Timber construction design
Citation preview
Project description
User Namai
Position
HECO - HCS - Timber construction design
(1 By 7) Page 1
Project information
Planned construction
Deadline 2015.05.19
Item overview
Description
Article number
Diameter
Length 300 mm
8,5 mm
46838
TOPIX-CC 8,5 x 300
Type Cylinder head
VE/piece 50
Number 12
Result
Number of screws 12 TOPIX-CC 8,5 x 300
Nopre-drilled
6 mm=Edge distance
48 mm=Screw distancce
40 mm=Edge distance
176 mm=Screw distancce
32 mm=Edge distance
90 =Screw-in angle
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(2 By 7) Page 2
Geometry
CarrierGlulam, homogeneousMaterial
GL28hClass of strength
NoDouglas fir
YesSpruce, pine or fir
240= mmWidth
500= mmHeight
Pressure distribution panel16= mmThickness
SupportEnd supportType
240= mmWidth
284= mmLength
0= mmOverhang
Screws0= mmMinimum distance from support edge
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(3 By 7) Page 3
Load
Single load / line load with support distanceSupport reaction due to
200= mmDistance of impact to support
1Class of usage
Permanent characteristic load108,00= kN
1,35=Partial safety factor
PermanentLoad effect duration class
Variable characteristic load80,00= kN
1,30=Partial safety factor
MediumLoad effect duration class
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(4 By 7) Page 4
Static verification
LCC1 Load case combination permanent
LCC2 Load case combination permanent and variable
Support pressure
Aef = l * Min(bA; b)
l [mm] bA [mm] b [mm] Aef [mm]
314 240 240 75360
c,90,d = Fc,90,dAef
Fc,90,d [kN] Aef [mm] c,90,d [N/mm]145,80 75360 1,93LCC1
249,80 75360 3,31LCC2
fc,90,d = kmod * fc,90,kM
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(5 By 7) Page 5
kmod f c,90,k [N/mm] M f c,90,d [N/mm]0,60 3,00 1,30 1,38LCC1
0,80 3,00 1,30 1,85LCC2
= c,90,dkc,90 * fc,90,d
* 100%
c,90,d [N/mm] kc,90 f c,90,d [N/mm] [%]1,93 1,00 1,38 139,73LCC1
3,31 1,00 1,85 179,55LCC2
Support pressure with reinforcement
Fax,,Rk = n * fax,k * d1 * lef
1,2 * cos + sin * (k
350)
0.8
n fax,k [N/mm] d1 [mm] lef [mm]
1 12,50 8,0 292
[] k [kg/m] Fax,,Rk [kN]90 410 33,13
Fax,,Rd = kmod * Fax,,Rk
Mkmod Fax,,Rk [kN] M Fax,,Rd [kN]0,60 33,13 1,30 15,29LCC1
0,80 33,13 1,30 20,38LCC2
Npl,k = * d21
4 * fy,k
d1 [mm] f y,k [N/mm] Npl,k [kN]
4,85 900 16,63
Npl,d = Npl,kM
Npl,k [kN] M Npl,d [kN]16,63 1,10 15,12
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(6 By 7) Page 6
R90,d,1 = kc,90 * B * lef,1 * fc,90,d + n * Min(Fax,,Rd; c * Npl,d)kc,90 B [mm] lef,1 [mm] f c,90,d [N/mm]
1,00 240 314 1,38LCC1
1,00 240 314 1,85LCC2
n Fax,,Rd [kN] c Npl,d [kN]12 15,29 0,66 15,12LCC1
12 20,38 0,66 15,12LCC2
R90,d,1 [kN]
224,24LCC1
259,02LCC2
R90,d,2 = B * lef,2 * fc,90,d
B [mm] lef,2 [mm] f c,90,d [N/mm] R90,d,2 [kN]
240 578 1,38 192,07LCC1
240 578 1,85 256,10LCC2
R90,d = Min(R90,d,1; R90,d,2)
R90,d,1 [kN] R90,d,2 [kN] R90,d [kN]
224,24 192,07 192,07LCC1
259,02 256,10 256,10LCC2
= VdR90,d
* 100%
Vd [kN] R90,d [kN] [%]145,80 192,07 75,91LCC1
249,80 256,10 97,54LCC2
Support pressure179,55%=
Support pressure with reinforcement97,54%=
The screw is suitable for the selected system.
Version: 3.0.2.33
HECO-Schrauben GmbH & Co.KG
Dr.-Kurt-Steim-Strasse 28 D-78713 Schramberg
Phone: +49 (0)7422 989-0 Fax: +49 (0)7422 989-200 2015.05.19
Project description
User Namai
Position
HECO - HCS - Timber construction design
(7 By 7) Page 7
Construction notes
1. Determination pursuant to DIN EN 1995-1-1 2010-12 & DIN EN 1995-1-1/NA 2010-12 inconnection with approval number ETA-12/0132 for HECO TOPIX-CC full-thread screws as woodconnection media.
2. The screws may only be used for static or quasi-static loads. 3. Wood moisture content must be less than 20%. 4. The loads transferred by the screw forces must be taken up without deformation of the support. 5. All calculations must be verified and cleared before performance by the responsible bearing
structure planner.