Titolo
The EGTC Area
E G T C FOUNDERS
Key Figures
Municipalities
km2 / km2
Gorizia/Gorica 35.996 41,11 875
Nova Gorica 31.308 309,00 103
Šempeter-Vrtojba 6.446 15,00 423
Total 73.750 365,11 202
Looking to the past…The post war situation
1947
THE COLD WAR AND THE BORDER LINE
1947
COLD WAR
1947
The army controls the border inside the city
NOVA GORICA 1947
… NOVA GORICA some years later…
COLD WAR – CLOSED BORDER
THE COLD WAR
International trade in ‘60s
INTERNATIONAL AGREEMENS AND SOME SPARKS OF OVERTURE
1953 VIDEMSKI SPORAZUM / ACCORDO DI UDINE
1975 OSIMSKI SPORAZUMI / ACCORDI DI OSIMO
1975
Osimo agreements
1953
Udine agreement
…and the war
1991
The fall of…Gorizia wall
2004
E G T C FOUNDERS
GORIZIA NOVA GORICA SEMPETER VRTOJBA
Steps towards EGTC
December 2008 – September 2009
Participation in the first and second steps of the ADRIA strategic project (2007-2013 IT-SLO territorial cooperation programme) which forsees the planning of a light underground and the institution of the first EGTC.
October 2009 – January 2010
Preparatory works of the Italian-Slovenian mixed group of the threee municipalities, Informest and CEI (Central European Initiative).
January 21staand February 18th 2010
EGTC approval by Gorizia and Nova Gorica municipality council; EGCT approval by Šempeter-Vrtojba municipality council
Steps towards EGTC
February 2010
Official signature of the EGTC Agreement
From left: Dragan Valenčič, Mayor Občina Šempeter-Vrtojba; Ettore Romoli, Mayor Comune di Gorizia; Mirko Brulc, Mayor Mestna občina Nova Gorica
Steps towards EGTC
March 2010
Documentation sent to relevant Italian and Slovene Ministries for EGTC approval
June 2010
The EGTC is approved by the Slovenian government. The Italian government asks for some purely formal changes to the documents.
May 2011
The Italian government approves the EGTC.
September 15, 2011
The EGTS has been registered and acquires juridical personality
October – November 2011
Notice of institution publication in the Official Journal of the European Union and in the Italian Republic Official Journal and formal achievement of the procedure.
EGTC GO Identity Card
Headquarters: Gorizia (Italy); temporarily c/o Informest
Legislation: Italian
Duration: unlimited, subject to Assembly’s decision and according to EU legislation provisions
Juridical form: recognized no-profit association with juridical personality operating under public law
Territorial jurisdiction: Members’ territory; Participation to the EGTC is open to other public institutions or operating under public law as ‘associated members’ – conditions settled by the Assembly
Working languages: Italian and Slovenian, all EGTC bodies have two working languages and all their work is bilingual
Costs:- 50% of the start-up fund covered by the Italian partner and 50% by the Slovene one- Self sustenance through fund raising
EGTC STRUCTURE
Comune di Gorizia Mestna Občina Nova Gorica Občina Šempeter-Vrtojba
ASSEMBLEA
ASSEMBLY 14 4 anni/years
ASSEMBLEA
ASSEMBLY 14 4 anni/years
PRESIDENTE
PRESIDENT2 years
DIRECTOR
4 years
Board of Auditors Standing Committees-ENERGY
-TRANSPORT-HEALTHCARE
-CULTURE-URBAN PLANNING
7 5 2
Italian Slovenian Secretariat
(managed by INFORMEST)
staff
EGTC AND NEW 2014-2020 PROGRAMMING
A PROPOSAL FOR AN INTEGRATED TERRITORIAL INVESTMENT
1. Alignment with National guidelienes
2. Compliance with Regional Priorities
3. Inclusion of ITI in Operational Programme (Regional or Cross border)
4. Coordination and synergies between Managing Authorities of the funds
5. EGTC as intermediary body for the management of ITI (art. 99 General Rules + art.10 ETC)
EGTC AND NEW 2014-2020 PROGRAMMING
EGTC AND NEW 2014-2020 PROGRAMMING
SOME CONCRETE EXAMPLES
•SUSTAINABLE ENERGY ACTION PLAN FOR THE 3 MUNICIPALITIES
•MATERNITY HOSPITAL
•JOINT URBAN PLANNING FOR REVITALIZATION OF MARGINALIZED INNER CITY AREAS
EGTC AND NEW 2014-2020 PROGRAMMING
Strenghts and weaknesses
• Strategic coordination of the policies in the field of local transport, Energy and natural resources management; healthcare and welfare services; culture and training, urban planning
• Implementation of territorial cooperation programmes and projects co-financed by the EU or other financing sources.
• Open consultation for the criteria of the new 2014-2020 EU programming period in which the EGTC will be able to give a substantial contribution as a cross-border institution, representative of the territory
• Option for the management of ITI within Italy-Slovenian CBC programme
• Lack of clear guidelines on how to concretely design ITIs
• New Programming tools are creating great expectations for local stakeholders but programming bodies are still reluctant and are not encouraging their activation
• EGTC is much more seen as a «container» rather than a tool for the achievement of concrete results
• In spite of the great opportunity offered by the new programming period tools (territorial approach, role of EGTC, multi-fund options) institutions are adopting a conservative approach rather an innovative one
Thanks for your attention!
Saverio D’EreditàProject Manager
INFORMESTTechnical Secretariat of EGTC – GO