MANUAL
CTOBER1943
Publ
icDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
2/65
GE
MENT,
.C, 11April1944.
3,ischangedasfollows:
UEa.(Superseded.)Oneunitpro-
ge or45feetof reinforcedbridge.Theprin-
nitarefour10-ton trestles,50trestlebalk,
onchess,and10-tontrestlebracing.(Seeapp.)
perseded)a.General.Oneunitof
etransportedby two2/-toncargotrucksand
lersortwo4-tonpontontrucksand two2-wheel
eeltrailer.Theprimemoveris either
argotruckwitha12-footloading bedora4-ton
t,3-inchloadingbed.The2%-tonshort heel-
ootloadingbed cannotbeusedsincetheover-
rferewith thetrailedload.
etwo-wheelpole-typetrailer,typeII,
rectangularframewitha drawbarofadjusta-
elescopic,permittingthreeadjustmentsin
horizontallywhenthetrailerisunhooked
hetrailer byclampingbeamsheldinposi-
crewsandchainlinks.Whenthetraileris not
msareheldinbracketsespeciallyprovidedfor
a sparetire,weighsabout2,300pounds.
d)a.General.The2/2-tontrucksarc
ras the4-tontrucks,andalltrailers areloaded
trailerloadprovidesequipmentforoneabut-
e-halftrestle spans.Thecombinedloadspro-
pletebridge75feet long(fivespans).
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
3/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
4/65
wo-wheeltrailersee figure18andthefollow-
_ _
hoes
rimemoversee figure18andthefollowing
pacity
n
0-ton
0-ton
ton
o3-ton,two hoistsinchest__
nepickets
h
withchain
istsandshoes
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
5/65
WaterTrestles.
2trestle.Becauseoftheshape oftheM2
thepinholes,itisdifficultto assemblebythe
)above.Twotrestlebalklyingone ontop
pendiculartothe shoreline.Twomore
acedapproximately12feetfromthe firstpair.
acrossthe balk(fig.21.1)andthetrestle
ection,thefourbalkmaybeusedin con-
an.
estlebalkandtransom{or assemblyofM2trestle.
hodofholdingtrestlecolumns.Atrestle
insteadofa ropelashingtoholdthe trestle
aligned.Theclampisplacedwiththehandle
rrapid loosening.(Seefig.27.1.)Whenthe
ofthehandleissufficientto releasethetrestle
e intothewater.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
6/65
dingtrestlecolumnwithtrestlebracingclampin erectionof
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
7/65
EQUIPMENT
pacity..1
n6
6
0-ton._:32
0-ton30
2
ton6
o3-ton,twohoists inchestwithspare
nepickets__ 2
6
h16
withchain6
withouthoists4
TARYOF\\TAR:
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
8/65
NICALMANUAL
CTOBER1943
MENTPRINTINGOFFICEWASHINGTON1943
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
9/65
9October1943.
Bridge,ispublishedforthe information
ned.
TARYOFWAR:
2);R5(3);X.
lsseeFM21-6.)
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
10/65
GE
graph
quired,5
PMENT
LOADINGS
ARATIONOFSITE
6
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
11/65
DGE
NDINGSTAGES
ngstage 30
e32
ts33
nts34
DBRIDGEMAINTENANCE
,ANDSTORAGEOFEQUIPMENT
MENT54
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
12/65
estlebridge(fig.1)is aportablefixed
ossinginfantrydivisionloadsoverdrygaps,
e bedofwhichisless than12feetbelow
dge
ebridgeconsistsof10-tontrestle balk
-tontrestles.Trestlebracingmakesthe
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
13/65
hereareeight balkperspan,notinclud-
reinforcedbyaddingsixbalktoeachspan.
g.Clearwidthofthe roadwayis9feet
UEa.Oneunitprovides75feetof bridge,
principalcomponentsofoneunitarefour
tlebalk,eighty10-tonpontonchess,and
eapp.)
tockedingeneraldepotsforissue as
ofoperationscommander.
geusedasa fixedbridge.Postedand
enintableI.
ombinationwithfloatingbridge.
ridgegovern.Thesecapacitiesvarywith
M5-10.)
IMEREQUIRED.Underfavorablecon-
ruct75feetof 10-tontrestlebridgeinabout
ite.Darkness,tiredorinexperiencedper-
rconstructionsite,orenemyactivityin-
Asuggestedworkingpartyorganizationis
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
14/65
How.
)
-
w..
r.
M1
A2
e
un,
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
15/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
16/65
ENT
leMl.(1) The10-tontrestleM1(alu-
om,twocolumns,andtwo shoes.Two
d toadjusttheheightof thetransom.The
ainhoists,weighs750pounds.It is15feet
/zincheswide fromcentertocenterof
eadclearanceis12feet.(Seefig.2.)
etrestletransomM1 isabuilt-upalloy
g, 9incheswide,and15 inchesdeep.Asteel
pportstheendfittingsoftrestle balk.Metal
positionofthe8 pairsoftrestlebalkused
xtrabalk willfitineach intervalbetween
ximumof15pairs ofbalkperspancan be
Cleats areprovidedonthetransomfor
lk.
stlecolumnsM1 arealuminumalloy
er.Theyare insertedthroughwellsineach
dsecuredinplaceby pinschainedtoeach
ticalrowofholes,on33^-inchcenters,is
n.Twohorizontalpinholes,spaced 1^
dperpendiculartoeach otherthrougheach
.Eachend ofthetransomisheld inplace
oughoneofthe twoholesinthecolumn
mn.(Seefig.3.)A 3>-inchadjustmentin
nstertingthe pininanotherholeon the
holesinthetransom.A 1^-inchadjustment
lumnthrough90 andusingtheotherhole
mnpermitsattachmentofguy lines.Below
ngertowhichtheratchetchainhoist is
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
17/65
ntransomandcolumn
stle shoeM1isa metalfooting24inches
bottomofeachtrestlecolumnbyaball-
freemovementoftheshoeaboutthe endof
tothe columnbytwohookschainedtothe
pairof holesinthecolumnandthe other
ofthecolumn.
)Two1^-to 3-tonratchetchainhoists
ghtofthetrestletransom.Thistype ofhoist
etrestleM1 andthetrestleM2,and sup-
lchainhoist.It hasa12-footchainwhich
ya singlestrandofchaintakesthe load
attwostrands ofchaintaketheload
with10-tontrestles,the single-chaincon-
ull effectivelengthof12feet.
chain hoistisattachedtotheswiveled
olumnM1,ortothe chain-hoistbracketonthe
ookto thestirrupatthe endoftransom
ofthetransomM2.Toadjust theheight
iston eachcolumn,removetransompins,
desired levelactuatingbothhoistsatthe
ndremovehoists.Thehoists arenot
yloadsof thebridge;therefore,theymust
d,withthetransompinsin place,before
ge.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
18/65
st,1^/2-to}-ton
eighsabout38 pounds.Twochainhoists
sin achest.Ratchetchainhoistsarealso
e anchorlines.
e 10-tontrestleMl(steel)is anall-
ral designanddimensionstothealuminum
e assembledtrestleisaboutthesameas
1.Thetrestleisdescribedonlyas itdiffers
g. 5.)
This transomconsistsofatubularsteel
heslong and19inchesdeep.Thetubeis
ereisno columnwellateachend;instead,
thetrestlecolumncanbeinsertedfromthe
epthejawsofthis openingtogether.
somarethreesetsof pinholes,andtwo
m.Toone pin,insertedintheoutermostset
helowerendoftheratchetchainhoist. The
ughone ortheotherofthe tworemaining
oneoftheholesin thetrestlecolumn,thus
ecolumn.Thelattertwo setsofholesare
rtically,and,sincetheholesonthe trestle
hesapart,a1^-inchadjustmentcanbe
verticalrowof holesinthecolumnM2
olumn.Theswiveledhangerontopofthe
placeis substitutedadetachablechain-
escribedbelow.
hoeismadeofsteeland is27inchessquare.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
19/65
2
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
20/65
n-hoistsupportingbracket
bracket.Adetachablechain-hoistsup-
neendofeachratchetchainhoist,used to
estletransom.Thebracketisheldin place
ertedthroughoneofthe holesinthetrestle
hedtotheend ofthepinlocksit inplace.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
21/65
butmentsill,andtrestlebalk
ntrestlebalk(fig.7)areused asstringers
.Abalk,whichismadeofwood,is 4by6
s,and weighsabout100pounds.Metal
erthetubeonthe topofthetrestle transom.
sedtolashthebalk tothetransomandpro-
ng.
chess(fig.7)areused tofloorthebridge.
sn^byi]/zinchesby 12feet,andweighs
ateachendtopermitinsertionof siderail
chessareprovidedtofillin smallspacesin
ertransoms.
tonpontonabutmentsills(fig.7)aremade
hesby13feet,andweigh135 pounds.They
eringsattheir ends.Scoremarksoneach
epositionsofbalk.Thesill isstakedinplace
kareusedforsiderails.Theyare placed
yabovetheoutsidebalk.
n-tonpontonsiderailclampsareusedto
ngageundertheoutsidebalk andabove
hessinplacebetweenthem(fig. 8).Aclamp
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
22/65
estlebracingsteadiestrestlespanscrossed
racingpartsareasfollows:
s a22-footsectionof2^-inchstandard
-inchandone 1^-inch,drilledateachend.
teningthestrutshoe.Apicketis inserted
screwtheassembledstrutandstrutshoe
Abracingstrutweighs125 pounds.(See
eusedonlyforbracing;otheruses orrough
rdamageit.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
23/65
oeand.strut-shoepinassembly
shoe(fig.10)is attachedtothebracing
ytoscrewthestrutintothe ground.Theshoe
oitmaybescrewedinto softearth(fig.34).
y.Thestrut-shoepin(fig.10) fastens
utshoe.Throughoneendof thepinisa
p. Topreventlossofthepin assemblywhen
fromthestrut,thestrut-shoepinshould be
withthelatchandboatsnap insertedintheir
.Thisclamp(fig.n)fastensthebracing
n(fig.12)orto theanchorpost(fig.33).It
lampsconnectedbyaswiveljoint.The
s fastenedtothebracingstrut,andthe
mnortotheanchorpost.Theclampweighs
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
24/65
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
25/65
ost
sts(fig.13)anchortheend trestle,
stoo hardforstrutshoes.The postisa
pipe4^inchesin diameter(sameasthe
ralflangeat oneend.Theotherendhas a
gapicketusedto screwthepostintoa hole.
to theanchorpostwithacolumn-bracing
waysshouldbeanchoredsecurelytohold-
r,6-inchcapacity
apacity.Thisauger(fig.14)is used
eanchorpostis set.Itis5 feetlongand
ninepickets.Thisprefabricatedhold-
estle-shoeanchorcableonthe shore,when
vailable.Itconsistsof ametalplatewith
.Eachpicketis 1^4inchesindiameterand
le atoneendforeasy removal.Theentire
s,andeachpicketweighs15pounds.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
26/65
ickets
ope.Thisgrip,(orcome-along)(fig.16)
etchainhoisttothetrestle-shoeanchor
Twogrips usuallyarerequiredforthis;one
efreeendof thecableendsinan eye.
wire rofe
eused
rope
s
ch
p
nding
rerope
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
27/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
28/65
OADINGS
eneral.Oneunitofa 10-tontrestle
rtedontwotwo-wheel,pole-typetrailers
trucks.(Seefig.18.)
etwo-wheelpole-typetrailerwith
angularframewithadrawbarof adjustable
scopic,permittingthreeadjustmentsin
orizontallywhenthetrailerisunhooked
hetra1ler byclamp1ngbeamsheld1n
edscrewsandchainlinks.Whenthetrailer
beamsareheld inbracketsespeciallypro-
a sparetire,weighsabout2,300pounds.
eeltrailer.Thisisa 4-tonponton
oadingbed,whichwillaccommodate
eightofproperlyloadedvehiclesisas
s
s
Thetwotruckandtrailerloads are
truckandtrailerloadprovidesequipment
one andone-halftrestlespans.Thecom-
mentforacompletebridge75 feetlong
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
29/65
wheeltrailer(seefig.18).
LTRAILERLOAD
pontontruck(seefig. 18).
NTONTRUCKLOAD
apacity
st,1^-to3~ton
0-ton
-to3-ton....
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
30/65
TION
eis selectedtomeetbothtechnicaland
rtacticalrequirementsseeFM5-6.
ENTS.Thefollowingtechnicalcharacter-
esshouldpermitquickconstructionof
sonbothsidesof thegap.
firm,tosupportthe abutmentsilland
sts.Theyshouldnot besohighor steepas
ngfortheapproach,norso lowthatnormal
erflowthesiteorunnecessarilyincreasethe
o supporttrestles.Ifthegapis water-
rexaminationoftheareatobe occupiedby
othat obstructionssuchasstumpsandsnags
rnaturalholdfastsshouldbe present
trestle-shoeanchorcables.
Ea.Theapproachroadshouldbecon-
epreparedand clearedpriortoarrivalof
adjustedtofittheterrain.The abut-
orthe abutment,forunloadingtrucksand
quipment.Wherestackingspaceisnotavail-
emaybebuiltdirectlyfromthe trucksand
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
31/65
GE
onbridgeconstructionisdescribedwithout
ofpersonnel.Asuggestedorganizationofper-
sofeachworkingsection,isgivenin sec-
eis constructedfromthenearbankby
bankabutments,(1)Centeringand
edrivenon thecenterlineofthe bridge,
sillandtheother about20feetfartherfrom
far-banksideofthesill islaidagainstthe
secondstaketotheendsof thesillare
shing.The sillissquaredwhenits middle
bridgeandthese twodistancesareequal.
ngandsquaring,theoutline ofthesillis
guideinexcavation.
entsill
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
32/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
33/65
s leveledforthesill,allowingspacefor
nofabutment-spanbalkonthe near-bank
xedinplaceby11pickets,9 onthesideof
betweenscoremarks,and2ontheside away
endsofthesill.
abutment-spanbalkareinposition on
cedon edgeagainsttheendsofthe balk,
heflooring.Thischessisthe enddam.Itis
wopicketsneareachend.Roadmetalis
heend damto1inchabovethe flooring.
efar-bankabutmentisconstructedas
edeterminedaftererectionofthefar-bank
rosseswater,materialsforthe farabut-
bankontheraftused toerectdeep-water
watertrestles.Therearetwomethods
ertrestle:
ruts,(a)Assembly:Thetrestleis assem-
ts finalpositionaspossiblewithoutinter-
eabutmentsill. Thetransomisplacedon
ebalk,lyingoneon topoftheotherin the
umnsareinsertedinthetransomand held
lowestsetofholesin thecolumnthatthe
ootingsallows.Trestleshoesareattachedto
fastenedbyhookschainedtotheshoes.
the shoessothattheycanbe anchoredto
pedientfootingsforincreasingthebearing
pared.(Seepar.21.)Ratchetchainhoistsare
oistend hookedtothetransomstirrup.
to thetopofeachcolumnbya column
snuglybutleftjust freeenoughtopermit
n,inordertopreventshearing theconnec-
serected.(Seefig.21.)
edtrestleisraisedand manhandledinto
utmentsillisproperlyembeddedandseats
repared.Threemenraiseeachcolumn,and
gstrutto guidethetrestleintoa vertical
etrestleis spacedattheproperdistance
acingthe outerbalkinposition.Thenit
plumband centeredonthecenterlineof
lk thenaredeliveredandplaced,andthe
ed.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
34/65
cingstruts
(a) Assembly.Thetrestleisassembled
struts. Two^-inchropeguylines,about
byclovehitchesattheirmiddlepoints to
etrestlecolumns.(Seefig.22.)
estle,threemen raiseeachcolumnand
ofthe guylines,whichsteadiesandplumbs
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
35/65
raisedandmanhandledintofinal position.
afterthetrestlebalkhavebeenplacedin
tle-bracingstrutsarefastenedtothe top
stle iserected,picketsbeingplacedthrough
nstoformladderrungsforclimbing.(See
ines
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
36/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
37/65
ep-watertrestlesareassembledand
aftconstructedof10-tonpontons(fig.24)
24).Eitherbracingstruts orguylines
trestleasitis raisedtoposition.
ctdeep-watertrestles
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
38/65
stlesassembledonraft
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
39/65PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
40/65
etrestletransomis placedonitssideon
wardfromtheraft.Trestlecolumnsare
htheir upperendsriverwardandwith
nsproject1ngshorewardbeyondthebottom
portionsof thecolumnsrestacrossabalk
Trestleshoes areattachedtothecolumns.
ted,but thecolumnsarefastenedtothe
stiedtothe shoesandtransomstirrupsas
ngthelashing atthestirrupafterthe trestle
sesthe columnstoslidethroughthetransom
opintotheirseatings.Anchorcablesof
uldbeattachedto theshoessothatthey
sts.
atertrestle
ntheraft withtrestleassemblyreaches
gethetrestleis raised,guylinesorbracing
and plumbthetrestle.Outsidetrestlebalk
e.Theraftismanouvereduntilthe centerof
terlineofthebridge.Thenthe officerin
olumnsdropped(fig.27).Chainhoists are
omisraisedclearof theraft,andtransom
racingis installedanddeckinglaid.The
kup anothertrestle.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
41/65
atertrestleContinued
odofincreasingbearingareaoftrestle shoes
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
42/65
Underrepeatedcrossingsofheavyloads,
yriver bedssettleexcessively.Trestlecol-
ttlesappreciablymorethantheother.Figures
ofexpedientfootingsusedtoincreasebearing
hesespreadfootingsare lashedtothetrestle
trestle.Panelsofsteelgratingor airplane
rthefootings,helppreventthemfromsl1pp1ng
msetvert1cally,w1thp1ns1nthelowest
gs orplanksunderthetransom,likemud
1ngand w1lladdr1g1d1tytothe columns.
ulttomove,however.Evenwiththe aidof
willneedcontinuousmaintenance.(Seesec.
ebridgesite,and properpreparationand
footings,willreducemaintenance.
dientmethodofincreasingbearingareaoftrestleshoes
Conditionsinfluencingtypeofinstalla-
cingused dependsmainlyuponstability
ns,wheresettlementofindividualtrestles
tomakeanintegralunit ofeachtrestleand
twobracingstrutsfromthe topofeach
dat thesides.Thisis calledtripodbracing.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
43/65
unstablefoundations
ons,wherelittlesettlementisprobable,
ectedwithsinglediagonalbracing.(See
djacenttrestlesareconnectedwithdouble
32.)Wherefouror moretrestlesareused,
aced,eachpairof trestlesthusforming
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
44/65
emistablefoundation.
mis nearthetopofthe trestlecolumns,
ssarytoprovidelateralstability.Onan unstable
diagonalstrutbetweencolumnsunderthe
ablefoundations,itconsistsof twotransverse
)(fig.31).
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
45/65
stablefoundation
heend trestleonanytypeoffounda-
orebybracingstrutsfromthetop oftheend
postsinholes,dug withthepost-holeauger,
ach.Eachbracingstrutisfastenedtothe
dby acolumn-bracingclamp.Theanchor
ecurelytoholdfasts(fig.33).
nstheendtrestlei sfurtherbracedina
secondbracingstrut fromthetopofeach
gsidethebridge.(See fig.30.)
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
46/65
e
estles,(1)Unstablefoundation.Nor-
omakethetrestle anditsbracingactasa
etopofeachcolumnmaybe usedon
0.)Thetripod-bracingstrutsform anangle
nterlineofthebridge.The firststepisassem-
dstrutshoe.Thestrut-shoeshankis inserted
gstrutandfastenedwiththe strut-shoepin.
ofthebracingstrut thenisplacedatthe
esoil,andtheupper endofthebracing
estlecolumntodeterminewherethecolumn-
enedto thecolumn.Acolumn-bracingclamp
umn,andthe strutportionofthe clampis
ebracingstrut.Thispermitsthe clampto
twhilethestrut isturnedbya steelpicket
eend.Thestrutshoe isscrewedintothe
rmfooting.(Seefig.34.)Thecolumnand*
andtightenedalternatelytoobtaina firm
andstrut.Finally,thecolumn-bracingclamps
racingstrut.Underno circumstancesshould
weenadjacenttrestlesifthere isapossibility
rethan Ifoot.
.Useonelongitudinaldiagonalbracing
31.)
ongitudinalcrossbracing.Bothendsof
dontheoutside,and bothendsofthesecond
columns.(Seefig.32.)
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
47/65
gstrutshoeintoground
ble,(1)Shoesofendtrestlesare pre-
steningthemwithwirerope toanchorposts
hen siteconditionsrequire,alltrestleshoes
eshouldbe used;itstretcheslessthan
htenedwiththe ratchetchainhoistand
ble,passone endofthewirerope
hetrestleshoe,andfastenthe freeendto
eusingatleast threeclips,spacedabout
er endofthecablearoundthe holdfastor
achedtotheholdfast,placeonecablegrip
nthestandingpartof thecable,andconnect
hetchainhoist.Fastenlooselythreecable
position.Tightencablewithratchetchain
Removeratchetchainhoistandcablegrips.
racing.SeesectionVIII.
ormalconstruction.Inthenormalbridge
pan,notincludingsiderails.Theoutsidebalk
thecleatsoneachtransom.(Seefig.36.)
sidebalkare laidfirst,tospacethetrestle
eis inpositiontheremainingbalkare laid.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
48/65
e-shoeanchorcable
ctedbyraftit maybenecessarytoslideout
gbalkalreadyin place,topersonnelonthe
ofthebalkonthe transom.
balktotransom
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
49/65
on.Inthereinforcedbridgethereare14
gsiderails,the 6pairsofextrabalk being
the balkofthenormalbridge(centerspace
ssper span.Half-chessareusedtofill
ovetrestle transoms.Chessareplacedwith
ndalinedalongtheline betweenoutsidepairs
dto within1footofthe lasttrestle,to
ofthe lastspanofbalk.Twomenlay chess,
balkandreceivingchessdeliveredbycarriers
hinsingle fileontheright-handside ofthe
acedandclampedonebaybehind the
ilclampspersiderailare placed,withscrew
sofeachspan.(See fig.38.)
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
50/65
amps
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
51/65
llowingtablegivesasuggestedorgani-
constructthe10-tontrestlebridge.For
ileddutiesof sections,seeparagraphs25
but-
nd
st
y
ten
al-
-
uc-
rry
dshal-
hird
rect
stle.3
n
quip-
atertrestle,sectionimmediatelystartsassemblingtrestlesonraft.
p-watertrestle,sectionassemblesitonraft.
workassistinerectingtrestlebracing.
5feet,menmust beaddedtocarryingsection.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
52/65
NCO,6men)
butments.
esand bracing.
es.
ndfastensiderail
bleclips(for
ofbridge,andlevel
nplace(9 on
eachendof
areinplace,set
ewithtopflush
ketstoholdin
near-bankface).
ptolevelofI inch
e.
stle-shoeanchor
inerectionof
es.
bankabutment,
g,sectioncar-
estlebalk) and
tilpositionof
rmined.Re-
ledaftercom-
ent.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
53/65
ON(1NCO,10men)
allow-watertrestle
edingtrestlesand
onraft.
succeeding
g ferried.
hainhoists,
ed).
etrestleon).
).
ngs).
stles:
ainhoistsandguy
(loadedonraft):
hain
).
n
erec-
etrestle
ngs).
2trestlebalk,in-
s,attachchain
es (orbracing
te:Ifbracing
pto snugfit,but
umnto pre-
boltduringerec-
es(or bracing
of bridge.
m.
agehoists.
tles:
ime)onraft.
trestlesarebeing
equipmentonraft
dtrestles:
atertrestle,sectionimmediatelystartsassemblingtrestlesonraft.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
54/65
1NCO,14men)
restlesandfar-
tle,succeeding
tmentequip-
hess(NCOand
s,andside-
s(1
but first
span.
ffounda-
d14men):
restlesandfar-
t(seepar.20).
nd8men):
balkon transomsof
y(secondtrestle
p-watertrestles).
e.
ss guylinesto
dge.
estleupright.
next trestle,or
ainingdeep-water
ffar-bankshal-
-abutment
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
55/65
NGSTAGES
singpneumaticor10-tonpontonraftsa
ftdirectlyfromthebanksusuallycanbe
lesstimethanit takestoconstructalanding
otbepreparedwithabulldozer,or where
bulldozerisavailable,alandingstage is
ng-typelandingstagesufficesforlight
g10-tontrestlesis preferred,andmustbe
YPELANDINGSTAGEa.Multiple-span
stage(fig.39) isbuiltwitha hingespan
s. Theriverwardendofthehingespan is
edso thatthebalkprotrude6 to7feet
esno liveload;itis usedonlytoraiseand
ndingstage;loading
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
56/65
balkis securedtothetransombya detach-
Shorewardendsofbalkareattachedinthe
somofthe adjacenttrestle.Thenumberand
andingstagematchthoseofthe rafts.Chess
thehingespaninthe usualmanner.Two
oneachsiderailon theshorewardsideofthe
uylinesor trestlebracing(fig.39)maybe
position.Chainhoistsareused toraiseand
ge.Wheredeepwateriswithin 15
restlespansmaybeeliminatedanda single
ctlyontheabutmentsill maybeused.If
feetoftheshore,trestlebalk maybeused;
ustbesubstitutedfortrestlebalk.(See fig.40.)
dingstage;unloading
FTa.Balkonthe raftshouldnotpro-
r enoughtoallowthetrestlebalk ofthe
eriverwardgunwale(orfloat sill)ofthe
eeboardoftheshorewardpontonor float
eraftmaybe savedbysupportingtheriver-
anonahingesill placedontheshoresideof
floatsill).A trestlebalkmaybeusedas a
raft(fig.41).
areusedunderthedeckof theraft,
eninterlockingbalkmakesitdifficultto
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
57/65
INGSTAGE.Whentheraftapproaches,
ghto allowtheshorewardendofthe raft
aththeoverhangingportionofthe hinge
somislowereduntilthe hinge-spanbalk
on.Hooksofthe chainhoistsaredisengaged
desfreeonthe columnsastheloadmoves
isloaded,chainhoistsareengagedand
ermithinge-spanbalktocleartheraft, which
NFORRAFTLANDING
NCOLUMNS
ADINGANDUNLOADINGRAFT
ANDINTERLOCKINGBALK
dingstage
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
58/65
ADINGRAFTS.Theapproachingraftis
ldin placebyguylinesto theshorefrom
dandri verwardpontons.Whilevehiclesare
guylinesareanchoredtosuitableholdfasts.
maysupplementguylines.
UIREMENTSa.Thehingespan ofthe
edinabout 20minutesbyexperiencedper-
ckedatthesite.Onenoncommissioned
uiredas aworkingparty.
ditiontothecrewoperatingtheferry,
nhoists andguylines.
oadedat thelandingstageinabout
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
59/65
geguardnormallyisprovided.Its duties
chforfloatingminesandotherobjects
.
ridge.
ecessity.Trafficcontrolinsuresprompt
calvehicles,divertsvehiclesthataretoo
spacingofvehicles,andotherwiseexpedites
reventsdamagetothebridge.
ehiclesarenotpermittedtoblockroads.
ersectionsofapproachroadswithmainroad
vehiclesthatcannotcrossthebridge,and
lmentforvehicleswaitingtocross.While
rsareinstructedasto speedandvehicle
ebridge.
epostedateachend ofthebridgeand
onalguardsareplacedatintervals onlong
bridgeguardmust knowthesafe
etableI.)Load limitsshouldbeexceeded
nallconcernedknowtherisk,and underthe
estindicatedbya recordofprevious
erlyplaced,andtight.
gcautionspeed(seeebelow).
edforcrossingwithcaution(see/below).
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
60/65
enthe 10-tontrestlebridgeisused
shouldnot exceedthefollowingspeeds:
able I),25milesper hourforlight
for heavyvehicles.
tion(tableI), 5milesperhour.
combinationwithafloatingbridge,
thespeedsestablishedforfloatingbridges.
18inches.If clearanceofwheelsortracks
chsideofthe vehicle,speedmustbereduced,
n 3inches,thevehicleshouldbeguided
minimumintervalbetweenvehicleson
east50yardsmust bemaintainedbetween
tion.
Ea.Spareparts.Asmallsupplyofspare
tlebracing,andothermaterialsforrepair
neabutmentforimmediateuse.Alarger
undercoverandconcealmentinthe
eshouldbe inspectedfrequentlyfor
ouldbetightenedperiodically.
einitialsettlementoftrestles,and
geisin use,column-bracingclampsshould
edtoreleasestressesintroducedin thebrac-
stles.
uldbeadjustedtoallowfor smallsettle-
blesettlement,thetrestlemustbe raised
onarebuiltfoundationandnewfootings.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
61/65
ND
eral.Aregularprogramofinspection,
epair,andpaintingshouldbesetupandfol-
sstoredafterextendeduseit isespecially
take correctivemeasures.
ouldbethoroughlycleanedbeforebeing
eriod.Metalpartsshouldbe keptcleaned
reducerusting.Chainhoists inparticular
ventexcessivewearanddamageto the
mechanicaldevicesaredesignedto
outlubrication.Screwpartsparticularly
ecausethisleadsto accumulationofdirt
cessivefoulinganddamageto screwparts.
nhoistsshouldfollowthemanufacturer's
okeeptrestlesandwoodenpartsthor-
39^fordetails.)
s,andsills.Ingeneral,repairs tothese
ngcrushedor splinteredwood,reshaping,
emishes,andstra1ghteningandrefastening
ouldberemovedfromcondemnedtimbers
placements.Minordamagesthroughcutsor
subjecttodecay,andshouldbetrimmed
acticable.
iderail clampsandsimilarfittingscon-
mationsofmetalpartsand removingburs
he transomandcolumnsofatrestle
field.Minor puncturesanddamagetothe
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
62/65
epairedwitha 10-tonpontonrepairkitand
eweldingandcuttingset.Otherrepairsgen-
depot.
uipmentmustbekeptpaintedto pre-
rotting.Thisis particularlynecessarywhen
open,orusedinsalty orbrackishwater.
Paint,olivedrab,lusterless,marked
coat.Thisis ahighlywater-resistant
materials.Useonlyforrefinishingwater-
marked"PaintF-I."Containscritical
aintingsteelandaluminumwater-immersi-
ed"PaintF-II."Useforrepainting
"Paintcleanerandthinner."Useas
r.Furnishedin50-gallondrums.
t,marked"PaintetcherH3P04."Etch-
minumalloyequipment.Furnishedin
ourpartsofwaterwithone partofpaint
oveoldpaint.
ndsteeltrestles.Removelooseandcracked
tterfromall surfaceswithwirebrush.Clean
entisavailable.Removesandfromsurfaces
dditiontosuch cleaning,washsurfaceswith
erandthinner),andrinse inclean,unused,
aluminumsurfaceswithphosphoricacid
her),keepingsolutionincontactwithalu-
tes;thenwashthesurfacethoroughlywith
atsofprimer(PaintF-I)to thetrestle
yonefinishcoatof paint(PaintA)24hours
,andotherwoodenparts.Cleanallloose
foreignmatteroff surfacestobepainted,
ocoatsofprimer (PaintF-II).Applyone
rs afterpriming.
ces.Brass,bronze,andothernonferrous
uminum)neednotbepainted,butshouldbe
ereflectionoflight.
yprimerwithin5hours aftercompletion
rovideasmooth,evensurface,suitablefor
ofsubsequentcoats.Applybybrushorspray.
on ofpaintwithaquart ofmineralspirits
.Donotapply painttomoistsurfaces,nor
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
63/65
sspartis protectedagainsteffectsof
ove50 F.theatmosphereincontactwith
ouldbeat approximatelythesametempera-
chitisapplied.Whenpaintinghas com-
eration,includingprimingcoatsandfinish
dassoonaspracticableallowing,however,
nprimingandfinishcoats.
Alwaysstoreequipmentundercover,
nstorage,disposeequipmentsothatwater
entilationis adequate,andnoneofthe
ound.Equipmentmustbewellpaintedwhen
xtendedperiod.
aybestored inanyconvenientfashion,
eventcrushng orbendingofcolumnsand
transomshouldbeplacederect,toavoid
magetocleats.Trestleshoes maybe
e,teethdown,columnsalsolaidsideby side.
eyalwaysshouldbestoredin chests.
esemembersshouldbeplacedin well-
heground,withoneend higherthanthe
if intheopen.
re suitableforstoringandtransporting
mallmetalparts.
eseincluderopeandsteelpickets.Rope
andstoredasprescribedin engineerfield
dbeforestorage,itshouldbewashedthor-
dirt.
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
64/65
apacity1
type6
n6
et2
0-ton32
0-ton36
pacity40
capacity2
-to3-ton4
nepickets2
,clamp6
nch32
withouthoists4
,transom4
PublicDomain,Google-digitized
/http://www.h
athitrust.org/access_
use#pd-google
7/30/2019 Tm 5-276 Ten Ton Trestle Bridge
65/65
CTION(1NCO,10men)
tsecondshallow-
gtrestlesfromraft.
sttrestle.
teven-
stle:
ertrestle(par.
tles:
dtrestles
stle:^
dinsamemanner
tles:
bridgeNCOand
g6 menstay
on(4 trestlemen
rryingparty).
es.(2 raftmenon
nearlines.)
raftandengage
euntilbalken-
yerectedtrestle.
of bridgeby
en).
ining6 balk.
ttransomfree of
sconnectchain
ounload,or
m.
asnexttrestleis
stlesareun-
edinsame man-
watertrestles.
26).
p-watertrestle,sectionassemblesitonraft.
/www.h
athitrust.org/access_
use#pd-google