18
PETROVIETNAM Energy for National Sustainable Development Presented by: Ngo Anh Hien Deputy General Manager Gas Division of PetroVienam

Tong quan duong ong khi vn

  • Upload
    luuguxd

  • View
    1.844

  • Download
    8

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Tong quan duong ong khi vn

PETROVIETNAMEnergy for National Sustainable Development

Presented by: Ngo Anh Hien

Deputy General Manager

Gas Division of PetroVienam

Page 2: Tong quan duong ong khi vn

Content

OVERVIEW OF PIPELINE SYSTEM

CURRENT GAS PIPELINE SYSTEMS

DIRECTION TO DEVELOPMENT

ON-GOING GAS PIPELINE PROJECTS

UP-COMING GAS PIPELINE PROJECTS

PETROVIETNAMEnergy for National Sustainable Development

Page 3: Tong quan duong ong khi vn

Overview of Gas Pipeline System

In 1981, the first developed gas field from Tien Hai – Song

Hong basin with flowrate of 20 – 23 MMCM/year supplied

to local industry.

In 1995, the first associated gas from Bach Ho field – Cuu

Long basin – with flowrate 1 MMCM/day supplied to Ba

Ria Power Plant.

In 2003, a first natural gas from Lan Tay field – Nam Con

Son basin with flowrate of 2 MMCM/day supplied to Phu

My Power Complex. By October 2008, the flowrate was

increased to 20 MMCM/day.

In 2007, a first associated gas from PM3-CAA overlapping

area supplied to Ca Mau Power Complex.

PETROVIETNAMEnergy for National Sustainable Development

Page 4: Tong quan duong ong khi vn

Current Gas Pipeline Systems

• Northern area – Thai Binh Pipeline

• Rang Dong – Bach Ho – Phu My Pipeline

• Nam Con Son Pipeline

• PM3 – Ca Mau Pipeline

• Low Pressure Pipeline

PETROVIETNAMEnergy for National Sustainable Development

Page 5: Tong quan duong ong khi vn

Current Gas Pipeline Systems

PETROVIETNAMEnergy for National Sustainable Development

Northern area – Thai Binh

Fields: Tien Hai C (07/1981)D14_STL (5/2004)Dong Quan D (2005)

Specification: Length: ~20 kmDiameter: Small (~6”)

Description: Limited gas resources

Supply gas to Tien Haiindustrial zone, ThaiBinh.

Page 6: Tong quan duong ong khi vn

CAMBODIA

Ca Mau Complex

PM3-CAA

O Mon

Hiep Phuoc

Dinh Co GPP

Phu My Complex

Cuu Long Basin

Nam Con Son Basin

Ma Lay Tho Chu Basin

Bach Ho –Phu My PL:•Capacity: 2 bcmpa•Length: 117 km•Diameter: 16”

Nam Con Son 1 PL:•Capacity: 7 bcmpa•Length: 400 km•Diameter: 26”

PM3-Ca Mau PL:•Capacity: 2 bcmpa•Length: 330 km•Diameter: 18”

Block B, 48 &52

Current Gas Pipeline Systems

PETROVIETNAMEnergy for National Sustainable Development

Page 7: Tong quan duong ong khi vn

Current Gas Pipeline SystemsSoutheast Region

PETROVIETNAMEnergy for National Sustainable Development

LOÂ 06.1

LAÂ NTAÂ Y-

LANÑ OÛ

LOÂ 11.2

MOÛ

NHAØ MAÙ Y

XÖ Û LYÙ KHÍ NAM COÂ N SÔ N

NHAØ MAÙ YXÖ Û LYÙ KHÍ

DINH COÁ

TRUNG TAÂ M

PHUÙ MYÕ

GDC

BLOCK 06.1

LAN TAY

& LAN DO

BLOCK 11.2

BACH HO

DINH CO TERMINAL

NAM CON SON

DINH CO GPP

BACH HO

BA RIA POWER PLANT

BACH HO

GAS

DISTRIBUTION

CENTER

PHU MY GDS

PHU MY 2.1

PHU MY 2.1 EXT.

PHU MY 1

PHU MY 3NAM CON SON

GAS DISTRIBUTIONCENTER

PHU MY GDCPHU MY 2.2

PHU MY FERTILIZER

LOW PRESSURE

PM – MX - GD

PHU MY INDUSTRIAL ZONE

PHU MY - HCM

OFFSHORE

DINH CO AREA

BA RIA AREA

Max. capacity: 2.0 BCM/y

Max. capacity: 7 BCM/y

PHU MY 4

PHUONG DONG RANG DONG

PHU MY 3

NHON TRACH 1

HIEP PHUOC

CA NGU VANG

NHON TRACH 2

STD/STV

Rong Doi Moi

Page 10: Tong quan duong ong khi vn

Current Gas Pipeline SystemsLow Pressure Gas Pipeline

PETROVIETNAMEnergy for National Sustainable Development

Design Capacity:

1 BCMY

Specification: Length: 15 km

Description: Supply gas to theindustrial zonesalong the trunk-pipeline to Ba Ria,Phu My area.

Page 11: Tong quan duong ong khi vn

Direction to Development

PETROVIETNAMEnergy for National Sustainable Development

• Maximize the utilization of existing pipeline system.

• Expand gas pipeline system in Southeast and Southwest

region.

• Utilize gas reserves in the Central and Northern of

Vietnam.

• Interconnect regional/national gas pipeline systems.

• Expand gas usage in other sectors such as resident,

transportation, industry etc through low pressure and city

gas pipeline system.

Page 12: Tong quan duong ong khi vn

PETROVIETNAMEnergy for National Sustainable Development

Master Plan For Pipeline System

Page 13: Tong quan duong ong khi vn

On-going Gas Pipeline Projects

PETROVIETNAMEnergy for National Sustainable Development

Rong-Doi Moi – Bach Ho Pipeline

Design Capacity: 6.4 BCMY

Location: Southeast region

Description: To gather gas and then compress associated gas in Rong – Doi Moi gas fields through Bach Ho –Dinh Co pipeline.

Specification: RC1-RP2: 9,5km, 10”RP3-RP2: 8.5km, 12”RP3-RC4: 16km, 10”RC4-RC5: 5.5km, 8”RC4-RCDM: 3.5km, 8”

First gas: 12/2010

Page 14: Tong quan duong ong khi vn

On-going Gas Pipeline Projects

PETROVIETNAMEnergy for National Sustainable Development

Page 15: Tong quan duong ong khi vn

On-going Gas Pipeline Projects

PETROVIETNAMEnergy for National Sustainable Development

Block B – O Mon Pipeline

06-2

PETR

O

CARIGA

LI

CARI

G

O MON

PHU My Design Capacity: 6.4 BCMY

Location: Southwest region

Specification: Length: 406 kmOnshore: 160 km, 30”Offshore: 246 km, 28”

First gas: 2014

Customers: - O Mon Power Complex(O Mon Power Plant2,3,4,5)

- Gas-Power-FertilizerIndustry Zone in Ca MauProvince.

Page 16: Tong quan duong ong khi vn

Up-coming Gas Pipeline Projects

PETROVIETNAMEnergy for National Sustainable Development

Nam Con Son II Gas Pipeline

Design Capacity: 7 BCMY

Location: Southeast region

Description: The 400 km line will be built in parallelwith the 1st pipeline to transport gasfrom Block 05-2, 05-3 and 04-3 withconsideration of re-serving for otherpotential gas fields in Nam Con Sonbasin and importing gas later.

First gas: 2014

Page 17: Tong quan duong ong khi vn

Up-coming Gas Pipeline Projects

PETROVIETNAMEnergy for National Sustainable Development

Block 102/106 & 103/107 – Thai Binh Pipeline

Distances

Hong Long - Landfall: ~55km

Hac Long - Hong Long: 10,3km

Bach Long - Hong Long: 17,4km

Dia Long - Hong Long: ~20km

Hong Long - Thai Binh: ~40km

Thai Binh – Landfall: 19,54km

Page 18: Tong quan duong ong khi vn

THANK YOU!