c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page: 1/3 MEMO To: John Paul Stout, MPA Sustainable Development Manager City of Augusta 525 Telfair Street Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE ARCADIS U.S., Inc. Date: ARCADIS Project No.: January 10, 2014 GA064020 Subject: Augusta Sustainable Development Implementation Program (ASDIP) Technical Memorandum - Initiative 2, Task 1, Context-Sensitive Design Element Inclusion into GDOT 15 th Street Widening Project Background The Augusta Sustainable Development Implementation Program (ASDIP) consists of four interrelated planning initiatives designed to implement sustainable development in the City of Augusta. Initiative No. 2 focuses on development of a plan and implementation program for a multimodal transportation corridor within the identified project target area, which includes the Deans Bridge Road, Martin Luther King Jr. Boulevard, and 15 th Street corridors. The scope of work for Initiative No. 2 includes reviewing the current Georgia Department of Transportation (GDOT) plans and coordinating with GDOT to include context- sensitive elements within the proposed footprint of the State Route 4/15 th Street widening project (PI #220680). The desired outcome of Initiative No. 2 is a transportation improvement project that accommodates all uses (vehicles, pedestrians, bicycles, and public transit) and includes sufficient amenities. This technical memorandum summarizes the activities conducted under this task. Current GDOT Project The State Route 4/15 th Street project (PI #220680) is in the Augusta Regional Transportation Study Transportation Improvement Program (TIP) and the Georgia Statewide Transportation Improvement Program (STIP). As currently designed by GDOT, the project involves road widening and related improvements on 15 th Street and Martin Luther King Jr. Boulevard from Government Road to Milledgeville Road. The current concept includes two travel lanes in each direction separated by a 15-foot to 18-foot

To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:

1/3

MEMO

To:

John Paul Stout, MPA Sustainable Development Manager City of Augusta 525 Telfair Street Augusta, GA 30901 (706) 821-1796

Copies:

Adam Williamson, AICP, TSW Design

From:

Shamir Poudel, PE ARCADIS U.S., Inc.

Date: ARCADIS Project No.:

January 10, 2014 GA064020

Subject:

Augusta Sustainable Development Implementation Program (ASDIP) Technical Memorandum - Initiative 2, Task 1, Context-Sensitive Design Element Inclusion into GDOT 15th Street Widening Project

Background

The Augusta Sustainable Development Implementation Program (ASDIP) consists of four interrelated

planning initiatives designed to implement sustainable development in the City of Augusta. Initiative No. 2

focuses on development of a plan and implementation program for a multimodal transportation corridor

within the identified project target area, which includes the Deans Bridge Road, Martin Luther King Jr.

Boulevard, and 15th Street corridors. The scope of work for Initiative No. 2 includes reviewing the current

Georgia Department of Transportation (GDOT) plans and coordinating with GDOT to include context-

sensitive elements within the proposed footprint of the State Route 4/15th Street widening project (PI

#220680). The desired outcome of Initiative No. 2 is a transportation improvement project that

accommodates all uses (vehicles, pedestrians, bicycles, and public transit) and includes sufficient

amenities. This technical memorandum summarizes the activities conducted under this task.

Current GDOT Project

The State Route 4/15th Street project (PI #220680) is in the Augusta Regional Transportation Study

Transportation Improvement Program (TIP) and the Georgia Statewide Transportation Improvement

Program (STIP). As currently designed by GDOT, the project involves road widening and related

improvements on 15th Street and Martin Luther King Jr. Boulevard from Government Road to Milledgeville

Road. The current concept includes two travel lanes in each direction separated by a 15-foot to 18-foot

Page 2: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:

2/3

raised median with left-turn lanes at median openings. Pedestrian components include a 5-foot-wide

sidewalk along the east side and an 8-foot shared-used path along the west side intended to provide

pedestrian and bicycle accommodations. Street lighting is also included in the project.

Recommended Modifications to Current GDOT Project

Context-sensitive recommendations are categorized into bicycle and pedestrian accommodations, side

road alignment modifications, median modifications, and transit accommodations. Following is a summary

of these recommendations and the status of their inclusion in the GDOT project. Modification requests

submitted to GDOT and GDOT’s responses to those requests are included as Attachments 1 and 2. Plan

revisions showing these modifications are presented on the conceptual layouts included as Attachment 3.

GDOT is currently incorporating some of the modifications into the overall design of the State Route 4/15th

Street project.

Table 1: Summary of Context-Sensitive Design Element Inclusion in GDOT State Route 4/15th Street

Project

Modification Request Inclusion in GDOT Project Comments

Bicycle and Pedestrian

Accommodations

Will be included

Side Road Alignment

Modifications

To be partially included

Will be partially included. Contingent on

redevelopment of Augusta Housing

Authority redevelopment schedule of

Cherry Tree Crossing.

Median Width and Left-Turn

Bay Modifications

Will be reviewed Being reviewed by GDOT with new traffic

analysis.

Transit Accommodations

Will be included

Public Involvement Process

Residents of the project area as well as the users were consulted throughout the project process. This

began at the public meeting no. 1 which was used for visioning and gathering inputs from the public before

the conceptual design began. The public continued throughout the project development with two

additional meetings throughout the process. Public involvement details and a summary of input received

are included in the public involvement summary attached to this memo.

Page 3: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

c:\users\spoudel\appdata\local\microsoft\windows\temporary internet files\content.outlook\8vhz0eiv\memo002.doc Page:

3/3

Current Status of GDOT State Route 4/15th Street Project

The project is currently in the environmental documentation phase. Following is the anticipated project

schedule, which is contingent on the approval of the environmental document and associated special

studies:

Public Hearing Open House (PHOH) – Spring 2014

Environmental Approval – Spring 2015

Start Right-of-Way Acquisition – Summer 2015

Start Construction – Summer 2018

Attachments:

1. Modification Request by ASDIP Team

2. GDOT Response to ASDIP Modification Request

3. Project Layouts

4. Public Involvement Summary

Page 4: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc

Page:

1/4

MEMO

To:

Jeremy T. Busby, PE

Project Manager

Georgia Department of Transportation

Office of Program Delivery

600 West Peachtree Street, 25th Floor

Atlanta, GA 30308

Tlant

Copies:

Paul T. DeCamp, Jr., AICP

Steve Cassell, PE PTOE

John Paul Stout, MPA

Adam Williamson, AICP

From:

Shamir Poudel, PE

ARCADIS U.S., Inc.

Date: ARCADIS Project No.:

February 7, 2013 GA064020

Subject:

Request for Modification to GDOT 15th Street Project (PI #220680)

Augusta Sustainable Development Implementation Program (ASDIP)

Background

The Augusta Sustainable Development Implementation Program (ASDIP) consists of four interrelated

planning initiatives designed to implement sustainable development in the City of Augusta. Initiative No. 2

focuses on development of a plan and implementation program for a multimodal transportation corridor

within the identified project target area, which includes the Deans Bridge Road, Martin Luther King Jr.

Boulevard, and 15th Street corridors. The scope of work for Initiative No. 2 includes reviewing the current

GDOT plans and coordinating with GDOT to include context-sensitive elements within the proposed

footprint of the State Route 4/15th Street Road widening project (PI #220680). The desired outcome of

Initiative No. 2 is a transportation improvement project that accommodates all uses (vehicles, pedestrians,

bicycles, and public transit) and includes sufficient amenities.

As a part of Initiative No. 2, we have completed our review of the in-progress design plans and files dated

August 2012 for the GDOT project. We have also presented the current GDOT improvement project to the

public as well as the project steering committee. Based on our review, feedback from the public, input

from project steering committee and input from City of Augusta, we are requesting that GDOT consider

the following changes to the current project design for PI #220680.

Page 5: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc

Page:

2/4

Current GDOT Project

The State Route 4/15th Street project (PI #220680) is in the Augusta Regional Transportation Study

Transportation Improvement Program (TIP) and the Georgia Statewide Transportation Improvement

Program (STIP). As currently designed by GDOT, the project involves road widening and related

improvements on 15th Street and Martin Luther King Jr. Boulevard from Government Road to Milledgeville

Road. The current concept includes two travel lanes in each direction separated by a 15-foot to 18-foot

raised median with left-turn lanes at median openings. Pedestrian components would include a 5-foot-

wide sidewalk along the east side and an 8-foot shared-used path along the west side intended to provide

pedestrian and bicycle accommodations. Street lighting is also included in the project.

Recommended Modifications to Current GDOT Project

Our recommendations are categorized into bicycle and pedestrian accommodations, side road alignment

modifications, median modifications, and transit accommodations. Following are brief discussions of these

recommendations and the rationale behind these recommendations.

Bicycle and Pedestrian Accommodations

It is our request that GDOT consider including a 5-foot bicycle lane and 5-foot sidewalk along each side of

Martin Luther King Jr. Boulevard and 15th Street. Current GDOT design proposes an 8-foot path along the

west side of Martin Luther King Jr. Boulevard and 15th Street to jointly accommodate pedestrian and bicycle

traffic; however, the 8-foot path is too narrow to function as a two-way multi-use path. To minimize the

footprint impacts associated with this change, we are proposing that the raised median along Martin Luther

King Jr. Boulevard be reduced from 18 feet to 15 feet. In addition, we are proposing that a header curb be

utilized along the outside instead of a 24-inch curb and gutter. An additional strip of right-of-way will be

needed to accommodate these changes; however, most of the additional right-of-way need can be met by

converting the proposed permanent easements to required right-of-way. See the attached typical section for

the suggested dimensions. A proposed layout can be provided in Microstation and PDF formats.

Side Road Alignment Modifications

It is our request that GDOT consider modifying the current design at the intersections of:

• Essie McIntyre Boulevard and 15th Street

• Government Road and 15th Street

The current design for the Essie McIntyre Boulevard and 15th Street intersection calls for a major

realignment of the western leg of the intersection to provide a perpendicular intersection between these

Page 6: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc

Page:

3/4

roads. This intersection realignment would result in significant impacts to the TW Josey High School

property located in the northwest quadrant of the intersection. These impacts would affect parking spaces,

internal vehicular circulation, and a fenced area beyond the parking lot. We are proposing that a less

drastic realignment of Essie McIntyre Boulevard be utilized to minimize impacts to the high school. See

attached layout for suggested modifications.

The current design for the Government Road and 15th Street intersection calls for a major realignment of

Government Road so that it aligns with the entrance to the Cherry Tree Crossing apartments. According to

a recent announcement, the housing authority of the City of Augusta is planning to demolish the existing

Cherry Tree Crossing complex and redevelop it into a mixed-use development. With this redevelopment,

the entrance to this property can be relocated to match the existing Government Road, eliminating the

need to realign Government Road. Our preliminary discussions with the Augusta Housing Authority

indicate that the Authority is open to working with GDOT on the location of the new entrance. See

attached layout for suggested modifications.

Median Width and Left-Turn Bay Modifications

It is our request that GDOT consider revising the following with respect to medians:

• Length of currently proposed left-turn bays

• Width of narrowest section of median in the vicinity of left-turn lanes

• Addition of mid-block crossing

Our initial review of left-turning volumes and opposing through volumes indicates that there are

opportunities to reduce the length of the left-turn bays along Martin Luther King Jr. Boulevard and 15th

Street. The goal is to maximize areas along the corridor where full median width is available to install

grassing, landscaping, and a mid-block crossing without compromising the operations of the intersections.

We believe there are opportunities to provide wider median widths at the following locations:

• Station 108+00+/-: approximately 350 linear feet of wider median

• Station 116+00+/-: approximately 190 linear feet of wider median

• Station 133+00+/-: approximately 560 linear feet of wider median

• Station 218+00+/-: approximately 260 linear feet of wider median

• Station 230+00+/-: approximately 900 linear feet of wider median

• Station 241+00+/-: approximately 430 linear feet of wider median

Page 7: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

g:\tra\ga064012_augustaway\pm\deliverables\gdot memo\memo001.doc

Page:

4/4

The narrowest width of the median currently proposed is 1 foot in the vicinity of left-turn bays. We are

proposing that this be increased to 2 feet as shown in the attached typical section to improve visibility.

Our review of the corridor indicates that an additional pedestrian crossing is needed along Martin Luther

King Jr. Boulevard between the intersections of Olive Road and 15th Street. The distance between these

signalized intersections with a protected pedestrian crossing opportunity is 0.3 mile. A mid-block crossing

will alert motorists of the crossing and will allow pedestrians to take refuge at the median after crossing

two lanes of traffic.

Transit Accommodations

Currently the City of Augusta does not operate a bus route along Martin Luther King Jr. Boulevard and

15th Street. However, it is anticipated that the City will reroute Bus Route No. 6 through Martin Luther King

Jr. Boulevard and 15th Street after the GDOT widening is completed. In addition to replacing two existing

bus shelters located in the vicinity of TW Josey High School, it is requested that GDOT consider including

additional bus shelters at the following locations to serve the corridor with transit:

• Two bus shelters in the vicinity of TW Josey High School in addition to replacement of the two existing

bus shelters. The first new shelter is proposed to serve northbound buses along 15th

Street. The second

new shelter is proposed to serve westbound buses along Essie McIntyre Boulevard.

• Two bus shelters (one along northbound and one along southbound Martin Luther King Jr. Boulevard) at

the intersection of Milledgeville Road and Martin Luther King Jr. Boulevard to serve destinations

including the YMCA, Wilkerson Gardens Elementary School, and Augusta Christian School.

• Two bus shelters at the intersection of Olive Road and Martin Luther King Jr. Boulevard (one along

northbound and one along southbound Martin Luther King Jr. Boulevard) to serve the Jennings Homes

housing facility and Ebenezer Seventh Day Adventist School.

• Two bus shelters at the intersection of 15th Street and Martin Luther King Jr. Boulevard (one on each

side of the road) to serve residential areas in the vicinity of this major intersection.

Thank you for your consideration. We would be happy to meet with you to discuss these recommendations.

Attachments:

Revised Typical Section

Intersection Layouts

Microstation and PDF Concepts (not attached but available if needed)

Page 8: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE
Page 9: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE
Page 10: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE
Page 11: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE
Page 12: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE
Page 13: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

SE

E D

RA

WIN

G N

O. 2

MILLEDGEVILLE ROAD

TUB

MAN HO

ME ROAD

KRATHA DRIVE

ALLBRIGHT LANE

SR 4 /MILLEDGEVILLE ROAD

SR 4/DEA

N’S BRID

GE ROAD

1 OF 4FACILITIES

BIKE AND PEDESTIAN

US 1/SR 4 & 15TH STREET

PI 111+03.20

PC 102+35.44

PI 97+00.00

PC 109+54.78

PI 105+50.36

PT 112+46.61

N 66°37’14.9" E

N 49°22’

12.4" E

105+00

125+00

120+00

115+00

100+00

110+

00

24’

20’20’

20’

24’

24’

24’14’

24’24’

PL

PL

PL

PL

PL PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

P L

P L

P L

P L

P L P L

PL

P L

PL

PL

PL

P L

P L

P L

P L

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PLPL

PLPL

PL

PL

PL

PL

PL

PL

PL

0+00

PI 2+77.42

PI 0+00.00

S 24°06’44" E

SVXE7029

SVXE7029

SVXO810

SVXO810

SVXO830

SVXO830

0+00

PI 4+80.22

PI 0+00.00

S 18°15’09" E

SVXE7030

SVXE7030

SVXE7030

SVXO831

SVXO831

SVXD22684

SVXD22684

SVXE7011

SVXO832

SVXO832

SVXO833

SVXO833

SVXE2937

SVXE2937

SVXD21312

SVXD21312

SVXD22911

SVXD22911

SVXE7012

SVXE7012

SVXE7032

SVXE7032

SVXE7033

SVXE7033

SVXO834

SVXO834

SVXO603

SVXO603

SVXO603

SVXE10SVXE10

0+00

PI 4+72.66

PI 0+00.00

PI 1+87.12

N 22°40’30"

WN 23°07’07"

W

SVXD22899

SVXD22899

SVXD22913

SVXD22913

SVXO835

SVXO835

SVXE7035

SVXE7035

SVXE7016

SVXE7016SVXO858

SVXO858

SVXO858

SVXE7017

SVXE7017

SVXE7037

SVXE7037

SVXO784

SVXO784

SVXO859

SVXO859

SVXO859

SVXO608

SVXO608

SVXO608

SVXO608

0+00

SVXD22843

SVXD22843

SVXD22843

SVXE7019

SVXE7019

SVXE7039

SVXE7039

SVXD22844

SVXD22844

SVXF1594

SVXF1594

SVXF1594

SVXO786

SVXO786

SVXO787

SVXO787SVX859SVX859SVX859SVX859

SVXO610

SVXO610

SVXO610

SVXF1596

SVXF1596

SVXF1596

SVXE7020

SVXE7020

SVXE7000

SVXE7000

SVXO788

SVXO788

SVXO801

SVXO801

SVXO611

SVXO611

SVXO611

15+0

0

10+0

0

PI 1

8+39.0

4

S 86°45’43" E

SVXD22846

SVXD22846

SVXD22900

SVXD22900

SVXE7021

SVXE7021

SVXE7021

SVXE7022

SVXE7022

SVXO802

SVXO803

SVXO803

SVXF1610

SVXF1610

SVXF1610

SVXF1610 SVXO578

SVXO578

SVXO578

SVXO578

SVXE2968

SVXE2968

30+00

25+00

55+00

50+00

45+00

35+00

40+0

0

PI 26+52.21

PT 29+32.21

PI 40+96.70

PI 50+85.67

PC 33+02.66

PC 39+43.02

PI 33+02.66

PI 35+71.51

PT 42+44.98

PT 3

8+10.2

6

N 49°56’

17" E

N 66°49’55" E

N 66°49’55" E

S 86°55’22" E

SVXD22752

SVXD22678

SVXD22902

SVXD22902

SVXE7023

SVXE7023

SVXO804

SVXO804

SVXO579

SVXE7003

SVXE7003

PI 6+84.82

SVXE7004

SVXD22903

SVXD22903

SVXO580

SVXD22905

SVXD22905

SVXE7026

SVXE7026

SVXO792

SVXO806

SVXO806

SVXO807

SVXO807SVXO581

SVXD22756

SVXE7027

SVXE7027

SVXO794

SVXO794

SVXO808

SVXO808

SVXD22681

SVXD22681

SVXE7006

SVXE7006

SVXE7007

SVXO829

SVXO829

SVXO809

SVXO809

SVXD22641

SVXD22641

UTIL.BOX

FOUNDATION

DRAINAGE APPROXIMATE

DR

AIN

AG

E

AP

PR

OXI

MA

TE

DRAINAGE

APPROXI

MATE

DR

AIN

AGE

APP

RO

XIM

ATE

DR

AIN

AG

E

AP

PR

OXI

MA

TE

UTIL.BOX

LP TANK

EX. 18"PIPE

EX. 15PIP

E

EX. 36"

PIPE

EX. 36" PIPE

EX. 18"

PIPE

EX. 15"

PIPE

EX. 15" PIPE

EX. 15"

PIPE

EX. 36"

PIPE

EX. 18"

PIPE

EX. 36"

PIPE

EX. 36"

PIPE

EX. 36"

PIPE

EX. 15"

PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 15"

PIPE

EX. 1

8" PIP

E

EX. 18" PIPE

EX. 1

8" PIP

E

EX. 18" PIPE

EX. 15" PIPE

EX. 2

4" PIP

E

EX. 24" PIPE

EX. 24" PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 18" PIPE

EX. 18" PIPE

EX. 24" PIPE

EX. 24" PIPE

EX. 24" PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 15" PIPE

EX. 18" PIPE

EX. 24" PIPE

EX. 15" PIP

E

EX. 15" PIPEEX. 15" PIPE

EX. 15" PIPE

EX. 15" PIP

E

EX. 15" PIP

E

EX. 15" PIPE

EX. 15" PIPE

EX. 15" PIP

E

EX. 15" PIP

E

EX. 15" PIP

E

EX. 15" PIP

E

EX. 15" PIP

E

EX. 12" PIP

E

EX. 30" OR 36" PIPE

EX. 30" OR 36" PIPEEX. 36" OR 42" PIPE

WIL

LIS

DR

PIE

RCE

AU

TO

PIERCEAUTOSALES

DERSTOUTLET

STORE

SILVERBULLETLOUNGE

CHAPPARELLPACKAGE

WILLIAMSBURG

PLAZA

SUNCREEK

APTS

SHORT

STOP

GAS

BIG

A

AUTO

PARTS

FIRESTONE

CHILD’S

DREAM

WILKERSON

GARDEN

SCHOOL

AUTO

ZONE

FAMILY

DOLLAR

TOMPKIN

CO

COOK

MACHINE

SHOP

THE

FAMILY

Y

SIG

N

SIG

N SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

NSIG

N

WALL

DRAWING No.

STATE OF GEORGIA

DEPARTMENT OF TRANSPORTATION

PROPERTY LINE

REQUIRED R/W

W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER

W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER

15 FT TP 7 RAISED GRASSED MEDIAN

2 FT TP 7 RAISED CONCRETE MEDIAN

200

SCALE IN FEET

0 100

25R

25R

PI 11+64.82

PI 15+00.00

PC 10+

63.93

PT 1

2+55.7

2

N 42°43’03.4"

W

N 86°40’17.3" W

PI 28+82.32

PT 26+39.49

PC 21+86.14

PI 20+00.00

N 22°27’51.3"

W

N 24°11’45.3"

W

PI 111+03.20

PC 102+35.44

PI 97+00.00

PC 109+54.78

PI 105+50.36

PT 112+46.61

N 66°37’14.9" E

N 49°22’

12.4" E

PI 31+76.64

N 19°52’33.5"

W

PI 81+49.95

PI 80+00.00

S 32°13’31.1" E

PI 33+00.00

20R 20R

24’

20’

14’

24’

20R

25R 25R

+30.12

+44.03

+07.71

+68.46

+48.73

+16.96

+85.

99

+41.

96

+29.32

+15.80

+88.92

+00.97

+09.32

+44.00

+75.95

+56.14

+04.17

+09.11

+61.37

+69.79

+34.54

+27.30

+21.72

+36.

15

+85.34

+87.

64

+66.

46

+69.29

+89.67

+88.14

+32.88

+61.03

+65.19

20R

20R

20R

20R

20R

20R

20R

20R

20R20R

25R

25R

35R35R

20R

20R

20R

20R

15R 15R

20R

20R

20R

20R

15R

15R

20

R20

R

20R

Page 14: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

UTIL.BOX

RUINS

2138005

F

OU

ND

ATIO

N FOUNDATION

FOUNDATION

4-32

4-31

2138006

RUINS

RUINS

RUINS

2138007

FOUNDATION

UTIL.

BOXTOWER

4-34

4-33

213

8012

DQ

CRAB

KINGAUGUSTA

HOME

ACCESSORIES

FENDER’S

AUTO

WRECKING

G & O

AUTO

SALES

DISCOUNT

STORE

WET SPOT

CAR WASH

CHURCH

WARD

CHAPEL

A.M.E.

RONNIE’S

BODY

REPAIR

PHILLIP

’S66

SERVANT’SOF GODBAPTISTCHURCH

GA

AUTO

PARTS

EAST

AU

GUS

TA

SUP

ER

MA

RKE

T

SIG

N

SIG

N

SIG

N

SIG

N

BIL

LB

OA

RD

SIG

N

BIL

LB

OA

RD

SIG

N

SIG

N

SIG

N

channel

paved botto

m

42"

SE

E D

RA

WIN

G N

O. 1

SEE DRA

WIN

G N

O. 3

OLIVE ROAD

SR 4 / MARTIN LUTHER KING JR. BLVD.

SR 4 / 15T

H ST

REET

SR 4 / MARTIN LUTHER KING JR. BLVD.

2 OF 4FACILITIES

BIKE AND PEDESTIAN

US 1/SR 4 & 15TH STREET

PI 140+64.57

PI 148+00.00

PC 137+55.77

PI 145+06.72

PT 143+73.26

N 64°24’48.7" E

N 64°05’37.4" E

135+00

130+00

140+00

145+00

PI 205+30.55

PC 200+83.20

PT 209+74.20

N 27°27’56.2"

E

N 14°42’10.6"

E

200+00

205+00

210+00

14’

24’

24’

20’20’20’

14’

14’

24’14’24’24’24’24’

PL

PL

PL

PL

PL

P L

P L

P L

P L

P L

P L

P L P L

PL

PL

PL

PL

P L P L

PL

PL

PL

P L

P L

P L

PL

PL

PL

PL

PL

PLPL

PL

P L

P L

P L

PL

PL

PL

PL

PL

PL PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PLPL

PL

P LP L

P LP L

P L

P L

PLPL

PL

PL

PL

PL

PLPL

PL

PLPL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

SVXD22759

SVXD20153

SVXD20153

SVXO894

SVXO894

SVXO874

SVXO718

SVXO718

SVXO719

SVXO719

SVXO856

SVXO760

SVXO760

SVXO857

SVXO720

SVXO720

SVXO761

SVXO761

SVXO721

SVXO722

SVXO762

SVXO762

SVXO723

SVXO724

SVXF1595

SVXF1595

SVXO725

SVXO884

SVXO919

SVXO709

SVXO709

SVXD22754

SVXO711

SVXO711

SVXO903

DRAWING No.

STATE OF GEORGIA

DEPARTMENT OF TRANSPORTATION

PROPERTY LINE

REQUIRED R/W

W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER

W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER

15 FT TP 7 RAISED GRASSED MEDIAN

2 FT TP 7 RAISED CONCRETE MEDIAN

200

SCALE IN FEET

0 100

35R35R

35

R35

R

+30.11

N 55

°15’

23.6"

W

PI 35+00.00

N 31°13’30.7"

W

PI 5

7+00.0

0

PI 5

5+00.0

0

S 53°11’53.0" E

PI 140+64.57

PI 148+00.00

PC 137+55.77

PI 145+06.72

PT 143+73.26

N 64°24’48.7" E

N 64°05’37.4" E

PI 45+90.85

PI 50+66

.91

PT 48+58

.41

PC 43+21.21

PI 40+00.00

N 21°48’32.9"

W

N 9°26’52.3"

W

PI 205+30.55

PC 200+83.20

PT 209+74.20

N 27°27’56.2"

E

N 14°42’10.6"

E

PI 61+50.00

PI 60+00.00

S 28°32’49.4" E

PI 18+99.99

PI 17+00.0

0

N 36°01’39.3"

W

20’

+33.95

14’

+92.51

-0.02 -0.02

43+72.00

44+66.00

45+62.00

-0.02 -0.02

46+56.00

45+94.00

0.00 -0.0137

0.01045 -0.01045

0.01045 -0.01045

0.00 -0.0137 D/W TIE

TIE

D/

W

D/

W TIE

D/

W TIE

D/

W TIE

20R

25R

25R

25R25

R

25R25

R

14’

25R25R

24’

20’

+20.12

+45.12

+17.17

+09.52

+92.15

+88.39

+21.99

+52.55

+62.53

+50.42

+59.34

+67.92

+21.42

+71.43

+72.66

+61.81

+81.98

+59.07

+49.87

+34.74

+40.43

+32.70

+98.58

+93.80

20R20R

35R

Page 15: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

SEE D

RA

WIN

G N

O. 2

SEE D

RA

WIN

G N

O. 4

EAGLES

WAY

ESSIE

McINTYRE BLVD.

POST LANE

BRANCH ST.

SR 4 / 15TH STREET

De

WITT STREET

MORGAN STREET

3 OF 4FACILITIES

BIKE AND PEDESTIAN

US 1/SR 4 & 15TH STREET

PI 231+22.85

PT 233+86.13

PC 228+59.46

PC 211+51.26

PI 214+25.22

N 23°50’57.6" E

N 20°58’31.5" E

235+00

230+00

225+00

220+00

215+00

22’14’

14’ 14’14’

14’14’ 14’ 14’

14’ 14’14’ 14’

14’14’

14’14’

14’

18’

14’

24’

14’

14’

14’

14’

14’

14’

14’14’

14’

PL PL

PL

PL

PL

PL

PL

PL

PLPL

PL

PL

PLPL

PLPL

PLPLPL

P LP L

P L

P L

P LP L

P LP L

P L

P L P L P L

P L P L

P L

P L

P LP L

P LP L

P LP L

P LP L

P LP L

P L

P LP L

P LP L

P LP L

P L P LP L

P LP L

PL

PL

PL

PL PLPLPL

PL

PLPL

P L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P LP L

P L

P LP L

P LP L

P LP L

P LP L

P L

PL

PL

PL

PLPL PL PL

PL

P LP L

P LP L

P LP L

PL

PLPL

PL

PL

P L P L

PL

PL PL PL

PL

PL

PLPL

PL

PL

PL

PL

PL

PL PL PL

PL

PLPL

PLPL

PL PLPL

PL

PLPL

PLPL

PLPL

PL

PL

PL

PL PL PL PL

PL

PL

PL

PL

PL

PLPL

PL

PL

PL

PL PL PL

PL PL PL

PL PL

SVXO1013

SVXO1013

SVXO1013

SVXO1013

SVXO987

SVXO987

SVXO987

SC16621

SC16621

SC16621

SVXO714

SVXO714

SVXO715

SVXO715

SVXO735

SVXO1014

SVXO1014

SVXO1014

SVXO988

SVXO988

SVXO716

SVXO716

SVXO736

SVXO736

SVXO989

SVXO989

SVXO989

SC16739

SC16739

SC16739

SVXO737

SVXO737

SVXO738

SVXO738

SVXO990

SVXO990

SVXO990

SVXO739

SVXO1039

SVXO1039

SVXO1039

SVXO991

SVXO991

SC16593

SC16593

SC16593

SC16593

SC16593

SVXO972

SVXO972

SVXO972

SVXO992

SVXO992

SC16592

SC16592

SC16592

SVXO740

SVXO741

SVXO994

SVXO994

SVXO994

SVXO1000

SVXO1000

SVXO973

SVXO973

SVXO973

SVXO993

SVXO993

SVXO993

SVXO993

SVXO1040

SVXO1040

SVXO1040

SVXO1041

SVXO1041

SVXO1041

SVXO953

SVXO953

SVXO953

SVXO953

SVXO742

SVXO742

SVXO954

SVXO954

SVXO974

SVXO974

SVXO974

SVXO995

SVXO995

SVXO975

SVXO975

SVXO975

SVXO975

SVXO743

SVXO743

SVXO955

SVXO955

SVXO976

SVXO976

SVXO996

SVXO996

SVXO1003

SVXO1003

SVXO956

SVXO956

SVXO956

SC1088

SC1088

SC1088

SC16691

SC16691

SC16691

SVXO744

SVXO744

SVXO745

SVXO936

SVXO957

SVXO957

SVXO957

SVXO997

SVXO997

SVXO997

SVXO998

SVXO998

SC16693

SC16693

SC16693

SVXO726

SVXO746

SVXO958

SVXO958

SVXO978

SVXO978

SVXO978

SVXO999

SVXO999

SVXO979

SVXO979

SVXO979

SVXO727

SVXO747

SVXO747

SVXO1006

SVXO1006

SVXO959

SVXO959

SVXO959

SVXO728

SVXO728

SVXO748

SVXO748

SVXO749

SVXO749

SVXO960

SVXO960

SVXO980

SVXO980

SVXO980

SVXO729

SVXO729

SVXO981

SVXO981

SVXO981

SVXO982

SVXO982

SVXO982

SVXO982

SVXO961

SVXO961

SVXO961

SVXO961

SVXO730

SVXO730

SVXO962

SVXO962

SVXO983

SVXO983

SVXO983

SVXO963

SVXO963

SVXO963

SVXO731

SVXO731

SVXO984

SVXO984

SVXO984

SVXO964

SVXO964

SVXO964

SVXO712

SVXO712

SVXO732

SVXO733

SVXO965

SVXO965

SVXO1012

SVXO1012

SVXO1012

SVXO985

SVXO985

SVXO985

SVXO985

SVXO986

SVXO986

SVXO986

SVXO713

SVXO713

SVXO734

DR

AIN

AGE

APPR

OXIM

ATE

C.B.

C.B.

D.I.

D.I.

D.I.

D.I.

D.I.

C.B.

C.B.

C.B.

C.B.

RUINS

RUINS

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B. C.B.

C.B.

C.B.

C.B.

C.B.

D.I.

D.I.

D.I.

D.I.

D.I.D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

UNDERGROUND

FUEL TANKS

UN

DE

RG

RO

UN

DF

UE

L

TA

NK

S

C.B.

C.B.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

M.H.

UTIL.BOX

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

M.H.

M.H. M.H.M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

C.B.

C.B.C.B.

C.B.

RUINS

C.B.

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

D.I. D.I.

D.I.

M.H.

M.H.

M.H.

M.H.

M.H.M.H.

M.H.

C.B.

C.B. C.B.

C.B.

C.B. C.B. D.I.

D.I.

C.B.

D.I.

D.I.

UTIL.BOX

D.I.

LP T

AN

K

D.I.

D.I.

D.I.

M.H.

GASOLINE FILLER VALVE

B

& HTOOLS

SOUTHER

N

MACHIN

E

AND TOOLS

WILLIAMS

MEMORIAL

CHURCH

PHILLIP’S66

FACILITIESANDMAINTENANCEDEPT

T. W. JOSEY

HIGH SCHOOL

SHILOHCOMMUNITYCENTER

C. M. E.

CHURCH

CO

VE

RE

D

WA

LK

COVERED WALK

COVERED WALK

SILOS

TANK

TANK

SIG

N

SIG

N

SIG

N

SIG

N

BIL

LB

OA

RD

PH

ON

E

BIL

LB

OA

RD

SIG

N

SIG

N

DRAWING No.

STATE OF GEORGIA

DEPARTMENT OF TRANSPORTATION

PROPERTY LINE

REQUIRED R/W

W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER

W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER

15 FT TP 7 RAISED GRASSED MEDIAN

2 FT TP 7 RAISED CONCRETE MEDIAN

200

SCALE IN FEET

0 100

N 21°56’29.8" E

N 68°28’07.0"

W

S 56°42’01.3" E

S 68°14’10.5" E

S 69°29’54.2" E

N 20°11’41.3" E

N 66°50’11.6"

W

PI 231+22.85

PT 233+86.13

PC 228+59.46

PC 211+51.26

PI 214+25.22

N 23°50’57.6" E

N 20°58’31.5" E

N 47°54’49.4" E

N 21°35’54.8" E

S 42°05’05.0" E

S 54°47’48.1" E

S 70°47’35.0" E

TIE

D/W

D/W TIE

D/W TIE

D/W TIE

D/W TIE D/W TIE

D/W TIED/W TIE D/W TIE D/W TIE

D/W TIED/W TIE D/W TIE D/W TIE D/W TIE D/W TIE

D/W TIED/W TIE D/W TIE

D/W TIE

D/W TIE

14’

Page 16: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

SEE D

RA

WIN

G N

O. 3

GOVERNMENT ROAD

SWANEE QUINTET BLVD.

SR 4 / 15TH STREET

4 OF 4FACILITIES

BIKE AND PEDESTIAN

US 1/SR 4 & 15TH STREET

PI 255+82.51

PI 243+49.60

PT 246+99.35

PC 239+99.75

N 21°33’31.7" E

255+00

250+00245+00

240+00

14’14’

P L

P L

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

P LP L

P L

P L

P L

P L P L

PL

PL

PL

PL

PL

PLPL

PL

PL

PL

PL

PL

SVXO755

SVXO1152

SVXO717

SVXO717

SVXO758

SVXO759

SVXO1113

0+00

5+00

0+00

35+00

30+00

25+00

SVXO1045

SVXO1046

0+00

5+00

SVXO939

0+00

SVXO940

SVXO710

SVXO710

SVXO750

SVXB786

SVXO751

SVXO752

SVXB787

0+00

SVXO753

SVXO754

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.D.I.

D.I.D.I.

DR

AIN

AGE

APPR

OXIM

ATE

DRAINAGE APPROXIMATE

PL

AY

GR

OU

ND

UTIL.BOX

M.H.

D.I.

D.I.

D.I.

D.I.

D.I.

RUINS

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

D.I.

D.I.

PL

AY

GR

OU

ND

C.B.

DRAINAGE APPROXIMATE

M.H.

M.H.

M.H.

UTIL.BOX

U

TIL.B

OX

DRAINAGE APPROXIMATEDRAIN

AGE APPROXIMATE

UTIL.BOX

UTIL.BOX

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.C.B.

C.B.

C.B.

M.H.

M.H.

M.H.

M.H.M.H.

M.H.M.H.

M.H.M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

M.H.

D.I.

D.I.

M.H.

M.H.

M.H.M.H.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

D.I.

M.H.

M.H.

D.I.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

D.I.

C.B.

M.H.

M.H.

M.H.

M.H.

C.B.

C.B.

M.H.

M.H.

M.H.

M.H.

C.B.

C.B.

UNDERGROUND

FUEL TANKS

UTIL.BOX

D.I.D.I. D.I.

D.I.D.I.

D.I. D.I.

D.I.

D.I.D.I.

D.I. D.I.

UTIL.BOX

UTIL.BOX

C.B.

D.I.

OVERHEAD

SIGNAL

UTIL.BOX

C.B.

C.B.

C.B.

C.B.

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

PA

RKIN

G

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

L

OC

ATI

ON

CM

#

L

OC

ATI

ON

CM

#

LO

CA

TI

ON

CM

#

95550

OBS

CU

RE

D

AR

EA

OBS

CU

RE

D

AR

EA

OBS

CU

RE

D

AR

EA

OBS

CU

RE

D

AR

EA

FP

TC

TC

TC

TC

PA

RKIN

G

PA

RKIN

G

BB

TA

NK

TA

NK

ST

OR

AG

E

ST

OR

AG

E

ST

OR

AG

E

ST

OR

AG

E

ST

OR

AG

E

ST

OR

AG

E

SU

BST

ATIO

N

GILBERT MANOR

MEDICAL COLLEGE DORMS

CHERRY

TREE

CROSSING

APTS

CASTLEBERRY’S

CJ’S

FOOD

G E

SUPPLY

DURAMEDMEDICALSERVICE

PAPER

STOCK

DEALERS

EASTER

SEAL

KOAM

GAS

EMMETT ST

CSX R/R

RAIL

RO

AD A

VE

COVERED WALK

STA 248+62.00

SR 4/15TH ST

END CONSTRUCTION

18"

SHED

DRAWING No.

STATE OF GEORGIA

DEPARTMENT OF TRANSPORTATION

PROPERTY LINE

REQUIRED R/W

W/HEADER CURB AND 5’ SIDEWALK11.5’ SHOULDER

W/CURB & GUTTER AND 5’ SIDEWALK12’ SHOULDER

15 FT TP 7 RAISED GRASSED MEDIAN

2 FT TP 7 RAISED CONCRETE MEDIAN

200

SCALE IN FEET

0 100

PI 12+19.61

PI 10+00.00

S 54°33’18.5" E

PI 27+00.00

PI 23+51.10

PT 25+70.30

PC 21+04.78

PI 17+50.00

S 65°24’55.6" W

N 68°16’45.0"

W

N 68°16’45.0"

W

PI 255+82.51

PI 243+49.60

PT 246+99.35

PC 239+99.75

N 21°33’31.7" E

PI 41+11.58

PI 40+00.00

N 6°09’47.8" W

SR 4 / 15TH STREET

Page 17: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 1 -

Public Involvement Summary Initiative # 2 Public Involvement Meeting List

Initiative Meeting Time/Date Location Team Attendees 1. Initiative #2 Public Meeting #1

Held During Visioning Week/Charrette, 6:00pm, Tuesday, November 13, 2012

T.W. Josey High School 1701 15th Street Augusta, GA 30901

CC, Arcadis, TSW & WRT

2. Initiative #2 Public Meeting #2 Draft Concept Update

6:30pm, Thursday, June 13, 2013 T.W. Josey High School 1701 15th Street Augusta, GA 30901

CC, Arcadis, TSW & WRT

3. Initiative #2 Public Meeting #3 Concept Report Meeting

6:00pm, Tuesday, October 1, 2013 T.W. Josey High School 1701 15th Street Augusta, GA 30901

CC, Arcadis, TSW, & WRT

1. Public Meeting #1 Visioning Week T.W. Josey High School and Augusta Mini Theater November 13- 17, 2012 As part of the public engagement process for this project, the planning team hosted a 5-day event, known as Visioning Week. During the week of November 13-17, stakeholders were invited to participate in a series of visioning exercises designed to bring the community into the process of co-planning and co-designing project elements. The week’s activities consisted of a Visioning Workshop, Public Open House and Visioning Results Presentation. These events are summarized in the next section. Visioning Workshop - A kick-off meeting was held on Tuesday evening at T.W. Josey High School, in which approximately 50 residents, businesses owners and community leaders attended. The purpose of this meeting was to share with the community the desired outcomes of the week-long engagement process and to also capture an initial community response to aid in the development of preliminary design recommendations. The planning team introduced the four initiatives of the implementation plan to provide a context and general understanding of the program’s elements. Participants were then invited to participate in roundtable discussions centered on identifying key considerations. Groups of 8-10 people were led by a facilitator representing the planning team and were provided maps of the study area to notate points of interest. The facilitator provided guiding discussion questions about key project considerations including, transit, zoning, affordable housing, economic development, and public space. A representative from each group was asked to keep record of the discussion and each table provided a group report to summarize points of interest to all Participants. As a result, there were several areas of consensus raised from each of the roundtable groups.

Participants shared common interest in improving safety and transportation within the study area.

Specifically, groups identified a need for lighting improvements and other potential considerations included web-cam monitoring at bus stops.

Participants also indicated a need to improve the street design for better pedestrian access. This would take into consideration a need for better sidewalks, bike lanes and other additional features to better

accommodate safety for pedestrians.

Other considerations included the need for more routes within the corridor in addition to providing better transit amenities such as bus stop shelters with better lighting and potentially the integration of wifi hotspots.

Specific project considerations that were addressed by stakeholders included the need to revitalize the Regency Mall, Southgate Shopping Center, and the Cherry Tree public housing subdivision.

Recommendations for Regency Mall included ideas for adaptive reuses of the property which would provide better housing, retail options and recreation.

Stakeholders also saw an opportunity to introduce more businesses at the Southgate Shopping Center. Ideas for business opportunities included the introducing a FedEx Office that provides professional printing

and copy services.

Page 18: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 2 -

In addressing the future redevelopment at Cherry Tree, it was suggested by participants that attention to a full revitalization of the entire area surrounding the property was also essential.

An additional project opportunity was also identified near Martin Luther King and Steiner Avenue. The property is currently vacant warehousing, and participants saw this area as an ideal use for multifamily housing

and small retail.

Other concerns raised during roundtable discussions focused on the need to improve drainage issues within community.

Participants also desired to beautify the community, increase food outlets, and utilized alternative energy sources such as solar. Ways to incorporate an aesthetic along the bridge serving as a gateway into the

community were also discussed by participants. Lastly, the need to provide housing for lower income residents was greatly emphasized.

In closing, the planning team invited participants to continue their involvement by attending the open house sessions held at the Augusta Mini Theater as well as a final wrap-up meeting held on Saturday back at the high school. Visioning Week Open House - Following the Visioning Workshop, the team established a design studio at the Augusta Mini Theater to serve several purposes throughout the remainder of the week. On Wednesday the team along with City staff reviewed technical findings collected over several months including an overview of the economic market conditions and realities. The existing land use, landmarks and facilities, areas that are sustainable as well as susceptible to change. Also presented was the existing DOT transportation plan, inventory of facilities, traffic counts and intersection efficiency, internal and external multi-modal connections, and analyze options of lane widths, utilities and analyze storm water management systems. Finally, an overview of the existing code and regulations along with policy on green building and standards were presented. These findings would create the foundation for developing the design concepts. Following the presentation, large scale maps of the study area, existing conditions analysis and neighborhoods were posted and reviewed by the team. During this brainstorming session, the finding from the technical analysis and windshield surveys were used to generate consensus on a general program for Rocky Creek, Southgate and Deans Bridge Road, Oates Creek and Deans Bridge Road, and Cherry Tree and 15th Street. Over the remainder of the week, the team members, each with a specific target area, created development concepts representative of the results from the vision workshop, technical expertise and market realities. On Thursday and Friday, the design studio was open to the public. From 9am to 5pm on both days, over 50 property owners, business owners, residents and concerned citizens were able to view the existing conditions maps and review draft concept drawings. There were instances where the participants updated the team on their future plans for their businesses, concerns and desires for improvement as residents, and intentions for expansion or disposition of properties. The outcome of this information sharing often influenced the direction of the draft concept drawings for the target areas and adjustments were made accordingly. While the design session was underway, several stakeholders were invited to participate in interviews. The organizations participating in the interviews included Georgia Health Sciences, Paine College, City of Augusta Parks and Recreation, Augusta Greenway Alliance, 30901Dvelopment Corporation and the Augusta Mini Theater. Visioning Results Summary Presentation - The purpose of this session was to recap the events of Vision Week, share initial recommendations and gauge community support. Approximately 25 stakeholders attended this meeting on Saturday at T.W. Josey High School. Many of the Participants had participated in previous meetings held by the planning team and were knowledgeable of the activities and events preceding the wrap-up presentation. During this session, the planning team shared data collected on the project area, which was used to guide specific design and other program considerations. Some of this information was reflective of feedback provided during previous public involvement meetings such as visual preference exercises and descriptive words shared by residents during the project’s kick-off meeting. A market analysis on the economic conditions, housing conditions, commercial uses, and supply and demand factors impacting development in the area was introduced. Transportation findings affecting the area were outlined and specifically highlighted the need to plan for future growth within the area and provide better pedestrian safety features. Finally, detailed recommendations along with illustrative designs for Cherry Tree, Oates Creek, Rocky Creek, Southgate and the Regency Mall were presented. In addition to the presentations, a polling exercise was conducted in which the participants were presented a sequence of questions relating to the various presentation topics. Using small handheld devices participants were invited to vote on the provided responses to the posed questions. The questions related to home location, travel patterns, approaches to revitalizing the corridor and opinion regarding a possible corridor vision statement. While it was interesting to get some real-time feedback from the audience, the group was far too small to draw any conclusions. The presentation concluded with an unveiling of the draft mural concept drawing that will be the first beautification project to be implemented. The proposed mural will be installed on the exterior wall of the Mercy Ministries building on 15th St. The intent of the mural is to reflect a collaboration of the entire community to influence change. The presentations are on the website project website http://augustasustainable.com/public-involvement/

2. Transportation Public Meeting Summary T.W. Josey High School

Page 19: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 3 -

June 13th, 2013 - 6:00PM ARCADIS, the transportation consultant, facilitated a public meeting for the purpose of introducing the transportation recommendations for the Augusta Way Corridor and provide a status update on the GDOT 15th Street widening project. The public meeting kicked off with a welcome and brief explanation of the plan’s purpose and outcomes currently underway from John Paul Stout with the City of Augusta. Some of the HUD and GDOT funds allocated for the Sustainable Development Plan are being used to fund first phase implementation projects such as a mural project for the 15th Street Bridge. A muralist has been identified and has used input from the community to draft a design that reflects vision for the revitalization of the corridor and surrounding communities. Adam Williamson with TSW followed with a brief overview of the Sustainable Development Plan process including the 4 Initiatives: Initiative #1 - Develop a detailed plan for the Priority Development District and action/feasibility plans for up to three prototypical projects; Initiative #2 - Develop a detailed plan for a multi-modal transportation corridor bisecting the district; Initiative #3 - Revisit current codes to facilitate higher-density, mixed-use, mixed-income development in the district; Initiative #4 - Create an implementation plan for green, affordable housing in the district. Representatives from GDOT were in attendance and provided an update on the schedule for the 15th Street Widening Project. Several community stakeholders were concerned about the acquisition process. Although unable to address the questions in detail, the GDOT staff assured the attendees that staff from the GDOT acquisition department would be in attendance at the next public meeting to explain the right of way acquisition process and address questions in detail. The overview of the Transportation Recommendation for the 15th Street Widening project, their correlation to the Augusta Way Corridor and the improvements to Gordon Hwy, Milledgeville and Deans Bridge Road were presented by Tim Preece with ARCADIS. 15th Street Widening and Augusta Way Recommendations:

Installation of 5ft sidewalks and 5ft bike lanes on both sides of the street; no multi-use trail as previously proposed;

Planted median and/or turn lanes;

Improved access at TW Josey High School;

Minimal impact at the Government Street and 15th Street intersection;

Bus shelters along 15th Street and Martin Luther King, Jr. Blvd.;

Add a right-turn-lane at on Deans Bridge at Gordon Hwy.;

The improvements on 15th Street will widen the roadway to 92ft;

The majority of the acquisition, based on current design, will occur on the right side of the street (opposite side of street from TW Jose High School);

The proposed right away of 15th Street widening in located on www.augustasustainable.com

The presentation followed with and engaged Q&A session:

1. Will the 15th Street widening continue on Martin Luther King, Jr. Blvd? No. 2. Will 100% of the property acquired be used for the project? GDOT will not purchase land that it will not use. 3. As a business owner, who will be responsible for replacing the business signage that is located in the right of way if acquired? The GDOT acquisition staff will be in attendance at the next meeting to address all concerns regarding acquisition and right of way. 4. How will the widening project impact transit? The 15th Street widening project will increase accessibility of transit buses and service will be restored. 5. How much land will be taken? The amount of land needed for right of way will vary along the corridor. 6. When will acquisition begin? In 2016 it will begin, but there are several steps required before construction will begin.

Page 20: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 4 -

7. What happens to historic properties along 15th Street? At all cost, historic properties will be preserved. A map of the historic properties will be posted on the website (www.augustasustainable.com) .

Following the Q&A, consultants were available to answer additional questions utilizing the maps and diagrams posted for viewing.

3. Final Public Meeting Summary T.W. Josey High School October 1, 2013 - 6:00PM Approximately 70 community residents and stakeholders attended the final public meeting for the ASDIP on October 1st. The meeting was designed to provide yet another opportunity to receive comments on the draft transportation, development and zoning recommendations for the 15th Street corridor. The open house format provided opportunity for attendees to direct questions in their area of interest to the planning consultants at the various stations. The stations included: Zoning – The zoning station defined Form Based Code, described the proposed consolidation of code categories, and explained how the recommendations are solutions to issues and concerns that stakeholders identified early in the process.

Transportation – The transportation station was operated by both Arcadis and the GDOT Acquisition staff. Using a series of diagrams regarding streetscape and infrastructure improvement recommendations and the proposed alignment for 15th Street, the consultants were able to address questions such as:

What is the timeline for the 15th Street widening project?

How will the proposed median impact access to my business?

When will I be contacted regarding acquiring my property?

Are these improvements specifically designed to change the aesthetics of the area or address safety concerns?

Development Projects – Concept diagrams developed from input received during the visioning phase of the project were on display at this station. The team provided an overview of the proposed transformation plan that included various housing, retail, public space options throughout the corridor. In addition, meeting attendees were asked to review the project diagrams and complete a survey to rank the projects in order of priority.

Initiative # 2 Sub-Committee Meeting List

4. Transportation Corridor Subcommittee

Meeting #3 11:00pm-11:45pm, Tuesday, May 7, 2013

Municipal Building 530 Greene Street Augusta, GA 30901 Room 802

CC, TSW, WRT, & Arcadis

5. Code/Ordinance Subcommittee

Meeting #3 1:00pm-1:45pm, Tuesday, May 7, 2013

Municipal Building 530 Greene Street Augusta, GA 30901 Room 802

CC, TSW, & DKP

6. Land Acquisition Plan Subcommittee

Meeting #3 2:00pm-2:45pm, Tuesday, May 7, 2013

Municipal Building 530 Greene Street Augusta, GA 30901 Room 802

CC, TSW,WRT, & PES

7. Steering Committee Meeting #3

3:00pm-3:45pm, Tuesday, May 7, 2013

Municipal Building 530 Greene Street Augusta, GA 30901 Room 802

CC, TSW,WRT, & PES

Page 21: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 5 -

8. Transportation Corridor Subcommittee

Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901

CC, TSW, Arcadis, DKP & PES

9. Code/Ordinance Subcommittee

Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901

CC, TSW, Arcadis, DKP & PES

10. Land Acquisition Plan Subcommittee

Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901

CC, TSW, Arcadis, DKP & PES

11. Steering Committee Meeting #4 Tuesday, October 1, 2013 W.R. Toole Engineers 1005 Broad Street Augusta, GA 30901

CC, TSW, Arcadis, DKP & PES

4. Transportation Sub-Committee W.R. Toole Engineers May 7th, 2013 - 11:00AM This Transportation Sub-Committee meeting was led by ARCADIS on May 7th, 2013. The presentation consisted of an update on the GDOT 15th Street project, and its schedule and proposed recommendations for the Augusta Way Corridor. Draft transportation recommendations were presented at the June 13th public meeting and the final plan presented in October. The concept report is due to GDOT in January 2014.The team also presented a brief overview of traffic counts, crashes, and pedestrian/ transit facilities that influenced the transportation recommendations for the Augusta Way corridor. The follow-up discussion from the sub-committee members focused on the pedestrian and bike recommendations for 15th Street specifically the location of crosswalks and the proposed bike boxes at certain intersections. City staff also expressed concerns that the landscape medians and planned buffers will require a maintenance plan, but funding for these measures is limited. The consultants suggested a Business Improvement District/ Community Improvement District as a possible solution to pay for landscape and bike box maintenance. The next Committee meeting convened in early October.

7. Steering Committee W.R. Toole Engineers May 7th, 2013 - 3:00PM TSW presented a status report and brief overview of select project recommendations for each of the four plan initiatives was presented to the Steering Committee. A Potential Projects Map and Project Descriptions and phasing strategy was distributed to aid in the discussion. All four initiatives were discussed. The ASDIP has attracted attention from developers and the both Commission and Planning Department have been approached by interested parties. The ASDIP will allot for infrastructure improvements that will start the redevelopment process for the corridor and continue to attract attention to the area.

Page 22: To: John Paul Stout, MPA Adam Williamson, AICP, TSW 525 … · 2014. 1. 16. · Augusta, GA 30901 (706) 821-1796 Copies: Adam Williamson, AICP, TSW Design From: Shamir Poudel, PE

1/10/2014

- 6 -

8. Transportation Sub-Committee W.R. Toole Engineers October 1, 2013 - 10:00AM Arcadis presented at the final Transportation Sub-Committee meeting including an overview of the existing conditions, the GDOT 15th Street widening project update and next steps. GDOT, ARCADIS, and the City of Augusta Planning Commission have discussed modifications to the existing 15th Street widening design and GDOT has responded favorably to modifying bike and pedestrian accommodations along with transit shelters in strategic locations. GDOT would not commit to realigning Government Street adjacent to Josey High School and the locations and design of medians are still up for debate. ARCADIS is currently preparing a concept report containing all transportation and connectivity recommendations for submittal to GDOT in December.

9. Steering Committee W.R. Toole Engineers October1, 2013 - 11:00AM Adam Williamson, with TSW, provided a synopsis of the recommendations for each of the four ASDIP Initiatives. The overview focused on 3 key areas: Transportation, Form-Based Code and Land Acquisition. The transportation discussion, led by ARCADIS, and the City of Augusta Planning Commission staff have engaged the Georgia Department of Transportations in discussions on modifying the current GDOT plans for the 15th Street road widening project that is consistent with the ASDIP recommendations. Additionally, an overview of the work from Dover Kohl Partners on the form-based code was presented. They have developed a draft code that will consolidate the existing code classifications into six and have received feedback from the Code Subcommittee and the general public and are modifying accordingly. Land acquisition was also discussed, led by PES, outlining a strategy to move the catalytic projects identified in the ASDIP to implementation. With the assistance of an organized committee of City of Augusta departments, community organizations and leaders, this Implementation Oversight Committee will be tasked to: Identify and advocate for projects for development and leverage resources to support existing City departments including Code Enforcement, the Land Bank and Parks and Recreation as the first phase of project implementation. Elizabeth Jones agreed to convene the next meeting of the committee on October 15th at 2pm at the Shiloh Community Center.