Page 1: This is being provided simply as an example for creating a

This is being provided simply as an example for creating a project-sharing presentation. Feel free to utilize the

PowerPoint template provided, or create your own presentation. Thanks to the McKean Conservation

District for sharing this project as an example.

Page 2: This is being provided simply as an example for creating a

County: Mckean DGLVR Funds: $55,000Applicant: Ceres Twp In-Kind Funds: $21,940LVR or D&G: LVR (192ADT) Total Prj Value: $76,940Rd Name: Jander Run Status: Completed 2015

Dirt, Gravel, and Low-Volume Road Maintenance Program Completed Project Summary

Brief Problem Description: A 3’ round culvert in a ~9’ bankfull channel. Structure is failing, and is prone to overtopping and sediment deposition at inlet requiring regular cleanout. The pipe is on HQ Janders Runs, immediately upstream of a 12’ bridge for a PennDOT road, and about ½ mile from emptying into Oswayo Creek.

Brief Project Description: The existing 3’ structure was replaced with a 9.5’ with box culvert.

Page 3: This is being provided simply as an example for creating a

Jander Run, HQ tributary to Oswayo Creek

Project:3’ pipe

~12’ State Bridge

Page 4: This is being provided simply as an example for creating a

Before

On structure, looking downstream

Page 5: This is being provided simply as an example for creating a

BeforeInlet Outlet

Page 6: This is being provided simply as an example for creating a

Grant App

Page 7: This is being provided simply as an example for creating a

Site Plan

Page 8: This is being provided simply as an example for creating a

During

Establishing pump-around

Page 9: This is being provided simply as an example for creating a

DuringExcavation for new pipe

Page 10: This is being provided simply as an example for creating a

DuringCulvert assembly and placement

of stream bed

Page 11: This is being provided simply as an example for creating a

After

Page 12: This is being provided simply as an example for creating a

After

Page 13: This is being provided simply as an example for creating a

County: Mckean DGLVR Funds: $55,000Applicant: Ceres Twp In-Kind Funds: $21,940LVR or D&G: LVR (192ADT) Total Prj Value: $76,940Rd Name: Jander Run Status: Completed 2015

Dirt, Gravel, and Low-Volume Road Maintenance Program Completed Project Summary

Brief Problem Description: A 3’ round culvert in a ~9’ bankfull channel. Structure is failing, and is prone to overtopping and sediment deposition at inlet requiring regular cleanout. The pipe is on HQ Janders Runs, immediately upstream of a 12’ bridge for a PennDOT road, and about ½ mile from emptying into Oswayo Creek.

Brief Project Description: The existing 3’ structure was replaced with a 9.5’ with box culvert.