TITRE
Workshop on theAgency’s Work Programme for 2014
Ljubljana, 6 June 2013
Alberto Pototschnig - DirectorChristophe Gence-Creux - Head of Electricity dpt.Dennis Hesseling - Head of Gas dpt.Volker Zuleger - Head of Market Monitoring dpt.Andrej Beloglavec – Director’s office
ACER – An Expanding Role
Third Energy Package
REMIT
TEN-E Regulation
ORIGINAL MANDATE
TWO NEW MAJOR PIECES OF LEGISLATIONconfirm ACER’s growing responsibilities
These are reflected in the Four Themes of the2014 Work Programme
2
.The Agency being assigned the human and financial resources on which the Work Programme is based
Implementation of WP depends on
ACER WORK PROGRAMME 2014
• Network Codes• Early Implementation• Internal Market Monitoring
Themes of ACER WP 2014
• Completing REMIT Implementation
• Wholesale Market Monitoring
• TEN-E Regulation Implementation
• TYNDPs
• Enhancement of the Electricity and Gas Target Models
Theme 1: 2014 Market Integration Target
Theme 3: The Infrastructure Challenge
Theme 2: Wholesale Energy Market Integrity and Transparency
Theme 4: Future Challenges, including RES Integration Challenge
4
Theme 1 - Market Integration: FG & NC
State of Play
.8 Network Code (NC) priority areas identified by the Commission in 2011 to support the IEM integration by 2014
.ACER has already issued 7 Framework Guidelines (FG) √The 8th FG is expected by November 2013 ➦ NCs in 4 areas already recommended for adoption √Significant further progress expected this year ➦
FG NC RO Recomm. Adopted
Grid Connections √ √ √ √
Cap. Allocat. and Cong. Manag. √ √ √ √
System Operation √ √ ➦ ➦
Balancing √ ➦
Capacity Allocation Mechanisms √ √ √ √
Balancing √ √ √ √
Interoper. and Data Exchange √ ➦
Harmon. Trans. Tariff Structures ➦
Ele
ctr
icit
yG
as
5
European Council conclusions: Priority to “speeding up the adoption and implementation of remaining network codes”
.Complete work on NCs in all 8 priority areas and recommend them to the European Commission for adoption:
. Reasoned Opinions and Recommendations on Network Codes
.Support the Comitology Process
.Scoping (and drafting FG in) new areas:
. Rules for Trading in Gas
. Incremental Capacity in Gas
Theme 1 - Market Integration: FG & NC
6
Electricity
Title Issued NC SubmittedACER RO/QR/ Recomm/QR
NCAdopted
Grid Connections
20.07. 2011
RfG 3.07.2012DCC 4.01.2013HVDC Q2 2014
QR 25.03.2013R 25.03.2013Q2/Q3 2014
/
Capacity Alloc. and Cong. Manag.
29.07. 2011
CACM 7.09.2012FCA Q3/Q4 2013
QR 14.03.2013Q4 2013
/
System Operations
2.12. 2011
OS 28.02.2013 OPS 29.03.2013 LFCR Q2 2013ERPOT
RO 28.05.2013RO<29.06.2013
Q3 2013 /
Balancing18.09. 2012
BA Q4 2013 Q1 2014 /
Theme 1 - Market Integration: FG & NC
Theme 1 NC 2014 - Electricity
8
1.Reasoned opinion and Recommendation on the Network Code on electricity balancing
2.Reasoned opinion and Recommendation on the Network Code on HVDC connections
3.Reasoned opinion and Recommendation on the Network Code on operational procedures in emergency
4.Preparation for and monitoring of the implementation of the adopted Network Codes
Theme 1 NC 2014 - Electricity
9
. Early implementation will continue for Capacity allocation and congestion management and Balancing
State of Play
.Long-term: auction rules to be defined by March 2014 and implemented by 1 January 2015
.Day-ahead: delayed, but Nov 2013 “go live” target for NWE and 2014 EU-wide coupling goal still achievable
.Intra-day: key to accommodate RES. PXs failed to agree on the IT Platform. ACER to issue an informal opinion, which PXs have committed to follow
Title Issued NC SubmittedACER RO/
Recomm/QRNCAdopted
Capacity Allocation Mechanisms
03.08. 2011
06.03.2012
17.09.2012
RO 05.06.2012
QR 04.10.2012 09.11.2012
Approval Gas Com. 15.04.2013
Q3 2013
Balancing18.10. 2011
26.10.2012
21.02.2013
RO 25.01.2013
Rec. 25.03.2013/
Interoperability + Data Exch.
26.07. 2012
11.09.2013RO 11.12.2013Rec. Q4/13 -
Q1/14/
Harmonised Transmission Tariffs Rules
30.11. 2013
Q4 2014RO Q1 2015
Rec. Q2 2015/
Theme 1 - Market Integration: FG & NC
Gas
Theme 1 NC 2014 - Gas
11
1. Reasoned opinion and Recommendation on the Network Code on rules regarding harmonised transmission tariff structures
2. Preparation for and monitoring of the implementation of the adopted Network Codes
3. Drafting amendments for the relevant network codes related to incremental capacity
4. Scoping of rules for trading related to technical and operational provisions of network access services and system balancing
. Early implementation will continue for Capacity allocation mechanisms
State of Play
. Coordinated auction-based allocation of a common set of bundled capacity products at all Interconnection Points at regional level
Theme 1 NC 2014 - Gas
12
Internal Energy Market – Cross-sectoral (Electricity and Gas
.In 2014 the Agency will publish a market monitoring report covering:
- Retail prices in electricity and natural gas
- Wholesale market integration
- Access to networks (including electricity produced or gas sourced from renewable energy sources)
- Compliance with consumer rights
Theme 1 - Market Integration
13
Regional Initiatives – Cross-sectoral (Electricity and Gas)
.The Agency coordinates the Regional Initiatives (ERI and GRI) and monitors the implementation of regional and cross-regional projects developed in this frame.
In 2014 towards the Agency will publish:
- The Regional Initiatives Annual Status Review Report
- On-line quarterly reports on the activities of the Electricity Regional Initiative and the Gas Regional Initiative
(besides coordinating and monitoring activities for the early
implementation of Network Codes)
Theme 1 - Market Integration
14
Theme 2 - REMIT
Actively preparing for Market Monitoring
REMIT entered into force on 28 December 2011
Prohibitions of Market Abuse:-Market Manipulation-Attempted Market Manipulation-Insider Trading
Obligations:-to Publish Inside Information-to notify ACER of delays in the publication of Inside Information-to establish effective arrangements and procedures to identify breaches of Market Abuse prohibitions-to notify NRAs of suspected breaches of Market Abuse prohibitions
These Prohibitions and Obligations already apply
15
REMIT entered into force on 28 December 2011
Registration Platform ready in Q3 2013
Market Monitoring Solution Development launched in Q4 2011 and ongoing
Pilot Project on Data collection, data sharing and market monitoring (full cycle)
ACER’s REMIT Information System Development
Theme 2 - REMIT
Actively preparing for Market Monitoring
16
. Completion of the Monitoring Platform
. Tier 1: Data Sourcing
. Tier 2: Data Cleaning
. Tier 3: Surveillance System
. Tier 4: Data Exchange
. Activation of Systematic Wholesale Market Monitoring
. Timing dependent on Adoption of Implementing Acts
. Approach dependent on available resources
ACER’s approach to market monitoring
Data Acquisition
Trade DataFundamental Data
Preliminary analysis of “Anomalous Events”
Notification of “Suspicious Events” to
NRA(s)
Coordination of NRAs (if needed)
Automatic Screeningto identify “Anomalous
Events”
Monitoring Methodology:
“Anomalous Events”definition
Theme 2: REMIT
Preparing to Go-live in 2014
17
Wholesale Market Monitoring Approach
Data Acquisition
Trade DataFundamental Data
Preliminary analysis of “Anomalous
Events”
Notification of “Suspicious Events”
to NRA(s)
Coordination of NRAs (if needed)
Automatic Screeningto identify “Anomalous
Events”
Monitoring Methodology:
“Anomalous Events” definition
18
Guidance on the application of REMIT Definitions (2 Editions issued so far)
Recommendations to the Commission on the Records of Transactions required for effective monitoring, to be defined in Implementing Acts
Definition of Reporting requirements and standards
REMIT application, Definition of Reporting Requirements, Standards and Procedures
Actively preparing for Market Monitoring
Theme 2 - REMIT
REMIT entered into force on 28 December 2011
Monitoring Platform Development
19
Policy Documents
DocumentLegal basis
Public Consult.
Issued
Guidance on the application of REMIT definitions – 1st Edition
16(1) n/a 20 Dec 2011
Format for the Registration of Market Participants (CEREMP)
9(3) Apr-May 2012 26 Jun 2012
Guidance on the application of REMIT -2nd Edition
16(1) n/a 28 Sep 2012
Recommendations to the EC on the Records of Transactions
7(3) Jun-Aug 2012 23 Oct 2012
Recommendations to the EC on the Records of Transactions (balancing and capacity markets)
7(3) Jun-Aug 2012 26 Mar 2013
Guidance on the REMIT application -Update of 2nd Edition
16(1) n/a 24 April 2013
RRM and RIS registration guidelines 12(1) Mar-May 2013 Exp.Q3 2013
Guidance on the application of REMIT - 3rd Edition
16(1) n/a Exp.Q3 2013
Registration and Transaction Reporting User Manuals
12(1) n/a Exp. Q4 2013
Guidance on the application of REMIT – 4th Edition
16(1) n/a Exp. Q2 2014
IT Implementation Timeline
2013 2014Q1 Q2 Q3 Q4 Q1 Q2
Development of the Registration System
Design Study for MM SW
Development of theMkt Monitoring System
Development of data collection/sharing solutions
GO LIVE
ACER Pilot Project REMIT
Theme 3 – The Infrastructure Challenge
. Opinions on (electricity and gas) methodologies for cost-benefit analysis (CBA) of infrastructure projects
. Guidance and Recommendation on Incentives and Risk Assessment
. Guidance on Cross-border cost allocation methodology
. Annual consolidated report on progress of projects of common interest and recommendations to facilitate the implementation and overcoming delays/difficulties in PCI implementation (if necessary) 22
Theme 4 – Future Challenges and RES
European Council conclusions: “the deployment of renewable energy sources will continue, while ensuring their cost reflectiveness [and] further market integration”
.Review of the Electricity and Gas Target Models
State of Play
.Detailed Target Model for the Internal Electricity Market
.Broader Target Model for the Internal Gas Market
.These Target Models represent robust starting points for any evolution to handle the increasing penetration of renewable-based electricity generation:
.Greater flexibility in electricity and gas markets required
.Resource adequacy concerns in electricity generation23
Next steps
The 2014 Work Programme Outline is available on the ACER Website: www.acer.europa.eu
Deadline for Stakeholders to submit comments on the 2014 Work Programme Outline14 Jun
30 JunThe 2014 Work Programme is submitted by the Director to the BoR, the EP and the EC
1 SepThe Board of Regulators approves the 2014 Work Programme
30 SepThe Administrative Board, after consulting the EC, adopts the 2014 Work Programme approved by the BoR, and transmits it to the EP, the Council and the EC
24
Thank you for your
attention
Thank you for your attention!
www.acer.europa.eu