Safeguards Due Diligence Report
Document Stage: Preliminary Draft Project Number: TON 46351-002 April 2018
Tonga: Climate Resilience Sector Project
Prepared by Ministry of Meteorology, Energy, Information, Disaster Management, Environment, Climate Change and Communications (MEIDECC) for the Asian Development Bank. (ADB) The Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgement as to the legal or other status or any territory or areas.
Climate Resilience Sector Project Due Diligence Report
2
ABBREVIATIONS
ADB Asian Development Bank
AP Affected Person
CBD Central Business District
CEO Chief Executive Officer
CRSP Climate Resilience Sector Project
DDR Due Diligence Report
EA Executing Agency
GFP Grievance Focal Point
GoT Government of Tonga
GRM Grievance Redress Mechanism
MEIDECC Ministry of Meteorology, Energy, Information, Disaster Management,
Environment and Climate Change and Communications
MET Ministry of Education and Training
MIA Ministry of Internal Affairs
MLSNR Ministry of Lands, Surveys, and Natural Resources
NIIP National Infrastructure Investment Plan
O&M Operations and maintenance
PIU Project Implementation Unit
PMU Project Management Unit
PSC Project Steering Committee
PUMA Planning and Urban Management Agency
SD Sports Division
TMP Traffic Management Plan
Tonga Kingdom of Tonga
TOR Terms of Reference
Climate Resilience Sector Project Due Diligence Report
3
Table of Contents
1. Introduction ........................................................................................................................... 4
2. Project Overview ................................................................................................................... 4
3. Methodology ......................................................................................................................... 5
4. Project Components and Screening of Resettlement Impacts ............................................. 5
5. Due Diligence and Compliance Audit ............................................................................................... 5-7
6. Consultations and Disclosure ........................................................................................................... 8-9
7. Grievance Redress Mechanism .................................................................................................... 10-11
8. Follow up Actions ................................................................................................................ 11
9. Monitoring and Reporting .................................................................................................................. 11
ANNEX: I-XIII ...................................................................................................................................... 12-46
Climate Resilience Sector Project Due Diligence Report
4
Introduction
1. The Due Diligence / Social Compliance Report (DDR) is for the proposed candidate subproject of the Climate Resilience Sector Project (CRSP) - Upgrading the evacuation and post
disaster access road for Popua in Tongatapu; upgrading additional Government Primary Schools
(GPS) in Tongatapu, which are the GPS Ngele’ia and the GPS Hala-‘o-Vave; and relocating of
Lifuka, Ha’apai hospital from vulnerable area to higher ground. ADB has classified the proposed subproject as Category C for Involuntary Resettlement – meaning, “Additional
candidate sector subprojects no involuntary resettlement impacts. No further action is required”
(http://www.adb.org/site/safeguard-categories). The due diligence review presented here supports that classification.
Project Overview
2. The CRSP aims to mainstream climate resilience into government planning and address
country priorities focusing on the most vulnerable sectors and communities. The overall
proposed outcome seek to strengthen Tonga’s enabling environment for climate adaptation and disaster risk reduction at national and local level. This will be delivered through components
including mainstreaming climate resilience into development planning, monitor Tonga’s climate
data and information, established climate change trust fund to support community adaptive investment, and increase ecosystem resilience and climate infrastructure investment.
3. The Executive Agency (EA) of the CRSP is Ministry for Finance and National Planning
(MFNP). The Ministry of Meteorology, Energy, Information, Disaster Management, Environment, Climate Change and Communications (MEIDECC) is acting as the Coordinating Implementing
Agency (IA). A Project Management Unit (PMU) has been established in MEIDECC to monitor
the project activities and liaise with all implementing agencies, other stakeholders and ADB.
There are five Implementing Agencies (IAs) of whom three have set up their own Project Implementation Units (PIUs). These are MOI – Ministry of Infrastructure; MLNR – Ministry of
Lands and Natural Resources; MAFFF - Ministry of Agriculture, Food, Forestry and Fisheries;
MET – Ministry of Education and Training; and MoH – Ministry of Health. Two of the five IAs do not have a separate PIU but supported by PMU / MEIDECC. The IAs that do not have PIUs are
MET - Ministry of Education and Training and MOH - Ministry of Health. PMU in MEIDECC
supports IAs that requires assistance for Ministries that do not have the PIU platform. The PMU
supervises and supports all these PIUs and stakeholders. There are cross linkages between IAs in the project. These have been identified and the lines of communications are clarified. The
Project Director is responsible for the supervision of the individual consultants and coordination
with the firm.
4. No significant negative environmental and social impacts will occur from the
implementation of the climate infrastructure investments including the additional candidate sector sub-projects. In fact there is an emphasis on improving climate change adaptations and
outcomes through appropriate evacuation and post disaster access roads, safe location of
public facility, provision of safe school facilities and compounds with an enabling environment to
withstand inland inundation, drought and strong wind, as well as increase water harvesting and storage.
5. Ownership of the evacuation and post disaster access roads including the Popua evac road is MoI, the Ha’apai Hospital is MoH, and the five upgrades schools in Tongatapu is under
MET (GPS’) & Maamafo’ou (Lavengamalie) education platform arrangement.
6. In summary, all climate infrastructure including additional candidate sector sub-projects
investments provide a positive environmental benefit for climate resilience. The climate
infrastructure component improves performance, safety, and better public health outcomes
Climate Resilience Sector Project Due Diligence Report
5
through more reliable services for public usage and for natural disaster events. It will also
provide improve access for stakeholders and improve sustainability and building capacity in the areas of climate resilience, which will positively assisting the communities to be resilient from
the adverse impact of climate change.
Methodology
7. DDR works were carried out for all climate infrastructure investment. Tasks conducted
were consultation with relevant stakeholders, site visit, and review of email correspondences, cadastral map, lease documents, and project design documents. Climate infrastructure
investments are:
(i) Evacuation and post disaster access roads
8. Upgrading work for 6.64km in total for 3 villages in Tongatapu and 1 village road section
in the island of Eua1. The evacuation and post disaster roads will improve the security of the local population in the event of major climate related event by both allowing for evacuation and
post disaster access by emergencies vehicles, enhancing livelihoods of the local population
through facilitating their access to economic centres such as markets and providing employment and trading opportunities for both local and national workers.
(ii) Upgrading schools
9. Upgrading school2 is improving roofing, building structures, road access, cyclone
shutters, and drainage. The upgrading works reduced the number of days that school are
closed during cyclone season and to adapt to other effects of climate change such as droughts.
(iii) Hahake Coastal Protection
10. Hahake coastal protection is building coastline3 protection in eastern of Tongatapu
utilising rock revetment to control coastline erosion and to reduce impact of flood surges in
coastal communities’ households. The climate infrastructure investment expected benefits are
reduction in building and road damage, household income loss, statistical value of life loss and emergency costs, as well as recreation and amenity benefits from preserving the shoreline and
beaches.
(iv) Relocation of Ha’apa hospital to a less disaster prone area
11. This candidate subproject is aimed at the long-term need for relocation of the hospital to a less disaster-prone area. The current site is located no more than 5 metres from the low-lying
coastline of Lifuka island in the Ha’apai group. This coastal site is zoned and classified
extremely vulnerable to coastal erosion and inundation from storm surges and potential sea
level rise.
Due Diligence and Compliance Audit
12. All government-owned land is vested in the Crown. The Minister of Lands is the representative of the Crown in all matters concerning land in the Kingdom of Tonga.
1 Identified roads are Navatoka (2.25 km), Talafo’ou (2.27 km), Popua (1.26km) in the island of Tongatapu and Tufu
(1.04 km) on the island of ‘Eua. 2 GPS Fanga, GPS Kolomotu’a, GPS Hala’oVave, GPS Ngele’ia, and the Lavengamalie Side School
3 Total length of the sections is 2.05 km from over a total length of some 6.2 km of coastline.
Climate Resilience Sector Project Due Diligence Report
6
13. According to the Land Act of Tonga, the Minister of Lands grants leases and permits with the consent of Cabinet. Only the registered holder of a town or tax allotment may grant a
lease over the whole or part of the allotment, but only if the consent of the Tongan Cabinet has
been given in the manner dictated by the Land Act.
14. All climate infrastructure investment including additional candidate sector subproject are
all on government owned land. Therefore, there is no land issue.
15. All 4 evacuation and post disaster access roads4 are climate resilient and superimposed
on an existing government alignment, which are all constructed on existing government reserve.
Therefore, there is no need for resettlement and no land issues occurred. The evacuation and post disaster alignments are shown in Annex I-IV.
16. The 5 schools upgrade work5 is under the Ministry of Education and Training & the
Tokaikolo Education Management. Upgrading works reduced the number of days that school are closed during cyclone season and to adapt to other effects of climate change such as
droughts. Climate infrastructure investment benefits are avoided income/time loss resulting
from school closures; inconvenience to parents; avoided damage to schools due to flooding; piped water cost, drought and disaster alleviation reduction. All schools upgrade work is on
existing Ministry of Education and Training & Maamafo’ou lands; therefore, there is no land
issue. Ministry of Education and Training & Maamafo’ou site demarcations are illustrated in Annex V-IX. The following benefits have occurred.
o Water logging completely removed. Rainfall of 200mm in 1 day in 2017 recorded,
stagnant water was drained out from all schools within 5-6 hours during low tide. No
loss of school days for both students and teachers. Before CRSP school upgrades intervention it usually took 5-6 days for water log to drain out from the school
compound. Therefore, loss of school days were frequently happened during raining
and cyclone season. o During Gita category 4 cyclone on 12 February 2018, the new building constructed
at GPS Hala’ovave was used as evacuation center by the communities. Many large
and tall trees broken, lots of damages occurred on the surrounding areas. However,
new CRSP classroom building was not damaged. o Intervention provided under climate proofing of schools of CRSP had provided
resilience against climate events particular on droughts and reduced the loss of
school days also.
17. Hahake coastal protection is building coastline6 protection in eastern of Tongatapu utilising rock revetment to control coastline erosion and to reduce impact of flood surges in
coastal communities’ households. The climate infrastructure investment expected benefits are
reduction in building and road damage, household income loss, statistical value of life loss and
emergency costs, as well as recreation and amenity benefits from preserving the shoreline and beaches. The rock revetment construction alignment is built on the existing government
reserve; therefore, there is no land issue. Coastal protection alignment layout is in Annex X.
18. As for the new Ha’apai hospital site in Lifuka; there was a requirement for the land to
transfer from Ministry of Health to the Ministry of Education and Training has completed (Annex
4 Roads are Navatoka (2.25 km), Talafo’ou (2.27 km), Popua (1.26km) in the island of Tongatapu and Tufu (1.04 km)
on the island of ‘Eua. 5 GPS Fanga, GPS Kolomotu’a, GPS Hala’oVave, GPS Ngele’ia, and the Lavengamalie Side School
6 Total length of the sections is 2.05 km from over a total length of some 6.2 km of coastline.
Climate Resilience Sector Project Due Diligence Report
7
XIII, Figure 31); therefore no land issue. Building complies with the permanent and imposed
load, earthquake/seismic requirements by the structural building code provisions. Structural members are concrete reinforced steel, steel section and masonry bricks to withstand
Cyclone/Wind Actions Category 5. Building footprint is 2,035 sq. meters. Layout is illustrated in
Figure 1 and 2. The access road that connects the new hospital to the Fau Road with 254m x
~5m x .25m, and seal with 14mm single chip seal un-pre-coated with road widening of 1.2m for both side is on existing government reserve. The Ministry of Land, Survey, and Natural
Resources is finalizing the additional cadastral access in ANNEX XIII, Figure 30 to be
completed by the 31 May 2018. Therefore, there is no land issue.
Climate Resilience Sector Project Due Diligence Report
8
Consultations and Disclosure
19. The project team met on the 31 January 2018 with the following officials as listed below:
Name Organisation
Hon. Poasi Tei Minister for Ministry of Meteorology, Energy, Information, Disaster Management, Environment, Climate Change, and Communication
Mr. Paula P. Ma’u Chief Executing Officer, Ministry of Meteorology, Energy, Information, Disaster Management, Environment, Climate Change, and Communication
Ms. Lu’isa Tu’ia’fitu Malolo Project Director & Director for Climate Change Department, Ministry of Meteorology, Energy, Information, Disaster Management, Environment, Climate Change, and Communication
Ms. Rosamond C. Bing Chief Executing Officer, Ministry of Lands and Natural Resources
Ms. Kelela Tonga A/CEO Ministry of Infrastructure
Ms. Lu’isa T. Malolo Director for Climate Change and Project Director for Climate Resilience Sector Project
Mr. Tukua Tonga NUDS Project Manager & Director for PUMA, Ministry of Lands and Natural Resources
‘Atunaisa Fetokai NSPAO
Mr. Manu ‘Akau’ola Ministry of Education & Training
Mr. Isikeli Oko Ministry of Education & Training
Mrs. ‘Utulamataki Paongo Tonga Principal Ha’apai High School
Dr. Tevita Vakasiuola Niu’ui Ha’apai Hospital
Vika Fe’iloakitau Ministry of Finance and National Planning
Seventeen Toumoua NUDSP
Dr. David Lees CRSP, Team Leader
Mr. Winston Halapua CRSP
Mr. Malakai J. Vakasiuola CRSP
Mr. Feleti Fa’otusia CRSP
Mr. Sione Tukia Lepa CRSP
Mr. Nikolasi Palu CRSP
Ms. Falekakala Taufa GIS Officer, MLSNR
Mrs. Halalilika ‘Etika Head of GIS Section, MLSNR
Dr. Langitoto Helu CRSP
Climate Resilience Sector Project Due Diligence Report
9
20. The project team also carried out a site visit to the Ha’apai Hospital, roads, and upgrade schools on the 9 & 10 February 2018,
David Fay Asian Development Bank
Belvina Puamau Asia Development Bank
Taniela Faletau Asian Development Bank
Tatafu Moeaki Asian Development Bank
Winston Halapua CRSP PMU
Malakai J. Vakasiuola CRSP PIU
Dr. Atiq Islam CRSP PIU
Peni Halai CRSP PIU
Nikolasi Palu
Sione Pongi TPL
Sekitoa Petani Quarry, Hahake Coastal Protection
Gao Dong CCECC, Ha’apai Hospital Contractor
21. This DDR will be disclosed to the general public through distribution of the written
reports, posting documents on the government websites, and electronic access to the reports on the ADB project website.
Grievance Redress Mechanism
22. In order to receive and facilitate the resolution of any concerns or complaints of any Affected Person (AP) about the project’s social, environmental, and quality safeguards
compliance, the CRSP since its commencement, has a Grievance Redress Mechanism
(GRM) in place for all safeguard issues; providing a streamlined process for any concerns or issues in relation to resettlement, social safeguards, and environmental
impacts. CRSP is well into its implementation phase; the grievance redress process has
been widely disseminated to all affected people during project consultations and focus
group discussions. When and where the need arises, this mechanism will be used to address any concerns or complaints that may arise during implementation and operation
of the project.
23. The GRM will address APs concerns and complaints promptly and transparently through the process outlined below. The GRM will be gender responsive and readily accessible
to all APs at no cost. The GRM will not impede APs access to the Government judicial or
Climate Resilience Sector Project Due Diligence Report
10
administrative remedies. Implementing Agencies (IAs) in coordination with Executive
Agency and all IAs will further inform APs about the GRM.
24. The key functions of the GRM are to: (i) record, categorize, and prioritize the grievances;
(ii) resolve the grievances in consultation with complainant(s) and other stakeholders;
(iii) inform the aggrieved parties about the solutions; and (iv) forward any unresolved
cases to higher authorities for resolution.
25. Grievance Focal Points (GFP) have been established with the relevant IAs Officers,
PMU, and contractors to coordinate and address all complaints and concerns arising from any subproject. The contact details are provided to all affected persons.
26. The GFP will be assisted and supported by the PIUs and PMU. PIU maintains a register of complaints, keep track of their status and report to PMU.. PMU will regularly track
complaints received, actions taken and the status of resolution. All communications with
the affected person(s) will be documented, and checked.
27. Affected persons will be informed that they should ask any questions or discuss
grievances with the complaints by phone or in person; or to project staff visiting the area. The GFP is encouraged to discuss the issue with the contractor or safeguards team, as
often-minor environmental or social impacts can be remedied with immediate action.
28. If these questions/grievances are not answered within 1 week, it should be prepared in
writing (using the assistance of the local community leader, church or school if
necessary). The complainant will also be informed that national and international project
staff could assist them with writing a grievance if necessary.
29. Written complaints can be sent or delivered to the Grievance Focal Points where they
will be registered as being received, and will be treated confidentially. The GFP will have 1 week to deliver a resolution to the affected person.
30. In the event that a satisfactory answer cannot be provided, the affected person may
lodge the complaint with the Project Management Unit and receive a reply within 7 days.
31. Affected Persons have the right to take the dispute to the Chairman of the PSC, who will
also have one week to respond.
32. In the event that the situation is not resolvable, or the complainant does not accept the
decision, the affected person(s) may have recourse to the land court (or other relevant court). All court costs (preparation and representation) will be paid for by the project;
regardless of the outcome.
Table 1: Grievance Resolution Process
Stages in Response Handling
Required Activities
Recipients, Village Head or District/Town GFP
Verbally responds to questions and or complaints. May represent affected person in direct discussions with contractor or
safeguards team.
Climate Resilience Sector Project Due Diligence Report
11
If no response within 1 week, or response is unsatisfactory,
affected person prepares a grievance in writing .
IAs Registers the written complaint and attempts to solve it. If complaint is not resolved in 1 week, it is passed to the PMU for
resolution.
PMU
Registers the written complaint and attempts to resolve it with the affected person within 1 week.
If a solution is not reached, the PMU refers it to the CEO & Minister for MEIDECC.
CEO & Minster MEIDECC
Consults with other Minsters & CEOs, the GFP and PMU in the resolution of complaints.
Makes a decision within 1 week.
If the decision is still unacceptable to the complainant, they may
take it before the Land (or other relevant) Court, with all costs
paid for by the government.
Land (or other) Court The court hears the case and makes a final decision that is binding on all parties.
Follow up Actions
33. A Resettlement Plan is not required for the additional candidate subprojects. The
subproject will not cause any physical and economic displacements nor require any land acquisition since the scope of work will be confined within state-owned land. This will not
affect the proposed subproject, however, and need not be ordered as a project
condition.
Monitoring and Reporting
34. No monitoring and reporting is required for land acquisition and resettlement issues as
there are none. Relevant information related to safeguards, if any, will be reported in the
project’s progress quarterly report. Any unanticipated issues will be dealt with in accordance with ADB’s Safeguard Policy Statement (2009) and the project’s
resettlement framework.
Climate Resilience Sector Project Due Diligence Report
12
Figure 1: Ministry of Infrastructure Work Permit for Popua Evacuation Road
ANNEX I: Popua Evacuation Post Disaster Access Road
Climate Resilience Sector Project Due Diligence Report
13
Figure 2: Ministry of Lands, Survey, and Natural Resources Cadastral & Spatial Layout for Popua Evacuation Road
Climate Resilience Sector Project Due Diligence Report
14
Figure 3: Ministry of Lands, Survey, and Natural Resources for Popua Evacuation Road Satellite Spatial Layout
Climate Resilience Sector Project Due Diligence Report
15
Figure 4: Ministry of Infrastructure Work Permit for Navutoka Evacuation Road
ANNEX II: Navutoka Evacuation Post Disaster Access Road
Climate Resilience Sector Project Due Diligence Report
16
Figure 5: Ministry of Land, Survey, and Natural Resources Cadastral & Spatial Layout for Navutoka Evacuation Road
Climate Resilience Sector Project Due Diligence Report
17
Figure 6: Ministry of Infrastructure Work Permit for Talafo’ou Evacuation Road
ANNEX III: Talafo’ou Evacuation Post Disaster Access Road
Climate Resilience Sector Project Due Diligence Report
18
Figure 7: Ministry of Lands, Survey, and Natural Resources Cadastral Layout for Talafo’ou Evacuation Road
Climate Resilience Sector Project Due Diligence Report
19
Figure 8: Ministry of Lands, Survey, and Natural Resources Spatial Layout for Talafo’ou & Navutoka Evacuation Roads
ANNEX IV: Talafo’ou & Navutoka Evacuation Post Disaster Access Road
Climate Resilience Sector Project Due Diligence Report
20
Figure 9: Ministry of Infrastructure Work Permit for Tufuvai Evacuation Road,‘Eua Island
ANNEX V: Tufuvai Evacuation Post Disaster Access Road
Climate Resilience Sector Project Due Diligence Report
21
Figure 10: Ministry of Lands, Survey, and Natural Resources Cadastral Layout for Tufuvai Evacuation Road, ‘Eua Island
Climate Resilience Sector Project Due Diligence Report
22
Figure 11: Ministry of Lands, Survey, and Natural Resources Spatial Layout for Tufuvai Evacuation Road, ‘Eua Island
Climate Resilience Sector Project Due Diligence Report
23
Figure 12: Ministry of Lands, Survey, and Natural Resources Spatial Layout for Schools Upgrade Work
ANNEX VI: School Upgrade Work, Nuku’alofa, Tongatapu
Climate Resilience Sector Project Due Diligence Report
24
Figure 13: GPS Hala ‘o Vave New Classroom Work Permit
ANNEX VII: GPS Hala’oVave Upgrading School
Climate Resilience Sector Project Due Diligence Report
25
Figure 14: GPS Hala ‘o Vave Work site Layout Permit
Climate Resilience Sector Project Due Diligence Report
26
Figure 15: GPS Ngele’ia Work Permit
ANNEX VIII: GPS Ngele’ia Upgrading School
Climate Resilience Sector Project Due Diligence Report
27
Figure 16: GPS Ngele’ia work site Layout Permit
Climate Resilience Sector Project Due Diligence Report
28
Figure 17: GPS Fanga Work Permit
ANNEX IX: GPS Fanga Upgrading School
Climate Resilience Sector Project Due Diligence Report
29
Figure 18: GPS Fanga work site Layout Permit
Climate Resilience Sector Project Due Diligence Report
30
Figure 19: GPS Fanga student/teacher drop off elevated
Climate Resilience Sector Project Due Diligence Report
31
Figure 20: GPS Kolomotu’a Work Permit
ANNEX X: GPS Kolomotu’a Upgrading School
Climate Resilience Sector Project Due Diligence Report
32
Figure 21: GPS Kolomotu’a work site Layout Permit
Climate Resilience Sector Project Due Diligence Report
33
Figure 22: Lavengamalie Side School Work Permit
ANNEX XI: Lavengamalie Upgrading School
Climate Resilience Sector Project Due Diligence Report
34
Figure 23: Lavengamalie Side School work site Layout Permit
Climate Resilience Sector Project Due Diligence Report
35
Figure 24: Lavengamalie Side School Drainage Alignment
Climate Resilience Sector Project Due Diligence Report
36
Figure 25: Ministry of Infrastructure, Hahake Coastal Protection Work Permit
ANNEX XII: HAHAKE COASTAL PROTECTION
Climate Resilience Sector Project Due Diligence Report
37
Figure 26: Ministry of Lands, Survey, and Natural Resources Spatial Layout
Climate Resilience Sector Project Due Diligence Report
38
Figure 27: Ministry of Lands, Survey, and Natural Resources Spatial Layout for Hahake Coastal Protection
Climate Resilience Sector Project Due Diligence Report
39
Figure 28: Ministry of Lands, Survey, and Natural Resources Cadastral for Hahake Coastal Protection
Climate Resilience Sector Project Due Diligence Report
40
ANNEX XIII: Relocation of Ha’apai hospital to a less disaster prone area
Figure 29: Relocation of Ha’apai Hospital Work Permit
Climate Resilience Sector Project Due Diligence Report
41
Figure 30: Additional Hospital Access
Climate Resilience Sector Project Due Diligence Report
42
Figure 31: Ha’apai Hospital Foot Print
Climate Resilience Sector Project Due Diligence Report
43
Figure 32: Electrical, Fiber, and Telephone Layout Permit
Climate Resilience Sector Project Due Diligence Report
44
Figure 33: National Spatial Planning Authority Office Hospital Permit
Climate Resilience Sector Project Due Diligence Report
45
Figure 34: Ministry of Lands, Survey, and Natural Resources New Hospital Site Permit
Climate Resilience Sector Project Due Diligence Report
46
Figure 35: Cabinet Decision - Hospital Site Approval