31

Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Embed Size (px)

Citation preview

Page 1: Thomas Baron CERN Infor EAM User Meeting 26 June 2013
Page 2: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Infor EAM for the CERN Conference Rooms Service

Thomas Baron

CERN Infor EAM User Meeting

26 June 2013

LOGO

Page 3: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

• Why Infor EAM ?• Conception and Deployment• Operation• Integrations and Reporting• What’s next ?

Page 4: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conference Rooms Service•

Page 5: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conference Rooms Service• Born in Q4 2011• Activities

• Equipment standardisation• Meeting room A/V design• Meeting room installation coordination• Equipment monitoring• Preventive maintenance• Corrective maintenance and Technical support• User support

Page 6: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conference Rooms Service• Service coverage

• Staffing:• 2 staff• Outsourced team of 2 for the direct user support

119, 47%

136; 53%

CERN rooms

managedunmanaged

Page 7: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Why Infor ?• Need an inventory• Need to track location and move of equipment• Need to store/archive equipment related documents• Need to easily track and plan investment• Need to keep track of maintenance• Need to organise preventive maintenance• Need to centralise this information in order to easily

integrate with other tools

• Starting from sharepoint lists…• …then heard about Infor EAM

Page 8: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conception• Timeline

• First contact with GS (David and Tahar: Jan 2012)

• Test area: Jan 2012• Production: April 2012

Page 9: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conception• Lot of work with Infor support (Tahar)• Data structure

• Positions• Assets

• Custom attributes

• Parts• Stores• Regular/preventive maintenance• Conception of stickers and selection of tools

Page 10: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conception• Selected Tools

• Sticker printer• Brady BBP11 300dpi; ribbon 65mm• LabelMark 5 software

• Barcode scanner• CS-3070 ; blutooth and USB

• iPad

Page 11: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conception• Organic growth, not everything was

designed from the beginning• New use cases arise with production

Page 12: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Deployment• Initial data input

• From sharepoint lists using the Infor EAM Upload Utility

• Only for VC devices, PCs

• Then manually• «Tour des salles»,

inventory and manual

ingest• From April 2012

to April 2013

Page 13: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Deployment• User Training

• Service managers and technicians• By GS from April to July 2012• Lots of face to face sessions

• Sometimes the trainer is as lost as the student…

Page 14: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Deployment• Documentation in internal wiki

Page 15: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Operation: Use Cases• New rooms (web interface)

• Equipment order• Reception and information collection• Creation of room and positions• Creation of assets and link to positions

• Often use «Copy record»

• Edition, printing and sticking of barcode labels• Work order (DE - Design)• Archive plans and all documents in EDMS

Page 16: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Operation: Use Cases• Room upgrades

• Reception of new equipment• Registration in Infor in a dedicated store• Replacement of old asset• Work order (CA - Correctif Amélioration)

• Corrective maintenance• Repair and replacement of faulty equipment• Work order (CD – Correctif Dépannage)

Page 17: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Operation: Use Cases• Preventive maintenance

• Projector lamp hours exceeded• Work order (PC – Préventif conditionnel)• Not yet regular maintenance

Page 18: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Operation: Stock Management• List of parts

• Tracked by asset• PCs• projectors

• Or not• Lamps• Batteries• Splitters

• Used in WOs• Regularly checked and ordered

Page 19: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Operation: Some Figures• Structure

• 1038 positions• 881 assets• 142 parts• 5 stores

• Work• 233 WOs

Page 20: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Reporting• InforEAM integrated reporting a bit clumsy• Need for a dashboard-style reporting for

users and managers• Integration in a drupal module using

• Direct Oracle queries• Python and Google charts

Page 21: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Reporting

Page 22: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Integration• Using the equipment data in other service

related applications• In order to have a single source of information;

master repository• Using SQL queries

Page 23: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Integration: RAVEM• RAVEM (Room AV Equipment Manager)

Page 24: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Integration: Room Control App

Page 25: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

General comments (issues)• The standard interface is overly complex and lacks good

user guide which would give an overview on the concepts and philosophy• The support team should setup a FAQ or dedicated guide for

users with specific CERN use cases.

• A lot of issues with the standard web interface• The standard interface works only on IE !!!• One can open only one window at a time !!!• Sometime you start a search which takes ages and blocks the

whole interface. That’s especially when in the exploratory phase.• Asset/position numbering is clumsy for the user (should be

automated)• EDMS integration

Page 26: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

General comments (positive)• Very flexible• Adapts to all use cases• Excellent EAM light interface• Strong support• Good codification guidance• Could not do without it

Page 27: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

What could have been done better

• Better configuration of the operators web interface (simplification)• Managers should have the possibility to do that

themselves

• Integration to Room Control App ?• Fully dedicated AV input interface

Page 28: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

What’s Next ?• Still a long way to go!• Using the regular/preventive maintenance module

• Already configured• Regular «tour des salles» with checklist

• Better reporting• Investment tracking/profiling• Better tickets analysis

• Extend the use to other collaboration services• Public Information Screens• Webcast

• Integration with SNow

Page 29: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Conference Rooms Service

• info• http://cern.ch/conference-rooms

• status page• http://

avc-dashboard.web.cern.ch/Conference%20rooms

• contact• [email protected]

Page 30: Thomas Baron CERN Infor EAM User Meeting 26 June 2013

Thank you for your attention

Contact me:Thomas Baron (IT-CIS-AVC)[email protected]

Page 31: Thomas Baron CERN Infor EAM User Meeting 26 June 2013