Thomas Jefferson National Accelerator Facility

Page 1

UITF Progress meeting

Approved Labyrinth

Fresh air pulled through “chicken wire” gate

Page 2: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 2

UITF Progress meeting

Improving the ventilation in Cave2

Add a wall to help direct air flow

Add ductwork leading to rear of Cave2

Page 3: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 3

UITF Progress meeting

Page 4: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 4

UITF Progress meeting

Cryo lines from CTF along wallGN2 lines along the wall SF6 tank

Page 5: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 5

UITF Progress meeting

Helium dewars: 1,000 liters, 500 liters, 50 liters = 1,550 L 

¼ CM LHe capacity, ~ 400 L (?)

Total LHe supply from CTF….

Nitrogen line at 80 psi thru a 3/8 inch pipe = 22 cfm or 1,320 cubic feet per hour

SF6 inside vessel that hold HV power supply: 25 ft3 filled to 70 psi, ~ 54 lbs: total volume if released? 144 ft3

Helium, Nitrogen and SF6

Page 6: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 6

UITF Progress meeting

Rough Dimensions

Cave 1: 12’ x 12’ x 60’ ~ 8,640 ft3

Cave 2: 22’ x 54’ x 12’ ~ 14,256 ft3

Dick Owen made a more exact calculation: 25,704 ft3

Matt’s loose estimate, total volume: 22,896 ft3

Exhaust vent to outside

Exhaust vent to high bay

exit/entrance

exit/entrance

Page 7: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 7

UITF Progress meeting

131211975432

6’ tall Empty space below this metal sheet

66’

14’

4’

10’

Ceiling tiles = 24 Concrete blocks 14’ longThere are two “styles” of Ceiling tile, square and rectangular cross sections

New stairs here

Page 8: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 8

UITF Progress meeting

131211975432

6’ tall Empty space below this metal sheet

66’

4’

Ceiling tiles = 24 Concrete blocks 14’ longThere are two “styles” of Ceiling tile, square and rectangular cross sections

New stairs here

klystrons

Completely empty

One waveguide and LCW

Two waveguides

New electric here

HDIce

14’ 10’

Page 9: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 9

UITF Progress meeting

Page 10: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 10

UITF Progress meeting

Walkway:Backs of racks here

Metal plate, rad shielding

Electronics racks, side view

Front of rack here

Front of rack here

Page 11: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 11

UITF Progress meeting

Device Qty AC Power Each Total AC Power LCW Location

Gun High Voltage power supply

1 30A / 208 VAC 3 phase

30A / 208 VAC 3 phase

None Top of cave

ODH rack needs emergency power

1 20A/120 VAC single phase

20A/120 VAC single phase

Nonefrom an emergency power loop

Trim Rack 2 50A / 208 VAC 3 phase

100A/208 3Phase None Top of

caveChicane power supply 1 30A / 208 VAC 3

phase30A/208 3Phase None Top of

caveChicane magnets 3 none 4

GPM Cave

LLRF/Master Oscillator 1 20A / 120VAC

single phase

20A / 120VAC single phase

None Top of cave

Water skids for chopper & buncher

2 20A / 208 VAC 3 phase

40A/208 3Phase

4 GPM Cave

Solid state RF amps for choppers

420 Amp / 208 VAC single phase

80 Amp / 208 VAC single - phase to phase

Top of cave

4 Amplifiers at 400 Watts each

Solid state amplifier for 750 MHz buncher

1 25A/480 VAC 3 phase

25A/480VAC three phase

Top of cave

Cathode Power Supply for klystrons

1 100A / 480VAC 3 phase

100A / 480VAC 3 phase

None Top of cave

also for High power RF 1

208 VAC three phase and 120 VAC

Top of cave

Klystrons 3 none 16.5 GPM

Top of cave

5.5 GPM each

Circulators & loads 3 none 6

GPMTop of cave

2 GPM each

Cave Vacuum & Utility power

20A / 208 3Phase XX A / 240 VAC X circuits 20 A / 120 VAC

20A/208 3Phase 240 VAC

Cave

Ion Pump power supplies 1 20A 120VAC

single phase20A 120VAC single phasenone Top of

cave

Control Racks including cryo 12 20A / 120VAC

single phase

12 circuits@ 120 VAC@ 20 Amps

Top of cave

Control Room 1 20A / 120VAC single phase

4 circuits@ 120 VAC@ 20 Amps

Control Room

Inside the Cave 20A / 120VAC single phase

12 circuits@ 120 VAC@ 20 Amps

along perimeter of the cave

HDIce gets power from Big Bertha. Big Bertha will get power fed from a distribution panel in the annex. This distribution panel is attached to the generator. Ground isolated linesWalt thinks we might want two additional 480 VAC welding receptacles installed inside the cave too. These additional lines do not need to be attached to a generator.

Page 12: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 12

UITF Progress meeting

Page 13: Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility

Page 13

UITF Progress meeting

Walt: electronics racks platform design, for Neil to build

Neil Wilson: rack platform, unistrut to wall, temporary stairs, LCW, GN2 and compressed air

Layout of utilities added to unistrut

Have facilities remove stuff from control room wall exterior

Find a concrete block for empty space near control room

Have Walter move concrete block…