Tin Sni Tape M Hand B Table s Other bella Verona e (24ea per 100sq..) add 10%-15% waste ACCESORY LOCATION AND DISTRIBUTION Figure 1. Accessory d sories bella Verona bella Verona Hip

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • www.terrabellaroof.com

  • TerrabActual Actual CoveraCovera VeronaActual Actual Covera VeronaTerrab

    VeronaActual Covera VeronaActual Covera VeronaLengthWidth Valley LengthWidth Roof-toLengthWidth Z-Bar FLengthWidth=

    Self-t1/2”)

    bella Verona®length = 44.6Width = 18”

    age length = 3age width = 1

    a Ridge Cap®Length = 15.9Width = 15.2

    age Length = 4

    a End cap ella Verona, C

    a Bird-Stop ELength = 49.2

    age Length = 4

    a Bird-Stop RLength = 49.2

    age Length = 4

    a Valley: h = 8’

    = 18”

    Cap: h = 8’

    = 2”

    o-Wall Channh = 8’

    = 6”

    Flashing h=50” =3”

    apping screw

    ® 67”

    39.75” 5.74”

    94”

    25” 49.375”

    Classic

    ave: 2” 48”

    Ridge: 2” 48”

    nel:

    w#9 Hex (1/4”

    ” diameter) xx 1.5” (or lenggth sufficient to penetratee roof deck

    Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    Overview

    Terrabella Verona® Comparative Bene�tsProtection and

    Bene�ts Terrabella® Clay Tile Fiber Cement Shingle

    Weight Light 1.11 Lbs./Ft2 5.99-15 Lbs./Ft2 5.99 Lbs./Ft2 2.5-3.99 Lbs./Ft2

    Fire Class A Material Class A Material Class A Material Class A Material

    Wind Resistanceis for Terrabella

    is higher

    121 mph not cover winddamage

    up to 75 mph up to 111 mph

    Earthquake Added shear strength Prome to collapse No added shearstrength

    No added shearstrength

    Environmetal Recyclable Limited Recycling Limited Recycling Limited Recycling

    Impact ResistantUL 2218

    Class 4 - you canwalk on it, quali�es

    for discount on insurance

    High mailtenance Class 3 Class 3

    Maintenance/life cycle cost

    Low, retains itsappearance

    without damage

    High maintenance High maintenance High maintenance

    Base structureoptions

    Wood, steel andconcrete solid surface

    or support

    Wood, steel andconcrete solid surface

    or support

    Wood, steel andconcrete solid surface

    or support

    Wood, steel andconcrete solid surface

    Options forre-roo�ng

    Excellent, you may keepexisting roof

    TEAR OFF requiredfor re-roo�ng

    TEAR OFF requiredfor re-roo�ng

    TEAR OFF requiredfor re-roo�ng

  • The Twhile Each corrospeciacoa nwhich The pdefor

    Terrabella® Ve incorpora n

    panel is madsion resistanally patentedng (ceramic sh assures a lo

    pre-punched rming the pan

    Side Overlap

    erona le pang the benefit

    de with a gauce in many t

    d resin that cstone chips). ng las ng fin

    tabs allow nel due to the

    nels are specits and durabil

    uge 26 alumintypes of envireates a stroFinally the p

    ish.

    panels to beir uneven e

    Pre-fast

    -punched tening tabs

    TERRA

    ially manufaclity of metal r

    num-zinc coaronments. Th

    ong bond betpanel is coate

    be screwed e shape.

    ABELLA VE

    ctured to emuroofing.

    ated steel corhe steel coretween the steed with a pr

    onto de str

    RONA TILE

    ulate Italian c

    re that offerse is then coateel core and otec ve acry

    ucture below

    SYSTEM

    classic es

    s ted with a the stone

    ylic glazing

    w without

    Side Overlap

    Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    Terra

    AccesA.TerraB.TerraC. Terr

    E. TerrF. TerrG. TerrH. TerrI. TerrTerrab

    InstalTin SniTape MHand BTable sOther

    bella Veronaa e (24ea peer 100sq. .) aadd 10%-15%% waste

    ACCESORRY LOCATIOON AND DISTRIBUTIOON

    Figure

    e 1. Accessory dd

    ssories abella Veronaabella Verona

    a Hip and Ridg

    rabella Bird-stD. Terrabella Roof-to-wall Channel (8ft), step flashing and both sides of hips

    abella Z-Bar fabellaVeronarabella Veronrabella Flat Shabella Bird-stella Verona H

    Toolps

    Measure Benders saw Char required i

    a Hip and Ridgge (1.1 v

    top Eave(4 )

    flashing (4 ),a Valley (8 ) a Valley Cap(

    heet 14"x50" top Ridge (4ftHip and Ridge

    ls

    alk Line tems

    ge (1.1 covverage each) verage each)

    step and heaad wall ( ) t)

    e end cap (To

    CirculScrewHamm

    close the end

    lar Saw w Gun mer

    ds of hips andd ridges)

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    Roofing underlayment (one layer required) Spray Paint High Grade Roofing Sealant Galvanized Pipe Flashings 2x2 and 1x2 as needed for hipsand ridges Care and Recomme

    Guidelines: Products should be installed in accordance with the following guidelinesestablished by Terrabella®: • Do not use accessories that contain copper or lead with the steel roof system, as they are incompa metals. • A slope of 4/12 or more is required to install this product. • When handling the product, be careful not to deform panels. • Always wear gloves when working with metallic products. • When installing Terrabella® roofing panels, care should be taken to avoid excessive on between panels. This could damage the durability of the stone coa g. • Immediately after and/or during insta remove any steel that may remain on the panelsdue to drilling and cu ng. These will rust and might damage and stain the panels. • It is recommended that those working on the roof use rubber soled shoes to avoid damaging the product. Terrabella® Maintenance: • Terrabella® is designed to withstand a most environment, but the product life can be extended with proper maintenance. • Upon comp ng the i check that the roof surface is clean and free of objects that could damage the (metal burrs, screws, wire, sheet metal clippings, etc...) • Avoid foot traffic on the roof whenever possible. • It is recommended to clean the roof surface every six months when installed in a highly corrosive environment (use water and a so brush, or have a professional do the job). • Always carry out any work on the roof deck using all safety measures and wooden planksfor weight distri

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    It is important to carefully read each of the recommenda in this manual before the in process.

    Terrabella® is not responsible for improper installa on ormisinter of this manual. For the most current and up-to-date installa instru go to www.terrabellaroof.com General recommenda for transpor handling, and storage: Storage Recommenda : • Always store the product indoors. • Store the product in a dry and ven ated area. • Avoid stocking the product in direct contact with the floor over large periods of me. • If stored outside: Locate product on a firm surface and protect from damage. Allow for water to drain off of the panels and protect it from being blown by wind. • Packs of 5 panels can be stored on top of each other to a maximum height of 1 meter. Always make sure there is enough air circ on between packs. •If using tarpaulins, leave enough space at the ends of the canvasto allow for air • Do not use polyethylene or to cover the packages. •Do not store detergents, solvents, acidic materials, or alkali such as concrete or plaster with Terrabella® products. • It is recommended to store products near the place where they will be installed to avoid damage from handling. General recommenda for

    Structure: The roof structure should be inspected thoroughly. Any structural problems should be corrected prior to the installa of the roofing panels.

    Decking:15/32”minimum thickness; Grade B-C APA rate plywood or equal should be used.

    must be 2"x2" or 1”x2” standard grade Douglas fir or nominal thickness 1.5" x 1.5" and .75” x 1.5”.

    Underlayment:A minimum underlayment of #30 felt or synthe underlayment is required on all new constr and tear-offs. Always check local building codes prior to i

    Roof Saddles: Roof saddles are required behind any roof protrusion 48" in width and above. Panel diverters are easy to make and are a good way of water from the back of the protrusion and should be used where necessary.

    Sealants:A one-part polyurethane type sealant is recommended.

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    ROOFING PREPARATION New roof: The Terrabella Verona system does not require b ns to be installed on the deck. Prepare the wooden deck to be level and secure. Cut out decking in areas where you plan to install ridge vents and install #30 felt or equivalent synthe underlayment on the decking. Always check local building codes for addi al requirements. Reroofing:Terrabella® roofing system may be installed over an exis ng asphalt shingle roof (maximum of 1 layer). Follow the steps below before installing Terrabella® panels and accessories on top of shingles:

    Step 1: Remove all the old hips, ridges, gable material and any drip edge installed on eaves. Step 2:Cut any overhang flush with the exis ng fascia. If necessary, build up the fascia at the eave using 1”x4”s and 2”x2”s un l the fascia is flush with the rest of the roof. Step 3: Install a new layer of underlayment over the roof area. #30 felt or equivalent synthe c underlayment is recommended. Always check local building codes, materials such as ice and water shield might be required for your area.

    Step 4:Install Terrabella® roofing system following the installa procedure described in this manual. Be sure to use screws that are long enough to correctly fasten the panels and accessories on the deck or

    Tear-offs: If a complete tear-off is required, make sure to completely remove the en re old product in order to work on a leveled surface. Clean the deck thoroughly and install a layer of underlayment before installing the new product. ACCESSORY AND BATTEN INSTALATION

    installing the correct underlayment you must install all roof-to-wall channels, Valley Channels and b ens on the roof structure. Avoid fastening any Verona panels prior to installing these materials first. BATTENS AT GABLE TRIM When installing at a gable nail down two 2”x2” at the edge of the roof. this is done install a roof-to-wall channel on the inner face of the as shown in the figure below: This is done so there is a surface to screw the ridge piece onto at gables. Always use a 6” (15cm) overlap when joining two pieces of roof-to-wall channels together. Be sure to pre-paint the exposed sec of the channels so they match the color of the roof. Roof-to-wall channels at gables must have a minimum 1”(2.54cm) overhang past the eaves so as to allow water the water collected through the channels to exit the roof without dripping on the walls.

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    BATTENS AT HIPS & RIDGES When installing over hips you must place two stacked 2”x2” stacked up the center of the hips (An addi might be necessary depending on the roof pitch). A nailing down the

    proceed to install a roof-to-wall channel at each side of the hip as shown in the figure below: When fastening roof-to-wall channels, always place screws on as far away from the center of the hip as possible. This will allow water to flow through the channel without leakage at screw

    Be sure to pre-paint all exposed areas of channels.

    must beinstalled at ridges in the same manner without any roof-to-wall channel beside them. If there is need for ridge ven place two sets of stacked 2”x2” b ens spaced approximately 4” (10cm) on center at ridge. The figure below illustrates both scenarios:

    Valley Channel on The Terrabella® valley channel is installed on each one of the roof’s valleys and is designed to capture and evacuate the large amounts of water that focus on these areas. The Valley channel must be installed along the center line of each valley. As with the roof-to-wall channels at gables, install so that a minimum 1” (2.54cm)hangs past the edge of the eave. A minimum of 6” (15cm) overlap is required when joining two valley pieces together. Install over previously notched starter clips at eaves. This will reduce any possibility of leakage through the screw holes. Finally, snap or slide the stone-coated valley cap into place the valley is complete.

    screws may be used, but not required, to fix the valley caps in place.The exposed area of the valley should be painted to match the roof color. Installa onRoof-To-Wall Channel at Ver cal Structures Whenever the roof meets a structure such as a wall or a chimney, a roof-to-wall channel must also be installed in order to avoid leakage at these joints. Always start installing channels from the lowest point up towards the ridge. Remove any wall panels before installing the roof-to-wall channel so it can be installed over it later on. When a surface such as stucco is to be applied, do it the channel to cover it up. Screw the channel every 8” (20cm) and apply a roofing grade sealant on the joint between the channel and the structure that meets the roof. The installa on of a flashing is also recommended wherever it might be necessary the roof-to-wall channel is successfully installed. Stone-coated z-bars may be used over the channels to generate a consistent look on the roof. The Terrabella® roof-to-wall channel must have a 6” (15cm) minimum overlap. Paint any exposed areas of the channel to match the rest of the roof.

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    TERRAABELLA®VEERONAPANEL INSTALLLATION Once abegin mwith tguideli

    all b ns, Vm g thehe recommenes set forth

    Valley Channee first course ended under

    by this docum

    els and roof-of Terrabella

    rlayment andment.

    -to-wall chana® panels. Mad all of the

    nnels are sucake sure the raccessories

    cessfully instroof is complare installed

    talled, you metely protect

    d following t

    may ted the

    The Iniin the o

    First C

    evalley panels Leave overlapfasten panels Never straigh

    Secondstart ththe cou

    i al point forordershown o

    r panel instalon the diagra

    n will alwms below:

    ways be fromm the eave annd advance tooward the riddge

    ourse: Begine the course fchannel. Oncand fastenin

    the screw clp with a newdown the n

    ; this will help

    angle the scrht line.

    d Course: If ahe second courses does no

    ning at the efrom one endce you have ang them ontolosest to the

    w panel.A er ose of the Vp avoid water

    rews when fa

    a full panel wurse; con nu

    ot match, red

    Figure 2.In

    eave, place ad of the roof aligned the po the deck by overlap betfully installin

    Verona panelsr leakage.

    astening pane

    nstalla dia

    Figure

    was used on tue with a full ucing any cha

    full panel o it meetsn of the

    y the pre-putween panelsng the first cs. Avoid insta

    els as this ma

    agram

    n posi on 1(s and overlape first coursenched areas

    s for last; insourse of panalling screws

    3.Panel Overla

    he first courspanel. This mance of water

    ay deform th

    ap

    Figure X).Be psa roof-to-we of panels be

    on the backstall it a r nels at the eas on the valle

    sure to alwawall channel oegin placing t of each pancomple ng t

    ave, proceed ey areas of t

    ays r a

    the nel. the

    to the

    em and makke you lose yoour

    se, a half-panmust be done r leakage.

    nel or piece mso that the o

    must be used overlap on all

    to of

    1511 12 13 14

    4 5 6 7

    16

    8 9 10

    1 2 3

    Roof Deck

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    ConWhen the areinstalli

    ue installing fastening pa

    eas where wang a screw in

    It is stlines.Tfit flush Panelsalong tnecess A er tand th2” (5cm2 inche

    Keep m

    tly ridge. Panelsridge pthe firs

    This is througoverflochanne Panelsthat ggables,top of Panelsinstalle

    rongly recomhere should bh with a mini

    s at ridge: Befthe ridge. Thesary.Draw a ch

    he b ns are ba ens at t

    m) to the meaes up so that

    measuring, cuwith the pan

    s at gable: Papiece must best course of p

    done as an gh the roof-towing and leel and always

    s at hips and vghtly fit on th, notch the bthe roof-to-w

    s at Head Waed to the wal

    the next counels over at ater will flow these areas,

    rses making svalley chann

    w. If there is n use a roofing

    sure the overels and roof-

    no other wayg grade seala

    rlaps do not a-to-wall chany to securely nt around the

    align with thennels, avoid u

    fasten the pae installed scr

    e course belousing screws anel other threw.

    ow. on

    han

    mmended to dbe no space gmum gap.

    fore placing tese b ns mhalk line to in

    re nailed dowthe ridge. Maasurement. Cit can be scre

    u ng and benel below and

    anels installee fastened ovpanels must b

    addi onal pto-wall channeaking water s use caulk on

    valleys: Whehe valley chaird-stop eave

    wall channels

    all:As with thl. Add 1” (2.5

    draw a chalkgreater than 1

    k line every 31/8” (3.2mm)

    3rdcourse to m) between Ve

    maintain strarona panels a

    ight, horizonand they shou

    ntal uld

    he last line ofmust be nailednstall the batt

    f panels at thd down at thetens in a strai

    e ridge, instae center of thght line, befo

    all two stackehe ridge, use aore nailing do

    d 2”x2” ea third n

    own.

    ens n if

    wn, measure tark a panel w

    Cut the panel ewed into the

    the length bewith the meas

    using this nee ens whe

    etween the tosurement obtw measurem

    en installed. S

    op of the lasttained and ad

    ment and bendSee figure4:

    t panel installdd an ond the n

    led nal nal

    Figure

    4.Panels at riddge

    nding panelsd a correct ov

    s at the ridgeverlap is main

    . Make sure tntained with

    the modifiedthe rest of th

    piece is lockhe panels at t

    ked the

    ed at gables ver them on te notched as

    must be plache previously shown in the

    ced over the y s. Thee figure below

    roof-to-wall e bird-stop eaw:

    channel andave installed

    d a on

    rotec on aganel to exit oto the deck

    n the screws if

    ainst leakageoff of the rok below. Avof you do so.

    e as it permitoof. Preventi

    oid installing

    ts the water ing the chanscrews on t

    that is drainnnel from evhe roof-to-w

    ned ver

    wall

    ere panels mennels and ro

    e a full semi-cand valley ch

    eet hips and vof-to-wall chcircle at valleyhannels.

    valleys, cut thannels at hipys and hips. T

    he panels in aps. As with thTry to avoid u

    a size and shahe panels at tusing screws

    ape the on

    the ridge, mmeasuremen

    he panels at 54cm) to the

    easure the dnt and cut the

    distance frome panel. Bend

    m the last pand the add n

    nel nal

  • Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    inch soroofingon theTerrab

    o it is paralleg grade sealae wall. If theella® panels.

    el with the wnt and a flash

    ere are wall

    wall. Fasten thing as needepanels or si

    he panel to ed. Install a bidings, reinst

    the head wabird stop ridgetall them ove

    all and seal te over the paer the bent

    the joint withanel fastening

    n of t

    h a g it the

    RIDGEOnce tand en Ridge direc othe pre

    Fastendo notthat reend ca

    If a rid

    othe ridridge p

    E AND HIP the panels at nd caps may b

    Installa on:Mon of the winesence of strs as shown in

    the ridge pie plan to stone

    emain exposep on all ends

    dge vent is ton as shown i

    ge pieces as ypieces and en

    INSTALLAThips and ridg

    be installed. A

    Make sure tnd.This will carong winds. Bn the figure b

    eces on the be coat each oed. Once all p.

    o be installein the figure you normallyd cap.

    Figure 5. Panels at head

    ION ges are instalAll panels and

    to begin instause the overBefore installelow:

    ba at eveone with the tpieces are fa

    Figure 6.Rid

    d, roll it outbelow. r

    y would. Be su

    led as instrucd accessories

    t n fromrlap betweening the ridge

    ery overlap. Mtouch-up kit. stened, cut-o

    d wall

    cted above, tshould be ins

    dge piece insta

    on top of tr the ridge veure to cover t

    m the end on each ridge pe piece fasten

    Make sure toThese are th

    off the excess

    he Terrabellastalled at this

    a

    he ens aent has been the re rid

    f the roof opiece to reman the bird-sto

    o use pre-paine only screwss ridge piece

    a® Verona ridpoint.

    dge

    opposite to tain unalteredop ridge on t

    the d in the

    nt screws if ys in the syste and install t

    you ms the

    at the ridge aset over the ge vent with

    and adjust inb ns, instthe Terrabell

    nto tall la®

    ROOFING GRADESCALANT

  • Hip Installa on: When installing ridge pieces on hips, always start from the eave upwards. Fasten on the ens installed on the hip using 2 screws for each piece. Use pre-painted screws or stone coat each one installa on with the touch-up kit. placing the final hip piece, install the end caps where needed. Use sealant if there is a gap between the end cap and the hip piece. At the inters of the hip and ridge, modify the ridge pieces to connect them. Use n snips to do this process with ease. Cut the Ridge trim to fit the contour of the hip pieces and install sealant at the overlap of the cut hip trims. INSTALLATION AROUND PIPES Whenever a pipe vent is present in a roof, the panels around it must be cut in the shape of the pipe. Install a pipe flashing around the pipe vent. Cut the skirt on the top pipe flashing to fit height of the course, and fit it over the vent pipe. Mold the skirt of the flashing to fit the of the panel. Using a width of panel, that is wide enough to cover the en re pipe flashing skirt, carefully cut a hole to fit around the cone of the flashing. Install the “cover panel” and fasten. Be sure to seal and chip around the cone using the Terrabella Touch-up kit.

    Figure 17.Pipe flashing layout Figure 18.Installed pipe flashing

    Chimneys, Skylights & Dormers There will be mes where panels must be installed around a chimney, skylight or dormers.Install full panels where possible and use cut panels to cover the remaining areas.Start by measuring from the full panel belowthe chimney. Use the same procedure as with the in of panels on a head wall. Use roof-to-wall channels on the le and right faces of these structures. Install a z bar over the channel installing panel pieces over it.The roof-to-wall channel should extend a minimum of 4” (20cm) past the chimney’s edges. For the front of the structure install as you would at a ridge bending the top of the panel up and installing a bird-stop ridge. Follow with a Z- bar. A chimney saddle may be used to cover the area above the chimney or dome. Avoid using lead or copper materials for this purpose as they must not be in prolonged contact with the rest of the system. r the flashings are installed, proceed to install the rest of the panels above the channels. Follow the diagrams below for a successful

    Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    Pipe

    Pi pe Flashing

    Pi pe Flashing

    Roofing Grade Sealent

  • Z Bar

    Roofing Grade Sealent

    Roof to wallChannel

    Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com

    USINGTheTerany supanels

    Apply tfor 24 stains w

    Keep Use

    Figure 19.(1)Inat the back of as you would awith roofing gchimney.

    nstall roof-to-wf the chimney; bat a ridge. (2)Srade sealant. (

    wall channel onbend the front Seal all around (3) Install Z bar

    n both sides anpanel upwardthe chimney

    r around

    nd ds

    G THE TERRrrabella® toucrface. A er cas well as an

    RABELLA®TO

    the resin on thours before

    will not come

    p the resin aw

    safety glasse

    ch up kit is tocomple thny visible scre

    OUCH-UP Ko be used to rhe insta nws.

    KIT repair damagn on the roof,

    ged areas, hid, begin identi

    ding screws, oifying damage

    or stone-coatied or scratch

    ing hed

    the required ae walking ovee off.

    area and comer these spot

    mpletely covets. Be careful

    r it with the s not to spill a

    stone granuleany resin on

    es. Let it hardthe roof, the

    den ese

    way from thee eyes and mouth.

    es when handdling the stonne granules.