3

Click here to load reader

Top 5 Ways to Maximise FPSO

Embed Size (px)

DESCRIPTION

One of the biggest challenges that oil companies and vessel contractors face during the mid-late life cycle stage is ensuring that FPSOs continue to achieve high operational efficiency levels while balancing legislative, safety and integrity requirements. Download our latest report on the best practices and top 5 strategies that leading operational FPSO operators have highlighted as cornerstones to maximizing FPSO efficiency: http://goo.gl/pTM3Vk

Citation preview