31
Department Of Civil Engineering CHIKMAGALUR A Subject Seminar On “TILT UP CONSTRUCTION” Under The Guidance Of: Prof: Dr. M.NAGESH BE, M-Tech, PhD Presented By: ARJUNA.S ARJUNA.S (4AIO6CV003) (4AIO6CV003)

Tilt Up Construction

Embed Size (px)

DESCRIPTION

ppt document

Citation preview

Page 1: Tilt Up Construction

 

Department Of Civil Engineering

CHIKMAGALUR

A Subject Seminar On

  “TILT UP CONSTRUCTION”

Under The Guidance Of:

Prof: Dr. M.NAGESH

BE, M-Tech, PhD

Presented By:

ARJUNA.SARJUNA.S

(4AIO6CV003)(4AIO6CV003)

Page 2: Tilt Up Construction

CONTENTS INTRODUCTION

CONSTRUCTION –STEPWISE PROCEDURE

ADVANTAGES & BENEFITS

COMPARISON b/w TILT-UP CONSTRUCTION & CONVENTIONAL CONSTRUCTION

Page 3: Tilt Up Construction

INTRODUCTION

TO TILT-UP CONSTRUCTION

Page 4: Tilt Up Construction

STEPWISE

CONSTRUCTION

PROCEDURE...

Page 5: Tilt Up Construction

Step 1Step 1Slab PreparationSlab Preparation

Cement slab is poured to create the floor, where the tilt-up panels will be created.

Page 6: Tilt Up Construction

Step 3Step 3Preparation of MouldsPreparation of Moulds

Once the lines have been drawn, workers place brackets to outline where the tilt-up panels outside boundaries, windows and door openings will be.

Page 7: Tilt Up Construction

STEP 4Precise placement of panels

Ensuring the exact placement of the cement forms is critical to the success of the project. The tilt-up concrete panels must be sized and positioned in precisely the right dimensions and location.

Page 8: Tilt Up Construction

STEP 5Assembly of Construction Panels

Page 9: Tilt Up Construction

STEP 6Application of Bond breaker

At least 3 coats of Bond breaker is applied to Ensure total separation of the panel from the slab on erection day.

Page 10: Tilt Up Construction

STEP 7Placing the Reinforcements

Rebar is placed in the completed cement panel forms.

Page 11: Tilt Up Construction

Ready for concrete

With the wood forms securely constructed and the rebar and embeds, inserts in place, the tilt-up concrete panels in the photo above are ready to be poured with concrete.

Page 12: Tilt Up Construction

Step 8 Pouring the Tilt-up Construction Panels

To create each panel, workers pour the cement into the forms in a manner very similar to the way floor slabs are poured.

Once the cement has been poured, workers trowel the panels for a smooth, consistent finish

Page 13: Tilt Up Construction

STEP 9Smoothening the surface

Workers use a variety of equipment, including power trowels, to make sure the panels are level and smooth. These concrete panels will become the exterior walls of the building, necessitating a consistent smoothness or texture on all the panels.

Page 14: Tilt Up Construction

STEP 10STEP 10Removal of Forms work after curingRemoval of Forms work after curing

Once the concrete has cured, workers remove the wood forms and brackets to leave the tilt-up panels lined up on the floor slab.

Page 15: Tilt Up Construction

Erection DayErection Day

As panel is slowly raised it begins to tilt into the upright position

Page 16: Tilt Up Construction

STEP 11Erection

Workers help to guide a large mobile crane as it lifts a tilt-up concrete panel into place.

Page 17: Tilt Up Construction

STEP 12Attachment of Braces

Once the cement panel is set in place, the crew attaches the braces to the slab to keep the panel standing until it is attached to the other tilt-up panels and the roofing system.

Page 18: Tilt Up Construction

Crosschecking

Panel is then shimmed and leveled to the strictest of tolerances.

Page 19: Tilt Up Construction

Step 13Step 13Base of panels are securedBase of panels are secured

Depending on design, the base of the panels are connected to the footing, plates connecting the panels are welded and the sills are filled with grout.

Page 20: Tilt Up Construction

Step 14Step 14Panels are finishedPanels are finished

Panels are ground and patched to ensure a smooth

finish ready for paint.

Page 21: Tilt Up Construction

Project CompleteProject Complete

Gap/Old Navy Distribution CenterFishkill, New York

Page 22: Tilt Up Construction

Tilt-Up Construction Vs.Tilt-Up Construction Vs.Conventional ConstructionConventional Construction

Page 23: Tilt Up Construction

Tilt-Up Construction Costs Tilt-Up Construction Costs VS.VS.

Conventional Construction CostsConventional Construction Costs

Tilt-Up: $1,225,906

Conventional: $1,692,223

Page 24: Tilt Up Construction

Tilt-Up Construction Schedule VS.Tilt-Up Construction Schedule VS.Conventional Construction ScheduleConventional Construction Schedule

Page 25: Tilt Up Construction

BENIFITS OF TILT-UP FAST TRACK DELIVERY- Planning begins with an

evaluation of the site. COST CONTAINMENT- Engineering is a critical phase

of each and every Tilt-Up project. INNOVATION - Once planning is complete,

construction can begin on the floor and footings LOWER OPERATING COST - There are a number of

ways to form individual panels. ARCHTECTURAL AESTHETICS - Patterns or texture

can easily be added to the face of Tilt-Up panels.

SAFETY- Concrete placement methods for Tilt-Up panels are the same as those for floor slabs.

Page 26: Tilt Up Construction

SOME TILT-UP CONSTRUCTIONS…

Page 27: Tilt Up Construction

SOME TILT-UP CONSTRUCTIONS…

Page 28: Tilt Up Construction

SOME TILT-UP CONSTRUCTIONS…

Page 29: Tilt Up Construction

SOME TILT-UP CONSTRUCTIONS…

Page 30: Tilt Up Construction

SOME TILT-UP CONSTRUCTIONS…

Page 31: Tilt Up Construction

THANK YOU…

ARJUNA. S