KOREA) 52 2.65 140 2
SPRAY & TRAY
WATER STORAGE VOLUME : 14m3
2011
8 HYUNDAI STEEL
(DANJIN / KOREA) 77.5 0.2 105 1
SPRAY & TRAY
WATER STORAGE VOLUME : 15m3
2012
9 HYUNDAI STEEL
(DANJIN / KOREA) 150 0.23 105 1
SPRAY & TRAY
WATER STORAGE VOLUME : 40m3
2012
NO. CUSTOMER
( SITE )
CAPACITY
Q'TY SPECIFICATION
YEAR O
F
DELIV
ERY
ACCU
. CA
PACIT
Y
Ton
IN P
RESS.
kg/㎠
.g
OU
T
PRESS.
kg/㎠
.g
1 HYUNDAI STEEL
(DANGJIN/ KOREA) 10 35 17 3
VOLUME : 200m3
DESIGN PRESS : 40 kg/㎠.g 2011
2 HYUNDAI STEEL
(DANGJIN/ KOREA) 7 35 17 4
VOLUME : 125m3
DESIGN PRESS : 42 kg/㎠.g 2011
VII. STEAM ACCUMULATOR
VIII. OTHERS
NO. CUSTOMER
( SITE ) ITEM SPECIFICATION
YEAR OF DELIVERY
1 POSCO
(GWANGYANG / KOREA) FLUE GAS RE-HEATING
SYSTEM
PROJECT NAME : DE-NOX SYSTEM FOR SINTER PLANT OF STEEL
SUPPLY ITEM : TREAT GAS RE-HEATING SYSTEM GAS FLOW RATE : 1,686,605 kg/hr IN/OUT GAS TEMP. : 255℃ / 305℃ USED FUEL : LDG
2006
2
KOREA EAST-WEST POWER
(ILSAN / KOREA)
FURNACE WALL TUBE REPLACEMENT
BOILER CAPACITY : 590 T/H BOILER WORKING PRESSURE : 175 ata TUBE OUTDIAMETER : 63.5 mm TUBE THICKNESS : 6.5 mm WALL TYPE : MEMBRANE WALL TYPE
2011
3 LS-NIKKO INC.
(ULSAN/KOREA)
PROCESS GAS HEAT RECOVERY
SUPERHEATER
HEAT SOURCE : PROCESS GAS OF SULFUR PLANT
STEAM CONDITION - FLOW RATE : 70 T/H - PRESSURE : 52.5 ata - IN/OUT TEMPERATURE : 256.7℃ / 428℃
: : CONTACT
■ Burner / Combustion Equipment
345-4, Suha-ri, shindun-myeon, Icheon-si, Gyeonggi-do, KOREA
Tel : (82) 31-631-3400 Fax : (82) 31-631-2730
■ Combustion System And Burner With Instrumentation
441, Taejeon-Dong, Gwangju-si, Gyeonggi-do, KOREA
Tel : (82) 31-798-7711 Fax : (82) 31-798-7705
■ Boiler, Pressure Part, Vessel, Steel Fabrication
224-2, Shinnung-ri, Seoun-myeon, Anseong-si, Gyeonggi-do, KOREA
Tel : (82) 31-671-7911 Fax : (82) 31-671-7915
■ Web Site : http://www.sookook.co.kr
Head office & Icheon factory
Gwangju Factory
Anseong Factory