  • Supplier Quality Improvement Manual

    Tokai Eastern Rubber (Thailand), Ltd.

    Issued by Checked by

    Revision 11

    Effective date : 01 April 2012

    Approved by

    Technical Section

    Technical Supplier Manual

  • Supplier Quality Improvement Manual

    ContentsItem Page

    1. Quality assurance ideality 1

    2. Purpose 1

    3. Scope 1

    4. Requests for supplier4.1 Initial Control Organization 2

    4 2 Approval Initial Part of Supplier 34.2 Approval Initial Part of Supplier 3

    4.2.1 Production Preparation Schedule 4

    4.2.2 SPTT Audit 4

    4.2.3 Inspection Standard 5

    4.2.4 SBSC 7

    4.3 Initial Delivery Control 8

    4.4 PPAP Activity 8

    4.4.1 Reason to submit PPAP 8

    4.4.2 PPAP Retention / Submission Requirement for Supplier 9

    4.4.3 TER PPAP Status 23

    4.4.4 Record Retention 23

    4 5 P Ch R i t 244.5 Process Change Requirement 24

    4.5.1 Reason to information of process change 24

    Submission requirement for supplier

    4.5.2 Delivery requirement after PCN approved 25

    4.5.3 Change Control Flow 26

    4.5.4 Record Retention 27

    4.6 Guideline for Environmental Hazardous Substance Management 27

    4.7 Control of initial nonconforming products(NC) 32

    5. Attachment List 33

    Technical Supplier Manual Change Notification

    Technical Supplier Manual

  • Supplier Quality Improvement Manual

    1. Quality assurance ideality10

    1.1 Supplier shall produce parts that meet to TER satisfaction as purchasing agreement.

    TER would approve parts that shall be controlled quality continuously.

    1.2 Supplier shall improve production process to achieve condition and requirement and

    prepare quality assurance of part have not problem after delivery Especially for problems in TER

    shall be corrected and prevented immediately.

    1.3 TER shall audit QA system of supplier including monitoring and advising in order to

    assure quality of supplier efficiently and continuously.

    1.4 To conduct coordination between TER and supplier.

    1.5 Supplier shall apply ISO9000 or ISO/TS16949 to implement in Quality Assurance

    system.

    1.6 Initial part of supplier shall approved by TER before start Mass production.

    2. Purpose

    This guide to Technical Supplier Manual is defined a standard of quality assurance for new or

    changed product as supplied to "Tokai Eastern Rubber (Thailand),Ltd."

    3. Scope

    This manual applies to the quality assuarance activities of suppliers for new or change, which

    related to TER in assembly product. If it difficult to carry out them please contact to Technical section,

    QA&Technical department of TER

    Page 1 of 34 Technical Supplier Manual

  • Supplier Quality Improvement Manual

    4. Requests for supplier

    4 1 I iti l C t l O i ti4.1 Initial Control Organization

    Establish and maintain the quality assurance system. The supplier shall assign a person

    who responsible in quality and delivery for initial part. This assignment has aimed to ensure an establishment

    of a consistent quality assurance and delivery system to cover all processes of each supplied product

    for TER and response in our satisfaction of requirements. Supplier shall submit to Technical section within

    11

    7 days after received New Part Notice from Purchasing / TER.

    ** If Contact person change. Please Review /Revise this organization and submit to Technical

    section within 7 days.

    TER Engineering Div

    Project Organization Chart

    Project LeaderProject Name

    RT-50Supplier Name

    Factory ManagerName : Mr.N. YoshidaE-mail : [email protected] : (038) 893-557-61 ext.162Mobile Phone : 081-9496355

    < Manager > < Staff >Project Leader (Department): Project Leader (Department):

    TER Engineering Div.

    Engineering Div. Engineering Div.

    Core team4Marketing Div. Quality Div. Production Div. PE Div. PC Div. WH Div.

    Core team6Core team1 Core team2 Core team3

    RT 50

    Core team5

    j ( p ) j ( p )Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    Core Team # 1 (Department): Core Team # 1 (Department):Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :081-629-4615

    Mr.W.CherdpanMkt.Mgr.

    [email protected]

    02-685-3557-60 ext.110

    Mr.T.Makino

    Marketing Div. Marketing Div.

    02-685-3557-60 ext.112084-084-6660

    [email protected]

    [email protected]

    (038) 893-557-61 ext.210081-664-9426 085-436-4241

    [email protected]

    (038) 893-557-61 ext.112

    Mr.T.SuppachaiMkt.Staff

    QA & Technical GMMr.T.Chawalit

    Technical Dept.Supv.

    Mobile Phone : Mobile Phone :

    Core Team # 2 (Department): Core Team # 2 (Department):Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    Core Team # 3 (Department): Core Team # 3 (Department):Name : Name :Position : Position :E il E il

    081 629 4615

    Production Mgr.

    Production Div. Production Div.

    Quality Div. Quality Div.

    (038) 893-557-61 ext.116

    084 084 6660

    Mr.C.AtthayaProduction Supv.

    h @ h

    Mr.K.Projob

    j b@ h

    089-939-5191

    Mr.S.EkkaratQA Supv.

    [email protected]

    (038) 893-557-61 ext.117081-377-8504

    Ms.S.SaranyaQA & Technical Dept.Mgr.

    [email protected]

    E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    Core Team # 4 (Department): Core Team # 4 (Department):Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    Core Team # 5 (Department): Core Team # 5 (Department):Production Control Production Control

    Production EngineerProduction Engineer

    081-663-6295

    [email protected]

    (038) 893-557-61 ext.175081-723-2936

    [email protected]

    081-663-6295

    Mr.M.YoothasisthProduction Engineer Supv.

    [email protected]

    (038) 893-557-61 ext.175081-750-7738

    Mr.K.ProjobProduction [email protected]

    (038) 893-557-61 ext.175

    (038) 893-557-61 ext.175

    Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    Core Team # 4 (Department): Core Team # 4 (Department):Name : Name :Position : Position :E-mail : E-mail :Tel : Tel :Mobile Phone : Mobile Phone :

    (038) 893-557-61 ext.125 (038) 893-557-61 ext.125081-865-2072 081-330-4431

    PC Asst.Mgr. [email protected] [email protected]

    Production Engineer Production EngineerMr.W.Prapan Mr.K.Narest

    Mr.W.Prapan Mr.P.Sakdinan

    081-865-2072 081-7825986(038) 893-557-61 ext.125 (038) 893-557-61 ext.189

    [email protected] [email protected]

    PC Asst.Mgr. Supv.

    Page 2 of 34 Technical Supplier Manual

    Mobile Phone : Mobile Phone :

    Rev.01

    081 865 2072 081 330 4431

  • Supplier Quality Improvement Manual

    4.2 Approval Initial Part of Supplier

    T h i l ti t fl f l i iti l t t t f li i d PO tilTechnical section set flow for approval initial part start from supplier received PO until mass

    production(MP). In each stage technical will check/audit document and process of supplier.

    Page 3 of 34 Technical Supplier Manual

  • Supplier Quality Improvement Manual

    4.2.1 Production Preparation Schedule(PPS)

    S li i PPS hi h t i N P t N ti TER t l11

    Supplier issue PPS which contains New Part Notice, TER master plan

    (TD0, TM0, TM1, MP), SPTT stage and detail of part preparation. After received plan Supplier shall issue

    Supplier plan submit to TER within 2 week and update supplier plan in PPS submit to Technical every

    month. Technical will check progressive of part from PPS.

    Supplier shall issue supplier's PPS to Technical / TER after received New Part Notice for

    1st SPTT audit activity. Supplier shall update progressive of PPS by 25th of every month

    Supplier : XXXXXXXXXXXXXXXX 3Part No. : XXXXXXXXXXXXXXXX 2 Approved Approved Checked Checked Approved Checked IssuedPart Name: XXXXXXXXXXXXXXXX 1Mfg.No.: XXXXXXXXXXXXXXXX PLAN 0 dd/mm/yy xxxx

    ACTUAL Rev. Date PIC President Manager Advisor Engineer President Manager Engineer

    7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1

    sign sign sign

    20112010

    CUSTOMER Plan

    Tokai Eastern Rubber(Thailand),Ltd.

    History Recordnew issue sign sign sign sign

    Production Preparation Schedule

    ResponsibilityActivities

    Supplier:________________

    S-Lot ET PT1 PT2 SOP

    Raw Material& CKD XXXComponent Local parts XXX

    Process planning XXXXXXXXXxProd. Of Tooling/Equipment XXXXXXXXXxProd. Of Checking Fixture XXXXXXXXXxTry-out XXXXXXXXXxTurning & Modilication XXXXXXXXXxTooling & Equipment Transfer XXXXXXXXXxProd Of Tooling/Equipment XXXXXXXXXx

    Supplier Plan

    TER Plan

    CUSTOMER Plan

    Master Schedule

    epar

    ation

    JAPAN

    TM1TM0TD0 MP

    TM1TM0TD0 MP1stSPTT 3rdSPTT2ndSPTT

    Prod. Of Tooling/Equipment XXXXXXXXXxProd. Of Checking Fixlure XXXXXXXXXxInstallation XXXXXXXXXxTry-out XXXXXXXXXxTuning & Modification XXXXXXXXXxLow Volume Production Trial (LVPT) XXXXXXXXXxHigh Volume Production Trial (HVPT) XXXXXXXXXxStart of Vulume Production XXXXXXXXXxDimension & Appearance XXXXXXXXXxMaterial Evaluation XXXXXXXXXxPerformance Evaluation(Sample part) XXXXXXXXXxPerformance Evaluation XXXXXXXXXx(Re-comfirmation of Local Prod. Part) XXXXXXXXXxInspection Standard XXXXXXXXXx

    THAI

    Evalution

    Proc

    ess P

    re

    4.2.2 SPTT Audit

    T h i l t SPTT ti it f

    Inspection Standard XXXX