Title:PSVP Report Presenter’s Name: Bob Evans Economy: PSVP Coordinator 33rd APEC Transportation Working Group Tokyo, Japan October 10-14 2010

Title:PSVP Report Presenter’s Name: Bob Evans Economy: PSVP Coordinator

  • Upload
    alder

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

33rd APEC Transportation Working Group Tokyo, Japan October 10-14 2010. Title:PSVP Report Presenter’s Name: Bob Evans Economy: PSVP Coordinator. JAPAN 2010. 33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010. AGENDA. - PowerPoint PPT Presentation

Citation preview

Page 1: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

Title:PSVP Report Presenter’s Name: Bob EvansEconomy: PSVP Coordinator

33rd APEC Transportation Working Group Tokyo, JapanOctober 10-14 2010

Page 2: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

AGENDA

•1030-1100 Report on PSVP visits to Thailand and Vietnam and the outcomes of those visits. Adoption of recommendations from the report. 

•1100-1130 Program Overseer and MEGSEC A/Chair to advise APEC conditions for participation in PSVP. Economies to indicate agreement or alternative proposals.

•1130-1145 Development of timetable for future participation to complete visits to all Economies. 

•1145-1230 Economy reports and discussion of next phase, namely the establishment of cooperative measures to optimize the use of the “best practices” and “needs” of Economies, identified during visits. 

Page 3: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Report on PSVP visits to Thailand and Vietnam

Thailand:

Date of Visit: July 5th-9th 2010 to the ports

of Bangkok, Laem Chabang , Kerry Siam

Sea Port and BMTPacific Port.

Page 4: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

ThailandVisit Team Information:  Mr. Bob Evans APEC

Program CoordinatorLt.Col(Retd)Hj Rizal Fauzan bin Hj Mohd Bahrin Brunei

DarussalamTeam Member

Commander Richter Tipton (USCG) USATeam Member

Mr.Suchart Wongwai ThailandLiaison Officer

Haji Mohd.Yussof Haji Sharbini Brunei DarussalamObserver

 

Page 5: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

The Team

Page 6: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Page 7: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

River Traffic

Page 8: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Visits to datePapua New Guinea15-19 Oct. 2007Team:Canada, Thailand, AustraliaPorts: Port Moresby, Madang, RabaulThis was the initial visit upon which the final Manual was based.

Philippines20 -24 Oct. 2008Team: Japan, KoreaPorts: Manila, Cebu, Davao, Batangas

Korea/Japan13-17 April 2009 Team: Australia, PhilippinesPorts: Busan Incheon, Fukuoka, Yokohama

Page 9: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Australia18-22 May 2009Team: Vietnam, PNG,Ports: Brisbane, Townsville, Darwin

Thailand5-9 July 2010Team: Brunei Darussalam , USAPorts: Bangkok, Laem Chabang, Kerry Siam Sea Port, BMTPacific Sea Port

Vietnam15-20 Aug 2010Team: Australia, SingaporePorts: Ho Chi Minh, Haiphong, Quang Ninh, Hanoi

Page 10: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Projected Visits

Prior to December 31, 2010

Indonesia:NovemberTeam: Singapore, PNGPorts: Tanjong Priok, Surabaya.

Brunei DarussalamDecember 13th-15th

Team: Volunteers please!

Page 11: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Conducting a Visit

•Email requests are promptly responded to

•A forward program is established

•“Areas for Consideration” are acted upon

•Establish continuing information sessions to update Economies on progress.

 

Page 12: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Comments from Team Members

Victor Chan (Singapore) Vietnam visit.

“The PSVP has provided a good platform for APEC economies to identify and share bestpractices from one another and also help economies to determine areas that might need further improvement for considerations.”

Page 13: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Future Proposals and Recommendations for Endorsement by MEGSEC

 • All Economies should participate both as a Host and in providing a Team Member.

•The PSVP cannot simply be a visit with no further action being taken.

•The purpose of the PSVP is to determine not only areas where an Economy might benefit from some external assistance, but to identify Best Practice which could be used to provide that very same assistance to another Economy.

•An Economy must seek assistance through the MEGSEC Chair if the PSVP is to fulfill its intended purpose.

Page 14: Title:PSVP Report  Presenter’s Name: Bob Evans Economy: PSVP Coordinator

JAPAN 2010

33rd APEC Transportation Working Group, Tokyo, Japan, October 10-14 2010

Recommendations for consideration by MEGSEC

•MEGSEC members to endorse the continuation of the program and agree to indicate proposed involvement so that a forward schedule can be drawn up.

•Note the recommendations made subsequent to each visit and agree to their implementation in the Manual

•Consider and agree to a Phase 2 process which will build on the results of the visits.