Time Knitwear PVT Ltd.Baraibogh, Enayetnagar, Narayangonj, Bangladesh

(23.617692N,90.481259E)04th June 2014

1

Page 2: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

2

Observations

Page 3: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

3

Problems Observed

Item No 1: Heavily loaded cantilever slabs.Item No. 2: Long span of R.C. slabs Item No. 3: Discrepancies between drawings and as built structure.Item No. 4: Water ingress.Item No. 5: Exposed Reinforcement.

Page 4: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

4

Heavy loaded cantilever slabs.

Page 5: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

5

1

À

2 3 4 5 6 7 8

B

C

D

E

Heavily Loaded Cantilevers.

Page 6: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

6

Long span of R.C. slabs

Page 7: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

7

1

À

2 3 4 5 6 7 8

B

C

D

E

Large Slab Spans

Slab spans appear long, some cracking noted in soffitsat all levels in these bays.

Page 8: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

8

Discrepancies between drawings and as built structure.

Page 9: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

9

1

À

2 3 4 5 6 7 8

B

C

D

E

Discrepancies between drawings and as built structure..

Stair Column is rotatedIn opposite directionTo that shown on drawing.

These columns are larger as built than proposed drawings indicate.

Page 10: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

10

Water Ingress

Page 11: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

11

Water from planter may affectstructural elementsthrough cracks in roof screed.

Water from air conditioning unitmay affect structural elementsthrough cracks in roof screed.

Page 12: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

12

Exposed Reinforcement

Page 13: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

13

Page 14: Time Knitwear PVT Ltd. - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/Time-Knitwear-PVT-Ltd... · 3 Problems Observed Item No 1: Heavily loaded cantilever slabs. Item

14

Item No. Observation Recommended Action Plan Recommended Timeline

1Heavily Loaded Cantilever

slabsStructural engineer to check the capacity of the cantilevers for building loads.

6-weeks

2Heavily Loaded Cantilever

slabs

Engineer to Produce and actively manage a loading plan for all floor plates within the Building giving consideration to floor and column capacity.

6-weeks

3Heavily Loaded Cantilever

slabsContinue to implement the load management plan 6-months

4 Long span of R.C. slabsStructural engineer to confirm by calculation that the slabs are designed for the as constructed spans and are capable of carrying the building loads.

6-weeks

5Discrepancies between drawings and as built

structure.

Building engineer to update all drawings including load management plans to reflect the as built structure at each level.

6-months

6 Water ingressBuilding engineer to survey factory and identify areas of water ingress. Divert all water away from structure to protect the RC structures from direct contact with water

6-months

7 Exposed ReinforcementAll exposed reinforcement is to be protected from corrosion which may cause degradation of the concrete.

6-months