Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:
1/3
MEMO
To:
John Paul Stout, MPA Sustainable Development Manager City of Augusta 525 Telfair Street Augusta, GA 30901 (706) 821-1796
Copies:
Adam Williamson, AICP, TSW Design
From:
Shamir Poudel, PE ARCADIS U.S., Inc.
Date: ARCADIS Project No.:
January 10, 2014 GA064020
Subject:
Augusta Sustainable Development Implementation Program (ASDIP) Technical Memorandum - Initiative 2, Task 1, Context-Sensitive Design Element Inclusion into GDOT 15th Street Widening Project
Background
The Augusta Sustainable Development Implementation Program (ASDIP) consists of four interrelated
planning initiatives designed to implement sustainable development in the City of Augusta. Initiative No. 2
focuses on development of a plan and implementation program for a multimodal transportation corridor
within the identified project target area, which includes the Deans Bridge Road, Martin Luther King Jr.
Boulevard, and 15th Street corridors. The scope of work for Initiative No. 2 includes reviewing the current
Georgia Department of Transportation (GDOT) plans and coordinating with GDOT to include context-
sensitive elements within the proposed footprint of the State Route 4/15th Street widening project (PI
#220680). The desired outcome of Initiative No. 2 is a transportation improvement project that
accommodates all uses (vehicles, pedestrians, bicycles, and public transit) and includes sufficient
amenities. This technical memorandum summarizes the activities conducted under this task.
Current GDOT Project
The State Route 4/15th Street project (PI #220680) is in the Augusta Regional Transportation Study
Transportation Improvement Program (TIP) and the Georgia Statewide Transportation Improvement
Program (STIP). As currently designed by GDOT, the project involves road widening and related
improvements on 15th Street and Martin Luther King Jr. Boulevard from Government Road to Milledgeville
Road. The current concept includes two travel lanes in each direction separated by a 15-foot to 18-foot
c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:
2/3
raised median with left-turn lanes at median openings. Pedestrian components include a 5-foot-wide
sidewalk along the east side and an 8-foot shared-used path along the west side intended to provide
pedestrian and bicycle accommodations. Street lighting is also included in the project.
Recommended Modifications to Current GDOT Project
Context-sensitive recommendations are categorized into bicycle and pedestrian accommodations, side
road alignment modifications, median modifications, and transit accommodations. Following is a summary
of these recommendations and the status of their inclusion in the GDOT project. Modification requests
submitted to GDOT and GDOT’s responses to those requests are included as Attachments 1 and 2. Plan
revisions showing these modifications are presented on the conceptual layouts included as Attachment 3.
GDOT is currently incorporating some of the modifications into the overall design of the State Route 4/15th
Street project.
Table 1: Summary of Context-Sensitive Design Element Inclusion in GDOT State Route 4/15th Street
Project
Modification Request Inclusion in GDOT Project Comments
Bicycle and Pedestrian
Accommodations
Will be included
Side Road Alignment
Modifications
To be partially included
Will be partially included. Contingent on
redevelopment of Augusta Housing
Authority redevelopment schedule of
Cherry Tree Crossing.
Median Width and Left-Turn
Bay Modifications
Will be reviewed Being reviewed by GDOT with new traffic
analysis.
Transit Accommodations
Will be included
Public Involvement Process
Residents of the project area as well as the users were consulted throughout the project process. This
began at the public meeting no. 1 which was used for visioning and gathering inputs from the public before
the conceptual design began. The public continued throughout the project development with two
additional meetings throughout the process. Public involvement details and a summary of input received
are included in the public involvement summary attached to this memo.
c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:
3/3
Current Status of GDOT State Route 4/15th Street Project
The project is currently in the environmental documentation phase. Following is the anticipated project
schedule, which is contingent on the approval of the environmental document and associated special
studies:
Public Hearing Open House (PHOH) – Spring 2014
Environmental Approval – Spring 2015
Start Right-of-Way Acquisition – Summer 2015
Start Construction – Summer 2018
Attachments:
1. Modification Request by ASDIP Team
2. GDOT Response to ASDIP Modification Request
3. Project Layouts
4. Public Involvement Summary
g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc
Page:
1/4
MEMO
To:
Jeremy T. Busby, PE
Project Manager
Georgia Department of Transportation
Office of Program Delivery
600 West Peachtree Street, 25th Floor
Atlanta, GA 30308
Tlant
Copies:
Paul T. DeCamp, Jr., AICP
Steve Cassell, PE PTOE
John Paul Stout, MPA
Adam Williamson, AICP
From:
Shamir Poudel, PE
ARCADIS U.S., Inc.
Date: ARCADIS Project No.:
February 7, 2013 GA064020
Subject:
Request for Modification to GDOT 15th Street Project (PI #220680)
Augusta Sustainable Development Implementation Program (ASDIP)
Background
The Augusta Sustainable Development Implementation Program (ASDIP) consists of four interrelated
planning initiatives designed to implement sustainable development in the City of Augusta. Initiative No. 2
focuses on development of a plan and implementation program for a multimodal transportation corridor
within the identified project target area, which includes the Deans Bridge Road, Martin Luther King Jr.
Boulevard, and 15th Street corridors. The scope of work for Initiative No. 2 includes reviewing the current
GDOT plans and coordinating with GDOT to include context-sensitive elements within the proposed
footprint of the State Route 4/15th Street Road widening project (PI #220680). The desired outcome of
Initiative No. 2 is a transportation improvement project that accommodates all uses (vehicles, pedestrians,
bicycles, and public transit) and includes sufficient amenities.
As a part of Initiative No. 2, we have completed our review of the in-progress design plans and files dated
August 2012 for the GDOT project. We have also presented the current GDOT improvement project to the
public as well as the project steering committee. Based on our review, feedback from the public, input
from project steering committee and input from City of Augusta, we are requesting that GDOT consider
the following changes to the current project design for PI #220680.
g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc
Page:
2/4
Current GDOT Project
The State Route 4/15th Street project (PI #220680) is in the Augusta Regional Transportation Study
Transportation Improvement Program (TIP) and the Georgia Statewide Transportation Improvement
Program (STIP). As currently designed by GDOT, the project involves road widening and related
improvements on 15th Street and Martin Luther King Jr. Boulevard from Government Road to Milledgeville
Road. The current concept includes two travel lanes in each direction separated by a 15-foot to 18-foot
raised median with left-turn lanes at median openings. Pedestrian components would include a 5-foot-
wide sidewalk along the east side and an 8-foot shared-used path along the west side intended to provide
pedestrian and bicycle accommodations. Street lighting is also included in the project.
Recommended Modifications to Current GDOT Project
Our recommendations are categorized into bicycle and pedestrian accommodations, side road alignment
modifications, median modifications, and transit accommodations. Following are brief discussions of these
recommendations and the rationale behind these recommendations.
Bicycle and Pedestrian Accommodations
It is our request that GDOT consider including a 5-foot bicycle lane and 5-foot sidewalk along each side of
Martin Luther King Jr. Boulevard and 15th Street. Current GDOT design proposes an 8-foot path along the
west side of Martin Luther King Jr. Boulevard and 15th Street to jointly accommodate pedestrian and bicycle
traffic; however, the 8-foot path is too narrow to function as a two-way multi-use path. To minimize the
footprint impacts associated with this change, we are proposing that the raised median along Martin Luther
King Jr. Boulevard be reduced from 18 feet to 15 feet. In addition, we are proposing that a header curb be
utilized along the outside instead of a 24-inch curb and gutter. An additional strip of right-of-way will be
needed to accommodate these changes; however, most of the additional right-of-way need can be met by
converting the proposed permanent easements to required right-of-way. See the attached typical section for
the suggested dimensions. A proposed layout can be provided in Microstation and PDF formats.
Side Road Alignment Modifications
It is our request that GDOT consider modifying the current design at the intersections of:
• Essie McIntyre Boulevard and 15th Street
• Government Road and 15th Street
The current design for the Essie McIntyre Boulevard and 15th Street intersection calls for a major
realignment of the western leg of the intersection to provide a perpendicular intersection between these
g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc
Page:
3/4
roads. This intersection realignment would result in significant impacts to the TW Josey High School
property located in the northwest quadrant of the intersection. These impacts would affect parking spaces,
internal vehicular circulation, and a fenced area beyond the parking lot. We are proposing that a less
drastic realignment of Essie McIntyre Boulevard be utilized to minimize impacts to the high school. See
attached layout for suggested modifications.
The current design for the Government Road and 15th Street intersection calls for a major realignment of
Government Road so that it aligns with the entrance to the Cherry Tree Crossing apartments. According to
a recent announcement, the housing authority of the City of Augusta is planning to demolish the existing
Cherry Tree Crossing complex and redevelop it into a mixed-use development. With this redevelopment,
the entrance to this property can be relocated to match the existing Government Road, eliminating the
need to realign Government Road. Our preliminary discussions with the Augusta Housing Authority
indicate that the Authority is open to working with GDOT on the location of the new entrance. See
attached layout for suggested modifications.
Median Width and Left-Turn Bay Modifications
It is our request that GDOT consider revising the following with respect to medians:
• Length of currently proposed left-turn bays
• Width of narrowest section of median in the vicinity of left-turn lanes
• Addition of mid-block crossing
Our initial review of left-turning volumes and opposing through volumes indicates that there are
opportunities to reduce the length of the left-turn bays along Martin Luther King Jr. Boulevard and 15th
Street. The goal is to maximize areas along the corridor where full median width is available to install
grassing, landscaping, and a mid-block crossing without compromising the operations of the intersections.
We believe there are opportunities to provide wider median widths at the following locations:
• Station 108+00+/-: approximately 350 linear feet of wider median
• Station 116+00+/-: approximately 190 linear feet of wider median
• Station 133+00+/-: approximately 560 linear feet of wider median
• Station 218+00+/-: approximately 260 linear feet of wider median
• Station 230+00+/-: approximately 900 linear feet of wider median
• Station 241+00+/-: approximately 430 linear feet of wider median
g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc
Page:
4/4
The narrowest width of the median currently proposed is 1 foot in the vicinity of left-turn bays. We are
proposing that this be increased to 2 feet as shown in the attached typical section to improve visibility.
Our review of the corridor indicates that an additional pedestrian crossing is needed along Martin Luther
King Jr. Boulevard between the intersections of Olive Road and 15th Street. The distance between these
signalized intersections with a protected pedestrian crossing opportunity is 0.3 mile. A mid-block crossing
will alert motorists of the crossing and will allow pedestrians to take refuge at the median after crossing
two lanes of traffic.
Transit Accommodations
Currently the City of Augusta does not operate a bus route along Martin Luther King Jr. Boulevard and
15th Street. However, it is anticipated that the City will reroute Bus Route No. 6 through Martin Luther King
Jr. Boulevard and 15th Street after the GDOT widening is completed. In addition to replacing two existing
bus shelters located in the vicinity of TW Josey High School, it is requested that GDOT consider including
additional bus shelters at the following locations to serve the corridor with transit:
• Two bus shelters in the vicinity of TW Josey High School in addition to replacement of the two existing
bus shelters. The first new shelter is proposed to serve northbound buses along 15th
Street. The second
new shelter is proposed to serve westbound buses along Essie McIntyre Boulevard.
• Two bus shelters (one along northbound and one along southbound Martin Luther King Jr. Boulevard) at
the intersection of Milledgeville Road and Martin Luther King Jr. Boulevard to serve destinations
including the YMCA, Wilkerson Gardens Elementary School, and Augusta Christian School.
• Two bus shelters at the intersection of Olive Road and Martin Luther King Jr. Boulevard (one along
northbound and one along southbound Martin Luther King Jr. Boulevard) to serve the Jennings Homes
housing facility and Ebenezer Seventh Day Adventist School.
• Two bus shelters at the intersection of 15th Street and Martin Luther King Jr. Boulevard (one on each
side of the road) to serve residential areas in the vicinity of this major intersection.
Thank you for your consideration. We would be happy to meet with you to discuss these recommendations.
Attachments:
Revised Typical Section
Intersection Layouts
Microstation and PDF Concepts (not attached but available if needed)
SE
E D
RA
WIN
G N
O. 2
MILLEDGEVILLE ROAD
TUB
MAN HO
ME ROAD
KRATHA DRIVE
ALLBRIGHT LANE
SR 4 /MILLEDGEVILLE ROAD
SR 4/DEA
N’S BRID
GE ROAD
1 OF 4FACILITIES
BIKE AND PEDESTIAN
US 1/SR 4 & 15TH STREET
PI 111+03.20
PC 102+35.44
PI 97+00.00
PC 109+54.78
PI 105+50.36
PT 112+46.61
N 66°37’14.9" E
N 49°22’
12.4" E
105+00
125+00
120+00
115+00
100+00
110+
00
24’
20’20’
20’
24’
24’
24’14’
24’24’
PL
PL
PL
PL
PL PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L P L
PL
P L
PL
PL
PL
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PL
PL
PL
PL
PL
PL
PL
0+00
PI 2+77.42
PI 0+00.00
S 24°06’44" E
SVXE7029
SVXE7029
SVXO810
SVXO810
SVXO830
SVXO830
0+00
PI 4+80.22
PI 0+00.00
S 18°15’09" E
SVXE7030
SVXE7030
SVXE7030
SVXO831
SVXO831
SVXD22684
SVXD22684
SVXE7011
SVXO832
SVXO832
SVXO833
SVXO833
SVXE2937
SVXE2937
SVXD21312
SVXD21312
SVXD22911
SVXD22911
SVXE7012
SVXE7012
SVXE7032
SVXE7032
SVXE7033
SVXE7033
SVXO834
SVXO834
SVXO603
SVXO603
SVXO603
SVXE10SVXE10
0+00
PI 4+72.66
PI 0+00.00
PI 1+87.12
N 22°40’30"
WN 23°07’07"
W
SVXD22899
SVXD22899
SVXD22913
SVXD22913
SVXO835
SVXO835
SVXE7035
SVXE7035
SVXE7016
SVXE7016SVXO858
SVXO858
SVXO858
SVXE7017
SVXE7017
SVXE7037
SVXE7037
SVXO784
SVXO784
SVXO859
SVXO859
SVXO859
SVXO608
SVXO608
SVXO608
SVXO608
0+00
SVXD22843
SVXD22843
SVXD22843
SVXE7019
SVXE7019
SVXE7039
SVXE7039
SVXD22844
SVXD22844
SVXF1594
SVXF1594
SVXF1594
SVXO786
SVXO786
SVXO787
SVXO787SVX859SVX859SVX859SVX859
SVXO610
SVXO610
SVXO610
SVXF1596
SVXF1596
SVXF1596
SVXE7020
SVXE7020
SVXE7000
SVXE7000
SVXO788
SVXO788
SVXO801
SVXO801
SVXO611
SVXO611
SVXO611
15+0
0
10+0
0
PI 1
8+39.0
4
S 86°45’43" E
SVXD22846
SVXD22846
SVXD22900
SVXD22900
SVXE7021
SVXE7021
SVXE7021
SVXE7022
SVXE7022
SVXO802
SVXO803
SVXO803
SVXF1610
SVXF1610
SVXF1610
SVXF1610 SVXO578
SVXO578
SVXO578
SVXO578
SVXE2968
SVXE2968
30+00
25+00
55+00
50+00
45+00
35+00
40+0
0
PI 26+52.21
PT 29+32.21
PI 40+96.70
PI 50+85.67
PC 33+02.66
PC 39+43.02
PI 33+02.66
PI 35+71.51
PT 42+44.98
PT 3
8+10.2
6
N 49°56’
17" E
N 66°49’55" E
N 66°49’55" E
S 86°55’22" E
SVXD22752
SVXD22678
SVXD22902
SVXD22902
SVXE7023
SVXE7023
SVXO804
SVXO804
SVXO579
SVXE7003
SVXE7003
PI 6+84.82
SVXE7004
SVXD22903
SVXD22903
SVXO580
SVXD22905
SVXD22905
SVXE7026
SVXE7026
SVXO792
SVXO806
SVXO806
SVXO807
SVXO807SVXO581
SVXD22756
SVXE7027
SVXE7027
SVXO794
SVXO794
SVXO808
SVXO808
SVXD22681
SVXD22681
SVXE7006
SVXE7006
SVXE7007
SVXO829
SVXO829
SVXO809
SVXO809
SVXD22641
SVXD22641
UTIL.BOX
FOUNDATION
DRAINAGE APPROXIMATE
DR
AIN
AG
E
AP
PR
OXI
MA
TE
DRAINAGE
APPROXI
MATE
DR
AIN
AGE
APP
RO
XIM
ATE
DR
AIN
AG
E
AP
PR
OXI
MA
TE
UTIL.BOX
LP TANK
EX. 18"PIPE
EX. 15PIP
E
EX. 36"
PIPE
EX. 36" PIPE
EX. 18"
PIPE
EX. 15"
PIPE
EX. 15" PIPE
EX. 15"
PIPE
EX. 36"
PIPE
EX. 18"
PIPE
EX. 36"
PIPE
EX. 36"
PIPE
EX. 36"
PIPE
EX. 15"
PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 15"
PIPE
EX. 1
8" PIP
E
EX. 18" PIPE
EX. 1
8" PIP
E
EX. 18" PIPE
EX. 15" PIPE
EX. 2
4" PIP
E
EX. 24" PIPE
EX. 24" PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 18" PIPE
EX. 18" PIPE
EX. 24" PIPE
EX. 24" PIPE
EX. 24" PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 15" PIPE
EX. 18" PIPE
EX. 24" PIPE
EX. 15" PIP
E
EX. 15" PIPEEX. 15" PIPE
EX. 15" PIPE
EX. 15" PIP
E
EX. 15" PIP
E
EX. 15" PIPE
EX. 15" PIPE
EX. 15" PIP
E
EX. 15" PIP
E
EX. 15" PIP
E
EX. 15" PIP
E
EX. 15" PIP
E
EX. 12" PIP
E
EX. 30" OR 36" PIPE
EX. 30" OR 36" PIPEEX. 36" OR 42" PIPE
WIL
LIS
DR
PIE
RCE
AU
TO
PIERCEAUTOSALES
DERSTOUTLET
STORE
SILVERBULLETLOUNGE
CHAPPARELLPACKAGE
WILLIAMSBURG
PLAZA
SUNCREEK
APTS
SHORT
STOP
GAS
BIG
A
AUTO
PARTS
FIRESTONE
CHILD’S
DREAM
WILKERSON
GARDEN
SCHOOL
AUTO
ZONE
FAMILY
DOLLAR
TOMPKIN
CO
COOK
MACHINE
SHOP
THE
FAMILY
Y
SIG
N
SIG
N SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
NSIG
N
WALL
DRAWING No.
STATE OF GEORGIA
DEPARTMENT OF TRANSPORTATION
PROPERTY LINE
REQUIRED R/W
W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER
W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER
15 FT TP 7 RAISED GRASSED MEDIAN
2 FT TP 7 RAISED CONCRETE MEDIAN
200
SCALE IN FEET
0 100
25R
25R
PI 11+64.82
PI 15+00.00
PC 10+
63.93
PT 1
2+55.7
2
N 42°43’03.4"
W
N 86°40’17.3" W
PI 28+82.32
PT 26+39.49
PC 21+86.14
PI 20+00.00
N 22°27’51.3"
W
N 24°11’45.3"
W
PI 111+03.20
PC 102+35.44
PI 97+00.00
PC 109+54.78
PI 105+50.36
PT 112+46.61
N 66°37’14.9" E
N 49°22’
12.4" E
PI 31+76.64
N 19°52’33.5"
W
PI 81+49.95
PI 80+00.00
S 32°13’31.1" E
PI 33+00.00
20R 20R
24’
20’
14’
24’
20R
25R 25R
+30.12
+44.03
+07.71
+68.46
+48.73
+16.96
+85.
99
+41.
96
+29.32
+15.80
+88.92
+00.97
+09.32
+44.00
+75.95
+56.14
+04.17
+09.11
+61.37
+69.79
+34.54
+27.30
+21.72
+36.
15
+85.34
+87.
64
+66.
46
+69.29
+89.67
+88.14
+32.88
+61.03
+65.19
20R
20R
20R
20R
20R
20R
20R
20R
20R20R
25R
25R
35R35R
20R
20R
20R
20R
15R 15R
20R
20R
20R
20R
15R
15R
20
R20
R
20R
UTIL.BOX
RUINS
2138005
F
OU
ND
ATIO
N FOUNDATION
FOUNDATION
4-32
4-31
2138006
RUINS
RUINS
RUINS
2138007
FOUNDATION
UTIL.
BOXTOWER
4-34
4-33
213
8012
DQ
CRAB
KINGAUGUSTA
HOME
ACCESSORIES
FENDER’S
AUTO
WRECKING
G & O
AUTO
SALES
DISCOUNT
STORE
WET SPOT
CAR WASH
CHURCH
WARD
CHAPEL
A.M.E.
RONNIE’S
BODY
REPAIR
PHILLIP
’S66
SERVANT’SOF GODBAPTISTCHURCH
GA
AUTO
PARTS
EAST
AU
GUS
TA
SUP
ER
MA
RKE
T
SIG
N
SIG
N
SIG
N
SIG
N
BIL
LB
OA
RD
SIG
N
BIL
LB
OA
RD
SIG
N
SIG
N
SIG
N
channel
paved botto
m
42"
SE
E D
RA
WIN
G N
O. 1
SEE DRA
WIN
G N
O. 3
OLIVE ROAD
SR 4 / MARTIN LUTHER KING JR. BLVD.
SR 4 / 15T
H ST
REET
SR 4 / MARTIN LUTHER KING JR. BLVD.
2 OF 4FACILITIES
BIKE AND PEDESTIAN
US 1/SR 4 & 15TH STREET
PI 140+64.57
PI 148+00.00
PC 137+55.77
PI 145+06.72
PT 143+73.26
N 64°24’48.7" E
N 64°05’37.4" E
135+00
130+00
140+00
145+00
PI 205+30.55
PC 200+83.20
PT 209+74.20
N 27°27’56.2"
E
N 14°42’10.6"
E
200+00
205+00
210+00
14’
24’
24’
20’20’20’
14’
14’
24’14’24’24’24’24’
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P L P L
PL
PL
PL
PL
P L P L
PL
PL
PL
P L
P L
P L
PL
PL
PL
PL
PL
PLPL
PL
P L
P L
P L
PL
PL
PL
PL
PL
PL PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
P LP L
P LP L
P L
P L
PLPL
PL
PL
PL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
SVXD22759
SVXD20153
SVXD20153
SVXO894
SVXO894
SVXO874
SVXO718
SVXO718
SVXO719
SVXO719
SVXO856
SVXO760
SVXO760
SVXO857
SVXO720
SVXO720
SVXO761
SVXO761
SVXO721
SVXO722
SVXO762
SVXO762
SVXO723
SVXO724
SVXF1595
SVXF1595
SVXO725
SVXO884
SVXO919
SVXO709
SVXO709
SVXD22754
SVXO711
SVXO711
SVXO903
DRAWING No.
STATE OF GEORGIA
DEPARTMENT OF TRANSPORTATION
PROPERTY LINE
REQUIRED R/W
W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER
W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER
15 FT TP 7 RAISED GRASSED MEDIAN
2 FT TP 7 RAISED CONCRETE MEDIAN
200
SCALE IN FEET
0 100
35R35R
35
R35
R
+30.11
N 55
°15’
23.6"
W
PI 35+00.00
N 31°13’30.7"
W
PI 5
7+00.0
0
PI 5
5+00.0
0
S 53°11’53.0" E
PI 140+64.57
PI 148+00.00
PC 137+55.77
PI 145+06.72
PT 143+73.26
N 64°24’48.7" E
N 64°05’37.4" E
PI 45+90.85
PI 50+66
.91
PT 48+58
.41
PC 43+21.21
PI 40+00.00
N 21°48’32.9"
W
N 9°26’52.3"
W
PI 205+30.55
PC 200+83.20
PT 209+74.20
N 27°27’56.2"
E
N 14°42’10.6"
E
PI 61+50.00
PI 60+00.00
S 28°32’49.4" E
PI 18+99.99
PI 17+00.0
0
N 36°01’39.3"
W
20’
+33.95
14’
+92.51
-0.02 -0.02
43+72.00
44+66.00
45+62.00
-0.02 -0.02
46+56.00
45+94.00
0.00 -0.0137
0.01045 -0.01045
0.01045 -0.01045
0.00 -0.0137 D/W TIE
TIE
D/
W
D/
W TIE
D/
W TIE
D/
W TIE
20R
25R
25R
25R25
R
25R25
R
14’
25R25R
24’
20’
+20.12
+45.12
+17.17
+09.52
+92.15
+88.39
+21.99
+52.55
+62.53
+50.42
+59.34
+67.92
+21.42
+71.43
+72.66
+61.81
+81.98
+59.07
+49.87
+34.74
+40.43
+32.70
+98.58
+93.80
20R20R
35R
SEE D
RA
WIN
G N
O. 2
SEE D
RA
WIN
G N
O. 4
EAGLES
WAY
ESSIE
McINTYRE BLVD.
POST LANE
BRANCH ST.
SR 4 / 15TH STREET
De
WITT STREET
MORGAN STREET
3 OF 4FACILITIES
BIKE AND PEDESTIAN
US 1/SR 4 & 15TH STREET
PI 231+22.85
PT 233+86.13
PC 228+59.46
PC 211+51.26
PI 214+25.22
N 23°50’57.6" E
N 20°58’31.5" E
235+00
230+00
225+00
220+00
215+00
22’14’
14’ 14’14’
14’14’ 14’ 14’
14’ 14’14’ 14’
14’14’
14’14’
14’
18’
14’
24’
14’
14’
14’
14’
14’
14’
14’14’
14’
PL PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PLPL
PLPL
PLPLPL
P LP L
P L
P L
P LP L
P LP L
P L
P L P L P L
P L P L
P L
P L
P LP L
P LP L
P LP L
P LP L
P LP L
P L
P LP L
P LP L
P LP L
P L P LP L
P LP L
PL
PL
PL
PL PLPLPL
PL
PLPL
P L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P LP L
P L
P LP L
P LP L
P LP L
P LP L
P L
PL
PL
PL
PLPL PL PL
PL
P LP L
P LP L
P LP L
PL
PLPL
PL
PL
P L P L
PL
PL PL PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL PL PL
PL
PLPL
PLPL
PL PLPL
PL
PLPL
PLPL
PLPL
PL
PL
PL
PL PL PL PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL PL PL
PL PL PL
PL PL
SVXO1013
SVXO1013
SVXO1013
SVXO1013
SVXO987
SVXO987
SVXO987
SC16621
SC16621
SC16621
SVXO714
SVXO714
SVXO715
SVXO715
SVXO735
SVXO1014
SVXO1014
SVXO1014
SVXO988
SVXO988
SVXO716
SVXO716
SVXO736
SVXO736
SVXO989
SVXO989
SVXO989
SC16739
SC16739
SC16739
SVXO737
SVXO737
SVXO738
SVXO738
SVXO990
SVXO990
SVXO990
SVXO739
SVXO1039
SVXO1039
SVXO1039
SVXO991
SVXO991
SC16593
SC16593
SC16593
SC16593
SC16593
SVXO972
SVXO972
SVXO972
SVXO992
SVXO992
SC16592
SC16592
SC16592
SVXO740
SVXO741
SVXO994
SVXO994
SVXO994
SVXO1000
SVXO1000
SVXO973
SVXO973
SVXO973
SVXO993
SVXO993
SVXO993
SVXO993
SVXO1040
SVXO1040
SVXO1040
SVXO1041
SVXO1041
SVXO1041
SVXO953
SVXO953
SVXO953
SVXO953
SVXO742
SVXO742
SVXO954
SVXO954
SVXO974
SVXO974
SVXO974
SVXO995
SVXO995
SVXO975
SVXO975
SVXO975
SVXO975
SVXO743
SVXO743
SVXO955
SVXO955
SVXO976
SVXO976
SVXO996
SVXO996
SVXO1003
SVXO1003
SVXO956
SVXO956
SVXO956
SC1088
SC1088
SC1088
SC16691
SC16691
SC16691
SVXO744
SVXO744
SVXO745
SVXO936
SVXO957
SVXO957
SVXO957
SVXO997
SVXO997
SVXO997
SVXO998
SVXO998
SC16693
SC16693
SC16693
SVXO726
SVXO746
SVXO958
SVXO958
SVXO978
SVXO978
SVXO978
SVXO999
SVXO999
SVXO979
SVXO979
SVXO979
SVXO727
SVXO747
SVXO747
SVXO1006
SVXO1006
SVXO959
SVXO959
SVXO959
SVXO728
SVXO728
SVXO748
SVXO748
SVXO749
SVXO749
SVXO960
SVXO960
SVXO980
SVXO980
SVXO980
SVXO729
SVXO729
SVXO981
SVXO981
SVXO981
SVXO982
SVXO982
SVXO982
SVXO982
SVXO961
SVXO961
SVXO961
SVXO961
SVXO730
SVXO730
SVXO962
SVXO962
SVXO983
SVXO983
SVXO983
SVXO963
SVXO963
SVXO963
SVXO731
SVXO731
SVXO984
SVXO984
SVXO984
SVXO964
SVXO964
SVXO964
SVXO712
SVXO712
SVXO732
SVXO733
SVXO965
SVXO965
SVXO1012
SVXO1012
SVXO1012
SVXO985
SVXO985
SVXO985
SVXO985
SVXO986
SVXO986
SVXO986
SVXO713
SVXO713
SVXO734
DR
AIN
AGE
APPR
OXIM
ATE
C.B.
C.B.
D.I.
D.I.
D.I.
D.I.
D.I.
C.B.
C.B.
C.B.
C.B.
RUINS
RUINS
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B. C.B.
C.B.
C.B.
C.B.
C.B.
D.I.
D.I.
D.I.
D.I.
D.I.D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
UNDERGROUND
FUEL TANKS
UN
DE
RG
RO
UN
DF
UE
L
TA
NK
S
C.B.
C.B.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
M.H.
UTIL.BOX
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
M.H.
M.H. M.H.M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
C.B.
C.B.C.B.
C.B.
RUINS
C.B.
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
D.I. D.I.
D.I.
M.H.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.
C.B.
C.B. C.B.
C.B.
C.B. C.B. D.I.
D.I.
C.B.
D.I.
D.I.
UTIL.BOX
D.I.
LP T
AN
K
D.I.
D.I.
D.I.
M.H.
GASOLINE FILLER VALVE
B
& HTOOLS
SOUTHER
N
MACHIN
E
AND TOOLS
WILLIAMS
MEMORIAL
CHURCH
PHILLIP’S66
FACILITIESANDMAINTENANCEDEPT
T. W. JOSEY
HIGH SCHOOL
SHILOHCOMMUNITYCENTER
C. M. E.
CHURCH
CO
VE
RE
D
WA
LK
COVERED WALK
COVERED WALK
SILOS
TANK
TANK
SIG
N
SIG
N
SIG
N
SIG
N
BIL
LB
OA
RD
PH
ON
E
BIL
LB
OA
RD
SIG
N
SIG
N
DRAWING No.
STATE OF GEORGIA
DEPARTMENT OF TRANSPORTATION
PROPERTY LINE
REQUIRED R/W
W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER
W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER
15 FT TP 7 RAISED GRASSED MEDIAN
2 FT TP 7 RAISED CONCRETE MEDIAN
200
SCALE IN FEET
0 100
N 21°56’29.8" E
N 68°28’07.0"
W
S 56°42’01.3" E
S 68°14’10.5" E
S 69°29’54.2" E
N 20°11’41.3" E
N 66°50’11.6"
W
PI 231+22.85
PT 233+86.13
PC 228+59.46
PC 211+51.26
PI 214+25.22
N 23°50’57.6" E
N 20°58’31.5" E
N 47°54’49.4" E
N 21°35’54.8" E
S 42°05’05.0" E
S 54°47’48.1" E
S 70°47’35.0" E
TIE
D/W
D/W TIE
D/W TIE
D/W TIE
D/W TIE D/W TIE
D/W TIED/W TIE D/W TIE D/W TIE
D/W TIED/W TIE D/W TIE D/W TIE D/W TIE D/W TIE
D/W TIED/W TIE D/W TIE
D/W TIE
D/W TIE
14’
SEE D
RA
WIN
G N
O. 3
GOVERNMENT ROAD
SWANEE QUINTET BLVD.
SR 4 / 15TH STREET
4 OF 4FACILITIES
BIKE AND PEDESTIAN
US 1/SR 4 & 15TH STREET
PI 255+82.51
PI 243+49.60
PT 246+99.35
PC 239+99.75
N 21°33’31.7" E
255+00
250+00245+00
240+00
14’14’
P L
P L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
P LP L
P L
P L
P L
P L P L
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
SVXO755
SVXO1152
SVXO717
SVXO717
SVXO758
SVXO759
SVXO1113
0+00
5+00
0+00
35+00
30+00
25+00
SVXO1045
SVXO1046
0+00
5+00
SVXO939
0+00
SVXO940
SVXO710
SVXO710
SVXO750
SVXB786
SVXO751
SVXO752
SVXB787
0+00
SVXO753
SVXO754
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.D.I.
D.I.D.I.
DR
AIN
AGE
APPR
OXIM
ATE
DRAINAGE APPROXIMATE
PL
AY
GR
OU
ND
UTIL.BOX
M.H.
D.I.
D.I.
D.I.
D.I.
D.I.
RUINS
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
D.I.
D.I.
PL
AY
GR
OU
ND
C.B.
DRAINAGE APPROXIMATE
M.H.
M.H.
M.H.
UTIL.BOX
U
TIL.B
OX
DRAINAGE APPROXIMATEDRAIN
AGE APPROXIMATE
UTIL.BOX
UTIL.BOX
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.C.B.
C.B.
C.B.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
D.I.
D.I.
M.H.
M.H.
M.H.M.H.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
D.I.
M.H.
M.H.
D.I.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
D.I.
C.B.
M.H.
M.H.
M.H.
M.H.
C.B.
C.B.
M.H.
M.H.
M.H.
M.H.
C.B.
C.B.
UNDERGROUND
FUEL TANKS
UTIL.BOX
D.I.D.I. D.I.
D.I.D.I.
D.I. D.I.
D.I.
D.I.D.I.
D.I. D.I.
UTIL.BOX
UTIL.BOX
C.B.
D.I.
OVERHEAD
SIGNAL
UTIL.BOX
C.B.
C.B.
C.B.
C.B.
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
PA
RKIN
G
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
L
OC
ATI
ON
CM
#
L
OC
ATI
ON
CM
#
LO
CA
TI
ON
CM
#
95550
OBS
CU
RE
D
AR
EA
OBS
CU
RE
D
AR
EA
OBS
CU
RE
D
AR
EA
OBS
CU
RE
D
AR
EA
FP
TC
TC
TC
TC
PA
RKIN
G
PA
RKIN
G
BB
TA
NK
TA
NK
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
SU
BST
ATIO
N
GILBERT MANOR
MEDICAL COLLEGE DORMS
CHERRY
TREE
CROSSING
APTS
CASTLEBERRY’S
CJ’S
FOOD
G E
SUPPLY
DURAMEDMEDICALSERVICE
PAPER
STOCK
DEALERS
EASTER
SEAL
KOAM
GAS
EMMETT ST
CSX R/R
RAIL
RO
AD A
VE
COVERED WALK
STA 248+62.00
SR 4/15TH ST
END CONSTRUCTION
18"
SHED
DRAWING No.
STATE OF GEORGIA
DEPARTMENT OF TRANSPORTATION
PROPERTY LINE
REQUIRED R/W
W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER
W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER
15 FT TP 7 RAISED GRASSED MEDIAN
2 FT TP 7 RAISED CONCRETE MEDIAN
200
SCALE IN FEET
0 100
PI 12+19.61
PI 10+00.00
S 54°33’18.5" E
PI 27+00.00
PI 23+51.10
PT 25+70.30
PC 21+04.78
PI 17+50.00
S 65°24’55.6" W
N 68°16’45.0"
W
N 68°16’45.0"
W
PI 255+82.51
PI 243+49.60
PT 246+99.35
PC 239+99.75
N 21°33’31.7" E
PI 41+11.58
PI 40+00.00
N 6°09’47.8" W
SR 4 / 15TH STREET
1/10/2014
- 1 -
Public Involvement Summary Initiative # 2 Public Involvement Meeting List
Initiative Meeting Time/Date Location Team Attendees 1. Initiative #2 Public Meeting #1
Held During Visioning Week/Charrette, 6:00pm, Tuesday, November 13, 2012
T.W. Josey High School 1701 15th Street Augusta, GA 30901
CC, Arcadis, TSW & WRT
2. Initiative #2 Public Meeting #2 Draft Concept Update
6:30pm, Thursday, June 13, 2013 T.W. Josey High School 1701 15th Street Augusta, GA 30901
CC, Arcadis, TSW & WRT
3. Initiative #2 Public Meeting #3 Concept Report Meeting
6:00pm, Tuesday, October 1, 2013 T.W. Josey High School 1701 15th Street Augusta, GA 30901
CC, Arcadis, TSW, & WRT
1. Public Meeting #1 Visioning Week T.W. Josey High School and Augusta Mini Theater November 13- 17, 2012 As part of the public engagement process for this project, the planning team hosted a 5-day event, known as Visioning Week. During the week of November 13-17, stakeholders were invited to participate in a series of visioning exercises designed to bring the community into the process of co-planning and co-designing project elements. The week’s activities consisted of a Visioning Workshop, Public Open House and Visioning Results Presentation. These events are summarized in the next section. Visioning Workshop - A kick-off meeting was held on Tuesday evening at T.W. Josey High School, in which approximately 50 residents, businesses owners and community leaders attended. The purpose of this meeting was to share with the community the desired outcomes of the week-long engagement process and to also capture an initial community response to aid in the development of preliminary design recommendations. The planning team introduced the four initiatives of the implementation plan to provide a context and general understanding of the program’s elements. Participants were then invited to participate in roundtable discussions centered on identifying key considerations. Groups of 8-10 people were led by a facilitator representing the planning team and were provided maps of the study area to notate points of interest. The facilitator provided guiding discussion questions about key project considerations including, transit, zoning, affordable housing, economic development, and public space. A representative from each group was asked to keep record of the discussion and each table provided a group report to summarize points of interest to all Participants. As a result, there were several areas of consensus raised from each of the roundtable groups.
Participants shared common interest in improving safety and transportation within the study area.
Specifically, groups identified a need for lighting improvements and other potential considerations included web-cam monitoring at bus stops.
Participants also indicated a need to improve the street design for better pedestrian access. This would take into consideration a need for better sidewalks, bike lanes and other additional features to better
accommodate safety for pedestrians.
Other considerations included the need for more routes within the corridor in addition to providing better transit amenities such as bus stop shelters with better lighting and potentially the integration of wifi hotspots.
Specific project considerations that were addressed by stakeholders included the need to revitalize the Regency Mall, Southgate Shopping Center, and the Cherry Tree public housing subdivision.
Recommendations for Regency Mall included ideas for adaptive reuses of the property which would provide better housing, retail options and recreation.
Stakeholders also saw an opportunity to introduce more businesses at the Southgate Shopping Center. Ideas for business opportunities included the introducing a FedEx Office that provides professional printing
and copy services.
1/10/2014
- 2 -
In addressing the future redevelopment at Cherry Tree, it was suggested by participants that attention to a full revitalization of the entire area surrounding the property was also essential.
An additional project opportunity was also identified near Martin Luther King and Steiner Avenue. The property is currently vacant warehousing, and participants saw this area as an ideal use for multifamily housing
and small retail.
Other concerns raised during roundtable discussions focused on the need to improve drainage issues within community.
Participants also desired to beautify the community, increase food outlets, and utilized alternative energy sources such as solar. Ways to incorporate an aesthetic along the bridge serving as a gateway into the
community were also discussed by participants. Lastly, the need to provide housing for lower income residents was greatly emphasized.
In closing, the planning team invited participants to continue their involvement by attending the open house sessions held at the Augusta Mini Theater as well as a final wrap-up meeting held on Saturday back at the high school. Visioning Week Open House - Following the Visioning Workshop, the team established a design studio at the Augusta Mini Theater to serve several purposes throughout the remainder of the week. On Wednesday the team along with City staff reviewed technical findings collected over several months including an overview of the economic market conditions and realities. The existing land use, landmarks and facilities, areas that are sustainable as well as susceptible to change. Also presented was the existing DOT transportation plan, inventory of facilities, traffic counts and intersection efficiency, internal and external multi-modal connections, and analyze options of lane widths, utilities and analyze storm water management systems. Finally, an overview of the existing code and regulations along with policy on green building and standards were presented. These findings would create the foundation for developing the design concepts. Following the presentation, large scale maps of the study area, existing conditions analysis and neighborhoods were posted and reviewed by the team. During this brainstorming session, the finding from the technical analysis and windshield surveys were used to generate consensus on a general program for Rocky Creek, Southgate and Deans Bridge Road, Oates Creek and Deans Bridge Road, and Cherry Tree and 15th Street. Over the remainder of the week, the team members, each with a specific target area, created development concepts representative of the results from the vision workshop, technical expertise and market realities. On Thursday and Friday, the design studio was open to the public. From 9am to 5pm on both days, over 50 property owners, business owners, residents and concerned citizens were able to view the existing conditions maps and review draft concept drawings. There were instances where the participants updated the team on their future plans for their businesses, concerns and desires for improvement as residents, and intentions for expansion or disposition of properties. The outcome of this information sharing often influenced the direction of the draft concept drawings for the target areas and adjustments were made accordingly. While the design session was underway, several stakeholders were invited to participate in interviews. The organizations participating in the interviews included Georgia Health Sciences, Paine College, City of Augusta Parks and Recreation, Augusta Greenway Alliance, 30901Dvelopment Corporation and the Augusta Mini Theater. Visioning Results Summary Presentation - The purpose of this session was to recap the events of Vision Week, share initial recommendations and gauge community support. Approximately 25 stakeholders attended this meeting on Saturday at T.W. Josey High School. Many of the Participants had participated in previous meetings held by the planning team and were knowledgeable of the activities and events preceding the wrap-up presentation. During this session, the planning team shared data collected on the project area, which was used to guide specific design and other program considerations. Some of this information was reflective of feedback provided during previous public involvement meetings such as visual preference exercises and descriptive words shared by residents during the project’s kick-off meeting. A market analysis on the economic conditions, housing conditions, commercial uses, and supply and demand factors impacting development in the area was introduced. Transportation findings affecting the area were outlined and specifically highlighted the need to plan for future growth within the area and provide better pedestrian safety features. Finally, detailed recommendations along with illustrative designs for Cherry Tree, Oates Creek, Rocky Creek, Southgate and the Regency Mall were presented. In addition to the presentations, a polling exercise was conducted in which the participants were presented a sequence of questions relating to the various presentation topics. Using small handheld devices participants were invited to vote on the provided responses to the posed questions. The questions related to home location, travel patterns, approaches to revitalizing the corridor and opinion regarding a possible corridor vision statement. While it was interesting to get some real-time feedback from the audience, the group was far too small to draw any conclusions. The presentation concluded with an unveiling of the draft mural concept drawing that will be the first beautification project to be implemented. The proposed mural will be installed on the exterior wall of the Mercy Ministries building on 15th St. The intent of the mural is to reflect a collaboration of the entire community to influence change. The presentations are on the website project website http://augustasustainable.com/public-involvement/
2. Transportation Public Meeting Summary T.W. Josey High School
1/10/2014
- 3 -
June 13th, 2013 - 6:00PM ARCADIS, the transportation consultant, facilitated a public meeting for the purpose of introducing the transportation recommendations for the Augusta Way Corridor and provide a status update on the GDOT 15th Street widening project. The public meeting kicked off with a welcome and brief explanation of the plan’s purpose and outcomes currently underway from John Paul Stout with the City of Augusta. Some of the HUD and GDOT funds allocated for the Sustainable Development Plan are being used to fund first phase implementation projects such as a mural project for the 15th Street Bridge. A muralist has been identified and has used input from the community to draft a design that reflects vision for the revitalization of the corridor and surrounding communities. Adam Williamson with TSW followed with a brief overview of the Sustainable Development Plan process including the 4 Initiatives: Initiative #1 - Develop a detailed plan for the Priority Development District and action/feasibility plans for up to three prototypical projects; Initiative #2 - Develop a detailed plan for a multi-modal transportation corridor bisecting the district; Initiative #3 - Revisit current codes to facilitate higher-density, mixed-use, mixed-income development in the district; Initiative #4 - Create an implementation plan for green, affordable housing in the district. Representatives from GDOT were in attendance and provided an update on the schedule for the 15th Street Widening Project. Several community stakeholders were concerned about the acquisition process. Although unable to address the questions in detail, the GDOT staff assured the attendees that staff from the GDOT acquisition department would be in attendance at the next public meeting to explain the right of way acquisition process and address questions in detail. The overview of the Transportation Recommendation for the 15th Street Widening project, their correlation to the Augusta Way Corridor and the improvements to Gordon Hwy, Milledgeville and Deans Bridge Road were presented by Tim Preece with ARCADIS. 15th Street Widening and Augusta Way Recommendations:
Installation of 5ft sidewalks and 5ft bike lanes on both sides of the street; no multi-use trail as previously proposed;
Planted median and/or turn lanes;
Improved access at TW Josey High School;
Minimal impact at the Government Street and 15th Street intersection;
Bus shelters along 15th Street and Martin Luther King, Jr. Blvd.;
Add a right-turn-lane at on Deans Bridge at Gordon Hwy.;
The improvements on 15th Street will widen the roadway to 92ft;
The majority of the acquisition, based on current design, will occur on the right side of the street (opposite side of street from TW Jose High School);
The proposed right away of 15th Street widening in located on www.augustasustainable.com
The presentation followed with and engaged Q&A session:
1. Will the 15th Street widening continue on Martin Luther King, Jr. Blvd? No. 2. Will 100% of the property acquired be used for the project? GDOT will not purchase land that it will not use. 3. As a business owner, who will be responsible for replacing the business signage that is located in the right of way if acquired? The GDOT acquisition staff will be in attendance at the next meeting to address all concerns regarding acquisition and right of way. 4. How will the widening project impact transit? The 15th Street widening project will increase accessibility of transit buses and service will be restored. 5. How much land will be taken? The amount of land needed for right of way will vary along the corridor. 6. When will acquisition begin? In 2016 it will begin, but there are several steps required before construction will begin.
1/10/2014
- 4 -
7. What happens to historic properties along 15th Street? At all cost, historic properties will be preserved. A map of the historic properties will be posted on the website (www.augustasustainable.com) .
Following the Q&A, consultants were available to answer additional questions utilizing the maps and diagrams posted for viewing.
3. Final Public Meeting Summary T.W. Josey High School October 1, 2013 - 6:00PM Approximately 70 community residents and stakeholders attended the final public meeting for the ASDIP on October 1st. The meeting was designed to provide yet another opportunity to receive comments on the draft transportation, development and zoning recommendations for the 15th Street corridor. The open house format provided opportunity for attendees to direct questions in their area of interest to the planning consultants at the various stations. The stations included: Zoning – The zoning station defined Form Based Code, described the proposed consolidation of code categories, and explained how the recommendations are solutions to issues and concerns that stakeholders identified early in the process.
Transportation – The transportation station was operated by both Arcadis and the GDOT Acquisition staff. Using a series of diagrams regarding streetscape and infrastructure improvement recommendations and the proposed alignment for 15th Street, the consultants were able to address questions such as:
What is the timeline for the 15th Street widening project?
How will the proposed median impact access to my business?
When will I be contacted regarding acquiring my property?
Are these improvements specifically designed to change the aesthetics of the area or address safety concerns?
Development Projects – Concept diagrams developed from input received during the visioning phase of the project were on display at this station. The team provided an overview of the proposed transformation plan that included various housing, retail, public space options throughout the corridor. In addition, meeting attendees were asked to review the project diagrams and complete a survey to rank the projects in order of priority.
Initiative # 2 Sub-Committee Meeting List
4. Transportation Corridor Subcommittee
Meeting #3 11:00pm-11:45pm, Tuesday, May 7, 2013
Municipal Building 530 Greene Street Augusta, GA 30901 Room 802
CC, TSW, WRT, & Arcadis
5. Code/Ordinance Subcommittee
Meeting #3 1:00pm-1:45pm, Tuesday, May 7, 2013
Municipal Building 530 Greene Street Augusta, GA 30901 Room 802
CC, TSW, & DKP
6. Land Acquisition Plan Subcommittee
Meeting #3 2:00pm-2:45pm, Tuesday, May 7, 2013
Municipal Building 530 Greene Street Augusta, GA 30901 Room 802
CC, TSW,WRT, & PES
7. Steering Committee Meeting #3
3:00pm-3:45pm, Tuesday, May 7, 2013
Municipal Building 530 Greene Street Augusta, GA 30901 Room 802
CC, TSW,WRT, & PES
1/10/2014
- 5 -
8. Transportation Corridor Subcommittee
Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901
CC, TSW, Arcadis, DKP & PES
9. Code/Ordinance Subcommittee
Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901
CC, TSW, Arcadis, DKP & PES
10. Land Acquisition Plan Subcommittee
Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901
CC, TSW, Arcadis, DKP & PES
11. Steering Committee Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901
CC, TSW, Arcadis, DKP & PES
4. Transportation Sub-Committee W.R. Toole Engineers May 7th, 2013 - 11:00AM This Transportation Sub-Committee meeting was led by ARCADIS on May 7th, 2013. The presentation consisted of an update on the GDOT 15th Street project, and its schedule and proposed recommendations for the Augusta Way Corridor. Draft transportation recommendations were presented at the June 13th public meeting and the final plan presented in October. The concept report is due to GDOT in January 2014.The team also presented a brief overview of traffic counts, crashes, and pedestrian/ transit facilities that influenced the transportation recommendations for the Augusta Way corridor. The follow-up discussion from the sub-committee members focused on the pedestrian and bike recommendations for 15th Street specifically the location of crosswalks and the proposed bike boxes at certain intersections. City staff also expressed concerns that the landscape medians and planned buffers will require a maintenance plan, but funding for these measures is limited. The consultants suggested a Business Improvement District/ Community Improvement District as a possible solution to pay for landscape and bike box maintenance. The next Committee meeting convened in early October.
7. Steering Committee W.R. Toole Engineers May 7th, 2013 - 3:00PM TSW presented a status report and brief overview of select project recommendations for each of the four plan initiatives was presented to the Steering Committee. A Potential Projects Map and Project Descriptions and phasing strategy was distributed to aid in the discussion. All four initiatives were discussed. The ASDIP has attracted attention from developers and the both Commission and Planning Department have been approached by interested parties. The ASDIP will allot for infrastructure improvements that will start the redevelopment process for the corridor and continue to attract attention to the area.
1/10/2014
- 6 -
8. Transportation Sub-Committee W.R. Toole Engineers October 1, 2013 - 10:00AM Arcadis presented at the final Transportation Sub-Committee meeting including an overview of the existing conditions, the GDOT 15th Street widening project update and next steps. GDOT, ARCADIS, and the City of Augusta Planning Commission have discussed modifications to the existing 15th Street widening design and GDOT has responded favorably to modifying bike and pedestrian accommodations along with transit shelters in strategic locations. GDOT would not commit to realigning Government Street adjacent to Josey High School and the locations and design of medians are still up for debate. ARCADIS is currently preparing a concept report containing all transportation and connectivity recommendations for submittal to GDOT in December.
9. Steering Committee W.R. Toole Engineers October1, 2013 - 11:00AM Adam Williamson, with TSW, provided a synopsis of the recommendations for each of the four ASDIP Initiatives. The overview focused on 3 key areas: Transportation, Form-Based Code and Land Acquisition. The transportation discussion, led by ARCADIS, and the City of Augusta Planning Commission staff have engaged the Georgia Department of Transportations in discussions on modifying the current GDOT plans for the 15th Street road widening project that is consistent with the ASDIP recommendations. Additionally, an overview of the work from Dover Kohl Partners on the form-based code was presented. They have developed a draft code that will consolidate the existing code classifications into six and have received feedback from the Code Subcommittee and the general public and are modifying accordingly. Land acquisition was also discussed, led by PES, outlining a strategy to move the catalytic projects identified in the ASDIP to implementation. With the assistance of an organized committee of City of Augusta departments, community organizations and leaders, this Implementation Oversight Committee will be tasked to: Identify and advocate for projects for development and leverage resources to support existing City departments including Code Enforcement, the Land Bank and Parks and Recreation as the first phase of project implementation. Elizabeth Jones agreed to convene the next meeting of the committee on October 15th at 2pm at the Shiloh Community Center.