This file has been cleaned of potential threats. If you confirm that the file is coming from a trusted source, you can send the following SHA-256 hash value to your admin for the original file. 2da2b16e967727a73b0abb25a6533998508cfea7cf14c9d8da5c047eb812a124 To view the reconstructed contents, please SCROLL DOWN to next page.

This file has been cleaned of potential threats. If you confirm that … · 2017. 6. 1. · 1. Only reputed electrodes like ADVANI / ESAB / D&H should be used for carrying out welding

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • This file has been cleaned of potential threats.

    If you confirm that the file is coming from a trusted source, you can send the following SHA-256

    hash value to your admin for the original file.

    2da2b16e967727a73b0abb25a6533998508cfea7cf14c9d8da5c047eb812a124

    To view the reconstructed contents, please SCROLL DOWN to next page.

  • IykTek vuqla/kku laLFkkuINSTITUTE FOR PLASMA RESEARCH

    ,(An Autonomous Institute of Department of Atomic Energy, Govt. of India)

    fudV bfUnjk iqy] HkkV] xka?khuxj&382 428 HkkjrnwjHkkLk% (079) 2396 2020/2021/2028 QSDLk% 91-079-23962277osc: www.ipr.res.in

    NEAR INDIRA BRIDGE, BHATDIST. GANDHINAGAR - 382 428 (INDIA)Phone: (079) 2396 2020/2021/2028 Fax : 91-079-23962277Web : www.ipr.res.in

    ENQUIRY ENQUIRY NO : IPR/EQL/17-18/046 Date : 03-05-2017

      Due on               :  11-05-2017 by 1:00 PM IST 

    Please send your offer in sealed envelope specifying Enquiry No, Date & Due Date, ALONG WITH your credentials for the following items:Important Note:Please note that e-mail quotations are not acceptable however you may send your queries (if any) to [email protected] ensure your sealed quotation reaches this office not later than above mentioned due date and time.Kindly go through the following documents properly before quoting which are available on the IPR web portal i.e., www.ipr.res.in / attached herewith.

    1) Instructions to the bidders & Terms and conditions (refer Form No: IPR-LP-01)2) Bidding format

    QUOTATION SHOULD BE ADDRESSED TO PURCHASE OFFICER ONLYSr No Description Quantity

    1 Supply, Installation, Testing and commissioning of 50 NB SS 304 (Sch. 40) pipes cut to required lengths and installed with all welded joints, necessary fittings, like elbows, Flanges, tees, bends (Long/short radius), Nipples, reducers, fasteners, PTFE / eq. gaskets (Sch-10) etc. Other details as per attached sheet.

    30.0 Rmts

    2 Supply and installation in position 50 NB PN-10/ Class 150 Wafer type butterfly valves. Other details as per attached sheet. 2.0 Nos. 3 Supply and installation in position 50 NB PN-10/ Class 150 Globe valve. Other details as per attached sheet. 1.0 Nos. 4 Providing and fixing in position of 50 NB class 150, Y-strainer with SS 304/316 body and SS 304/316 filter including matching flanges and fasteners. Other details as per attached sheet.

    1.0 Nos.

    5 Installation of 50 NB PRV (PRV will be supplied by IPR). Other details as per attached sheet. 1.0 Nos. 6 Installation of 50 NB Flow meter (Flow meter will be supplied by IPR). Other details as per attached sheet. 1.0 Nos.

    PDF processed with CutePDF evaluation edition www.CutePDF.com

  • 7 Providing and fixing in position, water pressure gauges with all SS accessories. Other details as per attached sheet. 2.0 Nos. 8 Providing and fixing in position, water temperature gauges with all SS accessories. Other details as per attached sheet. 2.0 Nos. 9 Minor civil work as per attached sheet. 1.0 Job

    Note: Please quote with complete technical details (Technical compliance sheet and product data sheet). Encl: As per Attachment. Sd/-Mr. D. RameshPurchase Officer-II

    Information to Vendors: We are working towards a single platform for our future requirement. Hence, please refer IPR website i.e, www.ipr.res.in for our future requirement.

  • 1

    Supply, Installation, Testing and commissioning of piping system including valves for LVPD power supply at IPR

    Scope of work:

    Supply, Installation, Testing and commissioning of 50 NB SS 304 (Shc. 40) pipes cut to required lengths and

    installed with all welded joints, necessary fittings, like elbows, tees, bends (Long/short radius), reducers, fasteners,

    PTFE / eq. gaskets etc. as mentioned in the BOQ (Refer attached drawing).

    Piping shall be properly supported from floor with proper supports, stands, clamps, as specified and as required will

    be supplied. The Contractor shall adequately design all the brackets, saddles, clamps and be responsible for their

    structural sufficiency. All piping work shall be carried out in a workman like manner, causing minimum disturbance

    to the existing services, buildings and structure. After the installation of pipe, pressure and leak test will be carried

    out.

    Supply, Installation, Testing of butterfly valve, Y-Strainer and globe valve as per instruction of IPR EIC.

    Supply, Installation, Testing of Pressure and Temperature gauges as per instruction of IPR EIC.

    Other necessary civil work like making slots/hole in the wall/RCC to run the pipe at desired location. After that

    remaining space around the pipe will be properly sealed.

    During the work execution all necessary civil work/ structure work should be carried out by contractor. After completion of the work, site should be properly cleaned.

    Whole work must be carried out to IPR satisfaction and as per instruction of engineer in charge.

    Pipe Joints:

    All joints in the pipe system shall generally be done by welding, unless otherwise mentioned, or directed at site. All

    welding shall be done by qualified welders and shall strictly conform to BIS Code of practice. All welds shall have

    100% visual inspection. Before welding of pipes, make proper ‘V’ notch at the joints by chamfering the end of pipe.

    with surface grinder. All electrodes shall be selected to match the mechanical and chemical properties of the parent

    material. The welding rods shall be selected as per AWS-E-7018 or Equivalent BIS code, subject to Purchaser’s

    approval.

    Pipe flanges:

    All flanges including flanges of valves are to be slip on serrated finished flanges (SORF) as per ASME B16.5, class

    150 SORF flanges.

    MEASUREMENTS:

    Unless otherwise specified, measurement for piping for the project shall be on the basis of centre line

    measurements described herewith. Piping shall be measured in units of length corrected to centimeter along the

    centre line of installed pipes including all pipe fittings, flanges (with gaskets, nuts, and bolts for jointing), unions,

    bends, elbows, tees, concentric and / or eccentric reducers, inspection pieces, expansion loops etc. The above

    accessories shall be measured as part of piping length along the centre line of installed pipes, and no special

    multiples of pipe lengths for accessories shall be permitted. The quoted rates for centre line linear measurements of

    piping shall include all wastage allowances, pipe supports including hangers, MS/SS channel, wooden haunches,

    nuts, check nuts, vibration isolator suspension where specified or required, and any other item required to complete

    the piping installation as per the specifications. None of these items will be separately measured nor paid for.

    However, all valves (globe / check / butterfly / ball), thermometers, pressure gauges shall be separately counted

    and paid as per their individual unit rates, which shall also include their insulation as per specifications. Piping

    measurements shall be taken before application of the insulation. Fabrication of all types of pipe supports, provided

    as per the instruction of Engineer-in-Charge, will be paid on weight basis, excluding weight of fasteners. All

    temporary lines or equipment required for flushing, testing, draining or drying should be provided, installed and

    dismantled by the contractor within his quoted rates. Open end of the pipes shall be blanked within his quoted

    rates.

    WELDING: 1. Only reputed electrodes like ADVANI / ESAB / D&H should be used for carrying out welding. 2. The welding shall be TIG welding and arc-welding method followed for welding SS structures. 3. In case of defect being identified in any weld joint, the joint shall be grounded off to the base metal and shall be

    re-welded.

  • 2

    4. The welding should be uniform and free from any welding defects

    TESTING & ACCEPTANCE: 1. Visual inspection of weld / flange joints shall be carried out. 2. Testing of Pressure Reducing Valve. After the piping job is completed, the entire piping shall be flushed out

    with water.

    3. Pressure testing of entire piping shall be carried out. Leakage, if any observed during testing shall be rectified immediately.

    4. The expenditures incurred for all the tests (including DPT and Radiography Test) shall be met by the contractor, if instructed by IPR EIC. Additional radiography required due to poor quality of contractor‘s

    welder, will be done at contractor’s cost.

    FREE ISSUE MATERIALS / SERVICES AND EXCLUSIONS:

    The vendor should employ required man power till the final commissioning of the project.

    a) IPR shall provide free power and water for fabrication and testing purposes.

    b) IPR shall provide single electric power point at one place from where the vender should distribute it as per

    requirement.

    c) IPR will not provide covered site office cum stores for the execution of the job.

    d) IPR will supply material as per Annexure-1 as a free issue material.

    ANNEXURE -I

    FREE ISSUE MATERIALS

    Sr.

    No.

    Items description Qty. Approx.

    Rates

    (Rs.)

    Approx.

    total cost

    (RS.)

    1 50 NB, SS, 150 #, Pressure regulating valve 01 Nos. 40000 40000

    2 50 NB Flow meter 01 Nos. 45000 45000

    Approx. Total Cost (Rs.) 85000

    SPECIAL TERMS & CONDITIONS:

    1. WORK COMPLETION PERIOD: 14 weeks from the date of P.O. 2. The scope also includes the warranty of 1 year after satisfactory acceptance from IPR.

    3. SUPERVISION BY THE CONTRACTOR: The contractor shall have sufficient supervisory work force so that

    one supervisor may be available on each job for day-to-day site work. The contractor shall have to arrange day-to-

    day planning and execution of each job.

    4. The expenditures incurred for all the tests (including DPT and Radiography Test) shall be met by the

    contractor.

    5. Some Piping work shall be done at height of approx 3.5 mtr. So contractor must make sure for safety of

    worker/fitter while doing welding work.

    STANDARDS/ CODES

    The following latest IS specifications / equivalent applicable codes are applicable for the proposed work.

    IS : 3656

    Welds testing by DP

    IS : 6392 – 1971/

    ASME B16.5

    Steel pipe flanges.

  • 3

    IS : 628

    Rubber gasket, Teflon gasket for SS piping.

    IS : 554 – 1975

    Dimensions for pipe threads for pressure tight joints

    IS : 7240 - 1981

    7413 - 1981 Code for practice for application and finishing of thermal insulation material

    at temp. From -80C to 40C. & 40C to 700C.

    IS : 1367

    Bolts, nuts, and studs./ threaded fasteners.

    ANSI - B36.19

    Stainless Steel pipes.

    IS : 444/87 Insulated rubber hose manufactured in woven textile / braided yarn reinforcement.

    APPROVED MAKES

    The following makes are approved by IPR. Deviations in the approved make will not be allowed. So, the

    vendor has to consider this while submitting price bid. Also, refer technical specifications, accordingly

    select approved makes.

    Description of item Approved makes

    Y-Strainer Trishul/ Triveni/ Sant/ Emerald/ Leader/ Advance/ Flowtech/

    Crescent valves/ Flairs/ Emerald/ Unimac

    Non Return Valves L&T/ Forbes Marshall/ Advance/ Intervalve/ Danfoss/ CRI/

    BDK/ Expert

    Butterfly and Globe valve

    (manual)

    L&T/ Intervalve / Weir-BDK / CRI/ Virgo/ Fisher control /

    AMRI/ Technova /Advance / Saunders / Crescent/ Deltech /

    Unimac/ Honeywell / Forbes Marshall

    Ball Valves (manual) L&T/ Forbes Marshall/ Virgo/ Velan / Saunders / Accuflow /

    Weir-BDK /Trishul /Indian / Crescent/ Unimac/ CRI

    SS pipe (Seamless / ERW)

    Suraj/Chokshi tube/ Ratnamani/ Remi/SAIL/Jindal/Indian

    seamless/*

    * Subject to IPR approval

  • 4

    SHEDULE OF QUANTITY

    (To be filled in by bidder and returned to IPR)

    Sr.

    No

    Item Description Qty Unit Unit rate (in

    Rs.)

    Total rate

    (in Rs.)

    1 SS PIPING (Refer attached drawing):

    Supply, Installation, Testing and commissioning

    of (SS 304) pipes cut to required lengths and

    installed with all welded joints, necessary fittings,

    like elbows, Flanges, tees, bends (Long/short

    radius), Nipples, reducers, fasteners, PTFE / eq.

    gaskets (Sch-10) etc.

    Schedule 40 pipe, fittings and flanges.

    1.1 50 NB 30 Rmts

    2 BUTTERFLY VALVE (SS) :

    Supply and installation in position the following

    PN-10/ Class 150 Wafer type butterfly valves

    center disc type, with slim seal, SS body, all SS-

    304 / SS-316 wetted parts, position indicator,

    centering lugs, locking lever handle, bubble tight

    shut off class-VI, replaceable EPDM/Teflon seat,

    high Cv values including required qty. of SS 150

    class (B16.5) matching flanges and metric thread

    nut-studs fasteners.

    2.1 50 NB 02 Nos.

    3 GLOBE VALVE (SS) :

    Supply and installation in position the following

    PN-10/ Class 150 Globe valves, SS body, all SS-

    304 / SS-316 wetted parts, locking wheel, bubble

    tight shut off class-VI, replaceable seat, including

    required qty. of SS 150 class (B16.5) matching

    flanges and metric thread nut-studs fasteners.

    3.1 50 NB, Flanged end 01 Nos.

    4 Y-Strainer (SS):

    Providing and fixing in position of following class

    150 - strainer, with SS 304/316 body and SS

    304/316 filter including matching flanges,

    fasteners and one spare filter element.

    4.1 50 NB, Flanged end 01 Nos.

    5 Installation of 50 NB PRV (PRV will be

    supplied by IPR)

    Installation of PRV in 50 NB line. It includes 01 No.

  • 5

    required qty. of Class 150 SS matching flanges (to

    be welded on pipe by contractor), metric thread

    SS nut-studs fasteners sets and PTFE gaskets.

    PRV shall be provided by the IPR as “Free

    Issue Material”.

    6 Installation of 50 NB Flow meter (Flow meter

    will be supplied by IPR)

    Installation of Flow meter in 50 NB line. It

    includes required qty. of Class 150 SS matching

    flanges (to be welded on pipe by contractor),

    metric thread SS nut-studs fasteners sets and

    PTFE gaskets. Flow meter shall be provided by

    the IPR as “Free Issue Material”. 01 No.

    7 Pressure gauges:

    Providing and fixing in position, water pressure

    gauges with all SS accessories like shutoff valve

    siphon pipe, etc. with 1% accuracy.

    Range 0-10 Bar. Dial 100 mm 02 Nos.

    8 Temperature gauges:

    Providing and fixing in position the dial type

    industrial Temp. gauges with all SS accessories.

    Range - 0 – 100 C, Accuracy 1%. 02 Nos.

    9 MINOR CIVIL WORK

    Piping network will be supported with MS support as per requirement with painting

    complete as per instruction of Engineer-in-

    Charge. Painting shall be of one coat of red

    oxide/ zinc coat with two coats of enamel

    paint. All painting colour code shall be

    approved by Engineer-in-Charge before

    execution.

    Other necessary civil work like making slots/hole in the wall/RCC to run the pipe at

    desired location. After that remaining space

    around the pipe will be properly sealed.

    During the work execution all necessary civil work/structure work should be carried out by

    contractor. After completion of the work, site

    should be properly cleaned.

    Whole work must be carried out to IPR satisfaction and as per the instructions of IPR

    engineer in charge.

    01

    Job

    TOTAL

    Total in words...............................................................................................................

  • 6

    …………………………………………………………………………………

    Indicate percentage except Freight

    Percentage Amount Included Excluded

    Packing and forwarding

    Excise Duty

    Sales Tax/VAT

    Service Tax

    Insurance

    Freight Rs.

    Important Note:

    IPR reserves the right to add / delete any or all of the items mentioned in SOQ.

    Understand all the specifications, terms and conditions of this tender thoroughly, visit the site and contact the purchase officer for any clarification if necessary.

    Deviations if any shall be clearly specified on separate sheet with all details.

    The bidder should sign all pages in token of acceptance of the terms and condition and return the same to us.

    Date: Name & signature of Bidder

    Place: (Office Seal)

  • 1

    TECHNICAL SPECIFICATION (TO BE SUBMITTED BY CONTRACTOR)

    BUTTERFLY VALVES (SS) for DM Water:

    Particulars Description Details to be filled by vendor

    Type / Class Wafer/ PN10

    Make L&T/ Intervalve / Weir-BDK /

    CRI/ Virgo/ Fisher control /

    AMRI/ Technova /Advance /

    Saunders / Crescent/ Deltech /

    Unimac/ Honeywell / Forbes

    Marshall

    MOC of all body parts: (Enclose details)

    Body CF8/CF8M-

    SS 304/SS 316

    Seat EPDM/Teflon

    Disc/ Stem SS 316/ SS 304

    Bearing/ sleeve --

    Fasteners SS

    Operating range & limits: Pressure (bar)

    10 bar

    Operating range & limits:

    Temp. (C).

    up to 80 C

    Cv value --

    Max. Shut of pressure --

    Flange standard conformity ASME B16.5, class 150 SORF

    flanges

    Leakage class (Testing as per API 598)

    VI

    Locking handle/ Lever Yes

    Additional features if any: --

    Y-STRAINER for DM Water:

    Particulars Description Details to be filled by vendor

    Make Trishul/ Triveni/ Sant/

    Emerald/ Leader/ Advance/

    Flowtech/ Crescent valves/

    Flairs/ Emerald/ Unimac

  • 2

    Type Y-Type/ --

    MOC CF8/CF8M-

    SS 304/SS 316, Casted

    Pressure class 150#

    Pressure drop at nominal flow (bar) --

    Filter element mesh size 100 mesh

    Provision of one spare filter element along with Y- strainer.

    Yes

    Globe VALVES (SS) for DM Water:

    Particulars Description Details to be filled by vendor

    Class PN10

    Make L&T/ Intervalve / Weir-BDK /

    CRI/ Virgo/ Fisher control /

    AMRI/ Technova /Advance /

    Saunders / Crescent/ Deltech /

    Unimac/ Honeywell / Forbes

    Marshall

    MOC of all body parts: (Enclose details)

    Body CF8/CF8M-

    SS 304/SS 316

    Seat SS 304/SS 316

    Disc/ Bonnet SS 316/ SS 304

    Fasteners SS

    Operating range & limits: Pressure (bar)

    10 bar

    Operating range & limits:

    Temp. (C).

    up to 80 C

    Cv value --

    Max. Shut of pressure --

    Flange standard conformity ASME B16.5, class 150 SORF

    flanges

    Leakage class (Testing as per API 598)

    VI

    Additional features if any: --

    Valve design BS: 1873/ API: 600/ ASME /

    ANSI B16.34