Tiziana Ferrari

Work package 5 – Network

Task, Partecipazione, Programma e Richieste Finanziarie

Tiziana Ferrari, INFN-CNAFI Workshop INFN-GRID

Page 2: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Work Package Task1. LAN/fabric networking.

– Evaluation of networking issues related to the fabric architectures under analysis in WP2.

2. FTP

– Study of standardization status of the ftp protocol at IETF;

– Experimental evaluation of prototypes of the grid ftp, i.e. of different implementations of the extended ftp protocol under definition at the Grid Forum: e.g. gsiftp (Globus), NCftp (NASA) and Washington University ftp;

– Contribution to the definition of the extensions of the ftp protocol in collaboration with the Grid Forum; evaluation of the possibility to extend the protocol definition for the support of file transfer in a multicast scenarios through reliable multicast.

Page 3: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Work Package Task (cont)3. Reliable Multicast

– Study of state of the art of reliable multicast for the evaluation of the maturity of this architecture currently under study at IRTF;

– Evaluation of the applicability of reliable multicast to replica management (sub-task to be developed in collaboration with WP2 of Data Grid) and for information exchange GRIS GIIS

– Experimentation of reliable multicast-based ftp prototypes; – Study of applicability of multicast extensions to ftp in the

framework of the Grid Forum. 4. IBP

– Evaluation of networking issues related to the IBP protocol;– Evaluation of IBP data server distribution in the wide area.

Page 4: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Work Package Task (cont)

5. Client-server connection methodologies

– Network = operazione di I/O all'interno di un sistema operativo (MPI, database distribuiti, DFS, AFS.....); estensibilita’ del sistema operativo alla rete;

– Network = interconnessione di server e client (server FTPS, WEB,...); modelli client/server, interfacce e protocolli.

6. Traffic Monitoring

• at network and application level - to be applied to Testbed 0 and following releases;

• adaptation/refinement of an existing monitoring tools

Page 5: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Work Package Task (cont)

7. MPLS

– Experimental study

– traffic engineering

– VPN

– QoS

– INFN-GRID test bed, TF-NGN

8. WDM/dWDM

– Technology tracking

– LAN and WAN (TF-NGN)

Page 6: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Participation1. LAN/fabric networking (coordination: F.Costa) F. Costa INFN-PD L. Gaido INFN-TO2. ftp (coordination: A.Forte/G.Tortone) A. Chierici, T. Ferrari INFN-CNAF A. Forte, L. Gaido, S. Lusso, INFN-TO P. Mastroserio, G. Tortone INFN-NA3. Reliable multicast (coordination: T.Ferrari) T. Ferrari INFN-CNAF R. Gomezel INFN-TS4. IBP (coordination: L.Gaido) P. Mastroserio INFN-NA L. Gaido, S. Lusso INFN-TO5. Client-server connection methodologies (SOAP) (coordination: G.Mirabelli/A.Ghiselli) A. Ghiselli INFN-CNAF G. Mirabelli INFN-Roma1 S. Barale INFN-TO R. Gomezel INFN-TS

Page 7: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Participation (cont)6. Traffic monitoring (coordination: P.Lo Re/G.Sava)

T. Ferrari, A. Italiano INFN-CNAF

G. Sava INFN-CT

P. Lo Re INFN-NA

R. Gomezel INFN-TS

Netgroup ?

7. MPLS (coordination: T.Ferrari)

A. Chierici, T.Ferrari INFN-CNAF

S. Lusso INFN-TO

8. WDM/dWDM (coordination: T.Ferrari)

T. Ferrari INFN-CNAF

S. Lusso, S. Barale INFN-TO

R. Gomezel INFN-TS

Page 8: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

ManpowerG. Sava INFN-CT 20 % 30 % datagrid, TM

P. Lo Re INFN-NA 30 %P. Mastroserio " 30 %G. Tortone " 20 %

F. Costa INFN-PD 30 %

G. Mirabelli INFN-Roma1 20 %

S. Barale INFN-TO 20 %A. Forte " 20 %L. Gaido “ 20 %S. Lusso " 30 %

R. Gomezel INFN-TS 25 %

A. Chierici INFN-CNAF 30 %T. Ferrari " 20 % 30 % datagrid, RM, TM, MPLS, WDMA. Ghiselli " 20 %A. Italiano " 30 %

Page 9: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Resoconto attivita’ e piano a breve termine• FTP:

– Test di Globus ftp tra NA, PD, TO, CNAF– ftp resume, striped ftp, autenticazione, TCP tuning– PIANO: test di Globus ftp su linee a 2.5 Gbps (GARR-G)

• Reliable multicast– Raccolta di documentazione e studio– Studio di applicabilita’ (DB management, Information

service)–

• IBP:– Studio– PIANO: verifica di fattibilita’ del test di un prototipo IBP

(specifica v.1.0, client/server, librerie)

Page 10: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

• Client-server connection methodologies

– Completamento specifiche

– Inizio attivita’ di studio

• Traffic monitoring

– Application: Throughput monitoring

– Network: RIPE Test Box (delay, jitter, packet loss, routing), pinger

– PIANO: applicazione degli strumenti estendendoli al testbed

• MPLS:

– PIANO: VPN e traffic engineering su reti a larga banda e con qualita’ di servizio (PlaGe)

Resoconto attivita’ e piano a breve termine (cont)

Page 11: Tiziana Ferrari Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Tiziana Ferrari

Richieste finanziarie

Centro/Sezione num trasferte trasferte HW

pers Italia WP5 Estero WP7

(Mlire) (Mlire) (Mlire)

WP7 Oxford GGF2 Roma TOT

CNAF 4 8 16 3 4 1 5 37

CT 1 2 8 0 0 1 0 11

NA 4 8 0 0 0 1 0 9

Roma1 1 2 0 0 0 0 0 2

PD 1 2 0 0 0 0 0 2

TO 4 8 0 3 0 1 0 12

TS 1 2 0 0 0 1 0 3

Tot (Ml) 16 32 24 6 4 5 5 76