Tm 5-276 Ten Ton Trestle Bridge

Embed Size (px)

Citation preview

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    1/65

    MANUAL

    CTOBER1943

    Publ

    icDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    2/65

    GE

    MENT,

    .C, 11April1944.

    3,ischangedasfollows:

    UEa.(Superseded.)Oneunitpro-

    ge or45feetof reinforcedbridge.Theprin-

    nitarefour10-ton trestles,50trestlebalk,

    onchess,and10-tontrestlebracing.(Seeapp.)

    perseded)a.General.Oneunitof

    etransportedby two2/-toncargotrucksand

    lersortwo4-tonpontontrucksand two2-wheel

    eeltrailer.Theprimemoveris either

    argotruckwitha12-footloading bedora4-ton

    t,3-inchloadingbed.The2%-tonshort heel-

    ootloadingbed cannotbeusedsincetheover-

    rferewith thetrailedload.

    etwo-wheelpole-typetrailer,typeII,

    rectangularframewitha drawbarofadjusta-

    elescopic,permittingthreeadjustmentsin

    horizontallywhenthetrailerisunhooked

    hetrailer byclampingbeamsheldinposi-

    crewsandchainlinks.Whenthetraileris not

    msareheldinbracketsespeciallyprovidedfor

    a sparetire,weighsabout2,300pounds.

    d)a.General.The2/2-tontrucksarc

    ras the4-tontrucks,andalltrailers areloaded

    trailerloadprovidesequipmentforoneabut-

    e-halftrestle spans.Thecombinedloadspro-

    pletebridge75feet long(fivespans).

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    3/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    4/65

    wo-wheeltrailersee figure18andthefollow-

    _ _

    hoes

    rimemoversee figure18andthefollowing

    pacity

    n

    0-ton

    0-ton

    ton

    o3-ton,two hoistsinchest__

    nepickets

    h

    withchain

    istsandshoes

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    5/65

    WaterTrestles.

    2trestle.Becauseoftheshape oftheM2

    thepinholes,itisdifficultto assemblebythe

    )above.Twotrestlebalklyingone ontop

    pendiculartothe shoreline.Twomore

    acedapproximately12feetfromthe firstpair.

    acrossthe balk(fig.21.1)andthetrestle

    ection,thefourbalkmaybeusedin con-

    an.

    estlebalkandtransom{or assemblyofM2trestle.

    hodofholdingtrestlecolumns.Atrestle

    insteadofa ropelashingtoholdthe trestle

    aligned.Theclampisplacedwiththehandle

    rrapid loosening.(Seefig.27.1.)Whenthe

    ofthehandleissufficientto releasethetrestle

    e intothewater.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    6/65

    dingtrestlecolumnwithtrestlebracingclampin erectionof

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    7/65

    EQUIPMENT

    pacity..1

    n6

    6

    0-ton._:32

    0-ton30

    2

    ton6

    o3-ton,twohoists inchestwithspare

    nepickets__ 2

    6

    h16

    withchain6

    withouthoists4

    TARYOF\\TAR:

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    8/65

    NICALMANUAL

    CTOBER1943

    MENTPRINTINGOFFICEWASHINGTON1943

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    9/65

    9October1943.

    Bridge,ispublishedforthe information

    ned.

    TARYOFWAR:

    2);R5(3);X.

    lsseeFM21-6.)

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    10/65

    GE

    graph

    quired,5

    PMENT

    LOADINGS

    ARATIONOFSITE

    6

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    11/65

    DGE

    NDINGSTAGES

    ngstage 30

    e32

    ts33

    nts34

    DBRIDGEMAINTENANCE

    ,ANDSTORAGEOFEQUIPMENT

    MENT54

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    12/65

    estlebridge(fig.1)is aportablefixed

    ossinginfantrydivisionloadsoverdrygaps,

    e bedofwhichisless than12feetbelow

    dge

    ebridgeconsistsof10-tontrestle balk

    -tontrestles.Trestlebracingmakesthe

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    13/65

    hereareeight balkperspan,notinclud-

    reinforcedbyaddingsixbalktoeachspan.

    g.Clearwidthofthe roadwayis9feet

    UEa.Oneunitprovides75feetof bridge,

    principalcomponentsofoneunitarefour

    tlebalk,eighty10-tonpontonchess,and

    eapp.)

    tockedingeneraldepotsforissue as

    ofoperationscommander.

    geusedasa fixedbridge.Postedand

    enintableI.

    ombinationwithfloatingbridge.

    ridgegovern.Thesecapacitiesvarywith

    M5-10.)

    IMEREQUIRED.Underfavorablecon-

    ruct75feetof 10-tontrestlebridgeinabout

    ite.Darkness,tiredorinexperiencedper-

    rconstructionsite,orenemyactivityin-

    Asuggestedworkingpartyorganizationis

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    14/65

    How.

    )

    -

    w..

    r.

    M1

    A2

    e

    un,

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    15/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    16/65

    ENT

    leMl.(1) The10-tontrestleM1(alu-

    om,twocolumns,andtwo shoes.Two

    d toadjusttheheightof thetransom.The

    ainhoists,weighs750pounds.It is15feet

    /zincheswide fromcentertocenterof

    eadclearanceis12feet.(Seefig.2.)

    etrestletransomM1 isabuilt-upalloy

    g, 9incheswide,and15 inchesdeep.Asteel

    pportstheendfittingsoftrestle balk.Metal

    positionofthe8 pairsoftrestlebalkused

    xtrabalk willfitineach intervalbetween

    ximumof15pairs ofbalkperspancan be

    Cleats areprovidedonthetransomfor

    lk.

    stlecolumnsM1 arealuminumalloy

    er.Theyare insertedthroughwellsineach

    dsecuredinplaceby pinschainedtoeach

    ticalrowofholes,on33^-inchcenters,is

    n.Twohorizontalpinholes,spaced 1^

    dperpendiculartoeach otherthrougheach

    .Eachend ofthetransomisheld inplace

    oughoneofthe twoholesinthecolumn

    mn.(Seefig.3.)A 3>-inchadjustmentin

    nstertingthe pininanotherholeon the

    holesinthetransom.A 1^-inchadjustment

    lumnthrough90 andusingtheotherhole

    mnpermitsattachmentofguy lines.Below

    ngertowhichtheratchetchainhoist is

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    17/65

    ntransomandcolumn

    stle shoeM1isa metalfooting24inches

    bottomofeachtrestlecolumnbyaball-

    freemovementoftheshoeaboutthe endof

    tothe columnbytwohookschainedtothe

    pairof holesinthecolumnandthe other

    ofthecolumn.

    )Two1^-to 3-tonratchetchainhoists

    ghtofthetrestletransom.Thistype ofhoist

    etrestleM1 andthetrestleM2,and sup-

    lchainhoist.It hasa12-footchainwhich

    ya singlestrandofchaintakesthe load

    attwostrands ofchaintaketheload

    with10-tontrestles,the single-chaincon-

    ull effectivelengthof12feet.

    chain hoistisattachedtotheswiveled

    olumnM1,ortothe chain-hoistbracketonthe

    ookto thestirrupatthe endoftransom

    ofthetransomM2.Toadjust theheight

    iston eachcolumn,removetransompins,

    desired levelactuatingbothhoistsatthe

    ndremovehoists.Thehoists arenot

    yloadsof thebridge;therefore,theymust

    d,withthetransompinsin place,before

    ge.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    18/65

    st,1^/2-to}-ton

    eighsabout38 pounds.Twochainhoists

    sin achest.Ratchetchainhoistsarealso

    e anchorlines.

    e 10-tontrestleMl(steel)is anall-

    ral designanddimensionstothealuminum

    e assembledtrestleisaboutthesameas

    1.Thetrestleisdescribedonlyas itdiffers

    g. 5.)

    This transomconsistsofatubularsteel

    heslong and19inchesdeep.Thetubeis

    ereisno columnwellateachend;instead,

    thetrestlecolumncanbeinsertedfromthe

    epthejawsofthis openingtogether.

    somarethreesetsof pinholes,andtwo

    m.Toone pin,insertedintheoutermostset

    helowerendoftheratchetchainhoist. The

    ughone ortheotherofthe tworemaining

    oneoftheholesin thetrestlecolumn,thus

    ecolumn.Thelattertwo setsofholesare

    rtically,and,sincetheholesonthe trestle

    hesapart,a1^-inchadjustmentcanbe

    verticalrowof holesinthecolumnM2

    olumn.Theswiveledhangerontopofthe

    placeis substitutedadetachablechain-

    escribedbelow.

    hoeismadeofsteeland is27inchessquare.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    19/65

    2

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    20/65

    n-hoistsupportingbracket

    bracket.Adetachablechain-hoistsup-

    neendofeachratchetchainhoist,used to

    estletransom.Thebracketisheldin place

    ertedthroughoneofthe holesinthetrestle

    hedtotheend ofthepinlocksit inplace.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    21/65

    butmentsill,andtrestlebalk

    ntrestlebalk(fig.7)areused asstringers

    .Abalk,whichismadeofwood,is 4by6

    s,and weighsabout100pounds.Metal

    erthetubeonthe topofthetrestle transom.

    sedtolashthebalk tothetransomandpro-

    ng.

    chess(fig.7)areused tofloorthebridge.

    sn^byi]/zinchesby 12feet,andweighs

    ateachendtopermitinsertionof siderail

    chessareprovidedtofillin smallspacesin

    ertransoms.

    tonpontonabutmentsills(fig.7)aremade

    hesby13feet,andweigh135 pounds.They

    eringsattheir ends.Scoremarksoneach

    epositionsofbalk.Thesill isstakedinplace

    kareusedforsiderails.Theyare placed

    yabovetheoutsidebalk.

    n-tonpontonsiderailclampsareusedto

    ngageundertheoutsidebalk andabove

    hessinplacebetweenthem(fig. 8).Aclamp

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    22/65

    estlebracingsteadiestrestlespanscrossed

    racingpartsareasfollows:

    s a22-footsectionof2^-inchstandard

    -inchandone 1^-inch,drilledateachend.

    teningthestrutshoe.Apicketis inserted

    screwtheassembledstrutandstrutshoe

    Abracingstrutweighs125 pounds.(See

    eusedonlyforbracing;otheruses orrough

    rdamageit.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    23/65

    oeand.strut-shoepinassembly

    shoe(fig.10)is attachedtothebracing

    ytoscrewthestrutintothe ground.Theshoe

    oitmaybescrewedinto softearth(fig.34).

    y.Thestrut-shoepin(fig.10) fastens

    utshoe.Throughoneendof thepinisa

    p. Topreventlossofthepin assemblywhen

    fromthestrut,thestrut-shoepinshould be

    withthelatchandboatsnap insertedintheir

    .Thisclamp(fig.n)fastensthebracing

    n(fig.12)orto theanchorpost(fig.33).It

    lampsconnectedbyaswiveljoint.The

    s fastenedtothebracingstrut,andthe

    mnortotheanchorpost.Theclampweighs

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    24/65

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    25/65

    ost

    sts(fig.13)anchortheend trestle,

    stoo hardforstrutshoes.The postisa

    pipe4^inchesin diameter(sameasthe

    ralflangeat oneend.Theotherendhas a

    gapicketusedto screwthepostintoa hole.

    to theanchorpostwithacolumn-bracing

    waysshouldbeanchoredsecurelytohold-

    r,6-inchcapacity

    apacity.Thisauger(fig.14)is used

    eanchorpostis set.Itis5 feetlongand

    ninepickets.Thisprefabricatedhold-

    estle-shoeanchorcableonthe shore,when

    vailable.Itconsistsof ametalplatewith

    .Eachpicketis 1^4inchesindiameterand

    le atoneendforeasy removal.Theentire

    s,andeachpicketweighs15pounds.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    26/65

    ickets

    ope.Thisgrip,(orcome-along)(fig.16)

    etchainhoisttothetrestle-shoeanchor

    Twogrips usuallyarerequiredforthis;one

    efreeendof thecableendsinan eye.

    wire rofe

    eused

    rope

    s

    ch

    p

    nding

    rerope

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    27/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    28/65

    OADINGS

    eneral.Oneunitofa 10-tontrestle

    rtedontwotwo-wheel,pole-typetrailers

    trucks.(Seefig.18.)

    etwo-wheelpole-typetrailerwith

    angularframewithadrawbarof adjustable

    scopic,permittingthreeadjustmentsin

    orizontallywhenthetrailerisunhooked

    hetra1ler byclamp1ngbeamsheld1n

    edscrewsandchainlinks.Whenthetrailer

    beamsareheld inbracketsespeciallypro-

    a sparetire,weighsabout2,300pounds.

    eeltrailer.Thisisa 4-tonponton

    oadingbed,whichwillaccommodate

    eightofproperlyloadedvehiclesisas

    s

    s

    Thetwotruckandtrailerloads are

    truckandtrailerloadprovidesequipment

    one andone-halftrestlespans.Thecom-

    mentforacompletebridge75 feetlong

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    29/65

    wheeltrailer(seefig.18).

    LTRAILERLOAD

    pontontruck(seefig. 18).

    NTONTRUCKLOAD

    apacity

    st,1^-to3~ton

    0-ton

    -to3-ton....

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    30/65

    TION

    eis selectedtomeetbothtechnicaland

    rtacticalrequirementsseeFM5-6.

    ENTS.Thefollowingtechnicalcharacter-

    esshouldpermitquickconstructionof

    sonbothsidesof thegap.

    firm,tosupportthe abutmentsilland

    sts.Theyshouldnot besohighor steepas

    ngfortheapproach,norso lowthatnormal

    erflowthesiteorunnecessarilyincreasethe

    o supporttrestles.Ifthegapis water-

    rexaminationoftheareatobe occupiedby

    othat obstructionssuchasstumpsandsnags

    rnaturalholdfastsshouldbe present

    trestle-shoeanchorcables.

    Ea.Theapproachroadshouldbecon-

    epreparedand clearedpriortoarrivalof

    adjustedtofittheterrain.The abut-

    orthe abutment,forunloadingtrucksand

    quipment.Wherestackingspaceisnotavail-

    emaybebuiltdirectlyfromthe trucksand

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    31/65

    GE

    onbridgeconstructionisdescribedwithout

    ofpersonnel.Asuggestedorganizationofper-

    sofeachworkingsection,isgivenin sec-

    eis constructedfromthenearbankby

    bankabutments,(1)Centeringand

    edrivenon thecenterlineofthe bridge,

    sillandtheother about20feetfartherfrom

    far-banksideofthesill islaidagainstthe

    secondstaketotheendsof thesillare

    shing.The sillissquaredwhenits middle

    bridgeandthese twodistancesareequal.

    ngandsquaring,theoutline ofthesillis

    guideinexcavation.

    entsill

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    32/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    33/65

    s leveledforthesill,allowingspacefor

    nofabutment-spanbalkonthe near-bank

    xedinplaceby11pickets,9 onthesideof

    betweenscoremarks,and2ontheside away

    endsofthesill.

    abutment-spanbalkareinposition on

    cedon edgeagainsttheendsofthe balk,

    heflooring.Thischessisthe enddam.Itis

    wopicketsneareachend.Roadmetalis

    heend damto1inchabovethe flooring.

    efar-bankabutmentisconstructedas

    edeterminedaftererectionofthefar-bank

    rosseswater,materialsforthe farabut-

    bankontheraftused toerectdeep-water

    watertrestles.Therearetwomethods

    ertrestle:

    ruts,(a)Assembly:Thetrestleis assem-

    ts finalpositionaspossiblewithoutinter-

    eabutmentsill. Thetransomisplacedon

    ebalk,lyingoneon topoftheotherin the

    umnsareinsertedinthetransomand held

    lowestsetofholesin thecolumnthatthe

    ootingsallows.Trestleshoesareattachedto

    fastenedbyhookschainedtotheshoes.

    the shoessothattheycanbe anchoredto

    pedientfootingsforincreasingthebearing

    pared.(Seepar.21.)Ratchetchainhoistsare

    oistend hookedtothetransomstirrup.

    to thetopofeachcolumnbya column

    snuglybutleftjust freeenoughtopermit

    n,inordertopreventshearing theconnec-

    serected.(Seefig.21.)

    edtrestleisraisedand manhandledinto

    utmentsillisproperlyembeddedandseats

    repared.Threemenraiseeachcolumn,and

    gstrutto guidethetrestleintoa vertical

    etrestleis spacedattheproperdistance

    acingthe outerbalkinposition.Thenit

    plumband centeredonthecenterlineof

    lk thenaredeliveredandplaced,andthe

    ed.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    34/65

    cingstruts

    (a) Assembly.Thetrestleisassembled

    struts. Two^-inchropeguylines,about

    byclovehitchesattheirmiddlepoints to

    etrestlecolumns.(Seefig.22.)

    estle,threemen raiseeachcolumnand

    ofthe guylines,whichsteadiesandplumbs

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    35/65

    raisedandmanhandledintofinal position.

    afterthetrestlebalkhavebeenplacedin

    tle-bracingstrutsarefastenedtothe top

    stle iserected,picketsbeingplacedthrough

    nstoformladderrungsforclimbing.(See

    ines

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    36/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    37/65

    ep-watertrestlesareassembledand

    aftconstructedof10-tonpontons(fig.24)

    24).Eitherbracingstruts orguylines

    trestleasitis raisedtoposition.

    ctdeep-watertrestles

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    38/65

    stlesassembledonraft

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    39/65PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    40/65

    etrestletransomis placedonitssideon

    wardfromtheraft.Trestlecolumnsare

    htheir upperendsriverwardandwith

    nsproject1ngshorewardbeyondthebottom

    portionsof thecolumnsrestacrossabalk

    Trestleshoes areattachedtothecolumns.

    ted,but thecolumnsarefastenedtothe

    stiedtothe shoesandtransomstirrupsas

    ngthelashing atthestirrupafterthe trestle

    sesthe columnstoslidethroughthetransom

    opintotheirseatings.Anchorcablesof

    uldbeattachedto theshoessothatthey

    sts.

    atertrestle

    ntheraft withtrestleassemblyreaches

    gethetrestleis raised,guylinesorbracing

    and plumbthetrestle.Outsidetrestlebalk

    e.Theraftismanouvereduntilthe centerof

    terlineofthebridge.Thenthe officerin

    olumnsdropped(fig.27).Chainhoists are

    omisraisedclearof theraft,andtransom

    racingis installedanddeckinglaid.The

    kup anothertrestle.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    41/65

    atertrestleContinued

    odofincreasingbearingareaoftrestle shoes

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    42/65

    Underrepeatedcrossingsofheavyloads,

    yriver bedssettleexcessively.Trestlecol-

    ttlesappreciablymorethantheother.Figures

    ofexpedientfootingsusedtoincreasebearing

    hesespreadfootingsare lashedtothetrestle

    trestle.Panelsofsteelgratingor airplane

    rthefootings,helppreventthemfromsl1pp1ng

    msetvert1cally,w1thp1ns1nthelowest

    gs orplanksunderthetransom,likemud

    1ngand w1lladdr1g1d1tytothe columns.

    ulttomove,however.Evenwiththe aidof

    willneedcontinuousmaintenance.(Seesec.

    ebridgesite,and properpreparationand

    footings,willreducemaintenance.

    dientmethodofincreasingbearingareaoftrestleshoes

    Conditionsinfluencingtypeofinstalla-

    cingused dependsmainlyuponstability

    ns,wheresettlementofindividualtrestles

    tomakeanintegralunit ofeachtrestleand

    twobracingstrutsfromthe topofeach

    dat thesides.Thisis calledtripodbracing.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    43/65

    unstablefoundations

    ons,wherelittlesettlementisprobable,

    ectedwithsinglediagonalbracing.(See

    djacenttrestlesareconnectedwithdouble

    32.)Wherefouror moretrestlesareused,

    aced,eachpairof trestlesthusforming

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    44/65

    emistablefoundation.

    mis nearthetopofthe trestlecolumns,

    ssarytoprovidelateralstability.Onan unstable

    diagonalstrutbetweencolumnsunderthe

    ablefoundations,itconsistsof twotransverse

    )(fig.31).

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    45/65

    stablefoundation

    heend trestleonanytypeoffounda-

    orebybracingstrutsfromthetop oftheend

    postsinholes,dug withthepost-holeauger,

    ach.Eachbracingstrutisfastenedtothe

    dby acolumn-bracingclamp.Theanchor

    ecurelytoholdfasts(fig.33).

    nstheendtrestlei sfurtherbracedina

    secondbracingstrut fromthetopofeach

    gsidethebridge.(See fig.30.)

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    46/65

    e

    estles,(1)Unstablefoundation.Nor-

    omakethetrestle anditsbracingactasa

    etopofeachcolumnmaybe usedon

    0.)Thetripod-bracingstrutsform anangle

    nterlineofthebridge.The firststepisassem-

    dstrutshoe.Thestrut-shoeshankis inserted

    gstrutandfastenedwiththe strut-shoepin.

    ofthebracingstrut thenisplacedatthe

    esoil,andtheupper endofthebracing

    estlecolumntodeterminewherethecolumn-

    enedto thecolumn.Acolumn-bracingclamp

    umn,andthe strutportionofthe clampis

    ebracingstrut.Thispermitsthe clampto

    twhilethestrut isturnedbya steelpicket

    eend.Thestrutshoe isscrewedintothe

    rmfooting.(Seefig.34.)Thecolumnand*

    andtightenedalternatelytoobtaina firm

    andstrut.Finally,thecolumn-bracingclamps

    racingstrut.Underno circumstancesshould

    weenadjacenttrestlesifthere isapossibility

    rethan Ifoot.

    .Useonelongitudinaldiagonalbracing

    31.)

    ongitudinalcrossbracing.Bothendsof

    dontheoutside,and bothendsofthesecond

    columns.(Seefig.32.)

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    47/65

    gstrutshoeintoground

    ble,(1)Shoesofendtrestlesare pre-

    steningthemwithwirerope toanchorposts

    hen siteconditionsrequire,alltrestleshoes

    eshouldbe used;itstretcheslessthan

    htenedwiththe ratchetchainhoistand

    ble,passone endofthewirerope

    hetrestleshoe,andfastenthe freeendto

    eusingatleast threeclips,spacedabout

    er endofthecablearoundthe holdfastor

    achedtotheholdfast,placeonecablegrip

    nthestandingpartof thecable,andconnect

    hetchainhoist.Fastenlooselythreecable

    position.Tightencablewithratchetchain

    Removeratchetchainhoistandcablegrips.

    racing.SeesectionVIII.

    ormalconstruction.Inthenormalbridge

    pan,notincludingsiderails.Theoutsidebalk

    thecleatsoneachtransom.(Seefig.36.)

    sidebalkare laidfirst,tospacethetrestle

    eis inpositiontheremainingbalkare laid.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    48/65

    e-shoeanchorcable

    ctedbyraftit maybenecessarytoslideout

    gbalkalreadyin place,topersonnelonthe

    ofthebalkonthe transom.

    balktotransom

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    49/65

    on.Inthereinforcedbridgethereare14

    gsiderails,the 6pairsofextrabalk being

    the balkofthenormalbridge(centerspace

    ssper span.Half-chessareusedtofill

    ovetrestle transoms.Chessareplacedwith

    ndalinedalongtheline betweenoutsidepairs

    dto within1footofthe lasttrestle,to

    ofthe lastspanofbalk.Twomenlay chess,

    balkandreceivingchessdeliveredbycarriers

    hinsingle fileontheright-handside ofthe

    acedandclampedonebaybehind the

    ilclampspersiderailare placed,withscrew

    sofeachspan.(See fig.38.)

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    50/65

    amps

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    51/65

    llowingtablegivesasuggestedorgani-

    constructthe10-tontrestlebridge.For

    ileddutiesof sections,seeparagraphs25

    but-

    nd

    st

    y

    ten

    al-

    -

    uc-

    rry

    dshal-

    hird

    rect

    stle.3

    n

    quip-

    atertrestle,sectionimmediatelystartsassemblingtrestlesonraft.

    p-watertrestle,sectionassemblesitonraft.

    workassistinerectingtrestlebracing.

    5feet,menmust beaddedtocarryingsection.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    52/65

    NCO,6men)

    butments.

    esand bracing.

    es.

    ndfastensiderail

    bleclips(for

    ofbridge,andlevel

    nplace(9 on

    eachendof

    areinplace,set

    ewithtopflush

    ketstoholdin

    near-bankface).

    ptolevelofI inch

    e.

    stle-shoeanchor

    inerectionof

    es.

    bankabutment,

    g,sectioncar-

    estlebalk) and

    tilpositionof

    rmined.Re-

    ledaftercom-

    ent.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    53/65

    ON(1NCO,10men)

    allow-watertrestle

    edingtrestlesand

    onraft.

    succeeding

    g ferried.

    hainhoists,

    ed).

    etrestleon).

    ).

    ngs).

    stles:

    ainhoistsandguy

    (loadedonraft):

    hain

    ).

    n

    erec-

    etrestle

    ngs).

    2trestlebalk,in-

    s,attachchain

    es (orbracing

    te:Ifbracing

    pto snugfit,but

    umnto pre-

    boltduringerec-

    es(or bracing

    of bridge.

    m.

    agehoists.

    tles:

    ime)onraft.

    trestlesarebeing

    equipmentonraft

    dtrestles:

    atertrestle,sectionimmediatelystartsassemblingtrestlesonraft.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    54/65

    1NCO,14men)

    restlesandfar-

    tle,succeeding

    tmentequip-

    hess(NCOand

    s,andside-

    s(1

    but first

    span.

    ffounda-

    d14men):

    restlesandfar-

    t(seepar.20).

    nd8men):

    balkon transomsof

    y(secondtrestle

    p-watertrestles).

    e.

    ss guylinesto

    dge.

    estleupright.

    next trestle,or

    ainingdeep-water

    ffar-bankshal-

    -abutment

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    55/65

    NGSTAGES

    singpneumaticor10-tonpontonraftsa

    ftdirectlyfromthebanksusuallycanbe

    lesstimethanit takestoconstructalanding

    otbepreparedwithabulldozer,or where

    bulldozerisavailable,alandingstage is

    ng-typelandingstagesufficesforlight

    g10-tontrestlesis preferred,andmustbe

    YPELANDINGSTAGEa.Multiple-span

    stage(fig.39) isbuiltwitha hingespan

    s. Theriverwardendofthehingespan is

    edso thatthebalkprotrude6 to7feet

    esno liveload;itis usedonlytoraiseand

    ndingstage;loading

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    56/65

    balkis securedtothetransombya detach-

    Shorewardendsofbalkareattachedinthe

    somofthe adjacenttrestle.Thenumberand

    andingstagematchthoseofthe rafts.Chess

    thehingespaninthe usualmanner.Two

    oneachsiderailon theshorewardsideofthe

    uylinesor trestlebracing(fig.39)maybe

    position.Chainhoistsareused toraiseand

    ge.Wheredeepwateriswithin 15

    restlespansmaybeeliminatedanda single

    ctlyontheabutmentsill maybeused.If

    feetoftheshore,trestlebalk maybeused;

    ustbesubstitutedfortrestlebalk.(See fig.40.)

    dingstage;unloading

    FTa.Balkonthe raftshouldnotpro-

    r enoughtoallowthetrestlebalk ofthe

    eriverwardgunwale(orfloat sill)ofthe

    eeboardoftheshorewardpontonor float

    eraftmaybe savedbysupportingtheriver-

    anonahingesill placedontheshoresideof

    floatsill).A trestlebalkmaybeusedas a

    raft(fig.41).

    areusedunderthedeckof theraft,

    eninterlockingbalkmakesitdifficultto

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    57/65

    INGSTAGE.Whentheraftapproaches,

    ghto allowtheshorewardendofthe raft

    aththeoverhangingportionofthe hinge

    somislowereduntilthe hinge-spanbalk

    on.Hooksofthe chainhoistsaredisengaged

    desfreeonthe columnsastheloadmoves

    isloaded,chainhoistsareengagedand

    ermithinge-spanbalktocleartheraft, which

    NFORRAFTLANDING

    NCOLUMNS

    ADINGANDUNLOADINGRAFT

    ANDINTERLOCKINGBALK

    dingstage

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    58/65

    ADINGRAFTS.Theapproachingraftis

    ldin placebyguylinesto theshorefrom

    dandri verwardpontons.Whilevehiclesare

    guylinesareanchoredtosuitableholdfasts.

    maysupplementguylines.

    UIREMENTSa.Thehingespan ofthe

    edinabout 20minutesbyexperiencedper-

    ckedatthesite.Onenoncommissioned

    uiredas aworkingparty.

    ditiontothecrewoperatingtheferry,

    nhoists andguylines.

    oadedat thelandingstageinabout

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    59/65

    geguardnormallyisprovided.Its duties

    chforfloatingminesandotherobjects

    .

    ridge.

    ecessity.Trafficcontrolinsuresprompt

    calvehicles,divertsvehiclesthataretoo

    spacingofvehicles,andotherwiseexpedites

    reventsdamagetothebridge.

    ehiclesarenotpermittedtoblockroads.

    ersectionsofapproachroadswithmainroad

    vehiclesthatcannotcrossthebridge,and

    lmentforvehicleswaitingtocross.While

    rsareinstructedasto speedandvehicle

    ebridge.

    epostedateachend ofthebridgeand

    onalguardsareplacedatintervals onlong

    bridgeguardmust knowthesafe

    etableI.)Load limitsshouldbeexceeded

    nallconcernedknowtherisk,and underthe

    estindicatedbya recordofprevious

    erlyplaced,andtight.

    gcautionspeed(seeebelow).

    edforcrossingwithcaution(see/below).

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    60/65

    enthe 10-tontrestlebridgeisused

    shouldnot exceedthefollowingspeeds:

    able I),25milesper hourforlight

    for heavyvehicles.

    tion(tableI), 5milesperhour.

    combinationwithafloatingbridge,

    thespeedsestablishedforfloatingbridges.

    18inches.If clearanceofwheelsortracks

    chsideofthe vehicle,speedmustbereduced,

    n 3inches,thevehicleshouldbeguided

    minimumintervalbetweenvehicleson

    east50yardsmust bemaintainedbetween

    tion.

    Ea.Spareparts.Asmallsupplyofspare

    tlebracing,andothermaterialsforrepair

    neabutmentforimmediateuse.Alarger

    undercoverandconcealmentinthe

    eshouldbe inspectedfrequentlyfor

    ouldbetightenedperiodically.

    einitialsettlementoftrestles,and

    geisin use,column-bracingclampsshould

    edtoreleasestressesintroducedin thebrac-

    stles.

    uldbeadjustedtoallowfor smallsettle-

    blesettlement,thetrestlemustbe raised

    onarebuiltfoundationandnewfootings.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    61/65

    ND

    eral.Aregularprogramofinspection,

    epair,andpaintingshouldbesetupandfol-

    sstoredafterextendeduseit isespecially

    take correctivemeasures.

    ouldbethoroughlycleanedbeforebeing

    eriod.Metalpartsshouldbe keptcleaned

    reducerusting.Chainhoists inparticular

    ventexcessivewearanddamageto the

    mechanicaldevicesaredesignedto

    outlubrication.Screwpartsparticularly

    ecausethisleadsto accumulationofdirt

    cessivefoulinganddamageto screwparts.

    nhoistsshouldfollowthemanufacturer's

    okeeptrestlesandwoodenpartsthor-

    39^fordetails.)

    s,andsills.Ingeneral,repairs tothese

    ngcrushedor splinteredwood,reshaping,

    emishes,andstra1ghteningandrefastening

    ouldberemovedfromcondemnedtimbers

    placements.Minordamagesthroughcutsor

    subjecttodecay,andshouldbetrimmed

    acticable.

    iderail clampsandsimilarfittingscon-

    mationsofmetalpartsand removingburs

    he transomandcolumnsofatrestle

    field.Minor puncturesanddamagetothe

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    62/65

    epairedwitha 10-tonpontonrepairkitand

    eweldingandcuttingset.Otherrepairsgen-

    depot.

    uipmentmustbekeptpaintedto pre-

    rotting.Thisis particularlynecessarywhen

    open,orusedinsalty orbrackishwater.

    Paint,olivedrab,lusterless,marked

    coat.Thisis ahighlywater-resistant

    materials.Useonlyforrefinishingwater-

    marked"PaintF-I."Containscritical

    aintingsteelandaluminumwater-immersi-

    ed"PaintF-II."Useforrepainting

    "Paintcleanerandthinner."Useas

    r.Furnishedin50-gallondrums.

    t,marked"PaintetcherH3P04."Etch-

    minumalloyequipment.Furnishedin

    ourpartsofwaterwithone partofpaint

    oveoldpaint.

    ndsteeltrestles.Removelooseandcracked

    tterfromall surfaceswithwirebrush.Clean

    entisavailable.Removesandfromsurfaces

    dditiontosuch cleaning,washsurfaceswith

    erandthinner),andrinse inclean,unused,

    aluminumsurfaceswithphosphoricacid

    her),keepingsolutionincontactwithalu-

    tes;thenwashthesurfacethoroughlywith

    atsofprimer(PaintF-I)to thetrestle

    yonefinishcoatof paint(PaintA)24hours

    ,andotherwoodenparts.Cleanallloose

    foreignmatteroff surfacestobepainted,

    ocoatsofprimer (PaintF-II).Applyone

    rs afterpriming.

    ces.Brass,bronze,andothernonferrous

    uminum)neednotbepainted,butshouldbe

    ereflectionoflight.

    yprimerwithin5hours aftercompletion

    rovideasmooth,evensurface,suitablefor

    ofsubsequentcoats.Applybybrushorspray.

    on ofpaintwithaquart ofmineralspirits

    .Donotapply painttomoistsurfaces,nor

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    63/65

    sspartis protectedagainsteffectsof

    ove50 F.theatmosphereincontactwith

    ouldbeat approximatelythesametempera-

    chitisapplied.Whenpaintinghas com-

    eration,includingprimingcoatsandfinish

    dassoonaspracticableallowing,however,

    nprimingandfinishcoats.

    Alwaysstoreequipmentundercover,

    nstorage,disposeequipmentsothatwater

    entilationis adequate,andnoneofthe

    ound.Equipmentmustbewellpaintedwhen

    xtendedperiod.

    aybestored inanyconvenientfashion,

    eventcrushng orbendingofcolumnsand

    transomshouldbeplacederect,toavoid

    magetocleats.Trestleshoes maybe

    e,teethdown,columnsalsolaidsideby side.

    eyalwaysshouldbestoredin chests.

    esemembersshouldbeplacedin well-

    heground,withoneend higherthanthe

    if intheopen.

    re suitableforstoringandtransporting

    mallmetalparts.

    eseincluderopeandsteelpickets.Rope

    andstoredasprescribedin engineerfield

    dbeforestorage,itshouldbewashedthor-

    dirt.

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    64/65

    apacity1

    type6

    n6

    et2

    0-ton32

    0-ton36

    pacity40

    capacity2

    -to3-ton4

    nepickets2

    ,clamp6

    nch32

    withouthoists4

    ,transom4

    PublicDomain,Google-digitized

    /http://www.h

    athitrust.org/access_

    use#pd-google

  • 7/30/2019 Tm 5-276 Ten Ton Trestle Bridge

    65/65

    CTION(1NCO,10men)

    tsecondshallow-

    gtrestlesfromraft.

    sttrestle.

    teven-

    stle:

    ertrestle(par.

    tles:

    dtrestles

    stle:^

    dinsamemanner

    tles:

    bridgeNCOand

    g6 menstay

    on(4 trestlemen

    rryingparty).

    es.(2 raftmenon

    nearlines.)

    raftandengage

    euntilbalken-

    yerectedtrestle.

    of bridgeby

    en).

    ining6 balk.

    ttransomfree of

    sconnectchain

    ounload,or

    m.

    asnexttrestleis

    stlesareun-

    edinsame man-

    watertrestles.

    26).

    p-watertrestle,sectionassemblesitonraft.

    /www.h

    athitrust.org/access_

    use#pd-google