TigerLift Installation Guide Part No. MNL-INS-X-01
Ver. 1 Rev. 4-24-13
Elevator Concepts ltd. by Wurtec
Installation Guide
2
Contents
I. IntroductionII. Rails & BracketsIII. Sling Assembly InstallIV. Stabilizer Bracket Assembly InstallV. Hydraulic Roped InstallVI. Winding DrumVII. Vertical/Horizontal Drum AssemblyVIII. Basement Drum MountIX. Platform Extensions & StringerX. Cables and Wedge SocketsXI Type “A” Instantaneous SafetyXII. Switches & FixturesXIII. Cab & GateXIV Final Checkout
Page 3
Page 4
Page 6Page 7Page 8
Page 10Page 12Page 13
Page 14Page 15Page 16
Page 17Page 18
Page 20
Elevator Concepts ltd. by Wurtec
Installation Guide
3
IMPORTANT! This manual is a general guide to the “X” series of Hydraulic and Winding Drum el-evators. ECL by Wurtec’s line of elevators are designed to be robust and highly customizable, so it is almost impossible to document every component in this manual. Some of the parts for your install may be job specific or updated. Check the installation documentation package for draw-ings specific to your job. If you need further assistance please contact our technical support line for help.
Tools Required• 1/2toncome-a-long • 1/2or3/4pipedies• Short4x4timber(forblocking) • ConduitBender• HammerDrill • Hammer• ElectricDrill • Sockets(1/4,3/8,7/16,1/2,9/16,3/4)• HacksaworSawzall • Wrenches(3/8,7/16,1/2,9/16,3/4)• Flatfile • Ratchetwithextensions(3/8–1/2drive)• 4’Level(orsimilar) • 10mmsocket(cableclipstays)• Square • 18mmsocket(fishplatehardware)• TapeMeasure • 3/32allenwrench(C.O.P.andhallcalls)• Volt/OhmMeter • Smallprecisionscrewdriver(included)• Wirecutters/Strippers • PlumbBob
1. Makesureyouhavethecorrectlayoutdrawing.Carefullyreviewallfielddimensionsagainstthe layout drawing.
2. Arrangethematerialonthejobsiteinsequentialorder.
3. Makesureyouhavethecorrectwiringdiagrams.Checkthepowersupplywithameterforproper voltagebeforeconnectinganyequipment.
4. Plan your wiring and conduit runs carefully. Set up the main stack to the controller with a minimum number of bends. Allow enough clearance of all wiring in the hoist way.
5. Worksafely!Keepyourjobneat.Alwayswearappropriateclothingandsafetyglasseswheneveryou cut,drill,weldorburn.Useacome-a-longtohoistheavymaterial.Checkallriggingbeforehoisting. Neverstandunderhoistedmaterials.Donotusedamagedhoistingequipment,oranyother damaged tools. Report any unsafe conditions or injuries immediately.
6. Makecertainyourfinishedproductissafe!Ifyouthinksomethingmightbeunsafe,askquestions aboutit.Besureeverysafetydeviceistested,andperformsasintended.Besurethatyourwiring conformstoallcoderequirements.Makesureyoudonotleaveanyjumpersoncontrolterminalsor devices.Beabsolutely100%positive,beforeleavingthejob,thatitisright. ! IMPORTANT !Check hoist way against shop drawing for correct dimensions, plumbness, pit size, squareness, cylinder hole if required, travel and overhead.
Check shop drawing (also in same packet) for location of center of the face of the rails in relation to the hoist way entrance. Mark this spot on the pit floor. At this point, it is advisable to suspend a plumb line from the ceiling so that it hits the marks. Check that the distance from the line to the back wall is no less than indicated on the drawing, and no more than 1/4” greater than indicated.
Elevator Concepts ltd. by Wurtec
Installation Guide
4
1. Looselyinstallbottomrailbracketstobottom(female)endofrails.Ifyouhavearoped(X5)type installationor,anyoneofourdrumunits,thebottomrailbracketsarepartofthebottomplate,whichis installednow.Installusingthefishplatehardwarekit.(Figure1) 2. Standrailsonmarks(orbottomplateforropedinstallation).Drillthepitfloorwitha1/2masonrybitfor the bottom bracket anchors
NOTE: Be sure to clean out the holes from debris and dust before inserting the anchors. Loosely install anchors. (Figure 1)
RAILS & BRACKETS
Winding Drum
X3(DirectHydraulic)
X5(RopedHydraulic)
WARNING! When anchoring any bottom rail brackettothefloor,besuretouseallmountingholes and anchors. Failure to do so may lead to an unsafe and potentially dangerous condition.
3.RefertoshopdrawingHOISTWAYELEVATIONtofind general location and intended orientation of rail bracket mountingangles(Typically6’incrementsfrompitfloor). Markthewallatfirstlocationtobegin.
4. Looselyinstallrailbracketmountingangles(hangers) tothewallusingtherailbracketkit(P/NRLS-9-7000- 1-1-0).Usingthedimensionsatthetopofthesame view,attachtotherailbracketslooselywithappropriate fasteners.(Figure2)
NOTE: 1 kit needed per spreader and hangers.
5. SecureONEbottomrailtospreaderwithrailclipsand backingplates.(Backingplatesmustbeusedtoensure theproperdistancebetweenrailfasteners).Besureto wipe rails clean of debris with mineral spirits.
Figure 1
ATTENTION!
IfyouareinstallingaDRUMmachine,positionthefactoryassem-bledcarframe(sling)inplaceontherail.Then,slidetheotherbot-tomrailintopositionthroughthesafety.Next,installsidestilesandtopbeamusingthecarframe1kit(P/NFRM-9-7000-1-1-0).Con-tinueontostep6afterthesling,stilesandtopbeamareinstalled.IfyouareinstallingeitheranX3orX5HYDRAULICunit,thenpro-
ceedtostep6BEFOREinstallingthesling.(Figure3)
8 8
6
Elevator Concepts ltd. by Wurtec
Installation Guide
5
Figure 2
6. Checkthealignmentwith4’levelin2directions. Adjusttomatchshopdrawingthen,tightenthe bolts when rails are aligned & plumbed. Be sure tochecktheDBGaftertightening.(Shimsmay benecessarytoachieveproperDBG)
7. Install shims if needed behind rails.
NOTE: Failure to shim the spreader if required may result in change in DBG and rails being out of square.
8. Installafishplateandthenextsectionofrails ontothesetjustcompleted,moderately tightening all bolts. Repeat steps 3 - 7.
Check all rail joints for smoothness. Shim and/or file as necessary. Securely tighten all fasteners! Before continuing, be certain that you are satisfied with your rail installation. If you do not think the rails are in the correct place, or aren’t securely fastened, tighten and correct NOW!
ForaHydraulicelevatorinstallproceedtopg.8,foraWindingDrumelevator,pleaseturntopg.10. TheWindingDruminstallationcoversbothanoverhead(verticalandhorizontal)andbasementtypemachine.
FIGURE2RAILBRACKETASSY
REF ID# QTY DSCP PART #
A 2 HANGER ANGLE
RLS-8-1027-1-2-0
B 1@ JOINT
FISHPLATE &BOLTS
RLS-2001-00-0
C 2 BACKING PLATE
RLS-8-1032-1-1-0
D 1 SPREADER RLS-9-1010-1-1-0-34
32 4 RAIL CLIP RLS-9002-00-0
6 4 1/2-13 x 1 3/4 G5 hex
FST-3404-00-0
28 8 1/2 washer FST-3415-00-0
31 8 1/2 lock washer
FST-3416-00-0
20 8 1/2-13 nut FST-3418-00-0
4 4 1/2-13 x 1-1/2 hex bolt
FST-3403-00-0
B
A
4
D
32
6
C
Rail Bracket Assembly
Elevator Concepts ltd. by Wurtec
Installation Guide
6
FIG 3 SLING ASSY
REF ID# QTY DESC PART #
A 2 SIDESTILES (RH&LH)
FRM-9-3009-1-1-A
B 1 TOPCROSSBEAM
FRM-8-3001-1-1-0-34
C 1 CARRIAGE ASSEMBLY
PERJOB
28 44 1/2 washer FST-3415-00-0
31 22 1/2 lock washer
FST-3416-00-0
20 22 1/2-13 nut FST-3418-00-0
4 22 1/2-13 x 1-1/2 hex bolt
FST-3403-00-0
4
4
4
B
CC
C
A
A
Figure 3
Sling Assembly Install
Elevator Concepts ltd. by Wurtec
Installation Guide
7
View From Behind Jack
FIG 4 STABLIZER BRACKET ASSY X5
REF ID# QTY DESC PART #
A 1 BRACKET JCK-8-2003-1-1-0
B 1 STOPANGLE
JCK-8-2005-1-1-0
C 1 STRAP JCK-8-2002-1-1-0
17 3 1/4-20 x 5/8 flangebolt
FST-3101-00-0
24 3 1/4-20flangenut
FST-3127-00-0
12 4 3/8-16 x 1 hex bolt
FST-3301-00-0
27 4 3/8flatwasher-zinc
FST-3313-00-0
22 4 3/8-16 nut FST-3309-00-0
30 4 3/8 lock washer-zinc
FST-3314-00-0
17
12
CB
A
Figure 4
Stabilizer Bracket Assembly Install
Elevator Concepts ltd. by Wurtec
Installation Guide
8
1. Measure the jack for proper length. It should be approximately half the travel+1’-5”.
2. Installthestanchiontubebyplacingitoverthemountingringlocated on the pit rail bracket assembly.
3. Loosely install the stabilizer bracket to the unistrut channel located on the lower spreader bracket. Install the stabilizer strap around the stanchion. See Figure 4.
4. Use4’leveltoplumbstanchion.Tightenstabilizerbolts. 5. Ifthejackislongerthan14feet,itwillhaveshippingringsinside. Therewillbeanoticeonthecylinder.Removetheshippingringsat this time. If you did not rig a chain fall at the top of the hatch to install thejack,youmayneedtodosotoremovetheplunger,oryoucan alsodothiswhilethejackassemblyisoutsideofthehoistway, restingonthefloor.Removetheheadbolts,andthehead.Becareful not to damage the seal or the o-ring. Install a ¾” eye bolt on the plunger,andcarefullyraiseitwiththechainfall.Removetheshipping rings,andthenreinstalltheplungerandhead. 6. Hoist jack and place on top of stanchion tube. Check inlet orientation. 7. Loosely install the stabilizer bracket to the unistrut channel located on the lower spreader bracket. Install the stabilizer strap around the stanchion-seeFigure4.Checkjackplumbnesswiththe4’levelin severaldirections,andtightenbolts. 8. Installthesheaveandsheaveguideassembly.Thesheaveismounted inayoke–looselyattachittotheplungerwitha¾”bolt.Installthe guidebeamtotheyoke,andtheninstallthegibbstotheguidebeam. Allow about 1/32” clearance between the gibbs and the rails. After the gibbsareinstalled,tightenthe¾”bolt,makingsureyoukeeptheyoke paralleltotherails,sothereisnobindinginthegibbs.Youmaywishto leavethecableguardoffuntilafterthecablesareinstalled. See Figure 5 9.Planyourhydraulicpipingrun.Checkthelocationofthepipingoutlet onthepumpingunit.Setthepumpingunitsoyourpipingwillhave aminimumnumberofelbows.Ifyouuseaflexhose,makesureitis nottwisted,kinked,orpassingthroughawall.Installshutoffvalvesas requiredbylocalcode.(Someinstallersputaunioninthelinesome wherenearthejacktofacilitateremovalinthefutureifitisever required.)Useahighqualitythreadsealantonallthreads.DONOT usethreadsealantonswivelfittingsforflexhoses.Cleantheinsideof allpipesandfittingstopreventmetalchips,lint,dirt,etc.fromgettingin thehydraulicsystem.IfyouusepipeorfittingsnotsuppliedbyElevator Concepts,makesuretheyareratedforthesystempressure.
Hydraulic-Roped X5 Installation
Figure 5
Elevator Concepts ltd. by Wurtec
Installation Guide
9
NOTE: THIS IS ESPECIALLY IMPORTANT ON ROPED HYDRAULICS (X5), the pressure is double that of an equivalent direct hydraulic (X3).
10. Fill pump tank with hydraulic oil. The pump motor intake must remain submerged with oil when the plungerisfullyextended.Mostjobstakebetween20and25gallons.Ifableedervalveissuppliedwith thejack,installitintheholeinthesideofthelowerhalfofthecylinderhead(removescrewifpresent).
NOTE: Leave screw in place if not installing bleeder valve.
11.Installhosebarbfittingintheupperholeonthesideofthecylinderhead(removescrewifpresent).Run the plastic tubing down along the jack and hydraulic line back to the pump tank. Be sure not to kink thetubing.Usewiretiesortapetokeepthedraintubefromhanginguponmovingparts. 12.Mountcontroller.Wirevalveandmotor.(Seethecontrollerdocumentationforfulldetails.) 13.Useatemporaryrunbuttontoengagecontactortorunpumpmotor.Bleedpiston.Setbypasspressure forapproximately750#.(SeethevalvedocumentationlocatedintheECLJobBinderunderthe“Other” tab,forfulldetails.) 14.Checkoperation.Runpistontostopringtocheckforsufficienttravel.Makesurethereisenoughover- headforthesheaveassembly.Makesurethegibbsdonotbindineithertheupordowndirection.Check plunger&cylinderwith4’level,adjustasrequired.
Elevator Concepts ltd. by Wurtec
Installation Guide
10
Winding Drum Installation
OVERHEAD MACHINE
1. Installthemachinebaseandmachine(drummotor)tothetopoftherailstack(seeFigure6forvertical andhorizontalconfigurations)usingthedrummachinekit(P/NDRM-9-7000-1-1-0).
NOTE: Themachineweighsabout280lbs.Makesureyouhaveadequateriggingforhoistingthemachineandmachinebase.Onemethodofgettingthemachineandbaseinplaceistoputthemonahandoperatedlifttruck(suchasMcMasterCarr9937T22),andusethecarframe(sling)asaworkingplatform.Hoistthecarframe(sling)uptothetopoftherails,andusethelifttrucktoraisethemachineandbaseintoposition.
2. Threadoneendofthecablethroughtheholeinthedrum.Installawireropeclamp(alsoknownas aCrosbyclamp)ontheendofthecable.Wrapthecablearoundthedrumuntilthecableisabout evenwiththelowestlanding.Youmayneedtosecurethecablewithtapeorwiretokeepitinthe groovesofthedrumuntilitisconnectedtothecarandhasweightonit.Repeatontheotherside.
NOTE: Some machines may be shipped without the breather valve installed. If so, remove plug and in-stall breather.
3. Oncethecableshavebeenattachedandproperlysecuredtothedrummachine,theliveend(endof cablestobeconnectedtocarframe/sling)mustbesecuredtothewedgesockets.Refertopage15for proper cable to wedge socket attachment procedure.
4. Atthispoint,thecarframemaybeloweredandtheplatformextensions,stringer,bracesandbuffer spring(s)maybeinstalledusingthecarframe1kit(P/NFRM-9-7000-1-1-0).Refertofigure8
BASEMENT MACHINE
1. Installtheoverheadsheavetothetopoftherailstack(seefigure7foroverheadorientation)using thedrummachinekit(P/NDRM-9-7000-1-1-0).
NOTE: Makesureyouhaveadequateriggingforhoistingtheoverheadsheaveintoplace.Onemethodofget-tingthesheaveintoplaceistoitonahandoperatedlifttruck(suchasMcMasterCarr9937T22),andusethecarframe(sling)asaworkingplatform.Hoistthecarframe(sling)uptothetopoftherails,andusethelifttrucktoraisethesheaveintopositionandsecurelyattachtotherails.
2. Whenattachingtheoverheadtotherails,besuretousealevelonthetopofthesheaveframeintwo directionsbeforetightening.Itisessentialthattheoverheadislevelandplumbontherails.
3. Runthecablesthroughthepulleysontheoverheadandallowtodrapetowardthepitfloor.
4. Raisethecarframeuptherailsandsecureintoplacetoallowadequateroomforinstallationofthe motorbaseangleassemblyandmachine(drummotor).
! IMPORTANT! Whenworkingonorunderthecarframe,makesurethecarframeissecuredtotherails.Thiscanbeaccomplishedbyusingrailpins(ifincluded)orblocking(usingtheappropriatelength4x4timbersto
restcarframeon).
5. Place the motor base angle assembly on the basement shelf and mark the holes for mounting. Drill the marked holes with a 1/2 masonry bit for the anchors.
Elevator Concepts ltd. by Wurtec
Installation Guide
11
NOTE: All eight mounting holes must be used!! NOTE: Be sure to clean out the holes from debris and dust before inserting the anchors.
6. Withthemotorbaseangleassemblyboltedtothebasementshelf,installthemachine(drummotor) usingthedrummachinekit(P/NDRM-9-7000-1-1-0).
NOTE: All eight mounting tabs must be used when installing the machine!!
7. Withthemachinemounted,taketheendofthecableclosesttothemachineandthreadthoughthe holeinthedrum.Installawireropeclamp(alsoknownasaCrosbyclamp)ontheendofthecable. Repeat on the other side of the machine.
8. Oncethecableshavebeenattachedandproperlysecuredtothedrummachine,theliveend(end ofcablestobeconnectedtocarframe/sling)mustbesecuredtothewedgesockets.Refertopage15 for proper cable to wedge socket attachment procedure.
9. Atthispoint,thecarframemaybeloweredandtheplatformextensions,stringer,bracesandbuffer spring(s)maybeinstalledusingthecarframe1kit(P/NFRM-9-7000-1-1-0).Refertofigure8
Elevator Concepts ltd. by Wurtec
Installation Guide
12
Vertical Drum Assembly
Horizontal Drum Assembly
B
A
A
B C
C
D4
2
E
D
C CE
Figure 6
FIG 6 OVERHEAD DRUM
REF ID# QTY DESC PART #
A 1 MACHINE N/A
B 1 BASE N/A
C 2 RAIL PLATE N/A
D 4 CLAMPBLOCK N/A
E 2 STABILIZER N/A
31 20 1/2 lock washer FST-3416-00-0
20 20 1/2-13 nut FST-3418-00-0
4 16 1/2-13 x 1-1/2 hex FST-3403-00-0
2 4 1/2-13 x 2 hex FST-3406-00-0
Elevator Concepts ltd. by Wurtec
Installation Guide
13
Basement Drum Mount
FIG 7 BASEMENT DRUM MACHINE
REF ID# QTY DESC PART #
A 1 MACHINE N/A
B 1 BASE N/A
C 4 SHEAVEASSY N/A
28 16 1/2 washer FST-3415-00-0
31 16 1/2 lock washer FST-3416-00-0
20 16 1/2-13 nut FST-3418-00-0
4 16 1/2-13 x 1-1/2 hex FST-3403-00-0
2 4 1/2-13 x 2 hex FST-3406-00-0
8 8 1/2 x 4-1/4 anchor FST-4005-00-0
C
4
A
B2
8
Figure 7
Elevator Concepts ltd. by Wurtec
Installation Guide
14
4
A
A
A
B
B
FIG 8 PLATFORM EXTENSIONS & STRINGER
REF ID# QTY DESC PART #
A 2 PLATEXTENSIONS PERJOB
B 1 STRINGER PERJOB
28 10 1/2 washer FST-3415-00-0
31 10 1/2 lock washer FST-3416-00-0
20 10 1/2-13 nut FST-3418-00-0
4 10 1/2-13 x 1-1/2 hex FST-3403-00-0
Platform Extension & Stringer
Figure 8
Elevator Concepts ltd. by Wurtec
Installation Guide
15
1. Insertendofcablethroughsocket,takingupallslackinthecable.
2. Threadtheendbackthoughsocket,leavingenoughcablelooptoinstallthe wedge.
3. Insert wedge into the loop.
4. Pulldownontheliveendofthecabletokeepittaut.Pulluponthedeadend withaquickpulluntiltheropeandwedgeareseatedinthesocket.
5. Afterallcablesareinstalled;lettheweightofthecar(andcounterweightsifso equipped)restonthecables.Theropeandwedgewillfirmlysetinthesocket. Installretainerclips-thelowerclipat2”abovethesocket,andtheupperclip4” abovethelowerclip.
6. Ifyoumustchangetheropelength,removetheweightfromthecable,anduse ahammerandadrifttotapthewedgeoutofthesocket.Youcanalsousea hammeranddrifttoroughlyequalizetheropetension.Withtheweightstillon thecable,tapthewedgedownonthetightestcableuntiltheropeslidesthrough.
WARNING! Remove any temporary shackle retaining devices (split nuts) and verify that shackles on car frame are free to move and engage the safety
mechanism in the event of cable slack.
7. Finishequalizingcabletensionwiththerodnuts.Holdthesockettoprevent rotation.
8. Somejurisdictionsrequireanadditionalmeanstopreventthewedgefrom dislodgingintheeventofaslackcablecondition.Installthewedgeretainersas shown.
ATTACHING CABLES TO WEDGE SOCKETS
Elevator Concepts ltd. by Wurtec
Installation Guide
16
TYPE “A” INSTANTANEOUS SAFETY WITH SLACK ROPE ACTUATIONADJUSTMENT PROCEDURE
1. Adjust the guide shoe or roller so there is about 1/16 clearance between the safety backup block and the backside of the rail. 2. Adjust the bearing plates so that both rollers engage the rails at the same time. The link rod goes throughthebearingplates,whichareboltedtotheplatformbeams.Theyhaveslottedholesfor adjustment. 3. Ifshacklesareusedonbothendsofthecable,makesurethatthedistancefromthebottomofthe shacklerodsinthepickupbeamtothejambnutis3/4”.Thisdistanceissetinthefactory,somake allhoistcableadjustmentsatthedeadendsetofshackleslocatedonthestanchionbase(cableswith swedgedendshavenoprovisionforadjustmentinthepickupbeam).
WARNING! Remove any temporary shackle retaining devices (split nuts) and verify that shackles on car frame are free to move and engage the safety mechanism.
4. Now make sure that there is proper clearance between the safety roller and the rail when the safety is fully retracted. Put enough weight on the car to compress the shackle springs fully to the stop tube. Withtheactuatorpantouchingthebottomofthewedgesocketshacklerods,adjustthelinkrodtoget 3/32”clearancebetweenrollerandrail.Bothswiveljointsarerighthand,soyouwillneedtoremove one end of the link rod to adjust it. 5. Manuallypulldownontheactuatorpan.Checkthatthereissufficienttravelinthelinkagetofully engage the safety rollers into the rails. Check again that both rollers engage the rails at the same time. 6. Make sure the safety switch is installed and adjusted so that it opens before the safety rollers hit the rails. The switch is located inside the center beam. 7. Thereareseveralvariationstotestthesafeties.Thesafestwayistouseahydraulicjackwitharemote cylinder,commonlyknownasaporta-power.Youwillneedonethathassufficientweightcapacity(2 tonsminimum)andstroke(about4”minimum).Fullyextendtheremotecylinder.Placeitontopofa good4x4timber,about48”long.Landthecarslingonit.Makesurethecablesarejustslack; excessiveslackcancauseproblemslaterbyfoulingthecables.Quicklyreleasetheporta-power.The safetiesshouldsetandholdthecar.Ifnot,recheckallstepsabove.Makesurethesafetyswitch operatescorrectly.Toreleasethesafeties,firstcheckthatthecablesareintheirsheavesandnot fouledonanybrackets,etc.Thenraisethecaruntilallslackisoutofthecables.Makesurethesafety rollersandlinkagefullyretractsandthesafetyswitchresets.Fileanygouges,burrs,etc.fromtherails.
Elevator Concepts ltd. by Wurtec
Installation Guide
17
SWITCHES & FIXTURES
1. Most installations will use our magnetic landing system. See the controller manual for complete details on installing this system.
2. Themagneticlandingsystemincorporatesterminallimits,andwhenrequired,finallimits.Thecontroller manual also contains details on installing these switches.
3. Itismucheasiertoinstallthelandingsystempriortoinstallingthecab.Finalfloorstopadjustmentsshould bedonewiththecabon;itisusuallyjustamatterofmovingthemagnetsafractionofaninch.Ifyouwant tosetthefloorstopswiththecaboff,youwillneedtorunthetravelcordandtemporarilyconnectittothe levelingunit.Thelandingunitcontrolboardisinthecartopbox,whichisnormallymountedtothecab ceiling.Youwillhavetohangthecartopboxfromthetopbeamtemporarily.
5. Makesurethevalveisadjustedproperlybeforesettingfloorstops.Followtheprocedurebelowtoadjust thevalve.
6. Runcartoeveryfloor.Checkintermediatefloorsstopsfrombothdirections.Youshouldbeabletoget within 1/2” regardless of direction or load.
7. Make sure all limits operate as intended.
8. Installandadjustthesafetyswitch.Thecontactblockcanbeeasilyremovedfromtheswitchbodyto facilitatewiring,whichgoestothecartopbox.
9. Installthepitstopswitchandrunwirestothecontroller.
10. Install the push button stations and door locks and run wires to the controller. Make sure door locks and wiring will not interfere with the platform. In some instances you may need to notch the platform. Run the car carefully through the hoistway to make sure there is no interference.
11. Connect the wiring per the controller manual diagrams.
NOTE: If installing a Hydraulic System, please refer to the Hydraulic System Set-Up manual located under the “Other” tab of the ECL Job Binder.
Elevator Concepts ltd. by Wurtec
Installation Guide
18
CAB & GATE
! ATTENTION ! Beforeinstallingthecab,besuretomakeadjustmentstothesidestileguiderollers(six).Thesearesetatthefactorybutmayneedadjustingonceontherailstoensureaplumbandlevelconditionaswellasproperclearanceofthesafetyblocksandrails.Thiswillaidinthecontinuedquietandsafeoperationoftheelevator.
Make sure the landing system and car safeties are installed and adjusted before attempting cab assembly. Reviewfigureonpg.19forbasiccabview.(Accordiangatesetupshown.) 1. Placethefloorontheplatform,maintainingtherunningclearanceindicatedonthelayoutdrawing; temporarilyscrewsomeshortwoodscrewsintotheunderside,onceitisinthedesiredlocation.See step3forfloorfasteningdescription. 2. Iftherearethreewalls,itisusuallyeasiertoputthemtogetherontopoftheplatform,andthenslide them into the recess around the perimeter of the platform. There will be a screw on each side of the shortwallthatgoesintoakeyholeslotintheclampbrackets(Fig13) thatareontheendofthelong walls. Attach the wall nearest the sidestile with the mounting angles. There are holes tapped in the sidestiles. Install the ceiling
3. Alwaysinstallthewallthatcoverstherailsfirst.Attachwiththemountingtabsontheflooroncethe wall is in place. The tabs should be mounted in opposing directions to eliminate shifting. There should besufficientclips.Slidetheotherwall(s)intoposition,andtheninstalltheceiling.Oncethecabwalls areinposition,thetemporaryfloorscrewscanberemoved.Thendrillholesthroughthefloortobe abletoreplacethetemporaryfastenerswithelevatorbolts.
4. Fastenthetopofthecabtothetopchannel,oftheframe,withthecabmountingangles.Thereare two holes in the top channel that correspond with one of the slots in the angles. The two round holes aretoscrewtheanglestotheceiling,oncethecabislevel.Besurenottoscrewthroughtheceiling! 5. Installthegatetracksandgates.Ifthereisagatebracket,foryourjob,youmaywanttoconnectit tothegatefirst.Adjusttheangleofthetracksothestrikepostofthegateisperpendiculartothestrike wall.Adjustthelevelofthetracksothatthebottomguidepinsareabout1/8”abovethebottomofthe sillgroove.
6. Installthegateswitches.Onsomejobstheyareprewired;simplyinstallthemontothemounting bracket.Checkforfullengagementwiththegateclosed.Adjustlocationuntilcontactismade,every time the gate is closed.
7. Installthecarfixturesandanyothercabaccessories.
8. Connectthetravelcordtothecartopbox.Thetravelcordshouldbegintohangfromthewall approximatelyonefootabovethehalf-waypointbetweenthelowest&highestfinishfloors.Withthe elevatorplatformevenwiththeloweststop,thecordshouldhangloosely,withabout6”leftfrom touchingthepitfloor.Itshouldbefedthroughthesecuredcar-topboxandfastenedwhenthecorrect placementisachieved.Besuretoleaveenoughextracabletosplitthecordup,andruntheleadsto thecontactsinthecar-topbox.Connectpercontrollerdocumentationattheotherend,inthemachine room/area.
9. Installdoorlocksanddoorlockcams.Youshouldwiretheminseries.Seecontrollermanualfordetails.
Elevator Concepts ltd. by Wurtec
Installation Guide
19
A.TravelCable B.CartopBoxC. Cab Ceiling D. Ceiling ClipsE. Cab Walls F. Wall StiffenerG.WallClips H.COPI. Cab Floor J. Kick PlateK. Sill Filler L. Floor ClipsM. Sill
A
B
C
E
H
E
F
G
J
D
L
IM
K
Elevator Concepts ltd. by Wurtec
Installation Guide
20
FINAL CHECKOUT
1. Wireupthecarandhatchdevicestothecontroller.Seethecontrollerdocumentationforcomplete details.2. Carefullyrunthecarthroughtheentirehatchtomakesurethereissufficientclearance.3. Runthecaronthestopringtomakesurethereissufficientoverheadclearance.Checkthatthereis sufficientoilinthepumpunit.4. Run the car on the buffers to make sure the plunger does not bottom out in the cylinder.5. Make sure all door locks function mechanically.6. Check out automatic operation. 7. Placefullloadinthecar.Checkbypasspressure,floorstops,speedinbothdirections.Adjustcontrol valveandswitchesasrequired.8. Makesureeverydoorlock,gateswitch,safetyswitch,andsafetydevicefunctionsasintended.Per formafullloadsafetytestifthecarissoequipped.9. Checkthatallfixturesfunctionproperlyandthatalllightbulbsareworking.10.Makesurealljumpersareremoved.11. Make sure the rails are lubricated.12. Clean up the installation.13. Congratulations!