This file has been cleaned of potential threats.
If you confirm that the file is coming from a trusted source, you can send the following SHA-256
hash value to your admin for the original file.
2da2b16e967727a73b0abb25a6533998508cfea7cf14c9d8da5c047eb812a124
To view the reconstructed contents, please SCROLL DOWN to next page.
IykTek vuqla/kku laLFkkuINSTITUTE FOR PLASMA RESEARCH
,(An Autonomous Institute of Department of Atomic Energy, Govt. of India)
fudV bfUnjk iqy] HkkV] xka?khuxj&382 428 HkkjrnwjHkkLk% (079) 2396 2020/2021/2028 QSDLk% 91-079-23962277osc: www.ipr.res.in
NEAR INDIRA BRIDGE, BHATDIST. GANDHINAGAR - 382 428 (INDIA)Phone: (079) 2396 2020/2021/2028 Fax : 91-079-23962277Web : www.ipr.res.in
ENQUIRY ENQUIRY NO : IPR/EQL/17-18/046 Date : 03-05-2017
Due on : 11-05-2017 by 1:00 PM IST
Please send your offer in sealed envelope specifying Enquiry No, Date & Due Date, ALONG WITH your credentials for the following items:Important Note:Please note that e-mail quotations are not acceptable however you may send your queries (if any) to [email protected] ensure your sealed quotation reaches this office not later than above mentioned due date and time.Kindly go through the following documents properly before quoting which are available on the IPR web portal i.e., www.ipr.res.in / attached herewith.
1) Instructions to the bidders & Terms and conditions (refer Form No: IPR-LP-01)2) Bidding format
QUOTATION SHOULD BE ADDRESSED TO PURCHASE OFFICER ONLYSr No Description Quantity
1 Supply, Installation, Testing and commissioning of 50 NB SS 304 (Sch. 40) pipes cut to required lengths and installed with all welded joints, necessary fittings, like elbows, Flanges, tees, bends (Long/short radius), Nipples, reducers, fasteners, PTFE / eq. gaskets (Sch-10) etc. Other details as per attached sheet.
30.0 Rmts
2 Supply and installation in position 50 NB PN-10/ Class 150 Wafer type butterfly valves. Other details as per attached sheet. 2.0 Nos. 3 Supply and installation in position 50 NB PN-10/ Class 150 Globe valve. Other details as per attached sheet. 1.0 Nos. 4 Providing and fixing in position of 50 NB class 150, Y-strainer with SS 304/316 body and SS 304/316 filter including matching flanges and fasteners. Other details as per attached sheet.
1.0 Nos.
5 Installation of 50 NB PRV (PRV will be supplied by IPR). Other details as per attached sheet. 1.0 Nos. 6 Installation of 50 NB Flow meter (Flow meter will be supplied by IPR). Other details as per attached sheet. 1.0 Nos.
PDF processed with CutePDF evaluation edition www.CutePDF.com
7 Providing and fixing in position, water pressure gauges with all SS accessories. Other details as per attached sheet. 2.0 Nos. 8 Providing and fixing in position, water temperature gauges with all SS accessories. Other details as per attached sheet. 2.0 Nos. 9 Minor civil work as per attached sheet. 1.0 Job
Note: Please quote with complete technical details (Technical compliance sheet and product data sheet). Encl: As per Attachment. Sd/-Mr. D. RameshPurchase Officer-II
Information to Vendors: We are working towards a single platform for our future requirement. Hence, please refer IPR website i.e, www.ipr.res.in for our future requirement.
1
Supply, Installation, Testing and commissioning of piping system including valves for LVPD power supply at IPR
Scope of work:
Supply, Installation, Testing and commissioning of 50 NB SS 304 (Shc. 40) pipes cut to required lengths and
installed with all welded joints, necessary fittings, like elbows, tees, bends (Long/short radius), reducers, fasteners,
PTFE / eq. gaskets etc. as mentioned in the BOQ (Refer attached drawing).
Piping shall be properly supported from floor with proper supports, stands, clamps, as specified and as required will
be supplied. The Contractor shall adequately design all the brackets, saddles, clamps and be responsible for their
structural sufficiency. All piping work shall be carried out in a workman like manner, causing minimum disturbance
to the existing services, buildings and structure. After the installation of pipe, pressure and leak test will be carried
out.
Supply, Installation, Testing of butterfly valve, Y-Strainer and globe valve as per instruction of IPR EIC.
Supply, Installation, Testing of Pressure and Temperature gauges as per instruction of IPR EIC.
Other necessary civil work like making slots/hole in the wall/RCC to run the pipe at desired location. After that
remaining space around the pipe will be properly sealed.
During the work execution all necessary civil work/ structure work should be carried out by contractor. After completion of the work, site should be properly cleaned.
Whole work must be carried out to IPR satisfaction and as per instruction of engineer in charge.
Pipe Joints:
All joints in the pipe system shall generally be done by welding, unless otherwise mentioned, or directed at site. All
welding shall be done by qualified welders and shall strictly conform to BIS Code of practice. All welds shall have
100% visual inspection. Before welding of pipes, make proper ‘V’ notch at the joints by chamfering the end of pipe.
with surface grinder. All electrodes shall be selected to match the mechanical and chemical properties of the parent
material. The welding rods shall be selected as per AWS-E-7018 or Equivalent BIS code, subject to Purchaser’s
approval.
Pipe flanges:
All flanges including flanges of valves are to be slip on serrated finished flanges (SORF) as per ASME B16.5, class
150 SORF flanges.
MEASUREMENTS:
Unless otherwise specified, measurement for piping for the project shall be on the basis of centre line
measurements described herewith. Piping shall be measured in units of length corrected to centimeter along the
centre line of installed pipes including all pipe fittings, flanges (with gaskets, nuts, and bolts for jointing), unions,
bends, elbows, tees, concentric and / or eccentric reducers, inspection pieces, expansion loops etc. The above
accessories shall be measured as part of piping length along the centre line of installed pipes, and no special
multiples of pipe lengths for accessories shall be permitted. The quoted rates for centre line linear measurements of
piping shall include all wastage allowances, pipe supports including hangers, MS/SS channel, wooden haunches,
nuts, check nuts, vibration isolator suspension where specified or required, and any other item required to complete
the piping installation as per the specifications. None of these items will be separately measured nor paid for.
However, all valves (globe / check / butterfly / ball), thermometers, pressure gauges shall be separately counted
and paid as per their individual unit rates, which shall also include their insulation as per specifications. Piping
measurements shall be taken before application of the insulation. Fabrication of all types of pipe supports, provided
as per the instruction of Engineer-in-Charge, will be paid on weight basis, excluding weight of fasteners. All
temporary lines or equipment required for flushing, testing, draining or drying should be provided, installed and
dismantled by the contractor within his quoted rates. Open end of the pipes shall be blanked within his quoted
rates.
WELDING: 1. Only reputed electrodes like ADVANI / ESAB / D&H should be used for carrying out welding. 2. The welding shall be TIG welding and arc-welding method followed for welding SS structures. 3. In case of defect being identified in any weld joint, the joint shall be grounded off to the base metal and shall be
re-welded.
2
4. The welding should be uniform and free from any welding defects
TESTING & ACCEPTANCE: 1. Visual inspection of weld / flange joints shall be carried out. 2. Testing of Pressure Reducing Valve. After the piping job is completed, the entire piping shall be flushed out
with water.
3. Pressure testing of entire piping shall be carried out. Leakage, if any observed during testing shall be rectified immediately.
4. The expenditures incurred for all the tests (including DPT and Radiography Test) shall be met by the contractor, if instructed by IPR EIC. Additional radiography required due to poor quality of contractor‘s
welder, will be done at contractor’s cost.
FREE ISSUE MATERIALS / SERVICES AND EXCLUSIONS:
The vendor should employ required man power till the final commissioning of the project.
a) IPR shall provide free power and water for fabrication and testing purposes.
b) IPR shall provide single electric power point at one place from where the vender should distribute it as per
requirement.
c) IPR will not provide covered site office cum stores for the execution of the job.
d) IPR will supply material as per Annexure-1 as a free issue material.
ANNEXURE -I
FREE ISSUE MATERIALS
Sr.
No.
Items description Qty. Approx.
Rates
(Rs.)
Approx.
total cost
(RS.)
1 50 NB, SS, 150 #, Pressure regulating valve 01 Nos. 40000 40000
2 50 NB Flow meter 01 Nos. 45000 45000
Approx. Total Cost (Rs.) 85000
SPECIAL TERMS & CONDITIONS:
1. WORK COMPLETION PERIOD: 14 weeks from the date of P.O. 2. The scope also includes the warranty of 1 year after satisfactory acceptance from IPR.
3. SUPERVISION BY THE CONTRACTOR: The contractor shall have sufficient supervisory work force so that
one supervisor may be available on each job for day-to-day site work. The contractor shall have to arrange day-to-
day planning and execution of each job.
4. The expenditures incurred for all the tests (including DPT and Radiography Test) shall be met by the
contractor.
5. Some Piping work shall be done at height of approx 3.5 mtr. So contractor must make sure for safety of
worker/fitter while doing welding work.
STANDARDS/ CODES
The following latest IS specifications / equivalent applicable codes are applicable for the proposed work.
IS : 3656
Welds testing by DP
IS : 6392 – 1971/
ASME B16.5
Steel pipe flanges.
3
IS : 628
Rubber gasket, Teflon gasket for SS piping.
IS : 554 – 1975
Dimensions for pipe threads for pressure tight joints
IS : 7240 - 1981
7413 - 1981 Code for practice for application and finishing of thermal insulation material
at temp. From -80C to 40C. & 40C to 700C.
IS : 1367
Bolts, nuts, and studs./ threaded fasteners.
ANSI - B36.19
Stainless Steel pipes.
IS : 444/87 Insulated rubber hose manufactured in woven textile / braided yarn reinforcement.
APPROVED MAKES
The following makes are approved by IPR. Deviations in the approved make will not be allowed. So, the
vendor has to consider this while submitting price bid. Also, refer technical specifications, accordingly
select approved makes.
Description of item Approved makes
Y-Strainer Trishul/ Triveni/ Sant/ Emerald/ Leader/ Advance/ Flowtech/
Crescent valves/ Flairs/ Emerald/ Unimac
Non Return Valves L&T/ Forbes Marshall/ Advance/ Intervalve/ Danfoss/ CRI/
BDK/ Expert
Butterfly and Globe valve
(manual)
L&T/ Intervalve / Weir-BDK / CRI/ Virgo/ Fisher control /
AMRI/ Technova /Advance / Saunders / Crescent/ Deltech /
Unimac/ Honeywell / Forbes Marshall
Ball Valves (manual) L&T/ Forbes Marshall/ Virgo/ Velan / Saunders / Accuflow /
Weir-BDK /Trishul /Indian / Crescent/ Unimac/ CRI
SS pipe (Seamless / ERW)
Suraj/Chokshi tube/ Ratnamani/ Remi/SAIL/Jindal/Indian
seamless/*
* Subject to IPR approval
4
SHEDULE OF QUANTITY
(To be filled in by bidder and returned to IPR)
Sr.
No
Item Description Qty Unit Unit rate (in
Rs.)
Total rate
(in Rs.)
1 SS PIPING (Refer attached drawing):
Supply, Installation, Testing and commissioning
of (SS 304) pipes cut to required lengths and
installed with all welded joints, necessary fittings,
like elbows, Flanges, tees, bends (Long/short
radius), Nipples, reducers, fasteners, PTFE / eq.
gaskets (Sch-10) etc.
Schedule 40 pipe, fittings and flanges.
1.1 50 NB 30 Rmts
2 BUTTERFLY VALVE (SS) :
Supply and installation in position the following
PN-10/ Class 150 Wafer type butterfly valves
center disc type, with slim seal, SS body, all SS-
304 / SS-316 wetted parts, position indicator,
centering lugs, locking lever handle, bubble tight
shut off class-VI, replaceable EPDM/Teflon seat,
high Cv values including required qty. of SS 150
class (B16.5) matching flanges and metric thread
nut-studs fasteners.
2.1 50 NB 02 Nos.
3 GLOBE VALVE (SS) :
Supply and installation in position the following
PN-10/ Class 150 Globe valves, SS body, all SS-
304 / SS-316 wetted parts, locking wheel, bubble
tight shut off class-VI, replaceable seat, including
required qty. of SS 150 class (B16.5) matching
flanges and metric thread nut-studs fasteners.
3.1 50 NB, Flanged end 01 Nos.
4 Y-Strainer (SS):
Providing and fixing in position of following class
150 - strainer, with SS 304/316 body and SS
304/316 filter including matching flanges,
fasteners and one spare filter element.
4.1 50 NB, Flanged end 01 Nos.
5 Installation of 50 NB PRV (PRV will be
supplied by IPR)
Installation of PRV in 50 NB line. It includes 01 No.
5
required qty. of Class 150 SS matching flanges (to
be welded on pipe by contractor), metric thread
SS nut-studs fasteners sets and PTFE gaskets.
PRV shall be provided by the IPR as “Free
Issue Material”.
6 Installation of 50 NB Flow meter (Flow meter
will be supplied by IPR)
Installation of Flow meter in 50 NB line. It
includes required qty. of Class 150 SS matching
flanges (to be welded on pipe by contractor),
metric thread SS nut-studs fasteners sets and
PTFE gaskets. Flow meter shall be provided by
the IPR as “Free Issue Material”. 01 No.
7 Pressure gauges:
Providing and fixing in position, water pressure
gauges with all SS accessories like shutoff valve
siphon pipe, etc. with 1% accuracy.
Range 0-10 Bar. Dial 100 mm 02 Nos.
8 Temperature gauges:
Providing and fixing in position the dial type
industrial Temp. gauges with all SS accessories.
Range - 0 – 100 C, Accuracy 1%. 02 Nos.
9 MINOR CIVIL WORK
Piping network will be supported with MS support as per requirement with painting
complete as per instruction of Engineer-in-
Charge. Painting shall be of one coat of red
oxide/ zinc coat with two coats of enamel
paint. All painting colour code shall be
approved by Engineer-in-Charge before
execution.
Other necessary civil work like making slots/hole in the wall/RCC to run the pipe at
desired location. After that remaining space
around the pipe will be properly sealed.
During the work execution all necessary civil work/structure work should be carried out by
contractor. After completion of the work, site
should be properly cleaned.
Whole work must be carried out to IPR satisfaction and as per the instructions of IPR
engineer in charge.
01
Job
TOTAL
Total in words...............................................................................................................
6
…………………………………………………………………………………
Indicate percentage except Freight
Percentage Amount Included Excluded
Packing and forwarding
Excise Duty
Sales Tax/VAT
Service Tax
Insurance
Freight Rs.
Important Note:
IPR reserves the right to add / delete any or all of the items mentioned in SOQ.
Understand all the specifications, terms and conditions of this tender thoroughly, visit the site and contact the purchase officer for any clarification if necessary.
Deviations if any shall be clearly specified on separate sheet with all details.
The bidder should sign all pages in token of acceptance of the terms and condition and return the same to us.
Date: Name & signature of Bidder
Place: (Office Seal)
1
TECHNICAL SPECIFICATION (TO BE SUBMITTED BY CONTRACTOR)
BUTTERFLY VALVES (SS) for DM Water:
Particulars Description Details to be filled by vendor
Type / Class Wafer/ PN10
Make L&T/ Intervalve / Weir-BDK /
CRI/ Virgo/ Fisher control /
AMRI/ Technova /Advance /
Saunders / Crescent/ Deltech /
Unimac/ Honeywell / Forbes
Marshall
MOC of all body parts: (Enclose details)
Body CF8/CF8M-
SS 304/SS 316
Seat EPDM/Teflon
Disc/ Stem SS 316/ SS 304
Bearing/ sleeve --
Fasteners SS
Operating range & limits: Pressure (bar)
10 bar
Operating range & limits:
Temp. (C).
up to 80 C
Cv value --
Max. Shut of pressure --
Flange standard conformity ASME B16.5, class 150 SORF
flanges
Leakage class (Testing as per API 598)
VI
Locking handle/ Lever Yes
Additional features if any: --
Y-STRAINER for DM Water:
Particulars Description Details to be filled by vendor
Make Trishul/ Triveni/ Sant/
Emerald/ Leader/ Advance/
Flowtech/ Crescent valves/
Flairs/ Emerald/ Unimac
2
Type Y-Type/ --
MOC CF8/CF8M-
SS 304/SS 316, Casted
Pressure class 150#
Pressure drop at nominal flow (bar) --
Filter element mesh size 100 mesh
Provision of one spare filter element along with Y- strainer.
Yes
Globe VALVES (SS) for DM Water:
Particulars Description Details to be filled by vendor
Class PN10
Make L&T/ Intervalve / Weir-BDK /
CRI/ Virgo/ Fisher control /
AMRI/ Technova /Advance /
Saunders / Crescent/ Deltech /
Unimac/ Honeywell / Forbes
Marshall
MOC of all body parts: (Enclose details)
Body CF8/CF8M-
SS 304/SS 316
Seat SS 304/SS 316
Disc/ Bonnet SS 316/ SS 304
Fasteners SS
Operating range & limits: Pressure (bar)
10 bar
Operating range & limits:
Temp. (C).
up to 80 C
Cv value --
Max. Shut of pressure --
Flange standard conformity ASME B16.5, class 150 SORF
flanges
Leakage class (Testing as per API 598)
VI
Additional features if any: --
Valve design BS: 1873/ API: 600/ ASME /
ANSI B16.34