Advanced Fertigation Solutions for Climate Resilient Rural Areas Topsector-Seed Money Project Jouke Campen

Topsector-Seed Money Project

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Topsector-Seed Money Project

Advanced Fertigation Solutions for Climate Resilient Rural AreasTopsector-Seed Money Project

Jouke Campen

Page 2: Topsector-Seed Money Project

System to provide water and nutrients to the plant

Irrigation should be based on time and radiation and (status of) the crop

Fertigation in agricultural

2

Page 3: Topsector-Seed Money Project

Irrigation and supply of nutrients

3

Page 4: Topsector-Seed Money Project

Open field as well

4

Page 5: Topsector-Seed Money Project

Simple systems

5

Page 6: Topsector-Seed Money Project

Simple systems

6

Page 7: Topsector-Seed Money Project

Pivot system

7

Page 8: Topsector-Seed Money Project

Medium technology

8

Page 9: Topsector-Seed Money Project

Advanced systems

9

Page 10: Topsector-Seed Money Project

Water and nutrient supply essential for crop production

Both should not be wasted in a (economic) sustainable production system

Simple, cheap and effective system is needed

Goal

10

Page 11: Topsector-Seed Money Project

Alinement of the control strategy

Feedback on the user interface, which control parameters are needed (time of irrigation, radiation sum, interval, EC and pH)

Step wise approach for software development● First automate irrigation strategy● Then control EC and pH

Selection of components used (sensors, pumps, control). Cost evaluation

Implementation of the software into the hardware

Demo setup

Meetings with Quantify

11

Page 12: Topsector-Seed Money Project

Delivery of some components take more time due to the shortage of chips globally

Now the components have arrived so a demo is built

COVID did not allow for a travel to Marocco to assess the current situation

A manual is to be written based on the actual system

A follow up where the system is tested in Marocco needs to be formulated. Contacts with CHU Agadir have been made.

Issues

12