25
Thurston County Shoreline Master Program Update September 20, 2017 Planning Commissioners Briefing

Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

Thurston CountyShoreline Master Program Update

September 20, 2017 Planning Commissioners Briefing

Page 2: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Presenter
Presentation Notes
BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the Shoreline Management Act and the first of many future briefings on the subject. Wanted to brief you before we started briefings with the Planning Commission.
Page 3: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 4: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 5: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 6: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

GMA: RCW 36.70A.030(5)

Geologic hazards

Fish and wildlifehabitat conservation areas

WAC 173-26-221(2)(a)

Frequently flooded areas

Critical aquifer recharge areas

Wetlands

Page 7: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

“No Net Loss”

Page 8: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

Minimum:• Marine waters•Lakes > 20 acres• Larger streams (> 20cfs mean annual flow)•“shorelands” 200’ landward from water’s edge, including 200’ of contiguous floodplain from edge of floodway• associated wetlands, including all wetlands within 100-year floodplain.

1)all or portions of the 100-year floodplain2)“land necessary for critical area buffers” SMA: 90.58.030(2)

GMA: RCW 36.70A.480(6)

Local Option:

Page 9: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

If a new SMP does not include the option to expand SMA jurisdiction to include “land necessary for buffers for critical areas,” then the local jurisdiction shall continue to regulate those critical areas and their required buffers under GMA as well as SMP.

This is sometimes referred to as “dual coverage.”

:M

GMA: RCW 36.70A.480(6)

OHWM

Page 10: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

OK to include allowances for pruning and selective cutting for view corridors, but can’t allow huge loopholes.

Example approach:

“Alter minimum needed for views, minimize shrub vegetation removal and ground disturbance. “

Can include specific criteria, e.g.,: Trees <6” dbh: Can cut up to 10% of without county authorization.

Trees > 6” dbh: Limit cutting to 15% of such trees in the buffer. Need county approval, must replace with native trees/shrubs.

Page 11: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

Allowances for remodels , and reconstruction of structures destroyed by fire or other natural disaster .

Typically allow reconstructionwithin existing building footprint.

Local policy decision: Some SMPs allow a small or one-time increase if the modification doesn’t increase nonconformity (intrusion into a buffer).

Allowances togo either up…

...or back

Ecology “default” for non-conforming uses: WAC 173-27-080

Page 12: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

Buffer Width Averaging•Total area of buffer afteraveraging= area within bufferprior to averaging.

Buffer Reduction•No reductions of more than 25%of standard width without avariance (also applies to averaging)

Page 13: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

View protection provision for singlefamily residences

Jefferson Co SMP example:On non-conforming lots, authorizesuse of common line setback toaccommodate shore views roughlycomparable to adjacent residences.

SMP includes specific criteria for whenthis option can be used

Page 14: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

• Maintaining existing landscaped areas within buffer

• Unpaved trails associated with residential use < 3’ wideunless additional width needed for safety in a hazardarea.

• Harvesting Wild Crops

• Noxious weeds and hazard trees

• Passive recreation (fishing /hunting)

• Site investigative work

• Maintaining existing roads/driveways and facilities w/in existing ROW, e.g. electric; water, sewer lines; naturalgas, cable

Maintaining existing utilities

Photo Courtesy: Kitsap Sun

Removing invasive species, Enhancing buffers

Page 15: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 16: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 17: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 18: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 19: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 20: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 21: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 22: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 23: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 24: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the
Page 25: Thurston County Shoreline Master Program Update · 2019-04-15 · BLUF: Bottom line for this presentation -- this is for information only, trying to provide you information on the

• Project Contacts:

• Thurston County• Brad Murphy, [email protected]

• Ecology• Sarah Cassal, [email protected]

Websites:http://www.co.thurston.wa.us/planning/shoreline/shoreline_home.htmhttp://www.ecy.wa.gov/programs/sea/shorelines/smp/index.html

Questions?