Tingo Pucará Water Supply System
OPERATION AND MAINTENANCE MANUAL
1
I. Overview II. SafetyIII. IntakeIV. Sedimentation/Pump TankV. Pump VI. PipelineVII. Storage TankVIII.Distribution SystemIX. Maintenance
CONTENTS
2
OVERVIEW
3
PLAN VIEW
4
Intake
Sediment/Pump Tank
Pump
Pipeline
StorageTank
DistributionSystem
CONTACT
5
Sistemas Electricos IndustrialesAve. 10 de Agosto N 64-349 y Bellavista(Sector Parque de los Recuerdos)Telefax: 2482-829 / 084-068-432Quito – Ecuador
GrimasaAv. 10 de Agosto (50-63) N36-177 y NN UUTelefono: 2 245-041 Fax: 2 273-020Quitoe-mail: [email protected]
Ferreteria San AgustinCalle Quito y Hnos. Pdez (esq.)Telfs.: 099 830 434 / 2812-797Fax: (03) 2802-156Latacunga - Ecuador
Dismaconcobre CIA. LTDA.Valladolid N24-611 y av. La CorunaTelefax: 2228-315 / 2235-207 / 2905-374e-mail: [email protected] – Ecuador
Acero Comercial Ecuatoriano S.A.Av. La Prensa N45-14 y Telégrafo 1Telf.: 2454 333 / Fax: 2454 455E-mail: [email protected]
SAFETY
6
• Fill in holes and trenches at the end of every day
SAFETY
7
• All valves should be opened and closed slowly to avoid damage
SLOWLY
SAFETY
8
• When entering a tank, always work with a partner:
• When entering a tank, the valve or switch controlling the flow into the tank should be off, and the person in the tank should lock it out:
SAFETY
9
Lock
PUMP
10
Turning the Pump On (Manual Mode):1. Inspection: Examine the pump and wiring, look for damaged wires
in contact with metal piping or water. 2. Turning ON, Manual Mode: turn the knob from the OFF to the
MANUAL Position. The green light should turn ON.
3. TURN OFF IMMEDEATLY if the red light comes on, OR if the pump pressure exceeds 475 PSI
PUMP
11
Powering On the Pump (Auto Mode)1.) Inspection: Examine the pump and wiring, look for damaged wires in contact with metal piping or water.
2.) Turning ON, Auto Mode: Simply turn the knobFrom the OFF to the AUTO Position. The Green Light should Turn ON.
3.) Turning OFF, Auto Mode: Simply turn the knob from the Auto to the OFF Position.
TURN OFF IMMEDEATLY IF:If the Red Light Turns ON.OR the Pump Pressure Exceeds 475 PSI
12
13
Trouble Shooting in Auto Mode1.) Inspection: Examine the lights on the front of the “Tablero” Green Light should Be ON, the Red Light, Cistern Empty Light and Supply Tank Full Light should be OFF.AT THIS TIME THE PUMP SHOULD BE ON
2.) Pump OFF, while in Auto Mode: If the Cistern water level is too low the Cistern Pump Light will be ON and the PUMP will turn OFF. If the Supply Tank water level is too high then the Supply Tank Full Light will be ON and the PUMP will Turn OFF.
Supply Tank Float SwitchCondition:PUMP ONSWITCH Normally CLOSEDPUMP OFF (Tank Full)SWITCH Normally OPEN
Cistern Float SwitchCondition:Switch Normally CLOSEDPUMP ONSWITCH OPENPUMP OFF (Cistern Empty)13
Servicing The “Tablero”1.) Opening the “Tablero”: The “tablero” control unit should only be opened or serviced by the equipment vendor or an approved member of the Tingo Pucara Water Committee. A key is required to Open the “tablero” Control Unit 2.)Before opening the “tablero” turn Power OFF at the Pump House Service Panel. By Switching the two 50A breakers into the OFF Position.
Special Key Required“Tablero”
Pump House Service Panel
Move Breaker to OFF
14
Servicing The “Tablero”3.) When the “Tablero” is OPEN: Upon opening the “tablero” the user may examine the subcomponents and wiring of the “tablero” for loose electrical connections or visible damage. The Pump Technician should take written notice of the damage and contact the equipment vendor. DO NOT ATTEMPT TO REMOVE PARTS FROM THE “TABLERO” UNLESS INSTRUCTED TO DO SO BY THE VENDOR.
Examine Relay Contacts for Damage.Relay Contacts are mechanical and haveA given life expectancy.
15
PIPELINE
16
Start Up:• Open the Shut off valve.
Turn the lever slowly to avoid damage.
OPENCLOSED
SLOWLY
PIPELINE
17
PIPELINE
Maintenance:• Every six months, turn
ball valves slowly on and off, 3 or 4 times to make sure they are not stuck.
• If any valves are leaking, fix them right away.
18
SLOWLY
PIPELINE
Maintenance (Continued):• After every storm, walk
along the pipeline and look for any signs of dirt washing away
• Fill in any bad areas right away
19
Maintenance (Continued):• Look for any sign of
water leaking along pipeline
• Look for holes, muddy or wet spots, and areas where dirt is washing away
• Fix leaks right away
PIPELINE
20
STORAGE TANK
21
Shut Down Procedure:1. Open the clean-out valve2. Close the distribution valve
12
STORAGE TANK
22
Shut Down Procedure (Continued)3. Remove all solids, and keep
solids away from drain.
STORAGE TANK
23
Shut Down Procedure (Continued)4. Thoroughly wash with disinfectant like bleach5. Rinse the tank with clean water
STORAGE TANK
24
Normal Operation:• Check that water is not coming out of overflow pipe. If water is coming from the overflow pipe, turn off the pump and check the float switch.
STORAGE TANK
25
Start Up Procedure:1. Close the Clean-Out Valve2. Open the distribution Valve
12
STORAGE TANK
26
Start Up Procedure (Continued):3. Check to make sure
the float switch is working correctly.
STORAGE TANK
Switch up:Pump should be off
Switch down:Pump should be on
27
DISTRIBUTION SYSTEM
28
DISTRIBUTION SYSTEM
29
Maintenance:1. Walk the system and check for
wet areas that could be leaks
DISTRIBUTION SYSTEM
30
Maintenance (Continued):2. Check for leaks at valve and PRV
boxes visually and by feel.
DISTRIBUTION SYSTEM
31
Maintenance (Continued):3. Repair leaks and replace any
defective valves or fittings.
DISTRIBUTION SYSTEM
32
Maintenance (Continued):4. Check that Flow Meters are working
properly by opening the valve on the tap stand and watch that the meter is operating.
DISTRIBUTION SYSTEM
33
Maintenance (Continued):5. Attach pressure valve to each tap
stand. Open valve and record the pressure.
DISTRIBUTION SYSTEM
34
Maintenance (Continued):6. Check for leaks at each tap stand, and
repair or replace valves as needed.
DISTRIBUTION SYSTEM
35
Maintenance (Continued):7. Every six months, turn
ball valves slowly on and off, 3 or 4 times to make sure they are not stuck. If any valves are leaking, fix them right away.
SLOWLY
Maintenance (Continued):8. Add permanent
location stakes when new pipelines are installed.
DISTRIBUTION SYSTEM
36
This manual was written by the members of the EWB-USA Pittsburgh Professional Chapter, for our friends in the
community of Tingo Pucará.