6
To do lists Zhijun Liang

To do lists

  • Upload
    livi

  • View
    33

  • Download
    1

Embed Size (px)

DESCRIPTION

To do lists. Zhijun Liang. Signal efficiency. Completed Data driven estimation with background subtraction. (Evgeny) Double check fragmentation photon uncertainty. (Zhijun) Cross check acceptance and correction factor for electron channel (Tian) - PowerPoint PPT Presentation

Citation preview

Page 1: To do lists

To do listsZhijun Liang

Page 2: To do lists

Signal efficiency

Completed Data driven estimation with background subtraction. (Evgeny)

Double check fragmentation photon uncertainty. (Zhijun)

Cross check acceptance and correction factor for electron channel (Tian)

Signal acceptance and efficiency for different SM and ATGC samples in electron channel( Tian, Zhijun)

Page 3: To do lists

ATGC part (Minghui, H,Liang)

Double check the numbers are consistent with cross section measurement part.

Include additional systematic due to ATGC dependence on acceptance and correction factors

MC coverage test.

Page 4: To do lists

MET acceptance uncertainty

Follow WW analysis : https://cdsweb.cern.ch/record/1395559/files/ATL-COM-PHYS-2011-1522.pdf

Cell out term: quote 13.2% uncertainty on this term.

In-time pileup : quote 3% uncertainty

Out-of-time : 33% of signal MC need to be smeared

Mutag term

Page 5: To do lists

Acceptance

Acceptance uncertainty due to scaleGenerate signal MC using Sherpa with different PDF

Generate signal MC using Sherpa with different scale

Page 6: To do lists

Theory

Double check the Wgamma parton level NLO cross section for pT>60GeV, N_jet=0

Compare Alpgen(Sherpa) shape with MCFM shape

pT of photon

Mass of llg(or lvg)

Range 0~500GeV, bin size 5GeV