27
City of El Paso: Sun Metro Legislative Agenda Briefing March 2016 Tiger V – TOD Operational 2017

Tiger V – TOD Operational 2017

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tiger V – TOD Operational 2017

City of El Paso: Sun Metro Legislative Agenda Briefing

March 2016

Tiger V – TOD Operational 2017

Page 2: Tiger V – TOD Operational 2017

Sun Metro FY 2016/17 Legislative Agenda

•  First and foremost, thanks for the new transportation bill: Fixing America’s Surface Transportation (FAST) Act; it addresses transit needs for the next 5 years

•  FY 2016/17 agenda centers around a Tiger grant for the expanding MCA area and a much needed bus capital replacement program in the coming years

2

Page 3: Tiger V – TOD Operational 2017

TIGER VIII Application Description

Construct a key transit hub to the Medical Center of the Americas (MCA), particularly in light of Texas Tech University’s aggressive expansion plans to their present medical school campus

3

Page 4: Tiger V – TOD Operational 2017

TIGER VIII Conceptual Transit Center

4

Page 5: Tiger V – TOD Operational 2017

Aerial Map of Proposed Site

TransferCenterSite

TTUCampus

UniversityMedicalCenter&Children'sHospital

JeffersonHighSchool

TTUCampusExpansionArea

5

Page 6: Tiger V – TOD Operational 2017

TIGER VIII Application Elements

!  Construct a $20M+ multifaceted facility, including !  Regional transfer center for

!  Alameda Brio BRT station !  7 Fixed Routes !  Paratransit loading bays

!  Parking structure for over 700 vehicles !  Health info center and MCA locator kiosks !  Reconstruct Alameda to accommodate higher

traffic volumes

6

Page 7: Tiger V – TOD Operational 2017

TIGER VIII Application Highlights

!  Provides a key hub for the central El Paso region for commuting to the MCA from the entire El Paso area

!  Increase economic development in an economically distressed area

!  Reduces congestion around the MCA by increasing the speed and convenience of transit for commuters

!  Located at the epicenter of healthcare on the MCA Campus for workers

!  Provides a “one-stop” concept for transit users whereby they can access medical, hospital, preventative, dental and other health-related services on a single, master-planned campus

7

Page 8: Tiger V – TOD Operational 2017

TIGER VIII Application Benefits

!  Increase ridership in this traffic congested and highly parking deficient area

!  Provide a key hub for central El Paso for commuting from all areas of El Paso, particularly utilizing the Alameda Brio BRT route when completed in 2017

!  Spur economic growth !  Reduce car operating costs, travel time savings and

reduced emissions !  Reduced costs for low income and uninsured clients/

patients who will be able to access several services at a single, convenient transit stop.

8

Page 9: Tiger V – TOD Operational 2017

Future Bus Capital Needs

"  2004 New Flyer buses (24) eligible in 2016

"  2012 El Dorado paratransit vans (34) eligible in 2016 = $7.8M

"  2014 Glaval paratransit vans (25) eligible in 2018

"  2007 NABI buses (35) eligible in 2019 = $20.7M

"  2008 NABI buses (20) eligible in 2019 = $11.8M

"  TOTAL 2016 to 2019 (138 vehicles)

=  $14.1M

=  $7.8M

=  $3.7M

=  $20.7M

=  $11.8M

=  $58.1M

9

Page 10: Tiger V – TOD Operational 2017

Alternative Fuels Tax Credit

! The Alternative Fuels Tax Credit provides public transportation providers with financial assistance in the form of a tax credit, to assist with converting their bus fleets from diesel to compressed natural gas "  Sun Metro’s tax credit is over $2.5 million annually "  Alt fuels tax credit expires Dec 2016 "  Support preserving the Alternative Fuels Tax

Credit for 2017 and beyond

10

Page 11: Tiger V – TOD Operational 2017

! SM’s new Transportation Operating Center (TOC) is prepared for solar power "  Install solar panels on existing bus canopies ($1.5M)

"  Build bus parking canopies for remaining bus parking area ($2M)

"  Install solar panels on new canopies ($1.6M)

"  Install lightning protection for entire TOC Facility ($270K)

"  Total project = $5.37M

"  Project will make the TOC totally Green: 100% CNG power fleet and Solar powered electricity for all facilities at the TOC

Future Capital Needs

11

Page 12: Tiger V – TOD Operational 2017

12

Snapshot of Sun Metro

"  16 million bus pax in FY 2015 "  310,000+ paratransit trips "  169 Fixed Route buses "  65 ADA (LIFT) buses "  12 JARC (Job Express) vans "  100% CNG bus fleet "  786 Authorized FTE’s including 3rd

party contractors staff "  FY15 operating budget $68.3M "  Fixed Route managed by First

Transit

Page 13: Tiger V – TOD Operational 2017

13

About the Facilities

−  Main facilities −  Transit Operations Center (TOC) −  Union Depot – satellite garage for

west side −  Fred Wilson LIFT – paratransit services

−  Terminals & Transfer Centers −  Downtown Transfer Center −  Union Plaza Transit Terminal and

Parking Garage −  Five Points Transit Terminal −  Eastside Transit Terminal −  Northgate Transit Terminal −  Westside Transfer Center −  Mission Valley Transfer Center −  Glory Road Transfer Center & Parking Garage

−  In Design −  Northgate Transfer

Center/Transit-Oriented Development

Montana BRIO Grant −  Far East Terminal

Page 14: Tiger V – TOD Operational 2017

14

Sun Metro’s Future

"  Four Brio RTS corridors($145M: 42.6% FTA, Mesa completed) "  Proposed Streetcar System ($102M: State 95%, SM 5%) "  Northgate Transfer Center ($15.5M) "  Three Transit Oriented Development (TOD) communities

planned: # Northgate Transfer Center & TOD #  Far-East Transfer Center & TOD #  Five Points Terminal & TOD

Page 15: Tiger V – TOD Operational 2017

New Transit Operations Center Fully Operational June 1, 2014

15

Page 16: Tiger V – TOD Operational 2017

TOC Fact Sheet

16

Page 17: Tiger V – TOD Operational 2017

MID2017

OCT2014

LATE2017

LATE2019

Page 18: Tiger V – TOD Operational 2017

18

Brio Rapid Transit System

•  Montana Brio ($43.9 M at LPA approval) • 58% FTA funded (Small Starts - $25.7 M)

• 22% FHWA/TxDOT funded (CMP - $9.7 M)

• 20% locally funded (CO Bonds - $8.5 M)

• Begin Service 2019/2020

• Mesa Brio ($27.1 M) • 50% FTA funded (Very Small Starts - $13.5 M)

• 28 % FHWA/TXDOT funded (CMP - $5.5 M, CMAQ - $2 M)

• 22% locally funded (CO Bonds - $5.9 M)

• Begin Service – 10/2014

• Alameda Brio ($35.5 M) • 100% locally funded (CO Bonds) • Currently in Final Design. Begin Service –2017/2018

• Dyer Brio ($35.9 M) • 57% FTA funded (Very Small Starts - $20.4 M)

• 23% FHWA/TXDOT funded (CMP - $8.3 M)

• 20% locally funded (CO Bonds - $7.2 M)

• Currently in Pre-Final Design. In Service –2018

Page 19: Tiger V – TOD Operational 2017

19

BRIO Rapid Transit System (RTS)

A Reality In 2014

Page 20: Tiger V – TOD Operational 2017

Mesa Brio RTS

Sun Metro Brio Station •  Unique Brio branding •  Near-level boarding •  Free Wi-Fi •  Fare pre-payment (ticket vending

machines)

•  Bike racks •  Shade screens with artwork •  Electronic real-time displays •  Solar-powered compacting

trashcans

Sun Metro Brio Vehicle •  Unique Brio branding •  Two TV monitors •  Traffic signal prioritization •  Cost: $790,000 (approx.) •  Length: 60 feet •  Fuel: Clean Natural Gas

•  Seating capacity: 48 seats •  Standing capacity: 24 •  Wheelchair positions: 2 •  Bicycle racks: 3 interior •  Audio/visual destination and next

stop information inside and outside vehicle

20

Page 21: Tiger V – TOD Operational 2017

Northgate TOD: before acquisition

Current Terminal

Aerial View of Northeast Property (Before) 21

Page 22: Tiger V – TOD Operational 2017

22

NorthgateTODLandUsePlan

NorthgateTransferCenter

ParkingStructureWren

Dia

na

Page 23: Tiger V – TOD Operational 2017

Northgate Transit Center/Parking Garage/Retail Center location

Aerial View of Northeast Property (After) 23

Page 24: Tiger V – TOD Operational 2017

Northgate TOD: approved layout

24

Page 25: Tiger V – TOD Operational 2017

Funding the Northgate TOD

25

TIGERVGrant 10,302,054STIPGrant 1,569,446City/SMMatch 3,437,000 incl.landvalue$1.3M

15,308,500

PrivateDeveloper(est) 111,000,000 incl.hard&softcosts126,308,500

NETODProjectFunding

Page 26: Tiger V – TOD Operational 2017

26

Proposed El Paso Streetcar

"  Streetcar route is 4.8 miles

"  Proposed historic PCC cars

"  27 stops

"  Maintenance and Storage Facility at DTC

"  Project Cost (State): $97,000,000

"  Planning-Design $5M – Sun Metro funded

Page 27: Tiger V – TOD Operational 2017

Contact Information

27

Jay Banasiak Sun Metro Director

(915)212-3301 [email protected]