Three-phase pollution test of diamond-shaped “suspension” insulator arrangement
for T-pylon tower
2
Background and goal• The National Grid isplanning for the new 400kV overhead line with T-pylon towers
• Dielectric (lightning andswitching overvoltages)and ice performanceperformed by STRI
• Goal of this paper:verification of pollutionperformance
• Full-scale three-phasetest to be developed
3
Challenges
• No IEC test for polymeric(composite) insulators
• No test for three-phasearrangement
• No IEC test for thesimulation of recovery ofhydrophobicity
4
Methodology-1: principles of IEC 60507 (solid layer)
5
Methodology-2: principles of CIGRE TB 555
6
Methodology-3: full-scale three-phase tests from 3 single phase transformers
7
High repeatability in pollution parameters
8
High repeatability in leakage current parameters
Practical summary
9
• Unique three phase full-scalepollution test for the complicatedgeometrical structure for 420 kVOHL equipped with compositeinsulators with hydrophobic surfacehas been successfully developed.
• Target pollution level withstood fortwo structures (no flashovers).
Scientific summary
10
• The test is applicable for complicatedgeometrical structures.
• The test is repeatable.• Reported to CIGRE within workinggroup D1.44
• Verified at different configuration.