Perpendicularity Inspection of Final Assembly TITLE: 7405 1 OF 7 22/6/7 A MI – Perp. Final WORK STATION: PAGES: DATE: REVISION: SWI: Technology in Motion STANDARD WORK INSTRUCTION Trained and capable of performing this work: Date: Supervisor or engineer giving Approving to perform: Operator 2 Operator 5 Operator 6 Operator 4 Operator 1 Operator 3 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have read this SWI and have successfully performed the work described in it in the presence of the Supervisor or Engineer signing in the second column on the date in the third column. 最最最最最最最最最

TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Embed Size (px)

Citation preview

Page 1: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74051 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Trained and capable of performing this work:

Date:Supervisor or engineer givingApproving to perform:

Operator 2

Operator 5

Operator 6

Operator 4

Operator 1

Operator 3

On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have read this SWI and have successfully performed the work described in it in the presence of the Supervisor or Engineer signing in the second column on the date in the third column.

最终装配垂直度检验

Page 2: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74052 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Safety Requirements: Safety glasses

In Process Check1) 开始检验前,参考图纸或检查表上的可接收垂直度公差 .2)

Perpendicularity Tolerances

Operator Maintenance1)2)3)4)5)

Material / Components1) Mechanical sheet2) Print3)4)5)

Tools & Fixtures1) 2)3)4)5)

Mechanical sheet

Page 3: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74053 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Safety Requirements: Safety glasses

In Process Check1) 如果轴太长,请将两块 V 型块叠放保证足够的空间 . 2) 确保电机水平安全地放置在 V 型块上 .

Operator Maintenance1) Verify calibration on dial indicator.2)3)4)5)

Material / Components1) motor2)3)4)5)

Tools & Fixtures1)V-block fixture2)Dial indicator3)4)5)

1. 将电机垂直置于 V 型块上2. 将指示器夹在轴端上 . ( 注意 : 有些夹指示器轴太短 .)

Page 4: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74054 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Safety Requirements: Safety glasses

In Process Check1) 验证测量值不能超过表的量程 . ( 测量器的表应在“ 0” ~“ 1”) 2)

Operator Maintenance1) 2)3)4)5)

Material / Components1) motor2)3)4)5)

Tools & Fixtures1)2)3)4)5)

3. 将测试器的面和指针尽可能于被测表面平行 .

真确的指针角度

正确的表角度

减小此角度

错误的表角度

错误的指针角度

Page 5: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74055 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Safety Requirements: Safety glasses

In Process Check1)Verify that indicator will not run out of travel distance.2) 在第 5 步旋转过程应避免指针碰到障碍物 ( 洞 , 突起 , ect.)

4. 将针头置于被测表面,保证针头尽可能远离中心

Operator Maintenance1)2)3)4)5)

Material / Components1)2)3)4)5)

Tools & Fixtures1)2)3)4)5)

5. 旋转时指示器清零

6. 360 度旋转千分表读取每个数值的总和(例如:右边 0.0021 +左边 0.0090 =总和为 0.0030 )

Page 6: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74056 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Safety Requirements: Safety glasses

In Process Check1) 测量值需在图纸或检查表的公差范围以内才算合格 Measurements must be within the tolerance on the Mechanical Sheet and Print to pass inspection.2)

7. 在表单上记录测量变化值 Record variance measured by dial indicator on mechanical sheet.

Operator Maintenance1)2)3)4)5)

Material / Components1)2)3)4)5)

Tools & Fixtures1)2)3)4)5)

8. 重复 1 ~ 7 步测量图纸上其它表面的垂直度 Repeat steps 1 through 7 to measure the perpendicularity of any other surface on the print.

Page 7: TITLE: Perpendicularity Inspection of Final Assembly SWI:REVISION:DATE:PAGES:WORK STATION: MI – Perp. FinalA2014-1-2# OF 77405 Technology in Motion STANDARD

Perpendicularity Inspection of Final AssemblyTITLE:

74057 OF 723/4/10AMI – Perp. Final

WORK STATION:PAGES:DATE:REVISION:SWI:

Technology in Motion

STANDARD WORK INSTRUCTION

Signatures of AuthorizationProduction: Manufacturing: Quality: Design: Other:

         

Revision: Date: Reason for Change: Editor:

A 9-26-06 New SWI Into. Tony Dick