  • D/2

    (See table for tie-bar size)

    Epoxy coated tie bar at 3’-0" c/c

    1’-6"1’-6"

    TIE-BAR SIZES FOR LONGITUDINAL JOINT

    Pavement Thickness, D

    D

    Single pass saw cut (Depth = D/3)

    TRANSVERSE SECTION THROUGH PCCP

    Less than or equal to 9"

    Greater than 9"

    #5

    #6

    Tie-Bar Size

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

    LONGITUDINAL JOINT

    SEPTEMBER 2012

    E 503-CCPJ-02

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    /s/ Richard L. VanCleave 09/04/12

    09/04/12/s/ Mark A. Miller

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • E503-CCPJ-01E503-CCPJ-02E503-CCPJ-03BACK

    E503-CCPJ-04BACK

    E503-CCPJ-05BACK

    E503-CCPJ-06BACK

    E503-CCPJ-07BACK

    E503-CCPJ-08