Page 1 of 5
ADDENDUM #1
DATE: 10.09.2019
TO CONTRACT DOCUMENTS ENTITLED:
PROJECT MANUAL FOR: CP190671 CRITICAL CARE ADDITION – NEW CATH LAB
CP180491 CRITICAL CARE ADDITION – INTERVENTIONAL RADIOLOGY
EXPANSION
ADVERTISEMENT DATE: 09.18.2019
PREPARED FOR: The Curators of the University of Missouri
CONSULTANTS: CP190671
bcDESIGNGROUP
100 E Park Street, Suite 202
Olathe, KS 66061
913.232.2123 x802
CP180491
The Clark Enersen Partners
2020 Baltimore Ave, Suite 300
Kansas City, MO 64108
816.474.8237
Drawings and Specifications for the above noted project and the work covered thereby are
herein modified as follows, and except as set forth herein, otherwise remain unchanged and in full
force and effect:
DIVISION 1:
1. Section 1.A Bid for Lump Sum Contract
a. REVISE TO address to the following:
Curators of the University of Missouri
Campus Facilities, Planning Design & Construction
Room L100 (Front Desk)
General Services Building
University of Missouri, Columbia, Missouri 65211
2. Section 1.E Special Conditions
a. REMOVE the following Section 2 Special Scheduling Requirements, Part n in its
entirety.
n. Third Party Inspections language coming from Owner.
b. REVISE Section 12 Permits to the following:
12. Permits
Permits and inspection for work on UM property are required.
a. The owners Representative shall secure University Authority Having
Jurisdiction building permits required for the project and shall
provide a list of required inspection to the Contractor.
Page 2 of 5
i. The Contractor shall coordinate and provide reasonable
scheduling and access to the Work for the Owner’s
Inspection.
ii. Re-inspection of work as a result of either failed inspection
or work not ready as scheduled may be at the Contractor’s
expense.
b. The Contractor shall comply with applicable codes and
standards as listed in the Contract Documents, General Conditions,
and the Healthcare Construction Guidelines.
c. All permits, including, but not limited to Infection Control, Hot
Work, Fire Alarm, Energized Work and HVAC interruption shall be
coordinated and scheduled with the Owner’s Representative or
designee prior to commencement of the work.
d. Permits for Boilers, Water Heaters and Pressure Vessels require an
installation permit from the State of Missouri. Before commencement
of Boilers, Water Heaters or Pressure Vessels the Contractor must
obtain an installation permit from the State of Missouri, Division of Fire
Safety, Boiler and Pressure Unit as required by 11 CSR 40-2.010
through 11 CSR 40-2.065. The permit applications are available at
http://www.dfs.dps.mo.gov/programs/bpv/
c. REVISE Section 13 Specialties, Part a.(3).d to become paragraph (4) as shown
below.
(4) Owner purchased Fluoroscopy and CT Imaging equipment will require
special coordination to ensure proper location of all rough in requirements.
Coordination with the manufacture during construction will be required to
determine acceptance of the room rough ins.
d. REVISE Section 17 Modification to Information for Bidders: Bidders Statement of
Qualifications, Part (1) to the following:
(1) Reference: Information for Bidders, Article 8.4
Insert new Article 8.4 to read as follows:
In addition to the Bidder’s Statement of Qualifications, the Bidder
must also submit evidence and meet the following qualifications:
e. REMOVE the following Section 22 Quality Assurance Log, Part b in its entirety.
b. The contractor shall designate a competent person, separate from the
superintendent or Project Manager, to act as the contractor’s QA
coordinator. The QA coordinator is responsible for planning, scheduling,
coordinating, conducting and verifying all commissioning activities required
by the Quality Assurance Log and ensuring all building systems are
complete, operable and ready for use by the Owner. At a minimum,
building ventilation systems, chilled/hot water generation systems, hydronic
distribution systems, power distributions systems and fire detection and
alarm systems, as applicable.
f. REVISE Section 26 Project Management/Communication Requirements, Part a to
the following:
a. The Contractor shall be represented at the site by a full-time, competent
Superintendent with no other assigned duties or responsibilities from the
beginning of the work until its final acceptance, unless otherwise permitted
Page 3 of 5
by the Owner’s Representative. The Superintendent for the Contractor for
the general building work shall exercise general supervision over all
subcontractors of any tier engaged on the work with decision-making
authority of the Contractor.
CP190671 SPECIFICATION:
1. In Section 06 4023 Interior Architectural Woodwork, Part 2.1.C.2.a.1 REVISE to the following:
a. Provide Extira™Treated Exterior Composite as manufactured by Jeld-wen at all wet
area countertops and backsplashes. Use only adhesives recommended by the
manufacturer. Water based adhesives are not recommended.
2. In Section 10 5113 Metal Lockers, Part 2.1.A ADD the following manufacturer(s):
a. Lockers MFG
3. ADD Physicist’s Report after Section 13 4900 Radiation Protection
4. REPLACE Section 20 1080 Testing, Adjusting, and Balancing in its entirety.
CP190671 DRAWINGS:
1. On drawing 6/A100 Site Usage Plan, fence location to remain as drawn. Install a gate at
the sidewalk that leads to the hospital. No parking will be permitted on any walks.
2. Drawing E204:
a. ADDED keyed note number 7 with emergency lighting inverter product code
3. Drawing E304:
a. REVISED keyed note number 17 to provide 1 data cable at the Aiphone intercom
station
b. REVISED keyed note number 18 to revise location of laser outlet from foot end of
the patient table to the boom
c. ADDED keyed note 23 to provide dual voltage isolated power panel for 120 volt
loads as well as 208 volt laser outlet
d. ADDED remote line isolation monitors to Cath lab
e. REVISED “ISO1” size to provide 208 volt load for laser
f. REMOVED circuiting from “B1” and “B2” light booms to “ISO2”. These loads are
served from Steris TPCU lighting controller
g. ADDED circuiting to “C4” equipment boom for the laser outlet
h. ADDED circuiting for Leviton box
i. ADDED disconnect for Siemens equipment
4. Drawing E500:
a. REVISED feeder sizes for “ISO1” and “ISO2”
CP180491 DRAWINGS:
1. Sheet G0.02 – Infection Control Barrier Plan
a. Revise extents of First and Second Floor infection control barriers.
2. Sheet A1.11 – Second Floor Plan
a. Relocate wall between Fluoroscopy Procedure Room C2053G and CT Procedure
Room C2053H. Relocate Lead-Lined Sliding door.
3. Sheet A1.20 - Second Floor Reflected Ceiling Plan
a. Revise Ceilings in Fluoroscopy Procedure Room C2053G and CT Procedure Room
C2053H per new wall and sliding door location.
4. Sheet A6.21 – Interior Elevations
a. Revise CT Procedure Rm – West to show new sliding door location and ceiling
pocket.
Page 4 of 5
5. Sheet A6.40 – Door Schedule, Door Types, Frame Type, Casework Details
a. Revise Hollow Metal Frame Types HMF-2 and HMF-3
b. Provide notch in Lead-Lined Sliding Door.
6. Sheet S2.01 – Framing Plan & Details
a. Reference Second Floor Framing Plan on attached sheet S2.01 for modified sliding
door location, additional Unistrut framing and modified Unistrut spacings &
elevations.
7. Sheet FP1.01
a. Revise Sprinkler layout in Fluoroscopy Procedure Room C2053G and CT Procedure
Room C2053H per revised wall location.
8. Sheet M1.02 – Second Floor HVAC Plan
a. Revised ductwork layout in Fluoroscopy Procedure Room C2053G to coordinate
with updated Siemens drawings.
9. Sheet M4.02 – Mechanical Schedules
a. Updated Laboratory Gas Equipment Schedule to include WAGD
b. Changed MA-1 to MSA-1 in the Master Alarm Schedule
10. P1.02 – Second Floor Plumbing Plan
a. Added WAGD piping to the Procedure Rooms
b. Changed MA-1 to MSA-1
11. E2.01 – Second Floor Power & Auxiliary Systems Plan
a. Relocated power for sliding door motor
12. E2.02 – Procedure Rooms Power & Auxiliary Systems Plan
a. Revised plans, notes, and symbols list to correctly correspond with finalized Siemens
equipment drawings.
13. E3.01 – Electrical One Line Diagram
a. Revised electrical one line diagram to include UPS per finalized Siemens equipment
drawings.
SUBSTITUTION REQUESTS:
1. The following substitution requests are APPROVED EQUALS.
a. Lockers MFG Knock Down Series
CLARIFICATIONS, QUESTIONS, ANSWERS:
1. CP190671 Critical Care Addition - New Cath Lab
a. The contact for project CP190671 is Elizabeth Turner, 913.232.2123 x803.
b. Bidder Questions:
i. Q1: I have a question on the floor patching/Leveler, The bid form has a unit
price for patching and leveling- Base bid quantity 170 cu ft. We don't usually
price this in cubic feet so can we get this changed to a square foot price?
What do they expect the average thickness for this to be? I didn't find any
other information concerning the floor prep in the spec sections for flooring.
Can you give us a idea of what you are expecting to be included in the
base bid?
A1: The quantity will remain in cubic feet as this is a volume measurement
which takes thickness into its quantity. In some areas, the floors are uneven,
and the thickness of the leveler will vary.
Also, as noted in Section 1.A, the leveler is defined in Section(s) 09 6513, 09
6516, and 09 6519.16.
2. CP180491 Critical Care Addition – Interventional Radiology
a. Corridor outside of project area – half of the corridor must remain open.
Page 5 of 5
b. Work to occur on the first floor under the project must be scheduled with the users.
Work to occur over a weekend. Space must be made ready to for use during
working hours.
c. Duct routing above procedure rooms must be heavily coordinated.
d. Pneumatic tube system – provided by a third-party installer. Route of tube system to
be coordinated with the owner and third-party installer during construction.
ATTACHMENTS:
1. CP190671 Physicist’s Report
2. CP190671 Section 20 10 80 TESTING, ADJUSTING AND BALANCING
3. CP190671 Drawing Sheets E204, E304, and E500.
4. CP180491 Drawing Sheets G0.02, A1.11, A1.20, A6.21, A6.40, S2.01, FP1.01, M1.02, M4.02,
P1.02, E2.01, E2.02, E3.01
ISSUED BY:
Kurt M. Broeckelmann
bcDESIGNGROUP
END OF ADDENDUM #1
104
105
1. COORDINATE EXACT LOCATION OF OCCUPANCY SENSORS WITH HVAC DIFFUSERS ONSITE.
MAINTAIN 5-6' SEPARATION PER MANUFACTURERS INSTRUCTIONS.
GENERAL NOTES:
MECHANICAL
ROOM
4L06
MECHANICAL
ROOM
4L06A
CATH LAB
2
CONTROL
ROOM
12
HALL
1
CORR.
CC4002
PATIENT RM
4E38
TOILET
4E38A
TOILET
4E39A
PATIENT RM
4E39
TOILET
4E40A
PATIENT RM
4E40
TOILET
4E41A
PATIENT RM
4E41
ELEV.
EC4023
SOILED
UTILITY
11
CLEAN
LIFT
C4035A
OFFICE
22
ELEV.
EC4020
OFFICE
10
ELEC.
C4034
BREAK
23
C4039
CORR.
CC4000
NOUR
C4016C
RR
C4016A
STAIR
CS4007P
CONSULT
C4012
SUPPLY
15
CALL ROOM
26
CALL ROOM
16
TOILET
27
CARTS
17
CORR.
CC4003
LOCKER
24
LOCKER
25
COMM.
C4026
CLOSET
C4010A
COMPUTER
C4010B
COMP.
C4004A
CLOSET
C4004B
RR
C4019A
ELEC.
C4018
ON-CALL
C4019
ON-CALL
C4022
RT
C4025
READING
ROOM
21
CATH. LAB
C4004
CONTROL
C4007
CATH. LAB
C4010
`N4B'
`N42'
`C4B'
`C42'
`L4A'
`L41'
`N41'
`C41'
`C4A'
`N4A'
TV
SS
TVSS
FA
a
FA
a
FA
a
FA
a
FA
a
FA FA
FA
a
FA
a
FA FA
FA
a
FD
FD
FA
NL
FA
FD
FA
a
FA
FA
FA
FA
a
FA
a
FC
FC
FC
FA
a
FA FA
FA
FA
FA
FA
FA
FA
FA
FD
1
FD
1
DA
DADA
DA
DA
DA
DA
DA DA DA
`C41.1A'
`C41.1'
`T41.1'
`MP'
OS
VSDCS
OS
OS
VS
D
LC2
1
CS
OS
LC7
OS
OS
CS
LC7
OS
OS
OS
CS
OS
OS
CS
CS
CS
OS
OS
OS
LC1
1
OS
LC2
CS
CS
CS
LC2
OS
LC1
CS
LC2
CS
OS
CS
OS
OS
LC1
CS
CS
XB
LC2
CS
2
CS4
CS4
ISOLATED
POWER
PANEL
`ISO1'
`ISO2'
XA
XA
XA
XA
XA
FA
a
FA
a
FA
a
FA
a
FA
a
FA
a
DA
FB
3
UA
3
3
3
3
3
3
3
3
3
3
3
3
3
1 TIE LIGHTING POWER AND CONTROL INTO EXISTING CORRIDOR SYSTEM/CIRCUIT.
REFERENCE CATH LAB EQUIPMENT MANUFACTURER DRAWINGS FOR LIGHTING CONTROL
INTERFACE NECESSARY FOR INTEGRATION OF FOOT CONTROL AND IN-USE LIGHT.
CONNECT NEW LIGHT FIXTURES AND SWITCHES IN THIS ROOM TO EXISTING ROOM WIRING.
EXTEND AS NEEDED.
CRITICAL POWER FOR TYPE `FB' LIGHTING IN CATH LAB SHALL BE ROUTED THROUGH
EMERGENCY LIGHTING INVERTER.
CONNECT NEW DOWNLIGHT FIXTURES AND SWITCHES IN THIS ROOM TO EXISTING ROOM
WIRING. EXTEND AS NEEDED.
30A, 2P TOGGLE SWITCH CONNECTED TO "IN-USE" LIGHT. PROVIDE SWITCH WITH CLEAR
PLASTIC COVER. SWITCH SHALL BE CONNECTED SUCH THAT THE LASER OUTLET ON THE
EQUIPMENT BOOM IS ENERGIZED ONLY WHEN THE SWITCH IS IN THE ON POSITION. REFER TO
SHEET E304 FOR OUTLET LOCATION.
ELECTRICAL CONTRACTOR SHALL PROVIDE (1) ONE MYERS POWER EMERGENCY LIGHTING
INVERTER, MODEL LV-3-R-1-X OR PRE-APPROVED EQUAL. COORDINATE FINAL LOCATION IN
CONJUNCTION WITH SIEMENS EQUIPMENT WITHIN EQUIPMENT CLOSET.
KEYED NOTES:
2
3
4
UA
WA
WA
WA
LTS1
LTS1
LTS1
UA
b
UA
b
UA
b
UA
b
UA
b
4
4
4
4
4
4
4
4
UA
b
UA
b
UA
b
3
-1
`C41.1A'
FB
3
FB
3
FB
3
FB
3
FB
3
FB
3
FB
3
-3
`C41.1A'
5
5
55
5
5
5
5
5 5
5 5
750VA/W
EMERGENCY
LIGHTING
INVERTER
6
6
7
7
1
1
1
Proj
ect T
itle:
913.232.2123
100 E Park Street, Suite 202Olathe, KS 66061
Project Team:
MO Certificate of Authority NumberA-2011037290
bcDESIGNGROUP
bcdg Project #:MU Project #:
12275.16CP190671
Issue: Date:#
Unive
rsity
of M
issou
ri, Co
lumbi
a, M
issou
ri
BID SET | VOLUME 1
Issue Date: 09.18.2019
Drawn by:
McClure Engineering
314.645.62321000 Clark Ave, St. Louis, MO 63102
Bob D. Campbell & Co.
816.531.41444338 Belleview, Kansas City, MO 64111
Missouri Certificate of Authority #000087
Missouri Certificate of Authority #000442
CRITI
CAL C
ARE A
DDITI
ON
- NEW
CAT
H LA
BCP
1906
71
AUSTIN P. STRIEKER
STATE LIC. #PE-2014032649
N
1/4"=1'
2'1' 4'0
SCALE: 1/4" = 1' - 0"
PARTIAL 4TH FLOOR PLAN - LIGHTING
S:\071601.001 U
MC
M
UH
C C
ath Lab C
Ds\E
lec\E
204-071601.001.dw
g 09/25/19 09:44 T
Fisher
E204PARTIAL 4TH FL PLANLIGHTING
TWF
1 ADDENDUM #1 10.08.2019
104
105
MECHANICAL
ROOM
4L06
MECHANICAL
ROOM
4L06A
CATH LAB
2
CONTROL
ROOM
12
HALL
1
CORR.
CC4002
PATIENT RM
4E38
TOILET
4E38A
TOILET
4E39A
PATIENT RM
4E39
TOILET
4E40A
PATIENT RM
4E40
TOILET
4E41A
PATIENT RM
4E41
ELEV.
EC4023
SOILED
UTILITY
11
CLEAN
LIFT
C4035A
OFFICE
22
ELEV.
EC4020
OFFICE
10
ELEC.
C4034
BREAK
23
C4039
CORR.
CC4000
NOUR
C4016C
RR
C4016A
STAIR
CS4007P
CORR.
CC4000
CONSULT
C4012
SUPPLY
15
CALL ROOM
26
CALL ROOM
16
TOILET
27
CARTS
17
CORR.
CC4003
LOCKER
24
LOCKER
25
COMM.
C4026
CLOSET
C4010A
COMPUTER
C4010B
COMP.
C4004A
CLOSET
C4004B
RR
C4019A
ELEC.
C4018
ON-CALL
C4019
ON-CALL
C4022
RT
C4025
READING
ROOM
21
CATH. LAB
C4004
CONTROL
C4007
CATH. LAB
C4010
`N4B'
`N42'
`C4B'
`C42'
`L4A'
`L41'
REFRIGERATOR
ICE MAKER
G
MICROWAVE
2D
F
V
3
D
TV
3
CR CR
F
V
G
F
V
F
V
F
V
2
3D3D
F
V
3D
3D
3D3D
F
V
2D
2D
2D
2D 2D
F
V
F
V
TD
1
CR
G
4DEC 4DEC
CR CR
4
2D
F
V
CR
F
SD
2D
3
2D
F
SD
G
3
`N41'
`C41'
`C4A'
`N4A'
TV
SS
TVSS
G
G
2D
G
F
V
8
J J
8
J
7
C1
MONITOR
BOOM
J
9
J
7
8
C2
ANESTHESIA
BOOM
10
STERIS TPCU
LIGHT CONTROLLER
1. ALL WIRING FROM ISOLATED POWER PANELS SHALL BE LOW LEAKAGE TYPE XHHW-2 (ROME FR-XLP OR
EQUIVALENT).
2. ALL DEVICE COVER PLATES IN CATH LAB SHALL BE STAINLESS STEEL.
3. NURSE CALL DEVICES PROVIDED, INSTALLED AND WIRED BY OWNER'S NURSE CALL VENDOR, ALL
SYSTEMS. CONTRACTOR RESPONSIBLE FOR ALL CONDUIT, PULL-STRINGS AND BACKBOXES.
GENERAL NOTES:
13
3D
3D
J
11
F
V
6
J
SIEMENS
GENERATOR
CABINET
3D
J
SIEMENS CATH
TABLE
3D
3D
MONITOR
+84" AFF
3D
TOUCH
PANEL
+44" AFF
AUDIO
INPUT
+44" AFF
AUDIO
INPUT
TOUCH
PANEL
+44" AFF
3D
MONITOR
+84" AFF
N
D
N
CB
3D
13
13
N
MC
N
D
3D
`C41.1A'
`C41.1'
`T41.1'
3D
F
V
3D
F
V
COAX
S
S
WAP
STERIS
INTEGRATION
RACK
CR
CR
3D
3D
S
3D
14
PS-1
14
14
PS-2
PS-3
AIPHONE
AIPHONE
MASTER
CONSOLE
3D
3D
FREEZER
4DEC
WAP
VOLCANO
6
2D
STERIS
+80"AFF
RFID
RFID
RFID
COAX
COAX
15
16
17
+42"
4D
JJJ
1 DEDICATED DUPLEX RECEPTACLE FOR OWNER FURNISHED, OWNER
INSTALLED COPY MACHINE.
JUNCTION BOX FOR DATA CONNECTION TO RELOCATED TIME CLOCK.
POWER, DATA AND COAXIAL CONNECTION FOR OWNER FURNISHED,
CONTRACTOR INSTALLED TV. PROVIDE RECESSED OUTLET BOX FOR
RECEPTACLE, DATA AND COAXIAL CONNECTION.
SURFACE RACEWAY, MOUNTED 48" AFF, WITH RECEPTACLES 24" ON
CENTER. ALTERNATE RECEPTACLES BETWEEN CIRCUITS SHOWN.
POWER CONNECTION FOR SIEMENS PROVIDED, CONTRACTOR INSTALLED
UPS. EQUIPMENT POWER SHALL BE SOURCED FROM `RDP1', LOCATED IN
THE CCA BUILDING BASEMENT. REFER TO THE ONE-LINE DIAGRAM AND
CONDUIT ROUTING PLANS FOR MORE INFORMATION.
CATH LAB SHALL BE OPERATED IN PRIVATE MODE FOR FIRE ALARM
PURPOSES.
PROVIDE JUNCTION BOX FOR RECEPTACLES AT BOOM STRUCTURE.
INSTALL WHIP AS NECESSARY FOR CONNECTIONS TO BOOM ELECTRICAL
BOX. COORDINATE EXACT NEEDS \ LOCATION WITH MANUFACTURER. EC
SHALL HARDWIRE ELECTRICAL WHIP DURING STERIS INSTALLATION.
DATA CONNECTION FOR BOOM MOUNTED DATA OUTLETS.
PROVIDE JUNCTION BOX FOR MOTOR \ BRAKE AT BOOM STRUCTURE.
INSTALL WHIP AS NECESSARY FOR CONNECTIONS TO BOOM ELECTRICAL
BOX. COORDINATE EXACT NEEDS \ LOCATION WITH MANUFACTURER. EC
SHALL HARDWIRE ELECTRICAL WHIP DURING STERIS INSTALLATION.
ROUGH-IN BOX FOR TPCU FURNISHED BY STERIS AND INSTALLED BY THE
CONTRACTOR. ROUTE 120V POWER THROUGH 1/2" KNOCKOUT.
COORDINATE FINAL LOCATION WITH MANUFACTURER.
LEVITON BOX FOR POWER CONNECTION TO T1 JUNCTION BOX.
JUNCTION BOX FOR POWER CONNECTION TO EXISTING FURNITURE
LIGHTING. COORDINATE FINAL LOCATION OF JUNCTION BOX SO IT IS
BEHIND A FURNITURE PANEL. COORDINATE FURNITURE CONNECTION
WITH FURNITURE MANUFACTURER.
NEW STERIS CAMERA IN EXISTING ROUGH-IN.
FUNCTIONAL DEVICES PSH500A POWER SUPPLY FOR VAV BOX POWER.
NEW LOCATION OF EXISTING NURSE CALL MASTER CONTROL CONSOLE.
REFER TO SHEET ED100 FOR EXISTING LOCATION.
AIPHONE MASTER CONSOLE PROVIDED BY OWNER. PROVIDE 2D DATA
DROP BELOW COUNTER. COORDINATE FINAL LOCATION WITH OWNER
PRIOR TO ROUGH-IN.
AIPHONE INTERCOM STATION PROVIDED BY OWNER. PROVIDE 1D DATA
DROP AT 42" AFF. COORDINATE FINAL LOCATION WITH OWNER PRIOR TO
ROUGH-IN.
JUNCTION BOX FOR POWER CONNECTION TO L6-30 NEMA LASER OUTLET
AT BOOM STRUCTURE. INSTALL WHIP AS NECESSARY FOR CONNECTIONS
TO BOOM ELECTRICAL BOX. COORDINATE EXACT LOCATION WITH
MANUFACTURER. ELECTRICAL CONTRACTOR SHALL HARDWIRE
ELECTRICAL WHIP DURING STERIS INSTALLATION.
PROVIDE 10 kVA STANDARD ISOLATED POWER PANEL WITH (16) 20 AMP
CIRCUIT BREAKERS.
KEYED NOTES:
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
23
19
`MP'
S
3D
3D
3D
TV
+84" AFF
TV
+84" AFF
(4) 4D
(5) 4D
(4) 4D
G
J
12
T
D
D
D
D D
T D
1
1
1
1
1
3
3
3
3
5
`C4B'
`N4B'
`C4A'
`N4A'
ISOLATED
POWER
PANEL
`ISO1'
`ISO2'
20 CIRCUITS TO BE FED FROM ONE OF THE 120/208V NORMAL POWER
PANELS LOCATED IN ELECTRICAL ROOM `C4034' WITH AVAILABLE
SPARE BREAKERS. CIRCUIT NUMBERS INDICATED ON PLAN ARE
FOR GROUPING PURPOSES ONLY. ACTUAL CIRCUIT NUMBERS WILL
VARY.
CIRCUITS TO BE FED FROM ONE OF THE 120/208V NORMAL POWER
PANELS LOCATED IN ELECTRICAL ROOM `C4018' WITH AVAILABLE
SPARE BREAKERS. CIRCUIT NUMBERS INDICATED ON PLAN ARE
FOR GROUPING PURPOSES ONLY. ACTUAL CIRCUIT NUMBERS WILL
VARY.
CIRCUITS TO BE FED FROM ONE OF THE 120/208V CRITICAL POWER
PANELS LOCATED IN ELECTRICAL ROOM `C4034' WITH AVAILABLE
SPARE BREAKERS. CIRCUIT NUMBERS INDICATED ON PLAN ARE
FOR GROUPING PURPOSES ONLY. ACTUAL CIRCUIT NUMBERS WILL
VARY.
PROVIDE 25 kVA DUAL VOLTAGE ISOLATED POWER PANEL WITH (16)
20 AMP, 120V CIRCUIT BREAKERS AND (1) 30 AMP, 208V CIRCUIT
BREAKER.
KEYED NOTES CONTINUED:
20
1,3,5
l
7
11
9
11
11 13
20
7,9,11
l
13
13
15
15
15
15
17
17
19
19
20
-17,19
20
-13,15
1
3
1
3
3
3
21
1,3
l
21
2
22
2
4
4
66
22
-2,4,6
8
8
10
12
14
14
22
-8,10,12,14
4
2
42
4
2
6
6
-2,4,6
`C41.1A'
l
1
`ISO1'
1
l
3,5
`ISO1'
3,5
l
10
`ISO1'
10
2,4,6,8
l
`ISO1'
2,4,6,8
J
9
J
7
C3
EQUIP BOOM
l
10
`ISO2'
10
2,4,6,8
l
`ISO2'
2,4,6,8
7 9
9
l
`ISO2'
9
l
1,3,5,7
`ISO2'
1,3,5,7
C4 EQUIP BOOM
1212
l
12
`ISO2'
11
l
`ISO2'
11
1
1
15
l
`ISO2'
15
7
9
`ISO2'
l
13
11
9
7
11
11
11
7
7
9
9
7,9,11
l
`ISO1'
-1,3,5
`C41.1A'
35
3
7,9-
`C41.1A'
J
12,14
l
12,14
`ISO2'
1
1
1
23
1
1
1
1
1
1
LIMS
1
1
18
SIEMEN'S SD
1
Proj
ect T
itle:
913.232.2123
100 E Park Street, Suite 202Olathe, KS 66061
Project Team:
MO Certificate of Authority NumberA-2011037290
bcDESIGNGROUP
bcdg Project #:MU Project #:
12275.16CP190671
Issue: Date:#
Unive
rsity
of M
issou
ri, Co
lumbi
a, M
issou
ri
BID SET | VOLUME 1
Issue Date: 09.18.2019
Drawn by:
McClure Engineering
314.645.62321000 Clark Ave, St. Louis, MO 63102
Bob D. Campbell & Co.
816.531.41444338 Belleview, Kansas City, MO 64111
Missouri Certificate of Authority #000087
Missouri Certificate of Authority #000442
CRITI
CAL C
ARE A
DDITI
ON
- NEW
CAT
H LA
BCP
1906
71
AUSTIN P. STRIEKER
STATE LIC. #PE-2014032649
N
1/4"=1'
2'1' 4'0
SCALE: 1/4" = 1' - 0"
PARTIAL 4TH FLOOR PLAN - POWER & SYSTEMS
S:\071601.001 U
MC
M
UH
C C
ath Lab C
Ds\E
lec\E
304-071601.001.dw
g 09/25/19 09:45 T
Fisher
E304PARTIAL 4TH FL PLANPOWER & SYSTEMS
TWF
1 ADDENDUM #1 10.08.2019
FIRST FLOOR
BASEMENT
SECOND FLOOR
THIRD FLOOR
SWITCHBOARD `RDP1'
1. COORDINATE ALL OUTAGES WITH OWNER PRIOR TO COMMENCEMENT
OF ANY WORK ACTIVITIES.
GENERAL NOTES:
2
125N
SWITCHBOARD `CDP1'
1
`MP'
125A
277/480
3P/4W
MCB
FOURTH FLOOR
100
`PU1'
100A
277/480
3P/3W
`UPS'
15KVA
277/480
3P/3W
30N
`SD'
600V
30AF
30N30N
`SC1'
30A
277/480
3P/4W
250N
`C41.1'
250A
277/480
3P/4W
`T41.1'
75kVA
200T
100
`C41.1A'
200A
120/208
3P/4W
MCB
60
TVSS
175
`ISO2'
25kVA
120/208
1P/3W
`ISO1'
10kVA
120/208
1P/3W
PANEL
NB1
225AT
250AF
PANEL NDP1
PANEL
N11
400AT
400AF
PANEL
N21
225AT
250AF
PANEL
N31
225AT
250AF
PANEL
N41
225AT
250AF
PANEL
N51
225AT
250AF
PANEL
N71
225AT
250AF
PANEL
N81
225AT
250AF
SPARE
250AT
250AF
SPARE
250AT
250AF
250A
SPACE
250A
SPACE
250A
SPACE
100A
SPACE
100A
SPACE
1600A, 480/277V, 3-PHASE, 4-WIRE, 65K AIC
PANEL
N12
400AT
400AF
TVSS
PANEL NDP2
PANEL
N22
225AT
250AF
PANEL
N32
225AT
250AF
PANEL
N42
225AT
250AF
PANEL
N52
225AT
250AF
PANEL
N72
225AT
250AF
SPARE
225AT
250AF
SPARE
225AT
250AF
SPARE
250AT
250AF
SPARE
250AT
250AF
250A
SPACE
250A
SPACE
250A
SPACE
100A
SPACE
100A
SPACE
1600A, 480/277V, 3-PHASE, 4-WIRE, 65K AIC
SPARE
1600AT
1600AF
GFP
Z
4000A, 480/277V, 3-PHASE, 4-WIRE, 65K AIC
SPARE
1600AT
1600AF
GFP
Z
SPARE
1600AT
1600AF
GFP
Z
SPARE
1600AT
1600AF
GFP
Z
ATS-6
600AT
1600AF
GFP
Z
MCC-3
800AT
1600AF
GFP
Z
ATS-7
800AT
1600AF
GFP
Z
ATS-5
1000AT
1600AF
GFP
Z
ATS-2
800AT
1600AF
GFP
Z
TVSS
1600AT
1600AF
GFP
Z
1600A
SPACE
1600A
SPACE
1600A
SPACE
1600A
SPACE
4000A, 480/277V, 3-PHASE, 4-WIRE, 65K AIC
1600AT
1600AF
GFP
Z
ATS-1
800AT
1600AF
GFP
Z
ATS-3
600AT
1600AF
GFP
Z
SPARE
1600AT
1600AF
GFP
Z
MCC-1
800AT
1600AF
GFP
Z
ATS-4
1000AT
1600AF
GFP
Z
1600AT
1600AF
GFP
Z
1600A
SPACE
1600A
SPACE
1600A
SPACE
1600A
SPACE
SPARE
1600AT
1600AF
GFP
Z
SPARE
1600AT
1600AF
GFP
Z
SPARE
1600AT
1600AF
GFP
Z
SPARE
4000AT
4000AF
GFP
Z
N.O.
K
3
3800AT
4000AF
GFP
Z
N.C.
K
1
3800AT
4000AF
GFP
Z
N.C.
K
2
UNIT SUBSTATION CCA1
UNIT SUBSTATION CCA2
POWER SUPPLY
`PS-1'
VAV
4W42
VAV
4W41
VAV
4W40
VAV
4W43
VAV
4W44
MOUNTED
ABOVE
CEILING
120V EQUIPMENT POWER
POWER SUPPLY
`PS-2'
VAV
4E41
VAV
4E40
VAV
4E42
MOUNTED
ABOVE
CEILING
120V EQUIPMENT POWER
POWER SUPPLY
`PS-3'
VAV
4E43
VAV
4E44
MOUNTED
ABOVE
CEILING
120V EQUIPMENT POWER
VAV CONNECTION DIAGRAMS
1 USE SPARE 250A, 3P BREAKER IN EXISTING PANEL `CDP1' LOCATED IN
BASEMENT.
INSTALL NEW 125A, 3P RMS BREAKER IN EXISTING PANEL `RDP1' LOCATED
IN BASEMENT. MATCH EXISTING TYPE, MANUFACTURER AND KAIC RATING.
SHUTDOWN TO OCCUR THURSDAY NIGHT STARTING AT 10:00 PM AND/OR
WEEKEND.
KEYED NOTES:
2
30
30N
30 3#10, 1#10 GRD - 3/4"C
4#10, 1#10 GRD - 3/4"C
40
40N
40 3#8, 1#10 GRD - 3/4"C
4#8, 1#10 GRD - 3/4"C
50
50N
50 2#4, 1#10 GRD - 1"C
4#6, 1#10 GRD - 1"C
60
60N
60 3#4, 1#10 GRD - 1 1/4"C
4#4, 1#10 GRD - 1 1/4"C
70
70N
70 3#4, 1#8 GRD - 1 1/4"C
4#4, 1#8 GRD - 1 1/4"C
100
100N
100 3#1, 1#8 GRD - 2"C
4#1, 1#8 GRD - 2"C
100T 4#1, 1#6 GRD - 2"C
125
125N
125 3#1, 1#6 GRD - 2"C
4#1, 1#6 GRD - 2"C
125T 4#1, 1#6 GRD - 2"C
150
150N
150
3#1/0, 1#6 GRD - 2"C
4#1/0, 1#6 GRD - 2"C
150T
4#1/0, 1#6 GRD - 2"C
175
175N
1753#2/0, 1#6 GRD - 2"C
4#2/0, 1#6 GRD - 2"C
175T4#2/0, 1#4 GRD - 2"C
200
200N
200
3#3/0, 1#6 GRD - 2"C
4#3/0, 1#6 GRD - 2"C
200T 4#3/0, 1#4 GRD - 2"C
225
225N
225 3#4/0, 1#4 GRD - 2 1/2"C
4#4/0, 1#4 GRD - 2 1/2"C
225T 4#4/0, 1#2 GRD - 2 1/2"C
300
300N
300 3#350MCM, 1#4 GRD - 3"C
4#350MCM, 1#4 GRD - 3"C
300T 4#350MCM, 1#2 GRD - 3"C
400
400N
350/400 3#500MCM, 1#3 GRD - 3 1/2"C
4#500MCM, 1#3 GRD - 3 1/2"C
400T 4#600MCM, 1#1/0 GRD - 4"C
450 450 TWO (2) 2 1/2" CONDUITS WITH
3#4/0, 1#2 GRD IN EACH
450N TWO (2) 2 1/2" CONDUITS WITH
4#4/0, 1#2 GRD IN EACH
500 500 TWO (2) 3" CONDUITS WITH
3#250MCM, 1#2 GRD IN EACH
500N TWO (2) 3" CONDUITS WITH
4#250MCM, 1#2 GRD IN EACH
600 600 TWO (2) 3" CONDUITS WITH
3#350MCM, 1#1 GRD IN EACH
600N TWO (2) 3" CONDUITS WITH
4#350MCM, 1#1 GRD IN EACH
600S TWO (2) 3" CONDUITS WITH
4#350MCM, IN EACH
800 800 TWO (2) 4" CONDUITS WITH
3#500MCM, 1#1/0 GRD IN EACH
800N TWO (2) 4" CONDUITS WITH
4#500MCM, 1#1/0 GRD IN EACH
800T TWO (2) 4" CONDUITS WITH
4#600MCM, 1#3/0 GRD IN EACH
1000 1000 THREE (3) 3 1/2" CONDUITS WITH
3#500MCM, 1#2/0 GRD IN EACH
1000N THREE (3) 3 1/2" CONDUITS WITH
4#500MCM, 1#2/0 GRD IN EACH
1200 1200 FOUR (4) 3" CONDUITS WITH
3#350MCM, 1#3/0 GRD IN EACH
1200N FOUR (4) 3" CONDUITS WITH
4#350MCM, 1#3/0 GRD IN EACH
1200T FOUR (4) 3" CONDUITS WITH
4#350MCM, 1#4/0 GRD IN EACH
1600 1600 FOUR (4) 3 1/2" CONDUITS WITH
3#600MCM, 1#4/0 GRD IN EACH
1600N FOUR (4) 3 1/2" CONDUITS WITH
4#600MCM, 1#4/0 GRD IN EACH
2000 2000 FIVE (5) 4" CONDUITS WITH
3#600MCM, 1#250MCM GRD IN EACH
2000N FIVE (5) 4" CONDUITS WITH
4#600MCM, 1#250MCM GRD IN EACH
2000T
FIVE (5) 4" CONDUITS WITH
4#600MCM, 1#300MCM GRD IN EACH
2500 2500 SEVEN (7) 4" CONDUITS WITH
3#500MCM, 1#350MCM GRD IN EACH
2500N SEVEN (7) 4" CONDUITS WITH
4#500MCM, 1#350MCM GRD IN EACH
3000 3000 EIGHT (8) 4" CONDUITS WITH
3#500MCM, 1#400MCM GRD IN EACH
3000N EIGHT (8) 4" CONDUITS WITH
4#500MCM, 1#400MCM GRD IN EACH
3000T EIGHT (8) 4" CONDUITS WITH
4#500MCM, 1#500MCM GRD IN EACH
3#12, 1#12 GRD - 3/4"C
4#12, 1#12 GRD - 3/4"C
20
20N
20
5#8 - 1"CTVSS
10#10 - 1"CMETER
1200S
FOUR (4) 3" CONDUITS WITH
4#350MCM IN EACH
400S
3#500MCM - 3 1/2"C
80
80N
80 3#3, 1#8 GRD - 1 1/4"C
4#3, 1#8 GRD - 1 1/4"C
600TTWO (2) 3" CONDUITS WITH
4#350MCM, 1#2/0 GRD IN EACH
800S TWO (2) 4" CONDUITS WITH
4#500MCM IN EACH
2000S
FIVE (5) 4" CONDUITS WITH
4#600MCM IN EACH
3000S EIGHT (8) 4" CONDUITS WITH
4#500MCM IN EACH
250
250N
250 3#250MCM, 1#4 GRD - 3"C
4#250MCM, 1#4 GRD - 3"C
1600T FOUR (4) 3 1/2" CONDUITS WITH
4#600MCM, 1#300MCM GRD IN EACH
SIEMEN'S
EQUIP
SIEMEN'S
EQUIP
SIEMEN'S
EQUIP
3 3
3
VAV
4W30
3#6, 1#10 GRD - 1"C50
1
Proj
ect T
itle:
913.232.2123
100 E Park Street, Suite 202Olathe, KS 66061
Project Team:
MO Certificate of Authority NumberA-2011037290
bcDESIGNGROUP
bcdg Project #:MU Project #:
12275.16CP190671
Issue: Date:#
Unive
rsity
of M
issou
ri, Co
lumbi
a, M
issou
ri
BID SET | VOLUME 1
Issue Date: 09.18.2019
Drawn by:
McClure Engineering
314.645.62321000 Clark Ave, St. Louis, MO 63102
Bob D. Campbell & Co.
816.531.41444338 Belleview, Kansas City, MO 64111
Missouri Certificate of Authority #000087
Missouri Certificate of Authority #000442
CRITI
CAL C
ARE A
DDITI
ON
- NEW
CAT
H LA
BCP
1906
71
AUSTIN P. STRIEKER
STATE LIC. #PE-2014032649
S:\071601.001 U
MC
M
UH
C C
ath Lab C
Ds\E
lec\E
500-071601.001.dw
g 09/25/19 09:45 T
Fisher
E500RISER DIAGRAM
TWF
1 ADDENDUM #1 10.08.2019
Page 1 20 10 80 10/08/19
20 10 80 TESTING, ADJUSTING AND BALANCING
20 10 81 GENERAL
A. Drawings and general provisions of Contract, including General and Special Conditions apply to this section.
B. This scope of services specifies the requirements and procedures for mechanical systems testing, adjusting, and balancing. Requirements include measurement and establishment of the fluid quantities of the mechanical systems as required to meet design specifications, and recording and reporting the results. The test and balance work will be performed by the Owner’s personnel. It is the Contractor’s responsibility to assist as outlined below.
C. Test, adjust and balance the following mechanical systems which are shown in the construction documents.1. Supply air systems, all pressure ranges, including variable volume and
constant volume systems.2. Return air systems.3. Exhaust air systems.4. Hydronic systems.5. Steam distribution systems.6. Cooling towers.7. Verify temperature control system operation.8. Plumbing water systems (i.e. recirculation pumps, booster pumps).
20 10 82 CONTRACTORS RESPONSIBILITIES
A. The contractor’s responsibilities are as follows:1. Notify the Owner’s Representative fourteen (14) days prior to the
schedule date for balancing the system.2. Schedule a two (2) week allowance for the testing and balancing firm to
complete the testing and balancing work when scheduling completion of all work required of the Contractor by the contract documents.
3. Cooperate with the testing and balancing firm and shall make all necessary preparations for the TAB efforts.
4. Complete the following work prior to requesting the TAB effort.a. Clean and flush all piping systems.b. Leak test and make tight all piping systems.c. Fill all piping systems with clean water.d. Clean and seal all ductwork systems.e. Service and tag all equipment.f. Set and align all motors and drives.g. Start up and prove all equipment and systems.h. Make preliminary settings on all control devices and
have all systems operational.i. Operate all systems successfully for twenty-four (24)
hours minimum.5. Lubricate all motors and bearings.6. Check fan belt tension.7. Check fan rotation.8. Patch insulation, ductwork and housing, using materials identical to
those removed.9. Seal ducts and piping, and test for and repair leaks.
Page 2 20 10 80 10/08/19
10. Seal insulation to re-establish integrity of the vapor barrier.11. Attend a coordination meeting prior to the balancing of the system and a
coordination meeting following the balancing of the system.12. Provide a complete set of as-built drawings prior to the TAB effort.13. Provide craftsmen of the proper trade to work with the TAB firm to make
adjustments and installation changes as required.14. Change out fan sheaves when and if required by the TAB firm.15. Dedicate the resources to accommodate all changes identified by the
test and balance firm in a timely manner.16. If a significant rebalance (Owner’s determination) of the HVAC system is
required due to the Contractor’s failure to properly install and check out the HVAC system, the cost of rebalancing the system shall be borne by the Contractor.
20 10 83 PRE-BALANCING CONFERENCE
A. Prior to beginning of the testing, adjusting and balancing procedures, a conference with the Owner’s representative, Engineer and the Test and Balance Agency’s representative will be held. The objective of the conference is final coordination and verification of system operation and readiness for testing, adjusting and balancing.
20 10 84 SEQUENCING AND SCHEDULING OF SERVICES
A. Test, adjust and balance the air conditioning systems during summer season and heating systems during winter season. This includes at least a period of operation at outside conditions within 5 deg. F wet bulb temperature of maximum summer design condition, and within 10 deg. F dry bulb temperature of minimum winter design conditions. Take final temperature readings during seasonal operation.
20 10 85 WORK INCLUDED
A. Testing and adjusting each air handling unit and return/relief fan to achieve the design airflow rates as scheduled.
B. Testing and adjusting each new or modified VAV box to achieve design minimum and maximum airflows, water flows, and heating capacity as scheduled.
C. Testing and adjusting each existing-to-remain VAV box serving the cath lab suite and immediately adjacent areas. Tests shall include pre-reads of each box at max and min airflow setpoints prior to any renovation work taking place. At the completion of the work, existing boxes shall be tested and balanced to ensure initial airflows are maintained.
D. Testing and adjusting each terminal unit water flow rate and/or airflow rate to achieve design flows and capacities.
E. Testing and adjusting each new exhaust branch connection to achieve design airflow rate as scheduled.
F. Testing and adjusting each air device to achieve design airflow rate as indicated on the plans.
G. Testing and adjusting the systems to maintain pressure relationships as required per ASHRAE 170. Note this will require repeated balancing of all system to obtain the pressure relationships.
Page 3 20 10 80 10/08/19
1. Cath Lab: positive to all adjacent spaces (+0.01 in. wc)2. Clean Supply: positive to adjacent spaces3. Soiled Utility: negative to adjacent spaces
H. Test and survey of all applicable central air handling units (AHU-4, AHU-5, AHU-6 & AHU-7) at the time of balancing to document operating conditions. This testing shall include, but shall not be limited to:
1. pressure profile across all components/sections of the AHU2. VFD speed command and Hz for all fans (supply and return)3. Duct static pressures in suply and return mains at both the entrance to
the shaft (in 8th floor mechanical room) and at the shaft connections at the 4th floor
4. Chilled water and heating water coil flows and control valve positions
I. Test and survey of central exhaust fans (EF-15A & EF-15B) at the time of balancing to document operating conditions. This testing shall include, but shall not be limited to:
1. Total static pressure at exhaust fans2. Total exhaust system airflow3. Fan speed (rpm) for each fan
UP
DN
VITREOU
S CHIN
AC
_TOILETS
AN
GLESEYK
-4396
VITREOU
S CHIN
AC
_TOILETS
AN
GLESEYK
-4396
VITREOU
S CHIN
AC
_TOILETS
AN
GLESEYK
-4396
UPDOWN
2
2
2
1
1
4
4 4 4
4
4
4
5 5
3
3
3
WORK WITHIN THE HATCHED AREA TO OCCUR AFTER REGULAR BUSINESS HOURS AND ON WEEKEND ONLY. WORK MUST BE COMPLETED BEFORE 12:00 AM MONDAY TO ALLOW TERMINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO RE-OCCUPATION
USE EXISTING WINDOW OPENINGS TO MEET NEGATIVE AIR FLOR REQUIREMENTS PER SPECIFICATIONS.
1
1
4
4
1
3
3
3
3
3 3
3
1
COORDINATE MATERIAL STAGING AREAS w/ MU OWNER'S REPRESENTATIVE
6
1
6
6
WORK WITHIN THE HATCHED AREA TO OCCUR AFTER REGULAR BUSINESS HOURS AND ON WEEKEND ONLY. WORK MUST BE COMPLETED BEFORE 12:00 AM MONDAY TO ALLOW TERMINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO RE-OCCUPATION
001A
3
3
3
3
5
1
5
1
THIS ELEVATOR FOR CONSTRUCTION USE
SCHEDULE USE OF THIS ELEVATOR WITH OWNER BEFORE USE
5
6
AS1.01 3
WORK WITHIN THE HATCHED AREA TO OCCUR ON WEEKEND ONLY. WORK MUST BE COMPLETED BEFORE 12:00 AM MONDAY TO ALLOW TERMINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO RE-OCCUPATION
4 4
4 4 4
4
4 4
3
3
5
5
3
3
1
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 1
0:1
6:4
0 A
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-A
-19
_sa
rah
.ja
nia
k@
cla
rke
ne
rse
n.c
om
.rv
t
Infection Control Barrier
Plan
G0.20
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTSSCALE: 1/16" = 1'-0"
SECOND FLOOR I.C. PLAN1
SCALE: 1/16" = 1'-0"
FIRST FLOOR I.C. PLAN2
INFECTION CONTROL BARRIER FB-3. THE BARRIER SHALL BE CONSTRUCTED OF 6 OR 10-MIL FIRE-RESISTANT POLYETHYLENE EXTENDING FROM FLOOR TO CEILING WITH A ZIPPER (ZIP WALL) OPENING. IF NECESSARY, NON-COMBUSTIBLE COMPONENTS (ZIP POLES, ETC.) SHALL BE UTILIZED TO SUPPORT THE POLYETHYLENE. THE BARRIER SHALL BE ADEQUATELY SEALED AT THE FLOOR AND CEILING CONNECTIONS AND BE MAINTAINED THROUGHOUT THE PROJECT TO PREVENT THE MIGRATION OF DUST FROM THE WORK AREA INTO THE ADJACENT OCCUPIED SPACE. THE ZIPPER/ZIP WALL OPENING SHALL REMAIN CLOSED DURING THE WORK PERIOD. THERE SHALL BE NO ADDITIONAL PENETRATIONS IN THE BARRIER. DASHED LINE REPRESENTS THE EXTENT OF THE FB-3 I.C. BARRIER REQUIREMENTS.
INFECTION CONTROL BARRIER EW-2. THE BARRIER SHALL BE ACHIEVED UTILIZING AN EXISTING WALL ASSEMBLY AS AN INFECTION CONTROL BARRIER. THE ASSEMBLY MUST EXTEND TO THE DECK/FLOOR ABOVE. THE ASSEMBLY SHALL BE VISUALLY EXAMINED AND ALL PENETRATIONS/OPENINGS OBSERVED IN THE ASSEMBLY SHALL BE REPAIRED AND/OR ADEQUATELY SEALED AND MAINTAINED THROUGHOUT THE PROJECT. TO PREVENT THE MIGRATION OF DUST FROM THE WORK AREA INTO ADJACENT OCCUPIED AREAS. DOOR OPENINGS IN THE ASSEMBLY, NOT BEING UTILIZED AS A CONTROLLED ACCESS POINT INTO THE PROJECT AREA, SHALL BE SEALED UTILIZING OPENING PROTECTIVES (OP-11) CRITERIA. DASHED LINE REPRESENTS THE EXTENT OF THE EW-2 I.C. BARRIER REQUIREMENTS.
EXTENTS OF ROOM TO ACT AS INFECTION CONTROL BARRIER EW-2. THE BARRIER SHALL BE ACHIEVED UTILIZING AN EXISTING WALL ASSEMBLY AS AN INFECTION CONTROL BARRIER. THE ASSEMBLY MUST EXTEND TO THE DECK/FLOOR ABOVE. THE ASSEMBLY SHALL BE VISUALLY EXAMINED AND ALL PENETRATIONS/OPENINGS OBSERVED IN THE ASSEMBLY SHALL BE REPAIRED AND/OR ADEQUATELY SEALED AND MAINTAINED THROUGHOUT THE PROJECT TO PREVENT THE MIGRATION OF DUST FROM THE WORK AREA INTO ADJACENT OCCUPIED AREAS. DOOR OPENINGS IN THE ASSEMBLY, NOT BEING UTILIZED AS A CONTROLLED ACCESS POINT INTO THE PROJECT AREA SHALL BE SEALED UTILIZING OPENING PROTECTIVES (OP-11) CRITERIA.
-ITEMS IN THE ROOM/SPACE SHALL BE COVERED COMPLETELY WITH POLYETHYLENE-ROOM DOOR(S) SHALL REMAIN CLOSED DURING THE WORK PERIOD.-A HEPA-FILTERED AIR-SCRUBBER SHALL BE UTILIZED INSIDE THE ROOM.-ALL CUTTING OF GYPSUM BOARD SHALL BE PERFORMED USING KNIFE OR HAND TOOL(S), NO POWER EQUIPMENT MAY BE UTILIZED.-'CLEAN AS YOU GO' ANY DEBRIS THAT FALLS UPON SURFACES IN THE WORK AREA SHALL BE COLLECTED UTILIZING A HEPA-FILTERED VACUUM.-THE ROOM SHALL BE CLEANED BY ENVIRONMENTAL SERVICES STAFF PRIOR TO RE-OCCUPANCY OF THE SPACE.
-ROOM DOORS(S) ADJACENT TO THE WORK AREA IN CORRIDORS SHALL REMAIN CLOSED DURING THE WORK PERIOD.-POLYETHYLENE BARRIERS TO BE INSTALLED TO CONTAIN WORK AREA PER I.C. PLANS.-ALL CUTTING OF GYPSUM BOARD SHALL BE PERFORMED USING KNIFE OR HAND TOOL(S), NO POWER EQUIPMENT MAY BE UTILIZED.-'CLEAN AS YOU GO' ANY DEBRIS THAT FALLS UPON SURFACES IN THE WORK AREA SHALL BE COLLECTED UTILIZING A HEPA-FILTERED VACUUM.-THE ROOM SHALL BE CLEANED BY ENVIRONMENTAL SERVICES STAFF PRIOR TO RE-OCCUPANCY OF THE SPACE.
MINIMUM HALF CORRIDOR OUTSIDE WORK AREA MUST REMAIN OPEN AT ALL TIMES. FULL SHUT DOWN OF CORRIDOR AT CONFLICT POINTS MUST BE SCHEDULED WITH OWNER BEFORE SHUT DOWN.
1.
2.
3.
4.
5.
6.
INFECTION CONTROL BARRIER NOTES
0 8' 16' 32'4'0 8' 16'
0 8' 16' 32'4'0 8' 16'
A - 001 10/08/2019 ADDENDUM #1
DN
FRONT
DN
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS SHOWN ON THE PLANS PRIOR TO COMMENCEMENT OF THE WORK. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATE INSTALLATION OF NEW WORK WITHIN THESE EXISTING CONDITIONS. ANY DEVIATIONS IN EXISTING CONDITIONS OR DIMENSIONS INDICATED SHALL BE COORDINATED WITH THE ARCHITECT AND OWNER.
2. ALL WALL / GENERAL PLAN DIMENSIONS ARE TO FACE OF MASONRY, FACE OF CONCRETE, AND TO FACE OF GYP. BOARD, TYP.
3. CONSTRUCTION OF WALLS ARE DESIGNATED STARTING ON TAG SIDE OF WALL.
4. ALL INTERIOR WALL FRAMING NOTED IN WALL TYPE SCHEDULE EXTENDS TO STRUCTURAL DECKING, BRACE AS REQUIRED. PROVIDE DEEP LEG SLIP TRACK AT TOP OF ALL INTERIOR WALLS / STUDS EXTENDING TO STRUCTURE TO ALLOW FOR DEFLECTION OF STRUCTURE.
5. INTERIOR DOOR FRAMES SHALL BE INSTALLED WITH THE HINGE SIDE OF DOOR FRAME 4" FROM ADJACENT WALL, UNLESS OTHERWISE DIMENSIONED.
6. ALL STEEL STUDS ARE MIN. 25 GA. UNLESS NOTED OTHERWISE. 20 GA STEEL STUDS REQUIRED AT ALL CEMENTITIOUS BACKER BOARD AND ABUSE RESISTANT GYPSUM BOARD AS SPECIFIED.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING AND INSTALLATION OF APPROPRIATE FRAMING NEEDED FOR WALLS HEIGHT. REFER TO “INTERIOR STEEL STUD FRAMING GAGE TABLE (1)” ON SHEET A0.00 FOR FRAMING GAGES AND STUD SIZING REQUIREMENTS.
8. REFER TO CODE COMPLIANCE PLANS FOR LOCATION OF FIRE RATED WALLS AND SMOKE SEPARATION WALL LOCATIONS AND REQUIREMENTS.
9. ALL OPENINGS IN RATED ASSEMBLIES SHALL BE SEALED WITH FIRE / SMOKE RATED MATERIALS AND ASSEMBLIES. INSTALL RATED JOINT SEALANTS AT BOTH FACES OF PARTITIONS, AT PERIMETERS, AND THROUGH FIRE RATED ASSEMBLIES. REFERENCE CODE COMPLIANCE PLANS FOR LOCATION OF RATED ASSEMBLIES.
10. ALL EXPANSION JOINT COVERS WITH CONNECTION TO RATED ASSEMBLIES SHALL MEET THE SAME REQUIRED RATING AS THE ASSEMBLY. REFERENCE CODE COMPLIANCE PLANS FOR LOCATION OF RATED ASSEMBLIES.
11. ALL STC-RATED WALL ASSEMBLIES AND PARTITIONS INDICATED SHALL HAVE STAGGERED SHEATHING AND GYP. BOARD JOINTS ON OPPOSITE SIDES OF ASSEMBLIES. REFERENCE WALL TYPE SCHEDULE FOR SOUND ATTENUATION INSULATION REQUIRED WITHIN STUD CAVITIES. SEAL ASSEMBLIES AT CONSTRUCTION PERIMETERS, DECKING MATERIAL (TOP & BOTTOM), BEHIND CONTROL JOINTS, AND AT ALL OPENINGS AND PENETRATIONS WITH A CONTINUOUS BEAD OF ACOUSTICAL JOINT SEALANT. INSTALL ACOUSTICAL JOINT SEALANTS AT BOTH FACES OF ASSEMBLIES
12. GENERAL CONTRACTOR SHALL COORDINATE REPAINTING OF WALLS BETWEEN SUBCONTRACTORS AFTER EXISTING FIXTURES ARE SCHEDULED TO BE REMOVED AND PRIOR TO FIXTURES BEING REINSTALLED. REFER TO ELECTRICAL & MECHANICAL PLANS.
GENERAL PLAN NOTES
CONTROLROOM
C2053K
FLUOROSCOPYPROCEDUREROOM
C2053G
CHECK IN
C2053D
CTPROCEDUREROOM
C2053H
EQ.
C2053J
47' - 8 5/8" 4 7/8" 8' - 5 3/8"
Y3
X3
Y3
Y3
Y3
Y3
Y3
B3
B3SHIELDED GLASS
SHIELDED DOOR
SHIELDED DOOR
EQ.
C2053F
16' -
7 1
/8"
READINGROOM
C2053E
ULTRASOUND
C2053B
MED.SUPPLIES/PAR
C2053Q
PATIENT
C2053P
CLEANLINEN
C2053N
RECEIVING
C2053A
SOILED
C2053M
CORRIDOR
C2053
EQUIPMENT
C2053C
C2053A.1
C2053J
A6.201 3
A6.20 2
H3 H3 H3
SHIELDED GLASS
X4
M3
M3
H6
X3H4
X3
X3
X3
X3
H3
M3
M3
M3
M3
M3
H3M4
H3
M3
M3
X3
C20
53H
C20
53G
C20
53K
C2053F
C2053B
C2053E
C20
53M
C20
53N
C20
53C
C2053Q
C2053A.2
HMF-2 HMF-3
A6.20
6
A6.2012
4 7/
8"13
' - 4
3/8
"4
7/8"
22' -
6 1
/8"
4 7/
8"6'
- 0
"5
5/8"
12' -
9 1
/4"
4 7/
8"6'
- 8
"
ALI
GN
H3
H3
4 7/
8"4'
- 1
"4
7/8"
1' -
11
1/4"
5 5/
8"3'
- 0
"3'
- 1
"4'
- 1
1"
21' -
10
1/4"
4 7/8" 4' - 0 1/2" 2" 4 7/8"
2 7/8"
11' - 10 1/2"
2"
4 7/8" 8' - 0"
4 1/
4"2'
- 1
1 3/
8"4
7/8"
5' -
6 3
/8"
4 7/
8"10
' - 3
"6'
- 0
"4
7/8"
7' -
7 1
/8"
4 7/
8"1'
- 3
"
4 7/8" 9' - 3" 4 7/8" 8' - 9"4 7/8" 8' - 1 1/4"
A6.209
8
11
A6.21 1
SLO
PE
1"
: 36"
12' -
0"
RA
MP
6
A2.10
8' -
9 3
/4"
4 1/
4"
2' - 3 1/4"
B3
M3
H3
10
A6.20
4
A6.20135
2
4
C20
53K
.1
C20
53K
.2
MB-4
114' - 0"
113' - 8"
X3
OVERHEAD CUBICLE CURTAIN & TRACK
MOBILE MEDICAL SUPPLY CABINETS, BY OWNER
MOBILE MEDICAL SUPPLY CABINETS, BY OWNER
MOBILE MEDICAL SUPPLY CABINETS, BY OWNER
MOBILE MEDICAL SUPPLY CABINETS, BY OWNER
MOBILE MEDICAL SUPPLY CABINETS, BY OWNER
5' - 0"
SHIELDED DOOR
4 1/4" 1' - 5 3/8" 4 7/8"
M3
M3
B3
B3
7
6' - 0" 1' - 2" 3' - 4" 4"
A B CZ.9
2
3
4
5
5
A2.10
Sim
C2053R
SLOPE 1" : 36"
12' - 0" RAMP
114' - 0" 113' - 8"
CORRIDOR
C2053R
FEC-2(RECESSED)
CORRIDOR
CC2010
RR
C2029A
SLEEPEGG
C2029
SLEEPEGG
C2030
EMG-1
C2031
EEG-1
C2033
SUB.WAITING
C2034
OFFICE
C2035
EXAM
C2036
PAT.TOILET
C2037
SLEEP LAB
C2038A
SLEEPMSLT
C2028
CORRIDOR
CC2003
CORRIDOR
CC2002
ELEC.
C2057
COMMCLOSET
C2010
PHYSICIANWORK
C2040
CORRIDOR
CC2040
OFFICE
C2054
STORAGE
C2056
RR
C2052
RR
C2050
CORRIDOR
CC2019
3
C20
53
A6.21 8
PROVIDE GROMMET IN COUNTERTOP
6
MOBILE TABLE
5
7
A6.21 9
10
11
12
7
A2.10
4' - 8"H3
10' -
2 3
/4"
4' -
0 5
/8"
IMAGING EQUIPMENT SHOWN FOR REFERENCE ONLY. COORDINATE EXACT LOCATION AND DETAILS W/ EQUIP. SUPPLIER
A2.10
8
H3
B3
X4
M3
PNEUMATIC TUBE SYSTEM
PROVIDE GROMMET IN COUNTERTOP
WRM-1 CRT-1
MED-1
WRM-1
CHT-1
CHT-1
MNT-2 CHT-2
MNT-1
CHT-2
CHT-1
GD-1 SHP-1
OWNER PROVIDED FURNITURE
H3
1 1/2" OPEN BETWEEN COUNTERTOP AND WALL
GD-1
SHARPS DISPOSAL
SHARPS DISPOSAL
GD-1
MB-4
SD-1
GD-1
1' -
0"
A1 A1 A1 A1
A1
A1
A1
11' - 2 1/2" 25' - 5"
X3X3
35' -
3 1
/4"
LEAD-LINED SLIDING DOOR
001A
Key Plan
AREA OF WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 1
0:1
6:2
5 A
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-A
-19
_sa
rah
.ja
nia
k@
cla
rke
ne
rse
n.c
om
.rv
t
Second Floor Plan
A1.11
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN
0 2' 4' 8'
A - 001 10/08/2019 ADDENDUM #1
FRONT
REFLECTED CLG LEGEND
5/8" GPDW CEILING SYSTEM
ACOUSTICAL PANEL CEILING SYSTEM. SEE ROOM FINISH SCHEDULE & RCP FOR TYPE.
2x2 ACCESS PANEL. REF: SPEC.AP
RCP ABBREVIATIONSAPC - ACOUSTICAL PANEL CEILINGGPDW - GYPSUM DRY WALL
RETURN AIR / EXHAUST AIR GRILLE, REF: MECHANICAL
SUPPLY AIR DIFFUSER, REF: MECHANICAL.
RECESSED & PENDANT MOUNTED LIGHT FIXTURES, REF: ELECTRICAL
RECESSED DOWNLIGHT, REF: ELECTRICAL
EXIT SIGNAGE, REF: ELECTRICAL
REFLECTED CLG GENERAL NOTES:
1. NEW CEILINGS IN EXISTING BUILDING SHALL BE INSTALLED AT EXISTING HEIGHT, FIELD VERIFY PRIOR TO DEMOLITION.
2. GPDW BULKHEADS SHALL BE FRAMED WITH 25 GAUGE 3 5/8" STEEL STUDS @ 16" O.C. AND 5/8" TYPE 'X' GPDW TO 6" ABOVE FINISH CEILING. BRACE AS REQUIRED.
3. LIGHTING FIXTURES AND MECHANICAL DIFFUSERS / GRILLES ARE SHOWN FOR REFERENCE ONLY, SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR EXACT LOCATIONS
4. ELEVATION TAGS ARE IN REFERENCE TO EXISTING SECOND FLOOR FINISH ELEVATION, NOT NEW RAISED FLOOR ELEVATION.
5. WHERE CEILINGS ARE EXPOSED TO STRUCTURE ABOVE, PAINT ALL UNFINISHED MATERIALS OVERHEAD INCLUDING, BUT NOT LIMITED TO ROOF DECKING, DUCTS, PIPES, CONDUITS & JUNCTION BOXES; SEE FINISH SHEETS FOR PAINT.
6. PROVIDE ACCESS PANELS AS REQUIRED IN HARD LID CEILINGS. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS.
CONTROLROOM
C2053K
FLUOROSCOPYPROCEDUREROOM
C2053G
CTPROCEDUREROOM
C2053H
EQ.
C2053J
NO WORK IN HATCHED AREA
NO WORK IN HATCHED AREA
NO WORK IN HATCHED AREA
APC-29' - 3" AFF
APC-19' - 0" AFF
APC-28' - 4" AFF
APC-18' - 6" AFF
APC-18' - 6" AFF
APC-18' - 6" AFF
APC-18' - 0" AFF
APC-18' - 6" AFF
APC-18' - 0" AFF
APC-18' - 6" AFF
APC-18' - 0" AFF
APC-18' - 0" AFF
CHECK IN
C2053D
SOILED
C2053MCLEANLINEN
C2053N
PATIENT
C2053P
EQ.
C2053F
READINGROOM
C2053E
EQUIPMENT
C2053C
ULTRASOUND
C2053B
CORRIDOR
C2053
RECEIVING
C2053A
MED.SUPPLIES/PAR
C2053Q
APC-19' - 0" AFF
SURGICAL LIGHT FURNISHED AND INSTALLED BY OWNER. GC IS RESPONSIBLE FOR CEILING TRIM, COORD. W/ OWNER
APC-28' - 0" AFF
APC-28' - 0" AFF
AZ.9
2
3
4
5
OVERHEAD CUBICLE CURTAIN & TRACK
APC-18' - 6" AFF
CORRIDOR
C2053R
2
A2.10
Sim
RR
C2029A
SLEEPEGG
C2029
SLEEPEGG
C2030
EMG-1
C2031
EEG-1
C2033
SUB.WAITING
C2034
OFFICE
C2035EXAM
C2036
PAT.TOILET
C2037
SLEEP LAB
C2038A
SLEEPMSLT
C2028
CORRIDOR
CC2010
CORRIDOR
CC2003
CORRIDOR
CC2002
ELEC.
C2057
COMMCLOSET
C2010
PHYSICIANWORK
C2040
CORRIDOR
CC2040
OFFICE
C2054
STORAGE
C2056
RR
C2052
RR
C2050
CORRIDOR
CC2019
APC-29' - 3" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFF
EXISTING8' - 6" AFFEXISTING
8' - 6" AFF
3/A2.10
APC-18' - 6" AFF
GPDW7' - 10" AFF
27' - 9 25/32" VERIFY
FOR REFERENCE ONLY. COORDINATE EXACT LOCATION AND DETAILS W/ EQUIP. SUPPLIER
CABLE TRAY BY EQUIP. MFR.
GPDW8' - 0" AFF
GPDW8' - 0" AFF
30' -
8 3
/8"
4' -
6 7
/8"
9 1/2"
3' -
10"
PREFINISHED BREAK METAL CLOSURE TRIM
GPDW7' - 10" AFF
GPDW7' - 10" AFF
001A
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 1
0:1
6:3
1 A
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-A
-19
_sa
rah
.ja
nia
k@
cla
rke
ne
rse
n.c
om
.rv
t
Second Floor Reflected
Ceiling Plan
A1.20
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN
0 2' 4' 8'
A - 001 10/08/2019 ADDENDUM #1
SECOND FLOOR113' - 8"
1' - 4 3/4" 5" 5" 5" 5" 1' - 7 1/4"
Vac
Air
Oxygen
Vac
Air
Oxygen
WALL BASE, PER SCHED.
SHARPS
DISPOSAL
GD-1
SHARPS
DISPOSAL
GD-1
4' -
0"
SP-1SP-1
SECOND FLOOR113' - 8"
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNER
WALL BASE, PER SCHED.
SP-1
CHT-1
MNT-1
SECOND FLOOR113' - 8"
OVERHEAD CUBICLE
CURTAIN & TRACK
WALL BASE, PER
SCHED.
SP-1
WRM-1
CHT-1
SECOND FLOOR113' - 8"
HMF-2
C2053G
MOBILE TABLE
WALL BASE, PER SCHED.WALL BASE, PER SCHED.
CHT-2 MNT-2
3
A6.40
SP-1
SP-1
SECOND FLOOR113' - 8"
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNER
OVERHEAD CUBICLE
CURTAIN & TRACK SP-1
WRM-1
SECOND FLOOR113' - 8"
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNER
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNER
WALL BASE, PER
SCHED.
5/8" MOISTURE AND
MOLD-RESISTANT
GPDW, PT.
SP-1
SECOND FLOOR113' - 8"
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNER
WALL BASE, PER SCHED.WALL BASE,
PER SCHED.
5/8" MOISTURE AND MOLD-
RESISTANT GPDW, PT.
SP-1
7' -
0"
TY
P.
SP-1
SECOND FLOOR113' - 8"
SHEILDED SLIDING
DOOR, SEE SPEC.
MOBILE MEDICAL
SUPPLY CABINET
SHEILDED SLIDING
DOOR, SEE SPEC.
C2053K.1
WALL BASE, PER
SCHED.
SP-1SP-1
SECOND FLOOR113' - 8"
WALL BASE, PER SCHED.
CHT-2
SP-1
7' -
0"
TY
P.
SP-1
SECOND FLOOR113' - 8"
HMF-3
C2053H
WALL BASE, PER SCHED.WALL BASE,
PER SCHED.
4
A6.40
SP-1
SECOND FLOOR113' - 8"
SHEILDED SLIDING
DOOR, SEE SPEC.
MOBILE MEDICAL
SUPPLY CABINET
SHEILDED SLIDING
DOOR, SEE SPEC.
WALL BASE, PER
SCHED.
3/
A2.10
7' -
0"
TY
P.
SP-1
NOTCH IN SOFFIT BEYOND. WRAP
ENDS WITH PREFINISHED BREAK
METAL CLOSURE TRIM, SEE RCP
FOR EXTENTS
3' - 10"
001A
SECOND FLOOR113' - 8"
MOBILE MEDICAL
SUPPLY CABINETS,
BY OWNERWALL BASE, PER
SCHED.
5/8" MOISTURE AND
MOLD-RESISTANT
GPDW, PT.
SP-1
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 1
0:1
6:3
4 A
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-A
-19
_sa
rah
.ja
nia
k@
cla
rke
ne
rse
n.c
om
.rv
t
Interior Elevations
A6.21
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 3/8" = 1'-0"
PATIENT RECOVERY - EAST1
SCALE: 3/8" = 1'-0"
PATIENT RECOVERY - NORTH2
SCALE: 3/8" = 1'-0"
PATIENT RECOVERY - SOUTH3
SCALE: 3/8" = 1'-0"
FLUOROSCOPY PROCEDURE RM - SOUTH5
SCALE: 3/8" = 1'-0"
PATIENT RECOVERY - WEST4
SCALE: 3/8" = 1'-0"
FLUOROSCOPY PROCEDURE RM - NORTH6
SCALE: 3/8" = 1'-0"
FLUOROSCOPY PROCEDURE RM - WEST7
SCALE: 3/8" = 1'-0"
FLUOROSCOPY PROCEDURE RM - EAST8
SCALE: 3/8" = 1'-0"
CT PROCEDURE RM - EAST9
SCALE: 3/8" = 1'-0"
CT PROCEDURE RM - SOUTH10
SCALE: 3/8" = 1'-0"
CT PROCEDURE RM - WEST11
SCALE: 3/8" = 1'-0"
CT PROCEDURE RM - NORTH12
0 2' 4' 6' 0 2' 4' 6' 0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
A - 001 10/08/2019 ADDENDUM #1
FLOOR LINE
WD - 1
RE
F: S
CH
ED
.
DO
OR
HE
IGH
T
REF: SCHED.
DOOR WIDTH
FLOOR LINE
HMF - 1
2"
REF: SCHED.
DOOR WIDTH /PAIR WIDTH 2"
2"
RE
F: S
CH
ED
.
DO
OR
HE
IGH
T
DOOR & FRAME TYPE GENERAL NOTES
1. PROVIDE SAFETY GLAZING OR FIRE-PROTECTION-RATED GLAZING IN LOCATIONS REQUIRED BY CURRENT LOCAL CODE. NOTIFY ARCHITECT OF CHANGES REQUIRED TO THE DRAWINGS. PROVIDE OBSCURE GLAZING AS INDICATED.
2. PROVIDE AND INSTALL SAFETY GLAZING IN LOCATIONS AS PER SECTION 2406 & 2408 OF THE 2009 INTERNATIONAL BUILDING CODE.
3. ALL DIMENSIONS ARE NOMINAL. ACTUAL DIMENSIONS TO BE PROVIDED BY SUPPLIER W/ ADJUSTMENTS MADE FOR INSTALLATION TOLERANCES REQUIRED. VERIFY ALL EXISTING OPENINGS PRIOR TO ORDER OF ALL NEW DOORS, DOOR FRAMES AND WINDOW FRAMES.
4. SEE FLOOR PLANS FOR DIRECTION OF DOOR SWINGS.
5. REFER TO WALL TYPE THICKNESS FOR THROAT DEPTHS OF HOLLOW METAL DOOR AND WINDOW FRAMES INSTALLED IN STEEL STUD WALLS W/ GYPSUM. HOLLOW METAL DOOR AND WINDOW FRAMES INSTALLED IN PRECAST, CAST-IN PLACE OR C.M.U. WALLS SHALL HAVE A STANDARD 6" NOMINAL THROAT DEPTH AND SHALL BE CENTERED IN THE WALL, UNLESS NOTED OTHERWISE.
6. ALL INTERIOR HOLLOW METAL DOOR FRAMES SHALL BE GROUTED FULL. COORDINATE WITH ELECTRICAL TRADES, FINISH HARDWARE AND ELECTRONIC EQUIPMENT.
7. VERIFY HOLLOW METAL FRAME FINISH WITH FINISH SCHEDULE.
8. MULLION LOCATIONS SHALL BE AS INDICATED ON THE DRAWINGS AND SHALL BE REFLECTED IN THE SHOP DRAWINGS. NOTIFY ARCHITECT OF ANY CHANGES OR DEVIATIONS.
9. BORROWED LIGHT LOCATIONS SHALL BE AS INDICATED ON THE PLAN DRAWINGS AND SHALL BE REFLECTED IN THE SHOP DRAWINGS. NOTIFY ARCHITECT OF ANY CHANGES OR DEVIATIONS.
SECOND FLOOR113' - 8"
3' -
0"
4' -
0"
2"3'
- 8
"2"
11' - 10 1/2"
2"11' - 6 1/2"2"
HMF-3
001A
SECOND FLOOR113' - 8"
3' -
0"
4' -
0"
2"3'
- 8
"2"
2"3' - 8 1/2"2"
4' - 0 1/2"
HMF-2
PROVIDE SHEILDING EQUIVALENT TO 1/16" LEAD-LININED GLASS
SECOND FLOOR113' - 8"
PROVIDE SHEILDING EQUIVALENT TO 1/16" LEAD-LINING
NOTCH SLIDING DOOR AT CABLE TRAY, COORD. w/ EQUIPMENT SUPPLIER
6 1/4"
1' -
3"
001A
BASIS OF DESIGN: ASSA ABLOY SL500 Surface Mount
3' - 0" R.O.
6' - 8" PER MFR.
7' -
0"
2' - 6"P.LAM CLAD PART. BD. COUNTERTOP, PL-2
2"
CONCEALED COUNTERTOP BRACKET @ 48" O.C., MAX. ATTACH TO BLOCKING IN STUD CAVITY, FINISH GYP. BD. AROUND BRACKET
5/8" TYPE 'X GPDW OVER STEEL STUD FRAMING, PT.
3/4" CEMENT BOARD DECK OVER 2 1/2" x 20ga TRACKS w/ 2 1/2" DEEP LEGS @ 12" O.C.
P.LAM CLAD PART. BD. COUNTERTOP, PL-2
CONCEALED COUNTERTOP BRACKET @ 48" O.C., MAX. ATTACH TO BLOCKING IN STUD CAVITY, FINISH GYP. BD. AROUND BRACKET
5/8" TYPE 'X GPDW OVER STEEL STUD FRAMING, PT.
2' - 1"
3/4" CEMENT BOARD DECK OVER 2 1/2" x 20ga TRACKS w/ 2 1/2" DEEP LEGS @ 12" O.C.
3' -
0"
CONCEALED COUNTERTOP BRACKET @ 48" O.C., MAX. ATTACH TO BLOCKING IN STUD CAVITY, FINISH GYP. BD. AROUND BRACKET
5/8" TYPE 'X GPDW OVER STEEL STUD FRAMING, PT.
3/4" CEMENT BOARD DECK OVER 2 1/2" x 20ga TRACKS w/ 2 1/2" DEEP LEGS @ 12" O.C.
2' - 6"
2' -
6"
CRASH RAIL, REF: SPEC.
P.LAM CLAD PART. BD. COUNTERTOP, PL-2
2' - 0"5"
2' - 6"
1' - 2"
3' -
0"
1' -
8"
2' -
10"
P.LAM CLAD PART. BD. BASE CABINET w/ ADJ. SHELVES, PL-1
P.LAM CLAD PART. BD. UPPER CABINET w/ ADJ. SHELVES, PL-1
SOLID SURFACE COUNTERTOP & BACKSPLASH, SSM-1
1/4" P.LAM CLAD PART. BD. BACK PANEL, PL-1
P.LAM CLAD TOEKICK, PL-1
4"
7"2'
- 3
"
2' - 6"
2' -
10"
8"11"
9"
SOLID SURFACE COUNTERTOP w/ BACKSPLASH, SSM-1
P.LAM CLAD PART. BD. COUNTERTOP PANEL, PL-1
FLOOR LINE
HMD - 1
RE
F: S
CH
ED
.
DO
OR
HE
IGH
T
REF: SCHED.
DOOR WIDTH
PROVIDE SHEILDING EQUIVALENT TO 1/16" LEAD-LINING #
SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 1
0:1
6:3
6 A
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-A
-19
_sa
rah
.ja
nia
k@
cla
rke
ne
rse
n.c
om
.rv
t
Door Schedule, Door
Types, Frame Types,
Casework Details
A6.40
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
DOOR SCHEDULE
DO
OR
NO
.
PA
IR W
IDT
H
DOOR FRAME
FIR
E R
AT
ING
AU
TO
OP
ER
AT
OR
CA
RD
RE
AD
ER
DE
LA
YE
D E
GR
ES
S
HO
LD
OP
EN
MA
GN
ET
IC L
OC
K
SO
UN
D S
EA
LS
SH
IEL
DIN
G
HA
RD
WA
RE
REMARKSWID
TH
HE
IGH
T
TY
PE
FIN
ISH
TY
PE
FIN
ISH
HE
AD
JAM
B
SIL
L
C2053 6' - 0" 3' - 0" 7' - 0" WD-1 STN HMF-1 PT SMOKE X X 3
C2053A.1 3' - 0" 7' - 0" WD-1 STN HMF-1 PT SMOKE X 7
C2053A.2 3' - 6" 7' - 0" WD-1 STN HMF-1 PT 4
C2053B 4' - 0" 7' - 0" WD-1 STN HMF-1 PT 4
C2053C 4' - 0" 7' - 0" WD-1 STN HMF-1 PT 1 HR 1
C2053E 3' - 0" 7' - 0" WD-1 STN HMF-1 PT 4
C2053F 3' - 0" 7' - 0" WD-1 STN HMF-1 PT 1 HR 2
C2053G 6' - 0" 3' - 0" 7' - 0" HMD-1 PT HMF-1 PT X X 6
C2053H 6' - 0" 3' - 0" 7' - 0" HMD-1 PT HMF-1 PT X X 6
C2053J 3' - 0" 7' - 0" HMD-1 PT HMF-1 PT X 2
C2053K 3' - 0" 7' - 0" WD-1 STN HMF-1 PT 5
C2053K.1 7' - 0" SD-1 SD-1 X
C2053K.2 7' - 0" SD-1 SD-1 X
C2053M 3' - 6" 7' - 0" WD-1 STN HMF-1 PT 1 HR X 8
C2053N 3' - 6" 7' - 0" WD-1 STN HMF-1 PT X 8
C2053Q 3' - 6" 7' - 0" WD-1 STN HMF-1 PT 1 HR X 8
C2053R 6' - 0" 3' - 0" 7' - 0" WD-1 STN HMF-1 PT 1 HR X X 3
SCALE: 1/4" = 1'-0"
DOOR TYPESSCALE: 1/4" = 1'-0"
HOLLOW METAL FRAME TYPES
SCALE: 1/4" = 1'-0"
LEAD-LINED SHIELDING DOORSCALE: 1/4" = 1'-0"
SLIDING DOOR - SINGLE (SD-1)
0 2' 4' 8' 0 2' 4' 8'
0 2' 4' 8'0 2' 4' 8'
SCALE: 3/4" = 1'-0"
CONTROL RM. - NORTH3SCALE: 3/4" = 1'-0"
CONTROL RM. - SOUTH4SCALE: 3/4" = 1'-0"
CONTROL DESK50 1' 2' 3' 0 1' 2' 3' 0 1' 2' 3'
SCALE: 3/4" = 1'-0"
ULTRASOUND - WEST1SCALE: 3/4" = 1'-0"
ADA SINK20 1' 2' 3' 0 1' 2' 3'
SCALE: 1/4" = 1'-0"
LEAD-LINED HOLLOW METAL DOOR TYPES
0 2' 4' 8'
A - 001 10/08/2019 ADDENDUM #1
001A
EXISTING STRUCTURE
EL. = 9' - 10 1/2" AFFB.O. CHANNEL
6"
C12X15.3 STEEL CHANNEL
(2) 1/2" DIA. THREADED RODS w/ DOUBLE NUTS @ BOTTOM
3" x 2" x 1/4" FITTED STEEL ANGLE w/ 1 1/2" LONG SLOTS
TYP.3/16"
TYP.3/16" 3"-5"
2"6"2"
SLIDING DOOR RAIL SYSTEM, PROVIDED & INSTALLED BY DOOR INSTALLER
SCREW ANCHOR - TYPE 'SA1', EACH THREADED ROD
DIAMETER
CONCRETE ANCHOR SCHEDULE
ANCHOR TYPE
SA1
ANCHOR DIMENSIONS
MINIMUM EMBEDMENT
ACCEPTABLE PRODUCTS
SIMPSON STRONG TIE
3/8" 2 1/2" KWIK HUS EZ ITITEN HD
ROD HANGER
HILTI
SCREW ANCHORS
SA2
MISC. NOTES
INTERNAL THREADING FOR 1/2" THREADED ROD
3/8" 3 1/4" KWIK HUS EZ TITEN HD
2
3
S2.01
3 1/2"
2' - 4" 3' - 0" 2' - 7" 2' - 2" 2' - 2"
2"
6"
3
S2.01
SIM.
CHANNEL LENGTH = 12' - 8 1/2"
EL. = 9' - 10 1/2" AFFB.O. CHANNEL
C12X15.3 STEEL CHANNEL
EXISTING STRUCTURE
EQ EQ
4
S2.01
EACH END
TYP.
EL. = 9' - 10 1/2" AFFB.O. CHANNEL
C12X15.3 STEEL CHANNEL
SLIDING DOOR RAIL SYSTEM, PROVIDED & INSTALLED BY DOOR INSTALLER
EL. = 10' - 5 3/4" AFFB.O. EXIST. JOIST
6"
3/16"
3" x 3" x 1/4" x 1' - 6" LONG STEEL ANGLE
B.O. EXIST. CONC. JOIST
(2) SCREW ANCHORS -TYPE 'SA2'
PENETRATIONS < 2" DIA.
PENETRATIONS 2" DIA. - 6" DIA.
PENETRATIONS 6" DIA. - 10" DIA.PENETRATIONS 10" DIA. - 16" DIA.
10"
2" TYP.
1' - 2"
2" TYP.
1' - 6"
2"
1' - 8"
NOTES:1. APPROVED SCREW ANCHORS, INSTALL PER MANUF. RECOMMENDATIONS:
- SIMPSON STRONG-TIE: SCREW ANCHOR = THD37400H- HILTI: SCREW ANCHOR = KH-EZ 3/8"x3"
2. CONTRACTOR MAY "GANG" SMALLER PENETRATIONS WHERE ADVANTAGEOUS BASED UPON FIELD CONDITIONS.
3. NOTIFY ARCHITECT/ENGINEER OF RECORD FOR ANY PENETRATIONS EXCEEDING SIZE LIMIITATIONS ESTABLISHED IN THE DETAILS.
4. COORDINATE WITH MECHANICAL DRAWINGS FOR DEMOLITION OF EXISTING PIPING AND DUCTWORK.
5. ALL PLATES TO BE INSTALLED ON UNDERSIDE OF CONCRETE SLAB.
6. PENETRATIONS ABOVE PLATES SHALL BE FILLED w/ CONCRETE FLUSH TO FINISHED FLOOR AFTER PLATES ARE INSTALLED.
2"
3/16" THK. GALV. STEEL PLATE
3/8" DIA. SCREW ANCHOR, TYP. (SEE NOTE 1)
3/16" THK. GALV. STEEL PLATE
3/8" DIA. SCREW ANCHOR, TYP. (SEE NOTE 1)
1/8" THK. GALV. STEEL PLATE
3/8" DIA. SCREW ANCHOR, TYP. (SEE NOTE 1)
1/8" THK. GALV. STEEL PLATE
3/8" DIA. SCREW ANCHOR, TYP. (SEE NOTE 1)
4"
1/2" THICK LOWER PLATE
1/2" THICK UPPER PLATE
FINISH FLOOR
EXISTING CONC. STRUCTURE
TABLE INSTALLATION PLATE, PROVIDED BY TABLE MANUF. & INSTALLED BY CONTR.
(4) SCREW ANCHORS -TYPE 'SA2'
(4) M12-8.8 A325M BOLTS
TYP.3/16"
(4) 6" x 4" x 3/8" x 0' - 3" TALL STEEL ANGLES
3/16"
NUT TO PL.,
TYP. OF 4
1" 1' - 10" 1"
1 15
/32"
1' -
5 1
/16"
1 15
/32"
LOWER PLATE PLAN
1/2"
(T
YP
.) 1/2" (TYP.)
1/2" DIA. HOLE, TYP. OF 4
1" 2" 8" 10 1/16"
1 15/16"
1"
LOWER PLATE PLAN
1 1/8" DIA. HOLE, TYP. OF 4
1 15
/32"
1 15
/32"
EQ
EQ
9/16" DIA. HOLE, TYP. OF 4
R 5"
1/2" THICK LOWER PLATE
1/2" THICK UPPER PLATE
FINISH FLOOR
EXISTING CONC. STRUCTURE
TABLE INSTALLATION PLATE, PROVIDED BY TABLE MANUF. & INSTALLED BY CONTR.
(4) SCREW ANCHORS - TYPE 'SA2'
(4) 3/4" DIA. A325 BOLTS
TYP.3/16"
(6) 6" x 4" x 3/8" x 0' - 3" TALL STEEL ANGLES
NUT TO PL.,
TYP. OF 4
4"
3/16"
1 1/
4"8
3/4"
8 3/
4"1
1/4"
1" 4 1/16" 1' - 7 7/16" 1' - 7 7/16" 4 1/16" 1"
LOWER PLATE PLAN
1 1/8" DIA. HOLE, TYP. OF 4
13/16" DIA. HOLE, TYP. OF 4
R 3"
1" 3' - 11" 1"
UPPER PLATE PLAN
1/2" DIA. HOLE, TYP. OF 41 1/
4"1'
- 5
1/2
"1
1/4"
1/2"
(T
YP
.) 1/2" (TYP.)
1' - 3"
Z.9 A BA.8
1
2
4
6
S2.01
1' - 11 3/8" 2' - 0 5/8" 5 SPA. @ 2' - 0" O.C. = 12' - 0" 1' - 10 1/2" 1' - 10 1/2" 5 SPA. @ 2' - 0" O.C. = 10' - 0" 2' - 9 23/32"
2
S2.01
EXISTING EXT. WALL
EXISTING EXT. WALL
9' - 0" 28' - 4" 9' - 0"
C10
X15
.3B
.F. =
9' -
10
1/2"
AF
F.
14' - 9 3/8"WA
LL-T
O-O
RIE
NT
AT
ION
PO
INT
9' -
0"
3' -
9 5
/8"
8' -
10
7/8"
WALL-TO-ORIENTATION POINT
9' - 0" 30' - 7 11/32"
5/8"
7 - P1001 UNISTRUT CHANNELS, B.S. = 9' - 3" AFF.
6 SPA. @ 2' - 0" O.C. = 12' - 0"
3' -
4"
2' -
7 3
/16"
2' -
0 1
3/16
"4'
- 0
"
2' -
8"
2' -
0"
2' -
0"
ORIENTATION POINT OF ANGIO TABLE BASE
ORIENTATION POINT OF MPT TABLE BASE
EXIST. 20" DEEP CONCRETE BEAM BELOW 4 3/4" THICK INTEGRAL SLAB ABOVE, TYP.
5 1/
2"5'
- 8
1/4
"
P1001 UNISTRUT CHANNEL PROVIDED BY CONTRACTOR & INSTALLED BY EQUIP. INSTALLERB.S. = 9' - 6 1/4" AFF., TYP. OF 2
27' -
2"
55' -
0"
EXIST. 20" DEEP CONCRETE BEAM BELOW 4 3/4" THICK INTEGRAL SLAB ABOVE, TYP.
12
S2.01
11
S2.01
14 - P1001 UNISTRUT CHANNELS, B.S. = 9' - 3" AFF.
10
S2.01
7
S2.01
6
S2.01
9
S2.01
P1001 UNISTRUT CHAN.B.S. = VERIFY w/ EQUIP. MANUF., TYP. OF 3
8
S2.01
7' -
7"
8
S2.01SIM. (A)
8
S2.01
SIM. (A)
[SEE NOTE 26]
001A
SIM. (A)
001A
001A
2' -
0"
2' -
0"
3' -
4"
P1001 UNISTRUT CHAN.B.S. = VERIFY w/ EQUIP. MANUF., TYP. OF 3
10
S2.01SIM.
001A
EXISTING STRUCTURE, TYP.
MEDICAL BOOM MOUNTING PLATE [SEE NOTE 1]NOTES:
1. MOUNTING PLATES SHALL BE PROVIDED BY MEDICAL BOOM MANUFACTURER & INSTALLED BY CONTRACTOR. ATTACH w/ (4) 1/2" DIA. BOLTS OR THREADED RODS, COORDINATE ATTACHMENT w/ BOOM MANUFACTURER.
P1000 UNISTRUT HANGER, TYP. OF 4 EACH FRAME
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
P1026 UNISTRUT CHANNEL CONNECTION, (BEYOND) TYP.
P1000 UNISTRUT CHANNEL, COORD. SPACING w/ BOOM MOUNTING PLATE, TYP. OF 2 EACH FRAME
4 5/
8"
7"8"
P1000 UNISTRUT BRIDGING, TYP. OF 2 EACH FRAME
(2) P1001 UNISTRUT RAILS @ 18" O.C., SPAN BETWEEN HANGERS AS NECESSARY TO SUPPORT FRAME
EL. = 9' - 8 1/4" AFF.B.O. FRAME
[1 3
/8"
@ S
IM.
(A)]
(FLD
. VE
RIF
Y)
001A
[EL. = 9' - 11 1/2" AFF. @ SIM. (A)]
GENERAL FRAMING NOTES:1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO COMMENCEMENT OF THE WORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE INSTALLATION OF THE NEW WORK WITHIN THE EXISTING CONDITIONS. ANY DEVIATION IN THE EXISTING CONDITIONS OR DIMENSIONS INDICATED SHALL BE COORDINATED WITH THE ENGINEER/ARCHITECT.
2. DO NOT SCALE PLAN FOR DIMENSIONS.
3. B.S. INDICATES BOTTOM OF STEEL ELEVATION.
4. ALL 'AFF' ELEVATIONS ARE RELATIVE TO TOP OF EXISTING CONCRETE SLAB.
5. INFILL OPENINGS IN EXISTING SLAB AS NECESSARY, PER 'EXIST. FLOOR OPENING INFILL DETAIL' THIS SHEET. FIELD VERIFY ALL OPENING SIZES & QUANTITIES.
UNISTRUT FRAMING NOTES:20. ALL UNISTRUT CHANNELS SHALL BE FABRICATED CONFORMING TO ASTM A653 GRADE 33 SPECIFICATIONS WITH A PRE-GALVANIZED FINISH.
23. PROVIDE & INSTALL WHITE PLASTIC CLOSURE STRIPS - TYPE P3184 P, IN ALL OPEN CHANNELS EXPOSED TO VIEW AFTER ALL MEDICAL EQUIPMENT & CEILINGS ARE INSTALLED. CONCEAL CHANNEL OPENINGS AS BEST AS POSSIBLE WITH CLOSURE STRIPS.
21. ALL UNISTRUT FITTINGS SHALL BE FABRICATED FROM STEEL THAT MEETS OR EXCEEDS THE PHYSICAL REQUIREMENTS OF ASTM A1011 SS GRADE 33, CONFORMING TO ASTM A575, A576, A635 OR A36 SPECIFICATIONS WITH AN ELECTRO-GALVANIZED FINISH CONFORMING TO AST B633 TYPE III SC1.
24. ALL UNISTRUT CHANNELS SHALL HAVE TYPE 'T' HOLE PATTERNS.
22. ALL UNISTRUT FASTENER SCREWS SHALL CONFORM TO SAE J429 GR 2 SPECIFICATIONS AND ALL NUTS SHALL BE FABRICATED FROM STEEL THAT MEETS OR EXCEEDS THE PHYSICAL REQUIREMENTS OF ASTM A1011 SS GR 33.
25. BOTTOM SURFACE OF ALL HORIZONTAL UNISTRUT CHANNELS SHALL BE LEVEL w/ A DEVIATION NOT EXCEEDING 1/64" OVER 39".
26. SUPPORT INDICATED CHANNEL w/ (3) 1/2" DIA. THREADED RODS ANCHORED TO STRUCTURE w/ SCREW ANCHORS - TYPE 'SA1', SPACED EQUALLY ALONG LENGTH OF CHANNEL.
GENERAL STRUCTURAL NOTES AND DESIGN CRITERIASTRUCTURAL MATERIALS
STRUCTURAL AND MISCELLANEOUS STEEL
W-SHAPES: ASTM A992, fy = 50,000 psiM -SHAPES, S-SHAPES, HP-SHAPES, CHANNELS, ANGLES, AND PLATES UNLESS OTHERWISESPECIFIED: ASTM A36, fy = 36,000 psi
STRUCTURAL TUBING UNLESS OTHERWISE SPECIFIED: ASTM A500 or A501, grade B, fy = 46,000 psi
PIPE: ASTM A53, Type E or S, grade B, fy = 35,000 psi
BOLTS AND NUTS
STEEL-TO-STEEL CONNECTIONS
Bolts: Type 1, heavy hexagonal head
Nuts: ASTM A563, grade C, heavy hexagonal
OTHER
Bolts: ASTM F3125 Grade A325N, grade A, hexagonal heads
Nuts: ASTM A563, grade A, hexagonal
Bolt-Nut-Washer Assemblies: ASTM F3125 Grade F1852N
Washers: ASTM F436, Type 1, hardened (at all slotted holes)
BUILDING CODE
STRUCTURAL DESIGN CRITERIA
VERTICAL LOADS
Use or Occupancy (2)
Dead Load (1)
Live Load (1)
psf
psf
psf
psf
(R1) Live load is reducible via IBC Live Load Reduction.
(5)
(1) Uniform load to be applied over the full tributary area of each structural member.
(2) See Framing Plans for concentrated loads from mechanical units, hoists and other equipment.
(3) Where applicable, 5 psf for rain-on-snow is included.
NOTES:
(4) Self-weight of framing structure and elevated slabs not included.
(5) Includes 20 psf partition (non-reducible) live load.
2nd Floor w/ Raised Flooring
Other Areas of 2nd & 3rd Floors
21
17
70
80
(R1)
(R1)
International Building Code, 2015 Edition
1.
EXISTING CONDITIONS
The General Contractor shall verify all existing dimensions and conditions prior to commencement of the work. It shall be the Contractor's responsibility to coordinate the installation of the new work within the existing conditions. Any deviation in the existing conditions or dimensions indicated shall be coordinated with the Engineer/Architect in order to modify the plan accordingly.
1.
CONSTRUCTION PROCEDURES & SAFETY REQUIREMENTS
Comply with all applicable city, county, state and federal laws, including the occupational safety and health act (OSHA) and regulations adopted pursuant thereto.
2. The structural contract documents represent the finished structure. They do not indicate the means andmethods of construction, unless noted or indicated otherwise.
3. Provide all measures necessary to protect the workers and all other persons during construction. Provide all necessary measures to avoid excessive stresses and to hold the structural elements in place during construction. Such measures shall include, but not be limited to: bracing, shoring for construction equipment, shoring for earth banks, forms, scaffolding, planking, safety nets, support and bracing for cranes and hoists, guying, etc...
4. Engage properly qualified persons to determine where and how temporary precationary measures shall be used. Observation visits to the site by Structural Engineer's field representatives shall not include above noted items.
5. Supervise and direct the work so as to maintain sole responsibility for all construction means, methods,techniques, sequences, and procedures.
1.
STEEL
GENERAL. Unless otherwise shown or specified, perform all steel work in accordance with the applicable requirements of the International Building Code, the American Institute of Steel Construction (AISC) "Steel Construction Manual", the Steel Joist Institute (SJI) "Standard Specifications, Load Tables and Weight Tables for Steel Joists and Joist Girders" and the Steel Deck Institute (SDI) "Design Manual for Floor and Roof Decks". If there should be conflicts among these documents, the provisions of the more restrictive shall govern.
MATERIALS. Material requirements for structural steel members are given in the STRUCTURAL MATERIALS section on this sheet.
HOLES. Holes in plates and structural tees used for web connections shall be standard AISC short slots with long dimension of slot to be in the direction of the beam span. Holes in beams shall be standard round holes. Except as specifically shown otherwise in the Details and Sections, center to center spacing of slotted holes in the direction perpendicular to the long direction of the slot shall not be less than 3 inches except that holes in beam flanges perpendicular to direction of beam span shall be at standard gage. Other holes shall be spaced as shown. Provide AISC standard oversize holes in column base plates.
2.
3
1.
REQUIRED IBC SPECIAL STRUCTURAL INSPECTIONS
2. Refer to the Special Inspections section of the Specifications for additional information.
All Special Structural Inspections shall be provided by the Owner, per IBC 2015, Chapter 17.
EXISTING EXT. WALL
P1000 UNISTRUT HANGER, TYP. OF 2 EACH FRAME
P1001 UNISTRUT RAIL, SPAN BETWEEN HANGERS AS NECESSARY TO SUPPORT FRAME, SEE PLAN FOR SPA.
EL. = 9' - 3" AFF.B.O. FRAME
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
EXISTING STRUCTURE, TYP.
P1026 UNISTRUT CHANNEL CONNECTION, (BEYOND) TYP.
8"7"
P1000 UNISTRUT HANGER, TYP.
MEDICAL EQUIPMENT RAIL SYSTEM, PROVIDED & INSTALLED BY EQUIP. INSTALLER, TYP.
EL. = 9' - 3" AFF.B.O. FRAME
EXISTING STRUCTURE, TYP.
P1026 UNISTRUT CHAN. CONN., (BEYOND) TYP.
8" 4' - 0" 1' - 4" 2' - 4 1/4" 5 1/2" 1' - 5 1/4"
END OF UNISTRUT FRAME BEYOND
P1001 UNISTRUT RAIL, SPAN BETWEEN HANGERS AS NECESSARY TO SUPPORT FRAME, SEE PLAN FOR SPA.
(3) 1/2" DIA. THREADED RODS EACH FRAME
P1000 UNISTRUT CHANNEL, TYP. OF 2, EACH FRAME
2' -
0"
EQ EQ EQ
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
(2) P1001 UNISTRUT CHANNELS PROVIDED BY CONTR. & INSTALLED BY EQUIP. INSTALLER
(FLD
. VE
RIF
Y)
11 1
/2"
7"8"
P1026 UNISTRUT CHAN. CONN., (BEYOND) TYP.
EQ EQ
A
EL. = 9' - 3" AFF.B.O. FRAME
EXISTING STRUCTURE, TYP.
(VERIFY w/ EQUIP. MANUF.)
P1000 UNISTRUT BRIDGING, TYP. OF 2 EACH FRAME
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
P1026 UNISTRUT CHANNEL CONNECTION, (BEYOND) TYP.
P1000 UNISTRUT BRACE w/ P1546 CONN. @ EACH END,(1) BRACE EA. END OF BRDG.
P1001 UNISTRUT RAIL, SEE PLAN FOR SPA.
P1000 UNISTRUT HANGER
1/2" DIA. THREADED ROD
SCREW ANCHOR -TYPE 'SA1', EACH THREADED ROD
SCREW ANCHOR -TYPE 'SA2'
(3) 1/2" DIA. THREADED RODS, EQ. SP.
EXISTING STRUCTURE, TYP.
MEDICAL BOOM MOUNTING PLATE [SEE NOTE 1]
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
NOTES:1. MOUNTING PLATES SHALL BE PROVIDED BY MEDICAL BOOM MANUFACTURER & INSTALLED BY CONTRACTOR. ATTACH w/ (4) 1/2" DIA. BOLTS OR THREADED RODS, COORDINATE ATTACHMENT w/ BOOM MANUFACTURER.
EL. = 10' - 2 1/2" AFF.B.O. FRAME
P1026 UNISTRUT CHANNEL CONNECTION, (BEYOND) TYP.
P1000 UNISTRUT HANGER, TYP. OF 4 EACH FRAME
(2) P1001 UNISTRUT RAILS @ 24" O.C., SPAN BETWEEN HANGERS AS NECESSARY TO SUPPORT FRAME
2" (TYP.)
PROVIDE 2" LONG SLOTS IN MOUNTING PLATE FOR 1/2" DIA. BOLTS, ORIENTATE SLOTS PERPENDICULAR TO UNISTRUT CHANNELS
EXISTING STRUCTURE, TYP.
MEDICAL BOOM MOUNTING PLATE [SEE NOTE 1]
P2325 UNISTRUT CHANNEL CONNECTION (BEYOND) , TYP.
P1026 UNISTRUT CHANNEL CONNECTION w/ (1) SCREW ANCHOR - TYPE 'SA2', TYP. OF 2 EACH HANGER
P1026 UNISTRUT CHANNEL CONNECTION (BEYOND), TYP.
(2) P1000 x 3' - 0" UNISTRUT CHANNELS @ 2' - 0" O.C.
P1001 UNISTRUT RAIL, SPAN BETWEEN HANGERS AS NECESSARY TO SUPPORT FRAME
NOTES:1. MOUNTING PLATES SHALL BE PROVIDED BY MEDICAL BOOM MANUFACTURER & INSTALLED BY CONTRACTOR. ATTACH w/ (4) 1/2" DIA. BOLTS OR THREADED RODS, COORDINATE ATTACHMENT w/ BOOM MANUFACTURER.
EL. = 10' - 0 7/8" AFF.B.O. FRAME
2" TYP.
P1000 UNISTRUT HANGER, TYP. OF 3 EACH FRAME 4"
4"7"
8"
P1000 UNISTRUT BRACE, TYP. OF 3 EACH FRAME
4 1/2" (MIN.)
EXISTING STRUCTURE, TYP.
MEDICAL BOOM MOUNTING PLATE [SEE NOTE 1]
(2) P1000 x 3' - 0' UNISTRUT CHANNELS @ 2' - 0" O.C.[1' - 1" O.C. @ SIM (A)]
(2) P1000 x 3' - 0" UNISTRUT CHANNELS (STACKED) w/ (3) SCREW ANCHORS - TYPE 'SA2' EQUALLY SPACED
NOTES:1. MOUNTING PLATES SHALL BE PROVIDED BY MEDICAL BOOM MANUFACTURER & INSTALLED BY CONTRACTOR. ATTACH w/ (4) 1/2" DIA. BOLTS OR THREADED RODS, COORDINATE ATTACHMENT w/ BOOM MANUFACTURER.
2" (TYP.)
EXISTING STRUCTURE, TYP.
SURGICAL LIGHT HOUSING, SEE ELEC. FOR QUANTITY, SIZES & LOCATIONS
LINE OF CEILING UNDERSIDE, SEE ARCH.
P1000 UNISTRUT CHANNEL
SCREW ANCHOR - TYPE 'SA2' @ EACH CONC. JOIST
FASTENERS PROVIDED & INSTALLED BY LIGHT INSTALLER
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/9/2
01
9 8
:05
:45
AM
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-S
-19
_m
ike
.mc
kie
@c
lark
en
ers
en
.co
m.r
vt
Framing Plan & Details
S2.01
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1 1/2" = 1'-0"
CONNECTION DETAIL3
SCALE: 1/4" = 1'-0"
SLIDING DOOR SUPPORT ELEVATION2
SCALE: 1 1/2" = 1'-0"
CONNECTION DETAIL4
SCALE: 1" = 1'-0"
EXST. FLOOR OPENING INFILL DETAIL1
SCALE: 1 1/2" = 1'-0"
ANGIO TABLE BASE SUPPORT14
SCALE: 1 1/2" = 1'-0"
MPT TABLE BASE SUPPORT13
SCALE: 1/4" = 1'-0"
SECOND FLOOR REFLECTED FRAMING PLAN
SCALE: 3/4" = 1'-0"
MED BOOM FRAME ELEVATION6
SCALE: 3/4" = 1'-0"
UNISTRUT FRAME ELEVATION12
SCALE: 3/4" = 1'-0"
UNISTRUT FRAME ELEVATION11
SCALE: 3/4" = 1'-0"
UNISTRUT FRAME ELEVATION10
SCALE: 3/4" = 1'-0"
MED BOOM FRAME ELEVATION7
SCALE: 3/4" = 1'-0"
MED BOOM FRAME ELEVATION9
SCALE: 3/4" = 1'-0"
MED BOOM FRAME SECTION8
SCALE: 3/4" = 1'-0"
SURGICAL LIGHT SUPPORT5
A - 001 10/08/2019 AS PER ADDENDUM #01
FRONT
CONTROLROOMC2053K
FLUOROSCOPYPROCEDUREROOMC2053G
CTPROCEDUREROOMC2053H
EQ.C2053J
CHECK INC2053D
SOILEDC2053M
CLEANLINENC2053N
PATIENTC2053P
EQ.C2053F
READINGROOMC2053E
EQUIPMENTC2053C
ULTRASOUNDC2053B
CORRIDORC2053
RECEIVINGC2053A
MED.SUPPLIES/PARC2053Q
AZ.9
2
3
4
CORRIDORC2053R
RRC2029A
SLEEPEGGC2029
SLEEPEGGC2030
EMG-1C2031
EEG-1C2033
SUB.WAITINGC2034
OFFICEC2035
EXAMC2036
PAT.TOILETC2037
SLEEP LABC2038A
SLEEPMSLTC2028
CORRIDORCC2010
CORRIDORCC2003
COMM
PHYSICIANWORK
STORAGEC2056
CORRIDORCC2019
NOT IN SCOPE
(OH-1)
(OH-1)
(OH-1)
(OH-1)
(OH-1)
(OH-1)
1
2
2
NOT IN SCOPE
3
4
1
001I
FP1.01FIRE PROTECTION PLAN
1
FIRE PROTECTION FLOOR PLAN
SCALE: 1/8" = 1'-0"
N
1/8" = 1'-0"
0 4 8 16 24
1" DROP
IN CEILING TILE
RETURN BEND DETAIL
1'-0"
1'-0"
SPRINKLER LOCATIONS
1'-0"
1'-0"
1'-0" 1'-0"
UNLESS NOTED
OTHERWISE
PENDENT HEAD
CEILING
BRANCH LINE
NO SCALE
NO SCALE
1. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT GENERAL SCOPE OF
WORK. CONTRACTOR IS RESPONSIBLE TO REVIEW GENERAL CONSTRUCTION
DRAWINGS, ARCHITECTURAL, CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL
AND PLUMBING DRAWINGS AND ASSOCIATED SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN
THIS PORTION OF CONSTRUCTION.
2. SYSTEM DESIGN IS BASED ON IBC 2018 AND NFPA 13 2016 & 2010. PIPE SIZES,
ROUTING, LENGTHS, ELEVATIONS, SPRINKLER LOCATIONS, ETC, ARE
PRELIMINARY, FOR COORDINATION PURPOSES, AND ARE TO BE VERIFIED
AND CONFIRMED BY CONTRACTOR. PIPE SIZING SHOWN IS SIZED BY
SIMILARITY TO THE EXISTING SYSTEM INSTALLED AS PER AVAILABLE
AS-BUILT DRAWINGS. COORDINATE WITH ALL OTHER DISCIPLINES. EXISTING
SYSTEM INFORMATION SHOWN IS AS ACCURATE AS COULD BE DETERMINED
FROM RECORD DOCUMENTS AND SITE INVESTIGATION BUT IS NOT
GUARANTEED. CONTRACTOR SHALL INVESTIGATE SITE TO CONFIRM EXISTING
SYSTEMS AND CONDITIONS PRIOR TO SUBMITTAL OF SPRINKLER SHOP
DRAWINGS.
3. SPRINKLER DESIGN DEMANDS SHALL BE AS FOLLOWS:
· ALL SPACES ARE LIGHT HAZARD UNLESS NOTED OTHERWISE ON
DRAWINGS.
· LIGHT HAZARD: 0.10 GPM/SF OVER 1500 SQ. FT. + 100 GPM HOSE
ALLOWANCE.
· ORDINARY HAZARD, GROUP I: 0.15 GPM/SF OVER 1500 SQ. FT. + 250 GPM
HOSE ALLOWANCE.
· ORDINARY HAZARD, GROUP II: 0.20 GPM/SF OVER 1500 SQ. FT. + 250 GPM
HOSE ALLOWANCE.
· DESIGN AREAS MAY UTILIZE QUICK RESPONSE SPRINKLER AREA
REDUCTIONS PER NFPA 13 ALLOWANCES. EXTENDED COVERAGE
SPRINKLERS SHALL BE PERMITTED.
4. ALL EXISTING FIRE SPRINKLERS, BRANCH LINES, AND MAIN PIPING WITHIN
THE WORK AREA SHALL BE DEMOLISHED, AND REPLACED WITH NEW. ALL
EXISTING MAINS AND STANDPIPE SUPPLY, FIRE HOSE CABINETS, OR PIPING
SERVING AREAS OUTSIDE THE WORK AREAS SHALL REMAIN AS INSTALLED
UNLESS NOTED OTHERWISE BY THESE DOCUMENTS. PROVIDE A NEW
CONTROL VALVE WITH TAMPER SWITCH AT THE TEE ON THE MAIN SERVING
THE WORK AREA, SO THAT THIS WORK MAY BE COMPLETED WITHOUT
AFFECTING THE REST OF THE SPRINKLER SYSTEM. ANY EXISTING SCHEDULE
10 PIPE OR GALVANIZED PIPE ENCOUNTERED WITHIN THE WORK AREA SHALL
BE REPLACED WITH NEW SCHEDULE 40 BLACK STEEL PIPE. CONTRACTOR
SHALL PROVIDE 100% COMPLETE SPRINKLER COVERAGE PER NFPA 13
WITHIN ALL SPACES OF THE WORK AREA, WHETHER SHOWN ON THESE
DRAWINGS OR NOT. SPRINKLERS AND PIPING WITHIN THE WORK AREA SHALL
BE SUPPLIED FROM EXISTING MAINS AND SUPPORTED FROM THE EXISTING
BUILDING FIRE PUMP.
5. PROVIDE TEMPORARY SPRINKLER PROTECTION WITHIN THE WORK AREA
DURING CONSTRUCTION. BEFORE DISABLING EXISTING SPRINKLERS,
PROVIDE TEMPORARY SPRINKLER PROTECTION AROUND THE PERIMETER OF
THE WORK AREA. TEMPORARY SPRINKLERS SHALL BE CONNECTED TO THE
NEAREST EXISTING SPRINKLER MAIN. TEMPORARY PROTECTION SHALL
CONSIST OF SIDEWALL SPRINKLERS AROUND THE OUTSIDE PERIMETER OF
THE WORK AREA, POINTING INTO THE WORKSPACE. THIS PROTECTION IS NOT
REQUIRED AT EXTERIOR BUILDING WALLS. SIDEWALL SPRINKLERS MAY BE
SPACED AT MAXIMUM SPACING PER NFPA 13, AND SHALL BE SUPPLIED BY 1"
CPVC PIPE. TEMPORARY PROTECTION SHALL BE INSTALLED IN SUCH A WAY
THAT IT MAY BE EASILY REMOVED AT THE END OF CONSTRUCTION, AFTER
THE NEW SPRINKLERS HAVE PASSED ACCEPTANCE TESTING AND HAVE HAD
WATER SERVICE RESTORED. TEMPORARY PROTECTION SHALL BE REMOVED
BY THE SPRINKLER CONTRACTOR.
6. LISTED SPRINKLERS SHALL BE USED AND INSTALLED WITH DEFLECTORS
LOCATED PER NFPA 13 AND THEIR LISTING. SPRINKLERS SHALL BE AS
INDICATED ON THE DRAWINGS. IN DROPPED CEILINGS SPRINKLERS SHALL BE
FLAT PLATE CONCEALED PENDENTS AS SHOWN, AND SPRINKLERS IN AREAS
WITHOUT CEILINGS SHALL BE UPRIGHT OR PENDENT.
7. SPRINKLERS WITHIN 2'-6" OF A HORIZONTAL DISCHARGE HEATING SUPPLY
DIFFUSER OR 12" OF A VERTICAL DISCHARGE HEATING SUPPLY DIFFUSER
SHALL BE INTERMEDIATE TEMPERATURE SPRINKLERS. INTERMEDIATE
TEMPERATURE SPRINKLERS MAY BE UTILIZED THROUGHOUT IN
ACCORDANCE WITH NFPA 13.
8. VALVES ON CONNECTIONS TO WATER SUPPLIES, SECTIONAL CONTROL
VALVES AND OTHER VALVES IN SUPPLY PIPES TO SPRINKLERS SHALL BE
SUPERVISED. ALL WIRING OF SUPERVISORY SWITCHES BY DIV 28.
9. NEW SPRINKLER PIPE 2" AND SMALLER SHALL BE THREADED OR WELDED
SCHEDULE 40 STEEL. NEW SPRINKLER PIPE 2½" AND LARGER MAY BE SAME
OR GROOVED SCHEDULE 40 STEEL. FLEXIBLE SPRINKLER DROPS SHALL NOT
BE PERMITTED. SCHEDULE 10 STEEL IS NOT PERMITTED. CONTRACTOR
SHALL REPLACE ANY EXISTING SCHEDULE 10 PIPE WITHIN THE WORK AREA
WITH NEW SCHEDULE 40 PIPE.
10. PROVIDE MEANS FOR WET SPRINKLER SYSTEM AIR VENT NEAR THE HIGH
POINT OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13.
11. ALL HOLES THROUGH FIRE OR SMOKE RATED CONSTRUCTION SHALL BE
PATCHED OR PLUGGED WITH A LISTED ASSEMBLY AS REQUIRED BY THE
CONSTRUCTION MATERIALS ENCOUNTERED AND THE SIZE OF THE HOLE.
12. THE SPRINKLER SYSTEM OR SYSTEMS ARE TO BE TESTED IN ACCORDANCE
WITH THE LATEST APPLICABLE STANDARDS.
13. SPARE SPRINKLER STOCK TO BE PROVIDED IN ACCORDANCE WITH NFPA 13.
14. AS THE SEISMIC DESIGN CATEGORY IS CATEGORY B, AND THE EXISTING
SYSTEM DOES NOT APPEAR SEISMICALLY BRACED, SEISMIC BRACING IS NOT
REQUIRED FOR SPRINKLER PIPING.
15. AVAILABLE PUMP INFORMATION INDICATED THE FOLLOWING:
· EXISTING FIRE PUMP: 1,250 GPM @ 120 PSI
· A 10% SAFETY FACTOR SHALL BE PROVIDED FOR THE CALCULATIONS.
· EXISTING SPRINKLER SPACING IS STANDARD COVERAGE. IF NEW
STANDARD COVERAGE SPRINKLERS ARE INSTALLED, HYDRAULIC
CALCULATIONS ARE NOT REQUIRED, PROVIDED THAT ALL NEW PIPE SIZING
MATCHES EXISTING.
· EXTENDED COVERAGE SPRINKLERS ARE PERMITTED FOR USE, HOWEVER
HYDRAULIC CALCULATIONS WILL BE REQUIRED TO PROVE PIPE SIZING.
16. CEILING HEIGHTS ARE 8'-6" UNLESS NOTED OTHERWISE.
GENERAL NOTES
1'-0" 1'-0" 1'-0" 1'-0"
(OH-2)
(OH-1)
WHERE THE CAPACITY OF ISOLATED TRAPPED
SECTIONS OF PIPE IS 50 GALLONS OR MORE,
DRAIN SHALL CONSIST OF A VALVE NOT SMALLER
THAN 1", PIPED TO AN ACCESSIBLE LOCATION.
SPRINKLER PIPE
WHERE THE CAPACITY OF ISOLATED TRAPPED
SECTIONS OF PIPE IS MORE THAN 5 GALLONS
AND LESS THAN 50 GALLONS, DRAIN SHALL
CONSIST OF A VALVE 1" OR LARGER AND A PLUG,
NIPPLE, OR CAP.
SPRINKLER PIPE
WHERE THE CAPACITY OF ISOLATED TRAPPED
SECTIONS OF PIPE IS LESS THAN 5 GALLONS,
DRAIN SHALL CONSIST OF A NIPPLE AND CAP OR
PLUG NOT LESS THAN 1/2" IN SIZE.
VALVE
GROOVED DRAIN CAP
ROUTE PIPE TO FLOOR DRAIN
VALVE
GROOVED DRAIN CAP
PLUG
UPRIGHT SPRINKLER
PLUG
TEE
SPRINKLER PIPE
NOTE:
ALL DRAINS SHALL DISCHARGE TO EXTERIOR OR TO FLOOR DRAIN CAPABLE
OF ACCEPTING FULL DRAIN CAPACITY.
AUXILIARY DRAIN DETAIL
NO SCALE
MAXIMUM CEILING
TEMPERATURE
°F °C
100 38
150 66
225 107
300 149
375 191
475 246
625 329
TEMPERATURE
RATING
°F °C
135-170 57-77
175-225 79-107
250-300 121-149
325-375 163-191
400-475 204-246
500-575 260-302
650 343
TEMPERATURE
CLASSIFICATION
EXTRA VERY HIGH
ULTRA HIGH
ULTRA HIGH
EXTRA HIGH
HIGH
INTERMEDIATE
ORDINARY UNCOLORED OR BLACK
COLOR CODE
WHITE
BLUE
RED
GREEN
ORANGE
ORANGE
YELLOW OR GREEN
BLUE
PURPLE
BLACK
BLACK
BLACK
ORANGE OR RED
GLASS BULB
SPRINKLER TEMP RATINGS & CLASSIFICATIONS
TEMPERATURE RATINGS OF SPRINKLERS RELATIVE TO HEAT SOURCES
SHALL BE VERIFIED BEFORE INSTALLATION.
SYMBOL LEGEND
SYMBOL
DIMENSION FROM FINISHED FLOOR UP TO CENTERLINE OF PIPE (FEET & INCHES)
DESCRIPTION
DIMENSION FROM BOTTOM OF DECK, DOWN TO CENTERLINE OF PIPE (INCHES)
CEILING HEIGHT
?-?
? Bts
HANGER SPACING CHART
N.T.S.
HANGER ROD SIZE PER NFPA-13
PIPE SIZE DIAM. OF ROD PIPE SIZE DIAM. OF ROD
UP TO AND
INCLUDEING 4"
3/8" 6" AND 8" 1/2"
GREATER THAN 48" FOR 1-1/4"
GREATER THAN 60" FOR 1-1/2" & LARGER
GREATER THAN 36" FOR 1"
48" FOR 1-1/4"
60" FOR 1-1/2" & LARGER
36" FOR 1"
THEN EXTEND HERE
MAX.
DISTANCE FROM SPRINKLER TO HANGER PER NFPA-13
PIPE SIZE
STEEL PIPE
THREADED
LIGHTWALL
COPPER
CPVC
N/A 12-0 12-0 12-0 12-0 12-0 12-0 N/A N/A
N/A 12-0 12-0 15-0 15-0 15-0 15-0 15-0 15-0
8-0 8-0 10-0 10-0 12-0 12-0 12-0 15-0 15-0
5-6 6-0 6-6 7-0 8-0 9-0 10-0 N/A N/A
3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" 6"
MAXIMUM DISTANCE BETWEEN HANGERS (FT-IN.) PER NFPA-13
NOTE: IF PRESSURE EXCEEDS 100 PSI:
PROVIDE HANGER FOR ANY ARM-OVER
(TO PENDENT HEAD) LONGER THAN 1'-0".
SPRINKLER LEGEND (ENTIRE PROJECT)
K FACTOR ESCUTCHEON
QUICK PENDENT WHITE 1/2" 5.6
LIGHT HAZARD
MIN
6
AREAMAX
22515
ORD. HAZARD
MIN
6
AREAMAX
13015
RESPONSE TYPE FINISH N.P.T.SYMBOL
CONCEALED
DROP/SPRIG
1" DROP
ALL SPACES ARE LIGHT HAZARD UNLESS NOTED OTHERWISE
ORDINARY HAZARD GROUP 1 OCCUPANCY
ORDINARY HAZARD GROUP 2 OCCUPANCY
EXISTING SPRINKLER SYSTEM PIPING TO REMAIN
NEW SPRINKLER SYSTEM PIPING
CONNECT TO EXISTING
*NOTE: INTERMEDIATE-TEMPERATURE SPRINKLERS MAY BE INSTALLED THROUGHOUT I.A.W. NFPA 13 SECTION 8.3.2.1.
*NOTE: PROVIDE HIGH TEMPERATURE SPRINKLERS WHERE INDICATED AND AS PER NFPA 13
# SHEET HISTORY:?
? - #
Landscape ArchitectureArchitecture
EngineeringInteriors
Plot
Tim
e St
amp:
File
Loc
atio
n/N
ame:
ISSUED 09/18/2019 CONTRACT DOCUMENTS
Kansas City, Missouri2020 Baltimore Avenue, Suite 300Kansas City, MO 64108-1914816 474.8237 Fax 816 474.8233
Lincoln, NebraskaFairway, Kansas
www.clarkenersen.com
Key Plan
AREA
OF
WORK
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
I - 001 10/08/2019 REVISION 1
1. COORDINATE SPRINKLER LOCATIONS WITH IMAGING RAIL PROVIDER TO
ENSURE RAIL DOES NOT OBSTRUCT SPRINKLER SPRAY PATTERN.
2. PRIVACY CURTAINS ARE ASSUMED TO MEET NFPA 13 8.6.5.2.2.1
REQUIREMENTS FOR 70% OR GREATER OPEN MESH EXTENDING AT LEAST 22"
DOWN FROM CEILING. CONTRACTOR TO VERIFY AND ADD SPRINKLERS AS
NECESSARY IF CURTAINS DO NOT MEET THESE REQUIREMENTS.
3. PROVIDE NEW BUTTERFLY CONTROL VALVE WITH TAMPER SWITCH AT
CONNECTION TO EXISTING 3" MAIN FOR ZONE ISOLATION. REMAINDER OF
EXISTING SPRINKLER SYSTEM OUTSIDE THE WORK AREA SHALL REMAIN
ACTIVE WHILE WORK IS COMPLETED.
4. PROVIDE NEW DRAIN CONNECTION FOR THE WORK AREA DOWNSTREAM OF
THE NEW BUTTERFLY VALVE. DRAIN CONNECTION SHALL BE MADE AS NEAR
AS POSSIBLE TO SOILED ROOM, AND DRAIN PIPING SHALL BE ROUTED TO
MOP SINK WITH DRAIN VALVE AT AN ACCESSIBLE HEIGHT.
KEYED PLAN NOTES
#
NEW BUTTERFLY CONTROL VALVE WITH TAMPER SWITCH
DN
FRONT
DN
T
T
T
T
T
T
T
T
T
M
T
M
M
M
D-1
1408Ø
D-1
2208Ø
D-1
2108Ø
D-1
706Ø
D-1
2008Ø
D-1
706Ø
D-1
1508Ø
D-1
2158Ø
D-1
2458Ø
12/12 SA
12/1
0 S
A
26/8
SA
34/8
SA
12/1
0 S
A
18/8
SA
VAV3-230670 CFM
VAV3-231425 CFM
VAV3-229360 CFM
VAV3-228495 CFM
VAV3-225490 CFM
VAV3-2261400 CFM
VAV3-2271465 CFM
50/1
2 S
A (
E)
18/1
4 R
A
36/1
4 R
A
46/10 RA
G-1
50012/12
G-1
49018/18
80/16 RA (E) DN
48/48 SA (E) DN
80/16 RA (E)
62/1
8 S
A (
E)
RAV3-231325 CFM
RAV3-230500 CFM
RAV3-229360 CFM
RAV3-2271315 CFM
RAV3-2261250 CFM
RAV3-225490 CFM
RAV3-2281165 CFM
22/1
4 R
A
12/10 SA
D-1
1508Ø
D-1
2008Ø
D-1
2008Ø
D-1
2458Ø
G-1
14012/12
G-1
22012/12
D-1
1006Ø
D-1
506Ø
10ØG-1
275
6ØG-1
50
G-122/221100
12/8 SA
12/10 RA
12/12 RA
12/12 RA
16/1
4 R
A
14/8 SA
12/12 RA
12/1
2 R
A
FSD-2
FSD-1
SD (E)
FSD-1
FSD-1
16/14 RA
6ØG-1
150
8ØG-1
150
38/16 RA (E)
22/1
0 R
A (
E)
26/1
0 R
A (
E)
12/8
RA
(E
)
24/8 RA (E)
12/4 RA (E)
12/4 RA (E)
12/1
0 R
A (
E)
12/4 RA (E)
12/4 RA (E)
12/6
RA
(E
)
14/12 RA (E)
G (E)
G (E)
G (E) G (E)
G (E)
G (E)
G (E)
APPROX. 2400 CFM RETURN AIR FROM EXISTING SPACES
1540 CFM RETURN AIR FROM EXISTING SPACES
14/1
0 R
A
12/12 RA
34/8
SA
D-2
2258Ø
D-2
2258Ø
D-2
2258Ø
18/12 RA
12/10 RA
16/14 RA
D-1
1258Ø
32/10 SA (E)
FSD-1
A BZ.9
2
3
4
FLUOROSCOPYPROCEDUREROOM
C2053G
CT PROCEDUREROOM
C2053H
EQ.
C2053J
CONTROL ROOM
C2053K
EQ.
C2053F
READING ROOM
C2053E
CHECK IN
C2053D
EQUIPMENT
C2053C
ULTRASOUND
C2053B
RECEIVING
C2053A
MED.SUPPLIES/PAR
C2053Q
PATIENT
C2053P
CLEAN LINEN
C2053N
SOILED
C2053M
CORRIDOR
C2053
RR
C2029A
SLEEP EGG
C2030
Z.9
Z.9
A
A
B
B
2 2
3 3
4 4
FSD-1
SIEMENS CABLE TRAY
18/1
4 S
A
EMG-1
C2031
CORRIDOR
C2053R
EEG-1
C2033
CORRIDOR
CC2010
SLEEP LAB
C2038A
SUB. WAITING
C2034
OFFICE
C2035
CORRIDOR
CC2019
EXAM
C2036
PAT. TOILET
C2037
COMM CLOSET
C2010
PHYSICIAN WORK
C2040
RR
C2050RR
C2052
STORAGE
C2056
G-122/22585
G-122/22580
46/10 RA
FSD-2
D-2
2258Ø
D-2
2258Ø
D-2
2258Ø
28/8
SA
34/8
SA
20/18 SA
D-2
2358Ø
D-2
2358Ø
D-2
2408Ø
D-2
2358Ø
D-2
2358Ø
D-2
2358Ø
20/18 SA
AC-21
AC-20
D-1
506Ø
D-1
506Ø
14Ø SA
14Ø SA
34/8 SA
FSD-1
EMG-1
C2031CORRIDOR
CC2010
SLEEP EGG
C2029
SLEEP MSLT
C2028
10/12 SA (E) (E)TAB-210
35/12 SA (E)23/10 SA (E)
16/10 SA (E)
10Ø
SA
(E
)
14/8
EA
(E
)
12/10 EA (E) 12/12 EA (E)
66/1
6 S
A (
E)
43/12 SA (E)
(E)VVR-5
(E)VVR-5
12/8 SA (E)
12/8 SA (E)
12/8 SA (E)
(E)D-
1108Ø
(E)D-
1108Ø
(E)D-
1108Ø
(E)VVR-7
(E)D-
1108Ø
(E)VVR-6
(E)D-
1108Ø
43/1
2 S
A (
E)
(E)VVR-6
(E)VVR-5
(E)D-
1108Ø
(E)AMS-2-1
(E)D-
1508Ø
12/8
SA
(E
)
1
1
270 CFM RA (E)
34/8 SA (E)
2
1
G-122/221165
8/6 EA
8/6
EA
6ØG-1
150
12/1
0 R
A
3
20/12 RA
12/1
2 R
A
12/8 SA (E)
8/8 RA (E)
36/8 SA
6"Ø PNEUMATIC TUBE
017
6"Ø PNEUMATIC TUBE
6"Ø PNEUMATIC TUBE
EXISTING PNEUMATIC TUBE
EXISTING PNEUMATIC TUBE
10/10 RA
3
46/10 RA
20/8
SA
6Ø RA (E)
D (E) D (E)
4
4
4
RAV3-2331000 CFM
12/4
RA
12/4 RA UNDER52
/16
RA
1
12/1
0 R
A
14/12 RA
RAV3-232310 CFM
SP AHU-3
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Fort Collins, Colorado
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/7/2
01
9 1
0:5
8:1
2 P
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-M
-19
_b
ren
ton
.bo
ye
r@c
lark
en
ers
en
.co
m.r
vt
Second Floor HVAC Plan
M1.02
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
SECOND FLOOR HVAC PLAN
GENERAL NOTES:
1. ALL NEW WORK IS SHOWN IN HEAVY LINEWEIGHT. ALL WORK TO REMAIN AS EXISTING IS SHOWN IN LIGHT LINEWEIGHT.
2. INSTALL ACCESS PANELS UPSTREAM OF FLOW SENSOR TYP. ALL RAVS
3. PNEUMATIC TUBE SHOWN FOR COORDINATION PURPOSES. REFER TO ARCH. AND PNEUMATIC TUBE MANUFACTURER DRAWINGS FOR INSTALLATION REQUIREMENTS.
PLAN NOTES:
PROVIDE COMBINED MOTORIZED DAMPER/AIRFLOW MEASURING STATION IN FOR EXISTING BRANCH RETURN DUCTWORK. MOTORIZED DAMPER TO MODULATE TO CONTROL TO AIRFLOW AS SHOWN. PROVIDE TAMCO/EBTRON AIR-IQ OR APPROVED EQUIVALENT PACKAGED AIRFLOW MEASUREMENT & DAMPER SOLUTION. RE: M3.02 FOR MORE INFORMATION.
PATCH DUCT CONNECTION FOR EXISTING RA TO ALLOW OTHER AREAS ON AHU-3 TO CONTINUE TO OPERATE DURING CONSTRUCTION.
ADJUST EXISTING CEILING DIFFUSER HEIGHT AS NEEDED WITH ARCHITECTURAL CHANGES IN CORRODOR C2053R.
PNEUMATIC TUBE SYSTEM BY OTHERS. COORDINATE WITH PNEUMATIC TUBE MANUFACTURER/INSTALLER.
0 2' 4' 8'
1
2
3
4
A - 001 10/07/19 ADD 001
LABORATORY GAS EQUIPMENT SCHEDULE
EQUIPMENT EQUIPMENT OPERATING PERFORMANCE MANUFACTURER
MARK: FUNCTION: CONDITIONS: REQUIREMENTS: AND MODEL: REMARKS:
MA-1 MEDICAL GAS INLET AIR N/A POWEREX - RECESSED WALL-MOUNTED DISS MEDICAL GAS OUTLET
SINGLE WALL MOUNT MODEL PX-DCN91XF1116 - PROVIDE GAS SPECIFIC ROUGH-IN ASSEMBLY, MATCHING GAS-SPECIFIC LATCH, AND COVER PLATE
OR EQUIVALENT - SEE ARCHITECTURAL INTERIOR ELEVATIONS FOR EXACT LOCATIONS, COORDINATE WITH CEILING TYPE PER ARCH
- ASSEMBLY TO BE CLEANED FOR PURE GAS SERVICE
MG-1 MEDICAL GAS INLET OXYGEN N/A POWEREX - RECESSED WALL-MOUNTED DISS MEDICAL GAS OUTLET
SINGLE WALL MOUNT MODEL PX-DCN91XF1124A - PROVIDE GAS SPECIFIC ROUGH-IN ASSEMBLY, MATCHING GAS-SPECIFIC LATCH, AND COVER PLATE
OR EQUIVALENT - SEE ARCHITECTURAL INTERIOR ELEVATIONS FOR EXACT LOCATIONS, COORDINATE WITH CEILING TYPE PER ARCH
- ASSEMBLY TO BE CLEANED FOR PURE GAS SERVICE
MV-1 MEDICAL VACUUM INLET VAC N/A POWEREX - RECESSED WALL-MOUNTED DISS MEDICAL GAS OUTLET
SINGLE WALL MOUNT MODEL PX-DCN91XF1122 - PROVIDE GAS SPECIFIC ROUGH-IN ASSEMBLY, MATCHING GAS-SPECIFIC LATCH, AND COVER PLATE
OR EQUIVALENT - SEE ARCHITECTURAL INTERIOR ELEVATIONS FOR EXACT LOCATIONS, COORDINATE WITH CEILING TYPE PER ARCH
- ASSEMBLY TO BE CLEANED FOR PURE GAS SERVICE
WAGD-1 WASTE ANESTHESIA WAGD N/A POWEREX - RECESSED WALL-MOUNTED DISS MEDICAL GAS OUTLET
GAS DISPOSAL MODEL PX-DCN91XF1132 - PROVIDE GAS SPECIFIC ROUGH-IN ASSEMBLY, MATCHING GAS-SPECIFIC LATCH, AND COVER PLATE
SINGLE WALL MOUNT OR EQUIVALENT - SEE ARCHITECTURAL INTERIOR ELEVATIONS FOR EXACT LOCATIONS, COORDINATE WITH CEILING TYPE PER ARCH
- ASSEMBLY TO BE CLEANED FOR PURE GAS SERVICE
ZVB-1 ZONE ALARM MED VAC N/A AMICO - MICROPROCESSOR CONTROLLED AND DESIGN TO COMPLY WITH NFPA 99
ZONE VALVE PANEL MED AIR MODEL VBU-M100707 - PANEL SHALL CONTAIN AUDIBLE AND VISIBLE ALARMS
OXYGEN OR EQUIVALENT - VALVES SHALL BE DUAL GAUGE PORT, CAST BRONZE, BALL-TYPE, WITH TFE SEATS AND SEALS
- VALVE BOX SHALL BE 18 GAUGE SHEET STEEL CONSTRUCTION.
- VALVE BOX ASSEMBLY SHALL BE SUPPLIED WITH DECORATIVE FRAME PAINTED WHITE
WHICH ENCLOSES AN EASILY REMOVABLE FLEXIBLE WINDOW.
ZVB-2 ZONE ALARM MED VAC N/A AMICO - MICROPROCESSOR CONTROLLED AND DESIGN TO COMPLY WITH NFPA 99
ZONE VALVE PANEL MED AIR MODEL VBU-M070505 - PANEL SHALL CONTAIN AUDIBLE AND VISIBLE ALARMS
OXYGEN OR EQUIVALENT - VALVES SHALL BE DUAL GAUGE PORT, CAST BRONZE, BALL-TYPE, WITH TFE SEATS AND SEALS
- VALVE BOX SHALL BE 18 GAUGE SHEET STEEL CONSTRUCTION.
- VALVE BOX ASSEMBLY SHALL BE SUPPLIED WITH DECORATIVE FRAME PAINTED WHITE
WHICH ENCLOSES AN EASILY REMOVABLE FLEXIBLE WINDOW.
ZVB-3 ZONE ALARM WAGD N/A AMICO - MICROPROCESSOR CONTROLLED AND DESIGN TO COMPLY WITH NFPA 99
ZONE VALVE PANEL MED VAC MODEL VBU-M10100707 - PANEL SHALL CONTAIN AUDIBLE AND VISIBLE ALARMS
MED AIR OR EQUIVALENT - VALVES SHALL BE DUAL GAUGE PORT, CAST BRONZE, BALL-TYPE, WITH TFE SEATS AND SEALS
OXYGEN - VALVE BOX SHALL BE 18 GAUGE SHEET STEEL CONSTRUCTION.
- VALVE BOX ASSEMBLY SHALL BE SUPPLIED WITH DECORATIVE FRAME PAINTED WHITE
WHICH ENCLOSES AN EASILY REMOVABLE FLEXIBLE WINDOW.
MSA-1 MASTER MED VAC N/A CHEMETRON - DUAL DISPLAY MODULES SHOWING SYSTEM PRESSURE
ALARM MED AIR IMPACT SERIES 74-15-OAV - INCLUDE SILENCE/ENTER BUTTON AND TEST/SHIFT BUTTON
OXYGEN OR EQUIVALENT - COLORED LED ALRM LIGHTS
- VALVE BOX SHALL BE 18 GAUGE SHEET STEEL CONSTRUCTION.
- ALARM SHALL STORE LAST FOUR ALARM CONDITIONS
- ALARM BUZZ IN EXCESS OF 90 DECIBELS
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Fort Collins, Colorado
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/7/2
01
9 1
0:5
8:1
5 P
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-M
-19
_b
ren
ton
.bo
ye
r@c
lark
en
ers
en
.co
m.r
vt
Mechanical Schedules
M4.02
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
A - 001 10/07/19 ADD 001
001A
DN
FRONT
DN
3/4" HWC (E)1 1/4" HW (E)1 1/2" CW (E)
3/4"
CW
(E
)
3/4"
HW
(E
)
S-1
S-3
1/2" HW
1/2" HWC
1/2" CW
1/2" CW, 1/2" HW, 1 1/2" V DN TO S-3
MV-1
MA-1MG-1
MV1
MA-1
MG-1
1/2" MA1/2" OX
3/4" MV
1/2"
MA
1/2"
OX
1" M
V
1/2"
MA
1/2"
OX
1" M
V
1/2" CW, 1/2" HW, 1 1/2" V DN TO S-1
MV1
MA-1
MG-1
MSB-1
3/4"
HW
3/4"
CW
3/4" HWC3/4" HW3/4" CW
S-23/4" CW, 3/4" HW, 1 1/2" V DN TO S-2
A B CZ.9
2
3
4
1 1/
2" V
(E
)1
1/2"
V (
E)
1 1/2" V (E)
2" V
(E
)
1 1/2" V (E)
1 1/2" V (E)
1 1/
2" V
(E
)
4" V (E)
4" V
(E
)
1 1/
4" H
W (
E)
1 1/
2" C
W (
E)
1" H
W (
E)
1" C
W (
E)
CAP
Z.9
Z.9
A
A
B
B
C
C
2 2
3 3
4 4
1 1/2" V (E) UP
3/4"
CW
3/4"
HW
3/4" CW3/4" HW
3/4"
HW
C
1 1/
2" V
AUTOMATIC FLOW BALANCING VALVE SET TO 0.5 GPM
BALANCING VALVE SET TO 0.5 GPM
FLUOROSCOPYPROCEDUREROOM
C2053G
CT PROCEDUREROOM
C2053H
EQ.
C2053J
RR
C2029A
SLEEP EGG
C2029
SLEEP EGG
C2030
EMG-1
C2031
CORRIDOR
C2053R
CORRIDOR
CC2010
EEG-1
C2033
SUB. WAITING
C2034
PATIENT
C2053P
CHECK IN
C2053D
CONTROL ROOM
C2053K
EQ.
C2053F
READING ROOM
C2053E
CHECK IN
C2053D
ELEC.
C2057OFFICE
C2054
RR
C2052RR
C2050
CORRIDOR
CC2040
PHYSICIAN WORK
C2040
CORRIDOR
CC2019
OFFICE
C2035MED.SUPPLIES/PAR
C2053Q
RECEIVING
C2053A
EQUIPMENT
C2053C
CORRIDOR
C2053
STORAGE
C2056
1 1/4" MV (E)1" MA (E)
1" OX (E)
1 1/2" HWC (E)
3" HW (E)
3" CW (E)
3/4" MV1/2" MA1/2" OX
1" MV3/4" MA3/4" OX
1 1/4" MV1" MA1" OX
1" M
V3/
4" M
A3/
4" O
X
1" M
V3/
4" M
A3/
4" O
X
1/2" OX1/2" MA3/4" MV
3/4" MV1/2" MA1/2" OX
ZVB-2
ZVB-1
ZVB-3
1" M
V3/
4" M
A3/
4" O
X
1 1/4" MV1" MA1" OX
MSA-1 1
ULTRASOUND
C2053B
3/4" CW/HW (E) UP
CW, HW DN (E) TO FIXTURE
CW, HW DN (E) TO FIXTURE
SOILED
C2053M
CLEAN LINEN
C2053N
AUTOMATIC FLOW BALANCING VALVE SET TO 0.5 GPM
3/4"
HW
C (
E)
MV
-1M
A-1
MG
-1
MV
-1M
A-1
MG
-1
3/4" HB-1WAGD, MV, MA, OX DN TO BOOMWAGD, MV, MA, OX DN TO BOOM
FD-1
1" W
AG
D
WA
GD
-1
WA
GD
-1
1" W
AG
D
1" W
AG
D
001A
1" WAGD
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Fort Collins, Colorado
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/7/2
01
9 1
0:5
8:2
6 P
M
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-M
-19
_b
ren
ton
.bo
ye
r@c
lark
en
ers
en
.co
m.r
vt
Second Floor Plumbing
Plan
P1.02
TCEP No.: 624-149-17
Columbia, MO
University of MissouriTeaching HospitalCritical Care Addition -Interventional RadiologyExpansion
September 18, 2019
MU No.: CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLUMBING PLAN
1
GENERAL NOTES:
1. ALL NEW WORK IS SHOWN IN HEAVY LINEWEIGHT. ALL WORK TO REMAIN AS EXISTING IS SHOWN IN LIGHT LINEWEIGHT.
PLAN NOTES:
MASTER ALARM MA-1 LOCATED ABOVE ZVB-2.
0 2' 4' 8'
A - 001 10/07/19 ADD 001
DN
FRONT
DN
J
NN
N
F
F
F
F
JJ
J
J
J
J
J
J J J
J
EL
EL
CR
DM
DMCR
CR
CRELDM
CR
EL
DM
J
N
EL
DM
CREL DM
ELEL DMDM
J
N
N NF F
S
S
SSS
S
N
N
F
F
F
F
F
F
F
FF
FF
F
JJ
JJ
J J
J
J J
J
J JM
JJ
J
M
M
M
J
J
J
J
J
M
J
J
J
J
J
J
J
N22
L2A
L21
T-L2A
T-C2B
C22
C2B
N2BT
T
T
T-N2B
A BZ.9
2
3
4
5
FLUOROSCOPYPROCEDUREROOM
C2053G
CT PROCEDUREROOM
C2053H
EQ.
C2053J
RECEIVING
C2053A
MED.SUPPLIES/PAR
C2053Q
CORRIDOR
C2053
READING ROOM
C2053E
+48"
EQUIPMENT
C2053C
ULTRASOUND
C2053B
PATIENT
C2053P
SOILED
C2053M
CLEAN LINEN
C2053N
CHECK IN
C2053D
EQ.
C2053F CONTROL ROOM
C2053K
AX
CT
DL
XFMR
MAVIG
HD3
+48" +48" +48"
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
+48"
ELECT
C2057
+48"
+48"
+28"
+28"
+48"
+48"
+28"
+28"
+36"
+36"
+36"
+36"
+48" +48"
+36"
+36"
+28"+28"
+48"
+48"
+48"
GFI
C
C
C
C
2
2 2
2
2
2
+48" +48" +48"
2 2 2
+44"USB
+44"USB
+44"USB
+44"USB
+44"USB
+44"USB
+44"USB
+48"
+44"USB
2
4
+57"
6
7
7
7
C
C
9
6
7
5
6
+28" +36"
+28"
+36"
+36"
+28"
+90"
+90"+120"
+120"
+48"
C
8WAP
P
+57"
10 9
9
WAP
9
+57"+57"
P
P
+57"+57"
9
9
9
9
9
9
9
9
9
9
9
NCL
NCL
SLEEP EGG
C2030
EMG-1
C2031
CORRIDOR
C2053R
EEG-1
C2033
SUB. WAITING
C2034
OFFICE
C2035
CORRIDOR
CC2019
OFFICE
C2054
RR
C2052
RR
C2050
CORRIDOR
CC2040
+120"
GFI GFI
D
+120"
+120"
DD
+120"+120"
9
6
+48"
+44"
CB
CB
9
C
9
+48"
3
GFI
C
C
C
CC
CC
C
GFI
GFI
N2B-2
N2B-3
N2B-4
N2B-5
C2B-2
C2B-4
N2B-8
C2B-8
N2B-10
C2B-10
N2B-12
N2B-13
N2B-15
N2B-17
N2B-18
N2B-19
C2B-11 C2B-12
N2B-21
C2B-13N2B-23
N2B-25
C2B-15
N2B-24
C2B-16
N2B-26
C2B-18
N2B-27
C2B-20N2B-9
C2B-24
C2B-38
C2B-34
C2B-35
C2B-35
N2B-28
9
9
9
9
+120"
9
N2B-14N2B-47
C2B-51
N2B-49
C2B-53
C2B-55
11
11 +60"
12
12 +60"
C2B-50
C2B-50
10
10
10
GFI
N2B-50
+44"+44"
C2B-54 N2B-51
C2B-56
15 15
N2B-52
C2B-57
C2B-58
F13
N2B-53 C2B-59
N2B-54
C2B-60
C2B-61
N2B-55
F F
13
14 C2B-62 C2B-63
+57"
+57"
C2B-64
AE2A-12AC2053J
16 30A/3P
C
C2B-65
C
C2B-73
C2B-66 C2B-67C2B-68 C2B-69
C2B-71
AC2053F
30A/3P
(E)
(E) (E)
(E)
(E)
WP30A/2P
CU2053F16
AE2A-28,30
WP30A/2P
16
CU2053J
17
AE2A-27,29
D
18
19
19
D
D
D
D
D
D
D
1918
18
C2B-70
18
D
AE2A-12
AE2A-12
AE2A-12
19
AE2A-12
18
18
18
18
18
C2B-70
20
20
21
L2A
1
(E)
N2B-56
C
C
30A/3P
N2B-29,31,33
22
C
C2B-78C
C2B-72
C
C2B-74
C2B-75C2B-76
C2B-77
23
24
26
2525
27
(TYP)
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/8/2
01
9 4
:46
:02
PM
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-E
-19
_d
an
.wro
ble
wsk
i.rv
t
Second Floor Power &
Auxiliary Systems Plan
E2.01
TCEP No.: 624-149-17
Columbia, Missouri
University of Missouri
Teaching Hospital
Critical Care Addition -
Interventional Radiology
Expansion
September 18, 2019
MU No.: #CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
SECOND FLOOR POWER & AUXILIARY SYSTEMS PLAN
0 2' 4' 8'
SECOND FLOOR POWER & AUXILIARY SYSTEMS PLAN NOTES
KEY NOTE DESCRIPTION
1 PROVIDE NEW ETC – ‘SC1008’ EMERGENCY TRANSFER DEVICE (OR EQUAL) AND CONNECT BOTH CRITICALAND NORMAL POWER PER MANUFACTURER’S REQUIREMTNS. CONNECT TRANSFER DEVICE TO OVERHEAD,ARM MOUNTED PROCEDURE LIGHT (OWNER PROVIDED). COORDINATE EXACT CONNECTION REQUIREMENTSWITH PROCEDURE LIGHT SUPPLIER/INSTALLER.
2 2 GANG BOX WITH SINGLE GANG EXTENSION RING AND BLANK COVER, FLUSH MOUNTED IN WALL AT +18" AFFUNLESS OTHERWISE INDICATED. ROUTE (1) 1" CONDUIT FROM BOX, CONCEALED UP WALL AND STUB ABOVETHE ACCESSIBLE CEILING IN THE CORRIDOR.
3 ELECTRICAL CONNECTION TO MOTORIZED SLIDING WALL ELECTRICAL CONTROL PANEL AND MOTOR. FUSEDDISCONNECT TO BE LOCATED ABOVE CEILING ADJACENT TO SLIDING DOOR MOTOR. COORDINATE EXACTLOCATION OF CONTROL PANEL AND PUSHBUTTON STATIONS WITH OWNER BEFORE ROUGH IN. PROVIDE ALLLOW VOLTAGE CABLING FOR PUSHBUTTONS, LIMIT SWITCHES, PHOTO EYE SENSORS, AND MOTORCONTROLS FOR A COMPLETE DOOR INSTALLATION. SEE MANUFACTURER’S INSTRUCTION FOR MOREINFORMATION.
4 ELECTRICAL CONNECTION TO COOLING UNIT. VERIFY EXACT LOCATION AND ELECTRICAL REQUIREMENTSEQUIPMENT INSTALLER/SUPPLIER.
5 120V ELECTRICAL CONNECTION FOR POWER OF MECHANICAL CONTROL TRANSFORMERS/ENCLOSED POWERSUPPLY FOR VB'S AND VBR'S SERVICING THE PROJECT AREA. PROVIDE ALL REQUIRED 120V ELECTRICALCONNECTIONS TO MECHANICAL CONTRACTOR PROVIDED AND INSTALLED CONTROLTRANSFORMERSENCLOSED POWER SUPPLIES. COORDINATE EXACT ENCLOSED POWER SUPPLY LOCATIONS,QUANTITIES, AND ADDITIONAL REQUIREMENTS WITH THE MECHANICAL CONTRACTOR AND THE OWNER'SBUILDING CONTROLS MANAGER. SEE THE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION,INCLUDING CONTROLS TRANSFORMERS/ENCLOSED POWER SUPPLY CONNECTIONS DETAIL.
6 SECURITY CAMERA LOCATION SHOWN FOR REFERENCE ONLY. REFER TO THE TELECOMMUNICATIONSPLANS FOR CABLING REQUIREMENTS.
7 LOCATION OF CARD READER. FULLY COORDINATE INSTALLATION AND CONNECTION DETAILS WITH THEDOOR HARDWARE SUPPLIERINSTALLER. SEE THE ACCESS CONTROL DETAILS FOR ADDITIONALINFORMATION.
8 ELECTRICAL PENETRATIONS THROUGH SMOKE RATED WALLS AND WALLS OF PRESSURIZED ROOMS SHALLBE SEALED. SEE ARCHITECTURAL AND MECHANICAL PLANS FOR SPECIFIC WALLS. SEE ELECTRICALSPECIFICATIONS FOR SEALING REQUIREMENTS.
9 FIRE RATED WALL. ALL ELECTRICAL PENETRATIONS SHALL BE SEALED WITH APPROVED FIRE CAULKING. SEEELECTRICAL SPECIFICATIONS FOR SEALING REQUIREMENTS. REFERENCE ARCHITECTURAL PLANS FOREXACT LOCATION OF FIRE WALL.
10 OUTLET BOX FOR AUTO DOOR OPERATOR STATION. INSTALL BOX IN WALL AT LOCATION INDICAETD.PROVIDE ALL NECESSARY CONNECTIONS BETWEEN PUSHBUTTON STATION AND POWER SUPPLY JUNCTIONBOX. ROUTE WIRE IN CONDUIT CONCEALED IN WALL AND ABOVE CEILING. COORDINATE INSTALLATION ANDCONNECTION DETAILS WITH THE DOOR HARDWARE SUPPLIER/INSTALLER.
11 120V CONNECTION TO PNEUMATIC TUBE SYSTEM STATION. STATION IS PROVIDED WITH A DUPLEX OUTLETTHAT THE CONTRACTOR SHALL MAKE CONNECTIONS TO. COORDINATE EXACT CONNECTION LOCATION ANDDETAILS WITH THE PNEUMATIC TUBE SYSTEM STATION SUPPLIER/INSTALLER.
12 DATA CONNECTION TO PNEUMATIC TUBE SYSTEMS STATION. COORDINATE EXACT DATA CONNECTIONLOCATION WITH THE PNEUMATIC TUBE SYSTEM SUPPLIER/INSTALLER.
13 STUB (1) 1” UP, THRU FLOOR, INTO IMAGING EQUIPMENT TABLE LEG. FROM TABLE LEG STUB UP, ROUTECONDUIT CONCEALED, BELOW RAISED FLOOR AND CONNECT TO JUNCTION IN CONTROL ROOM. COORDINATEEXACT LOCATION AND CONNECTION REQUIREMENTS WITH IMAGING EQUIPMENT SUPPLIER/INSTALLER.
14 PROVIDE 2 GANG BOX WITH SINGLE GANG EXTENSION RING, FLUSH MOUNTED IN WALL AT +18" AFF. FROMBOX, ROUTE (1) 1" CONDUIT BELOW RAISED FLOOR AND CONNECT TO JUNCTION IN CONTROL ROOM.
15 PROVIDE 2 GANG BOX WITH SINGLE GANG EXTENSION RING, FLUSH MOUNTED IN WALL AT +18" AFF.
16 PROVIDE ALL CONNECTIONS BETWEEN INDOOR AIR CONDITIONING UNIT AND CORRESPONDING OUTDOORCONDENSING UNIT.
17 ROUTE #10 THROUGHOUT ENTIRE CIRCUIT.
18 120V ELECTRICAL CONNECTION TO SMOKE DAMPER/COMBINATION FIRE SMOKE DAMPER. PROVIDE ALLNECESSARY CONNECTIONS TO DAMPER SO THAT UPON FIRE ALARM CONDITION OR DUCT SMOKE DETECTORACTIVATION, THE DAMPERS CLOSE. COORDINATE EXACT CONNECTION REQUIREMENTS AND LOCATION WITHTHE MECHANICAL CONTRACTOR.
19 PROVIDE 120V ELECTRICAL CONNECTION ROOM PRESSURE SENSOR. COORDINATE EXACT REQUIREMENTSWITH MECHANICAL CONTRACTOR.
20 CARD READER ROUGH-IN ONLY. FULLY COORDINATE INSTALLATION AND CONNECTION DETAILS WITH THEDOOR HARDWARE SUPPLIERINSTALLER. SEE THE ACCESS CONTROL DETAILS FOR ADDITIONALINFORMATION.
21 PROVIDE 120V ELECTRICAL CONNECTION GAS ALARM PANEL (MA-1). CIRCUIT PANEL TO A NEW 20A/1PCIRCUIT BREAKER LOCATED IN PANELBOARD ‘L2A’. COORDINATE EXACT CONNECTION REQUIREMENTS WITHTHE MECHANICAL CONTRACTOR.
22 DEVICES TO BE MOUNTED IN CASEWORK. COORDINATE EXACT LOCATION WITH CASEWORK PROVIDER.ROUTE ALL WIRING CONCEALED TO NEARBY WALL.
23 ELECTRICAL CONNECTION TO MAVIG LAMP 24V XFMR (PROVIDED BY IMAGING EQUIPMENT SUPPLIER). EC TOCONNECT AND PROVIDE LOW VOTLAGE WIRING TO LAMP AS REQUIRED FOR A COMPLETE INSTALLATION.
24 ELECTRICAL CONNECTION TO ANESTHESIA BOOM, (PROVIDED BY IMAGING EQUIPMENT SUPPLIER). EC TOPROVIDE ELECTRICAL CONNECTION TO (7) EM DUPLEX OUTLETS PROVIDED WITH BOOM AFTER BOOMINSTALLATION.
25 ELECTRICAL CONNECTION TO MONITOR BOOM, (PROVIDED BY IMAGING EQUIPMENT SUPPLIER). EC TOPROVIDE FINAL ELECTRICAL CONNECTIONS AFTER BOOM INSTALLATION.
26 ELECTRICAL CONNECTION TO INJECTOR BOOM, (PROVIDE BY IMAGING EQUIPMENT SUPPLIER). EC TOPROVIDE FINAL ELECTRICAL CONNECTIONS AFTER BOOM INSTALLATION.
27 CONTRACTOR TO PULL SPEAKER CABLING TO APPROXIMATE LOCATION SHOWN. PROVIDE 15' OF COILEDSLACK AT LOCATION SHOWN FOR FUTURE FLEXIBILITY.
ALL NEW RECEPTACLES ADDED UNDER THIS PROJECT’S SCOPE SHALL BE
HOSPITAL GRADE, TAMPER PROOF TYPE RECEPTACLES. SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
A - 001 10/08/19 ADDENDUM #1
FRONT
J J
J
J
J
J
J
J
J
J
J
J
J
J J
J J
J
J
J
J
J
A BZ.9
2
FLUOROSCOPYPROCEDUREROOM
C2053G
CT PROCEDUREROOM
C2053HEQ.
C2053J
+46" +46"
EQ.
C2053F
CONTROL ROOM
C2053K
AX
CT
+46"
+46"
+46"
+46"
DS DS
F
F
C
C
C
C
F
F
+72"
XF1
F
C
F
CMPT F1
VD4
HD3
PDC
EPO
SPD
EPO
EPO
VD5
HD2
VD3
EPO
GAN
EPOIC2
EPO
PU1
SC
CU1
HD1
VD2
VD1
D1
ICSU
P1
T1B10
UPS
SLEEP EGG
C2030
EMG-1
C2031
1
5
2
6
3
4
17
18
7
8
9
12
1311
10
14
15
16
SC1
31
32
33
37
40
41
42
43
44
45
4647
48
49
50
51
52
69
53
40
57
56
59
57
64
63
65 66
67
68
'IN-USE' 'IN-USE'
AFP
CLDCR1
CRBIN1
IN2
SD
XWP
COC
ICS
IN3
IN4
AFN
AFU
CC
IS2IS
LDC
RMD
T
+46"EPO
3
3
C
F 59
19
20
58
MAVIG
35
34
38
39
36
5455
60
61
62
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/9/2
01
9 8
:04
:26
AM
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-E
-19
_d
an
.wro
ble
wsk
i.rv
t
Procedure Rooms Power
& Auxiliary Systems Plan
E2.02
TCEP No.: 624-149-17
Columbia, Missouri
University of Missouri
Teaching Hospital
Critical Care Addition -
Interventional Radiology
Expansion
September 18, 2019
MU No.: #CP180491
09/18/2019 CONTRACT DOCUMENTS
SCALE: 1/4" = 1'-0"
PROCEDURE ROOMS POWER & AUXILIARY SYSTEMS PLAN
0 2' 4' 8'
PROCEDURE ROOMS POWER & AUXILIARY SYSTEMS PLAN NOTES
KEY NOTE DESCRIPTION
38 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM RMD TO UPS AS INDICATED ON DRAWINGS.
39 ELECTRICAL CONNECTION FROM CT POWER PANEL TO EPO PUSHBUTTON. SEE ELECTRICAL ONE LINEDIAGRAM FOR MORE INFORMATION.
40 ELECTRICAL CONNECTION FROM EPO PUSHBUTTON TO ADDITIONAL EPO PUSHBUTTON. SEE ELECTRICALONE LINE DIAGRAM FOR MORE INFORMATION.
41 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM SC1 TO WARNING LIGHT AS INDICATED ON DRAWINGS.
42 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM SC1 TO DOOR CONTACT SWITCH (DS) AS INDICATED ONDRAWINGS.
43 ELECTRICAL BRANCH CIRCUIT TO TABLE OUTLET XF1. PROVIDE #12 AWG CONDUCTORS IN 3/4" CONDUIT TOPANEL INDICATED. SEE ELECTRICAL ONE LINE DIAGRAM FOR MORE INFORMATION.
44 PROVIDE 120V DEDICATED CIRCUIT TO MAVIG XFMR. SEE SECOND FLOOR POWER & AUXILIARY SYSTEMSPLAN FOR MORE INFORMATION.
45 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM MAVIG XFMR TO SU AS INDICATED ON PLANS.
46 PROVIDE 2" CONDUIT ABOVE CEILING FROM P1 TO VD1 (PU1) AS INDICATED ON DRAWINGS.
47 PROVIDE (2) 3" CONDUIT ABOVE CEILING FROM P1 TO VD1 (PU1) AS INDICATED ON DRAWINGS.
48 PROVIDE 3" CONDUIT ABOVE CEILING FROM P1 TO VD1 (PU1) AS INDICATED ON DRAWINGS.
49 PROVIDE 2-1/2" CONDUIT ABOVE CEILING FROM P1 TO CU1 (PU1) AS INDICATED ON DRAWINGS.
50 PROVIDE (2) 3" CONDUITS UNDERFLOOR FROM SC TO VD3 (CR1) AS INDICATED ON DRAWINGS.
51 PROVIDE 3" CONDUIT UNDERFLOOR FROM SC TO T1 AS INDICATED ON DRAWINGS.
52 PROVIDE 2" CONDUIT ABOVE CEILING FROM VD1 TO CU1 AS INDICATED ON DRAWINGS.
53 PROVIDE 3" CONDUIT UNDERFLOOR FROM SC TO IS2 AS INDICATED ON DRAWINGS.
54 PROVIDE 3" CONDUIT ABOVE CEILING FROM VD2 TO VD3 AS INDICATED ON DRAWINGS.
55 PROVIDE 2" CONDUIT ABOVE CEILING FROM VD2 TO VD3 AS INDICATED ON DRAWINGS.
56 PROVIDE 3" CONDUIT ABOVE CEILING FROM VD1 TO D1 AS INDICATED ON DRAWINGS.
57 PROVIDE 2" CONDUIT ABOVE CEILING FROM VD2 TO D1 AS INDICATED ON DRAWINGS.
58 PROVIDE 2" CONDUIT ABOVE CEILING FROM VD2 TO VD1 (SC1) AS INDICATED ON DRAWINGS.
59 PROVIDE 2-1/2" CONDUIT UNDERFLOOR FROM IS2 TO T1 AS INDICATED ON DRAWINGS.
60 PROVIDE (2) 3" CONDUIT ABOVE CEILING FROM VD2 TO VD3 AS INDICATED ON DRAWINGS.
61 PROVIDE 3" CONDUIT ABOVE CEILING FROM VD2 TO "CUSTOMER SOURCES". COORDINATE FINAL LOCATIONSWITH OWNER.
62 PROVIDE 3" CONDUIT UNDERFLOOR FROM IN2 TO VD3 (CRB) AS INDICATED ON DRAWINGS.
63 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM IC TO VD3 (CRB) AS INDICATED ON DRAWINGS.
64 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM IC2 TO VD3 (CRB) AS INDICATED ON DRAWINGS.
65 PROVIDE 3" CONDUIT UNDERFLOOR FROM B10 TO T1 AS INDICATED ON DRAWINGS.
66 PROVIDE 3" CONDUIT UNDERFLOOR FROM B10 TO VD3 (CRB) AS INDICATED ON DRAWINGS.
67 PROVIDE 1/2" CONDUIT ABOVE CEILING FROM XF1 TO SC1 AS INDICATED ON DRAWINGS.
68 PROVIDE 2" CONDUIT ABOVE CEILING FROM VD2 (IS) TO "CUSTOMER MONITOR" (LIVE_REF VIDEO INTERFACETO OEM). COORDINATE FINAL LOCATIONS WITH OWNER.
69 PROVIDE 1-1/2" CONDUIT ABOVE CEILING FROM VD2 TO AFU AS INDICATED ON DRAWINGS.
PROCEDURE ROOMS POWER & AUXILIARY SYSTEMS PLAN NOTES
KEY NOTE DESCRIPTION
1 ELECTRICAL FEEDER FOR CT POWER PANEL. SEE ELECTRICAL ONE LINE DIAGRAM FOR MORE INFORMATION.
2 ELECTRICAL CONNECTION FROM CT POWER PANEL TO EPO PUSHBUTTON. SEE ELECTRICAL ONE LINEDIAGRAM FOR MORE INFORMATION.
3 ELECTRICAL CONNECTION FROM EPO PUSHBUTTON TO ADDITIONAL EPO PUSHBUTTON. SEE ELECTRICALONE LINE DIAGRAM FOR MORE INFORMATION.
4 ELECTRICAL CONNECTION FROM VD4 TO EPO PUSHBUTTON. SEE ELECTRICAL ONE LINE DIAGRAM FOR MOREINFORMATION.
5 ELECTRICAL BRANCH CIRCUIT TO SURGE PROTECTIVE DEVICE. SEE ELECTRICAL ONE LINE DIAGRAM FORMORE INFORMATION.
6 ELECTRICAL BRANCH CIRCUIT TO POWER DISTRIBUTION CABINET PDC. SEE ELECTRICAL ONE LINEDIAGRAMS FOR MORE INFORMATION.
7 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM VD4 TO WARNING LIGHT AS INDICATED ON DRAWINGS.
8 PROVIDE 3/4" CONDUIT ABOVE CEILING FROM VD4 TO DOOR CONTACT SWITCH (DS) AS INDICATED ONDRAWINGS.
9 PROVIDE 2-1/2" CONDUIT ABOVE CEILING FROM VD4 TO VD5 AS INDICATED ON DRAWINGS.
10 PROVIDE 3" CONDUIT ABOVE CEILING FROM GAN TO VD5 AS INDICATED ON DRAWINGS.
11 PROVIDE (3) 3" CONDUIT ABOVE CEILING FROM GAN TO VD4 AS INDICATED ON DRAWINGS. MINIMUM 6"BENDING RADIUS REQUIRED.
12 PROVIDE 3" CONDUIT ABOVE CEILING FROM GAN TO VD5 AS INDICATED ON DRAWINGS.
13 PROVIDE 1-1/2" CONDUIT ABOVE CEILING FROM GAN TO VD4 AS INDICATED ON DRAWINGS.
14 PROVIDE (2) 3" CONDUITS (IF REQUIRED PER LOCAL CODE) ABOVE CEILING FROM GAN TO ON-SITE WATERCONNECTION. MINIMUM 6" BENDING RADIUS REQUIRED.
15 PROVIDE 1" CONDUIT (IF REQUIRED PER LOCAL CODE) ABOVE CEILING FROM GAN TO SELECTED DRAIN TYPE.MINIMUM OF 6" BEND RADIUS REQUIRED.
16 PROVIDE 2-1/2" CONDUIT ABOVE CEILING FROM IN3 TO IN4 AS INDICATED ON DRAWINGS. VERIFY LENGTHRESTRICTIONS WITH MANUFACTURER.
17 PROVIDE 2-1/2" CONDUIT ABOVE CEILING FROM VD5 TO F1 AS INDICATED ON DRAWINGS.
18 PROVIDE 2-1/2" CONDUIT ABOVE CEILING FROM VD4 TO F1 AS INDICATED ON DRAWINGS.
19 PROVIDE 2" CONDUIT UNDERFLOOR FROM MPT TO VD4 (PDC) AS INDICATED ON DRAWINGS.
20 PROVIDE 2" CONDUIT UNDERFLOOR FROM MPT TO VD5 (COC) AS INDICATED ON DRAWINGS.
21-30 INTENTIALLY LEFT BLANK
31 ELECTRICAL FEEDER FOR AX POWER PANEL. SEE ELECTRICAL ONE LINE DIAGRAM FOR MORE INFORMATION.
32 ELECTRICAL BRANCH CIRCUIT FOR POLY. A100 CABINET PU1. SEE ELECTRICAL ONE LINE DIAGRAM FORMORE INFORMATION.
33 ELECTRICAL BRANCH CIRCUIT FROM UPS TO SD WITH FLEX CONDUIT FROM UPS BOX TO OUTPUT XFMRCABINET. SEE ELECTRICAL ONE LINE DIAGRAM FOR MORE INFORMATION.
34 ELECTRICAL BRANCH CIRCUIT FROM UPS TO SD. SEE ELECTRICAL ONE LINE DIAGRAM FOR MOREINFORMATION.
35 ELECTRICAL BRANCH CIRCUIT FROM SD TO SC1. SEE ELECTRICAL ONE LINE DIAGRAM FOR MOREINFORMATION.
36 ELECTRICAL BRANCH CIRCUIT FROM UPS TO OUTPUT TRANSFORMER CABINET. SEE ELECTRICAL ONE LINEDIAGRAM FOR MORE INFORMATION.
37 ELECTRICAL CONNECTION FROM UPS CABINET TO EPO PUSHBUTTON. SEE ELECTRICAL ONE LINE DIAGRAMFOR MORE INFORMATION.
EXACT LOCATIONS AND CONDUIT ROUTING SHOWN ARE APPROXIMATE AND FOR REFERENCE
ONLY. BEFORE PERFORMING ANY WORK RELATED TO SIEMENS IMAGING EQUIPMENT,
ELECTRICAL CONTRACTOR TO FULLY COORDINATE ALL IMAGING EQUIPMENT ELECTRICAL REQUIREMENTS WITH FINALIZED SIEMENS DESIGN DRAWINGS. SEE FINALIZED SIEMENS DESIGN
DRAWINGS FOR FURTHER INFORMATION AND REQUIREMENTS.
A - 001 10/08/19 ADDENDUM #1
ELECTRICAL LEGEND
SYM SIZE DESCRIPTION REMARKS
AFN ----- ETHERNET CONNECTION TO CUSTOMER'S INFORMATION SYSTEMS NETWORK. ACUSON FREESTYLE NETWORK
AFP 20A 110V, 20A HOSPITAL GRADE OUTLET 18" AFF. ELECTRICAL CONTRACTOR TO SUPPLY AND INSTALLA NEMA 5-20P PLUG ONTO SIEMENS POWER CORD FOR USE WITH THIS WALL OUTLET.
ACUSON FREESTYLE POWER
AFU ----- FIXPOINT DESIGNATION, SAME BOX/OPENING AS "D1". ACUSON FREESTYLEULTRASOUND CABLING
AX ----- MAIN PANEL WITH MAIN BREAKER. LOCATION DETERMINED BY CUSTOMER/CONTRACTOR. SEE"POWER SCHEDULE".
BREAKER PANEL
B10 AS REQUIRED PULL BOX MOUNTED BELOW FINISHED FLOOR WITH REMOVABLE BOTTOM COVER. PROVIDE 4" 0CONDUIT FROM BOX TO FLUSH WITH FINISHED FLOOR. PROVIDE STAINLESS STEELWATERPROOF PLATE ON TOP OF CORED OPENING IN FLOOR.
TABLE ACCESSORIES
CC 18" X 8" BUSHED OPENING IN VERTICAL DUCT "VD1" COVER AT FLOOR LINE. CABLE CABINET
CLD 3" 0 BUSHED OPENING IN TOP OF HORIZONTAL DUCT "HD1". C-ROOM CUSTOMER LD INPUTS
COC AS REQUIRED OPENING IN RACEWAY IN SHOWN LOCATION. CONTROL CABINET
CR1 3" 0 BUSHED OPENING IN TOP OF HORIZONTAL DUCT "HD1". CONTROL ROOM DISTRIBUTOR
CRB AS REQUIRED PULL BOX MOUNTED BELOW FINISHED FLOOR WITH REMOVABLE BOTTOM COVER. FOR A SINGLECONDUIT CONNECTION TO THIS BOX, PROVIDE A 3" CONDUIT THRU FLOOR. FOR MULTIPLECONDUIT CONNECTIONS, PROVIDE (2) 4" CONDUITS THRU FLOOR. E.C. TO DESIGN TRANSITION TOSURFACE FLOOR DUCT AS REQUIRED.
CONTROL ROOM UNDER-FLOORBOX
CT ----- MAIN PANEL WITH MAIN BREAKER. LOCATION DETERMINED BY CUSTOMER/CONTRACTOR. SEE"POWER SCHEDULE".
BREAKER PANEL
CU1 AS REQUIRED PULL BOX MOUNTED FLUSH IN FINISHED WALL AT FLOOR LINE. PROVIDE BOX WITH REMOVABLEFRONT COVER AND (1) 4" 0 BUSHING IN CENTER OF REMOVABLE COVER FOR CABLE EXIT. SEEPLAN FOR LOCATION.
COOLING UNIT
D1 AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING WITH REMOVABLE BOTTOM COVER WITH 4" 0BUSHED OPENING.
LD BOOM KIT
F1 AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING. PROVIDE BOX WITH REMOVABLE COVER PULLBOX MOUNTED ABOVE FINISHED CEILING, EXACT LOCATION TO BE COORDINATED WITH SIEMENSPROJECT MANAGER.
CARE VISION MONITOR CEILINGMOUNT
GAN AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING. PROVIDE BOX WITH REMOVABLE COVER ONUNDERSIDE WITH AN OPENING, AS REQUIRED, FROM BOX TO FLUSH WITH FINISHED CEILING.PROVIDE BUSHING AT CEILING LINE. SEE PLAN FOR LOCATION.
CABLE CHAIN
HD1 3 1/2" X 10" HORIZONTAL DUCT MOUNTED ON FINISHED WALL AT FLOOR LINE. PROVIDE DUCT WITHREMOVABLE FRONT COVER. IF REQUIRED BY LOCAL CODE, DIVIDE DUCT INTO (3) SECTIONS WITHMETAL DIVIDERS. CONNECT TO VERTICAL DUCT "VD2" AS SHOWN.
HORIZONTAL WALL DUCT
HD2 10" X 3 1/2" ELECTRICAL DUCT (6'-0" LONG) RUN HORIZONTALLY ON THE WALL AT THE FLOOR LINE ANDSURFACE MOUNTED ON FINISHED WALL AS SHOWN. DUCT TO BE DIVIDED INTO TWO SECTIONSWITH METAL DIVIDERS.
RACEWAY
HD3 10" X 3 1/2" ELECTRICAL DUCT (7'-0" LONG) RUN HORIZONTALLY ON THE WALL AT THE FLOOR LINE ANDSURFACE MOUNTED ON FINISHED WALL AS SHOWN. DUCT TO BE DIVIDED INTO TWO SECTIONSWITH METAL DIVIDERS.
RACEWAY
IC AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING IN LOCATION COORDINATED WITH INTERCOMINSTALLATION. PROVIDE REMOVABLE BOTTOM COVER WITH 3/4" 0 BUSHED OPENING.
INTERCOM MIC
IC2 AS REQUIRED PULL BOX MOUNTED FLUSH IN FINISHED WALL AT A RECOMMENDED HEIGHT OF 6' AFF. INTERCOM PROCEDURE RM.LOUDSPEAKER
ICS 12" X 4" OPENING IN RACEWAY IN SHOWN LOCATION. IMAGE CONSTRUCTION SYS.
IN1 3" 0 BUSHED OPENING IN TOP OF HORIZONTAL DUCT "HD1". INJECTORELECTRONICS/KEYPAD
IN2 ----- FIXED POINT DESIGNATION, SAME PULL BOX AS "B10". TABLE INJECTOR
IN3 AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL AT FLOORLINE IN CONTROL AREA. INJECTOR ELECTRONICS
IN4 AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING IN SHOWN LOCATION. CEILING MTD. INJECTOR
IS 4" 0 BUSHED OPENING IN VERTICAL DUCT "VD2" COVER AT FLOOR LINE. IMAGE SYSTEM
IS2 AS REQUIRED PULL BOX MOUNTED BELOW FINISHED FLOOR WITH REMOVABLE BOTTOM COVER. PROVIDE 4" 0CONDUIT FROM BOX TO FLUSH WITH FINISHED FLOOR WITH BUSHING AT FLOOR LINE.
IMAGE SYSTEM
LDC ----- FIXED POINT DESIGNATION, SAME OPENING AS "IS". LARGE DISPLAY CONTAINER
MPT AS REQUIRED PULL BOX MOUNTED TO UNDERSIDE OF FLOOR SLAB WITH 4" 0 CORE DRILL WITH SLEEVETHROUGH FLOOR SLAB ENDING FLUSH WITH FINISHED FLOOR IN SHOWN LOCATION.
MULTIPURPOSE TABLE
P1 AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING. PROVIDE REMOVABLE BOTTOM COVER WITH 8" 0BUSHED OPENING. PROVIDE CORRESPONDING OPENING AT CEILING LINE.
C-ARM
PDC 12" X 5" OPENING IN RACEWAY IN SHOWN LOCATION. POWER DISTRIBUTION CAB.
PU1 AS REQUIRED PULL BOX MOUNTED FLUSH IN FINISHED WALL AT FLOOR LINE. PROVIDE BOX WITH REMOVABLEFRONT COVER WITH 4" 0 BUSHED OPENING AT BOTTOM OF COVER.
GENERATOR
RMD AS REQUIRED SINGLE-GANG RJ45 JACK UPS REMOTE MONITORINGDEVICE
SC AS REQUIRED PULL BOX MOUNTED BELOW FINISHED FLOOR WITH REMOVABLE BOTTOM COVER. PROVIDE 6" 0CONDUIT FROM BOX TO FLUSH WITH FINISHED FLOOR WITH BUSHING AT FLOOR LINE.
SYSTEM CABINET
SC1 AS REQUIRED PULL BOX MOUNTED FLUSH IN FINISHED WALL AT FLOOR LINE. PROVIDE BOX WITH REMOVABLEFRONT COVER WITH 4" 0 BUSHED OPENING AT BOTTOM OF COVER.
SYSTEM CABINET
SD 30A 3-PHASE (PLUS N,G) 30A, 600V HD FUSIBLE SERVICE DISCONNECT LOCATED AT EYE-LEVEL,WITHIN 10' OF SIEMENS SYSTEM CABINET (SC1) AND 30A RK5 FUSES. SEE POWER SCHEDULE.
UPS SERVICE DISCONNECT
SPD AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL PROVIDED WITH 2" 0 OPENING IN FINISHEDCOVER. THE SURGE PROTECTIVE DEVICE MUST BE LOCATED WITHIN 3 FEET CABLE RUN FROMCIRCUIT BREAKER, AT HEIGHT DETERMINED BY CUSTOMER/CONTRACTOR.
SEE DETAIL S-101
SU AS REQUIRED PULL BOX MOUNTED ABOVE FINISHED CEILING. CONNECT 6 FOOT LONG FIXTURE WHIP, (EITHER1/2" OR 3/8" GREENFIELD) WITH 3 NUMBER 13 WIRE TO BOX FOR TERMINATION TO SIEMENSEQUIPMENT AT CEILING LINE.
MAVIG LAMP
T1 AS REQUIRED PULL BOX MOUNTED BELOW FINISHED FLOOR WITH REMOVABLE BOTTOM COVER. PROVIDE 4" 0CONDUIT FROM BOX TO FLUSH WITH FINISHED FLOOR WITH BUSHING AT FLOOR LINE.
TABLE
VD1 3 1/2" X 18" VERTICAL DUCT MOUNTED FLUSH IN FINISHED WALL. BEGIN DUCT AT FLOOR LINE AND EXTENDUP WALL ABOVE FINISHED CEILING. PROVIDE JUNCTION BOX (SIZED BY E.C.) AT TOP OF DUCTFOR CONDUIT TRANSITIONS. IF REQUIRED BY LOCAL CODE, DIVIDE DUCT INTO (3) SECTIONSWITH METAL DIVIDERS.
VERTICAL DUCT
VD2 3 1/2" X 10" VERTICAL DUCT MOUNTED FLUSH IN FINISHED WALL. BEGIN DUCT AT FLOOR LINE AND EXTENDUP WALL ABOVE FINISHED CEILING. PROVIDE JUNCTION BOX (SIZED BY E.C.) AT TOP OF DUCTFOR CONDUIT TRANSITIONS. IF REQUIRED BY LOCAL CODE, DIVIDE DUCT INTO (3) SECTIONSWITH METAL DIVIDERS.
VERTICAL DUCT
VD3 3 1/2" X 10" VERTICAL DUCT MOUNTED FLUSH IN FINISHED WALL. BEGIN DUCT AT FLOOR LINE AND EXTENDUP WALL ABOVE FINISHED CEILING. PROVIDE JUNCTION BOX (SIZED BY E.C.) AT TOP OF DUCTFOR CONDUIT TRANSITIONS. IF REQUIRED BY LOCAL CODE, DIVIDE DUCT INTO (3) SECTIONSWITH METAL DIVIDERS.
VERTICAL DUCT
VD4 10" X 3 1/2" ELECTRICAL DUCT MOUNTED FLUSH WITH FINISHED WALL IN SHOWN LOCATION PROVIDED WITHFINISHED, REMOVALBE COVERS. TO EXTEND FROM FLOOR LINE TO END ABOVE FINISHEDCEILING. DUCT TO BE DIVIDED INTO TWO SECTIONS WITH METAL DIVIDERS.
RACEWAY
VD5 10" X 3 1/2" ELECTRICAL DUCT MOUNTED FLUSH WITH FINISHED WALL IN SHOWN LOCATION PROVIDED WITHFINISHED, REMOVALBE COVERS. TO EXTEND FROM FLOOR LINE TO END ABOVE FINISHEDCEILING. DUCT TO BE DIVIDED INTO TWO SECTIONS WITH METAL DIVIDERS.
RACEWAY
XF1 750VA STEP-DOWN TRANSFORMER. SEE POWER SCHEDULE TRANSFORMER FOR TABLEOUTLET
XWP 2" 0 BUSHED OPENING IN HORIZONTAL DUCT "HD1" COVER IN SHOWN LOCATION. SYNGO X WORKPLACE LD INPUT
001A
400A
T16
00AF
1600
AT16
00AF
800A
T16
00AF
800A
T16
00AF
1000
AT16
00AF
600A
T16
00AF
1000
AT16
00AF
800A
T16
00AF
600A
T16
00AF
600A
T16
00AF
XXXA
T16
00AF
1600
AF
SPAC
E
1700
AT20
00AF
1700
AT20
00AF
TO AUTOSHED RELAYS
'ATS-1,2,3,4,5,6,7,8,9'
TO FIRE PUMPCONTROLLER
TO AUTOSHED RELAY
'ATS-1'
TO AUTOSHED RELAY
'ATS-4'
TO AUTOSHED RELAY
'ATS-3'
TO AUTOSHED RELAY
'ATS-5'
TO AUTOSHED RELAY
'ATS-7'
TO AUTOSHED RELAY
'ATS-6'
TO AUTOSHED RELAY
'ATS-9'
TO AUTOSHED RELAY
'ATS-2'
TO UNITSUBSTATION
CCA1
TO XFMR'T-1'
TO'X2B MP1'
TO'X2B MP2'
NOT TO SCALE
ELECTRICAL ONE LINE DIAGRAM - EMERGENCY
ALL CONDUIT SIZES SHOWN ON FEEDER SIZINGTABLE HAVE BEEN SIZED FOR EMT CONDUIT.ADJUST SIZE AS NECESSARY FOR OTHER RACEWAYTYPES. CONDUIT SIZE SHALL NOT EXCEED NECMANDATED FILL CAPACITIES.
TVSS
DESCRIPTION
ELECTRICAL ONE LINE DIAGRAM - EMERGENCY NOTES
KEY NOTE
TVSS
1 1
EPO EPO
PDC SPD
MP
2
3
2
EPOEPO
PU1
SC1
MP
2
3
2
UPS
5
4
4
MARK
1
2
FEEDER DESCRIPTION
FEEDER SCHEDULE
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
(4) #12 & (1) #12 GRND IN 3/4" CONDUIT
(4) #10 & (1) #10 GRND IN 3/4" CONDUIT
(4) #8 & (1) #10 GRND IN 3/4" CONDUIT
(4) #6 & (1) #10 GRND IN 1" CONDUIT
(4) #4 & (1) #8 GRND IN 1 1/4" CONDUIT
(4) #2 & (1) #6 GRND IN 1 1/4" CONDUIT
(4) #1 & (1) #6 GRND IN 1 1/2" CONDUIT
(4) 1/O & (1) #6 GRND IN 2" CONDUIT
(4) #10 & (1) #10 GRND IN 3/4" CONDUIT
(4) #8 & (1) #10 GRND IN 3/4" CONDUIT
(4) #8 & (1) #10 GRND IN 3/4" CONDUIT
(4) #8 & (1) #10 GRND IN 3/4" CONDUIT
(4) #4 & (1) #8 GRND IN 1 1/4" CONDUIT
(4) #3 & (1) #8 GRND IN 1 1/4" CONDUIT
(4) #3 & (1) #8 GRND IN 1 1/4" CONDUIT
(4) 2/O & (1) #6 GRND IN 2" CONDUIT
(4) 3/O & (1) #6 GRND IN 2" CONDUIT
MARK
1A
2A
3A
4A
5A
6A
7A
8A
9A
10A
11A
12A
13A
14A
15A
16A
17A
FEEDER DESCRIPTION
(3) #12 & (1) #12 GRND IN 3/4" CONDUIT
(3) #10 & (1) #10 GRND IN 3/4" CONDUIT
(3) #8 & (1) #10 GRND IN 3/4" CONDUIT
(3) #6 & (1) #10 GRND IN 3/4" CONDUIT
(3) #4 & (1) #8 GRND IN 1" CONDUIT
(3) #2 & (1) #6 GRND IN 1 1/4" CONDUIT
(3) #1 & (1) #6 GRND IN 1 1/4" CONDUIT
(3) 1/O & (1) #6 GRND IN 1 1/2" CONDUIT
(3) #10 & (1) #10 GRND IN 3/4" CONDUIT
(3) #8 & (1) #10 GRND IN 3/4" CONDUIT
(3) #8 & (1) #10 GRND IN 3/4" CONDUIT
(3) #8 & (1) #10 GRND IN 3/4" CONDUIT
(3) #4 & (1) #8 GRND IN 1" CONDUIT
(3) #3 & (1) #8 GRND IN 1 1/4" CONDUIT
(3) #3 & (1) #8 GRND IN 1 1/4" CONDUIT
(3) 2/O & (1) #6 GRND IN 2" CONDUIT
(3) 3/O & (1) #6 GRND IN 2" CONDUIT
MARK FEEDER DESCRIPTION
FEEDER SCHEDULE - CONTINUED
18
19
20
21
22
23
24
25
26
28
29
30
31
(4) 3/O & (1) #3 GRND IN EACH OF (2) 2" CONDUITS
27
32
33
34
(1) #8 GROUNDING ELECTRODE IN 3/4" CONDUIT
(4) 4/O & (1) #4 GRND IN 2 1/2" CONDUIT
(4) 250MCM & (1) #4 GRND IN 2 1/2" CONDUIT
(4) 350MCM & (1) #4 GRND IN 3" CONDUIT
(4) 500MCM & (1) #3 GRND IN 3" CONDUIT
(4) 4/O & (1) #2 GRND IN EACH OF (2) 2 1/2" CONDUITS
(4) 250MCM & (1) #2 GRND IN EACH OF (2) 2 1/2" CONDUITS
(4) 350MCM & (1) #1 GRND IN EACH OF (2) 3" CONDUITS
(4) 500MCM & (1) 1/O GRND IN EACH OF (2) 3" CONDUITS
(4) 300MCM & (1) 1/O GRND IN EACH OF (3) 2 1/2" CONDUITS
(4) 400MCM & (1) 2/O GRND IN EACH OF (3) 3" CONDUITS
(4) 350MCM & (1) 3/O GRND IN EACH OF (4) 3" CONDUITS
(4) 400MCM & (1) 4/O GRND IN EACH OF (5) 3" CONDUITS
(1) #6 GROUNDING ELECTRODE IN 3/4" CONDUIT
(1) #4 GROUNDING ELECTRODE IN 3/4" CONDUIT
(1) #2 GROUNDING ELECTRODE IN 3/4" CONDUIT
MARK
18A
19A
20A
21A
22A
23A
24A
25A
26A
28A
29A
30A
31A
27A
32A
33A
34A
FEEDER DESCRIPTION
(3) 3/O & (1) #3 GRND IN EACH OF (2) 2" CONDUITS
(3) 4/O & (1) #4 GRND IN 2" CONDUIT
(3) 250MCM & (1) #4 GRND IN 2 1/2" CONDUIT
(3) 350MCM & (1) #4 GRND IN 2 1/2" CONDUIT
(3) 500MCM & (1) #3 GRND IN 3" CONDUIT
(3) 4/O & (1) #2 GRND IN EACH OF (2) 2" CONDUITS
(3) 250MCM & (1) #2 GRND IN EACH OF (2) 2 1/2" CONDUITS
(3) 350MCM & (1) #1 GRND IN EACH OF (2) 2 1/2" CONDUITS
(3) 500MCM & (1) 1/O GRND IN EACH OF (2) 3" CONDUITS
(3) 300MCM & (1) 1/O GRND IN EACH OF (3) 2 1/2" CONDUITS
(3) 400MCM & (1) 2/O GRND IN EACH OF (3) 2 1/2" CONDUITS
(3) 350MCM & (1) 3/O GRND IN EACH OF (4) 2 1/2" CONDUITS
(3) 400MCM & (1) 4/O GRND IN EACH OF (5) 2 1/2" CONDUITS
(1) 1/0 GROUNDING ELECTRODE IN 1" CONDUIT
(1) 2/0 GROUNDING ELECTRODE IN 1" CONDUIT
(1) 3/0 GROUNDING ELECTRODE IN 1" CONDUIT
(4) 400MCM & (1) 250MCM GRND IN EACH OF (6) 3" CONDUITS
(4) 500MCM & (1) 350MCM GRND IN EACH OF (7) 3" CONDUITS
(4) 500MCM & (1) 400MCM GRND IN EACH OF (8) 3" CONDUITS
(4) 500MCM & (1) 500MCM GRND IN EACH OF (11) 3" CONDUITS
(3) 400MCM & (1) 250MCM GRND IN EACH OF (6) 2 1/2" CONDUITS
(3) 500MCM & (1) 350MCM GRND IN EACH OF (7) 3" CONDUITS
(3) 500MCM & (1) 400MCM GRND IN EACH OF (8) 3" CONDUITS
(3) 500MCM & (1) 500MCM GRND IN EACH OF (11) 3" CONDUITS
G1
G2
G3
G4
G5
G6
G7
G G
PROVIDE NEW CIRCUIT BREAKER IN THE EXISTING SPACE WITH AMPERAGE AND POLES INDICATED. NEW CIRCUIT BREAKER SHALLBE FULLY COMPATIBLE WITH EXISTING DISTRIBUTION PANEL, AND SHALL MAINTAIN THE INTERRUPT RATING AND UL LISTING OF THEPANELBOARD.
1
SPAR
E
SPAR
E
1 3 42
400/3
150/
3
150/
3
150/
3
80/3
125/
3
125/
3
5 6
GFPGFP
GFP GFP GFP GFP GFP GFP GFP GFP GFP GFP
13 3
NCNCNCNC
POWER
CABINETDISTRIBUTION
SURGE
DEVICEPROTECTIVE
125/3
110/
3
30/3
ROUTE (2) #14 AND (1) #14 GROUND IN 3/4" CONDUIT BETWEEN ALL EPO CONTACTS AND THE SHUNT TRIP MECHANISMS. CONNECTSHUNT TRIP MECHANISMS AND PUSH BUTTON(S) LOCATED ON PLANS SO THAT WHEN ANY PUSH BUTTON IS PRESSED, BREAKER ISTRIPPED TO OPEN POSITION. REFERENCE THE SIEMENS MEDICAL SOLUTIONS EQUIPMENT DRAWINGS FOR ADDITIONALINFORMATION REGARDING EPO SWITCH INSTALLATION REQUIREMENTS AND FUNCTIONALITY.
2
SHUNT TRIP TYPE CIRCUIT BREAKER, SIZED AS INDICATED. PROVIDE CONNECTIONS BETWEEN SHUNT TRIP MECHANISM AND PUSHBUTTON(S) LOCATED ON PLANS SO THAT WHEN PUSH BUTTON IS PRESSED, BREAKER IS TRIPPED TO OPEN POSITION. COORDINATEALL REQUIREMENTS WITH OWNER'S REPRESENTITIVES AND EQUIPMENT MANUFACTURER/INSTALLER.
3
14
124
NC NCNC NC
POLY
CABINETA1000
SYSTEMCABINET
125/3
100/
3
30/3
15/3
XF1
14
30AF30/3
4
3
PROVIDE GROUNDING FOR UPS TRANSFORMER CABINET AS REQUIRED PER MANUFACTURER'S REQUIREMENTS. ENSURE GROUNDIS IN ACCORDANCE WITH THE NEC AND SPECIFIED REQUIREMENTS.
4
FUSED DISCONNECT TO BE LOCATED WITHIN 10'-0" OF SYSTEM CABINET PER NEC.5
1A
EXISTING EMERGENCY SWITCHGEAR 'ESB1';480Y/277V, 3∅, 4W, 4000A, 65,000AIC. (LOWER LEVELEM ELEC RM C0005)
EXISTING DISTRIBUTION PANEL 'X21';480Y/277V, 3∅, 4W, 800A, 65,000AIC. (SECOND LEVELELEC RM C2020E)
AUTOMATICSYNC.
CONTROLLER
EXISTING 900KW, 480Y/277V, 3Ø, 4WDIESEL GENERATOR SET '6'.
EXISTING 900KW, 480Y/277V, 3Ø, 4WDIESEL GENERATOR SET '7'.
EXISTING AUTO SHED RELAY'ATS-8';
CT SCANNER MAINPANELBOARD 'CT'; 480Y/277V,3∅, 4W; 65,000AIC. (SECONDLEVEL EQUIPM RM C2053J)
AX IMAGING EQUIPMENT MAINPANELBOARD 'AX'; 125A 480Y/277V,3∅, 4W; 65,000AIC. (SECOND LEVEL
EQUIPM RM C2053F)
EATON 9355 15KVAUPS/BATT/INPUTXFMR CABINET
EATON 9355OUTPUTXFMR CABINET
001A
Key Plan
AREA
OF
WORK
#SHEET HISTORY:
?
? - #
Kansas City, Missouri
2020 Baltimore Avenue, Suite 300
Kansas City, MO 64108-1914
816 474.8237 Fax 816 474.8233
Lincoln, Nebraska
Fairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plo
t Ti
me
Sta
mp
:
File
Lo
ca
tio
n/N
am
e:
ISSUED
BID SET / VOLUME II
10
/9/2
01
9 7
:40
:26
AM
C:\
(1)
Re
vit
Pro
jec
ts\
20
19
\M
U I
R-E
-19
_d
an
.wro
ble
wsk
i.rv
t
Electrical One Line
Diagram - Emergency
E3.01
TCEP No.: 624-149-17
Columbia, Missouri
University of Missouri
Teaching Hospital
Critical Care Addition -
Interventional Radiology
Expansion
September 18, 2019
MU No.: #CP180491
09/18/2019 CONTRACT DOCUMENTSA - 001 10/08/19 ADDENDUM #1
001A