This electronic collection of documents is provided
for the convenience of the user
and is Not a Certified Document –
The documents contained herein were originally issued
and sealed by the individuals whose names and license
numbers appear on each page, on the dates appearing
with their signature on that page.
This file or an individual page
shall not be considered a certified document.
4
VICINITY MAP
OFFSITE DETOUR
LINCOLN COUNTY
REPLACE BRIDGE NO. 127 OVER HOWARDS CREEK
ON SR 1199 (TRINITY CHURCH ROAD)
GRADING, DRAINAGE, PAVING AND CULVERT
25 50 10050
25 50 10050
5 10 2010
D
T
V
=
=
=
=
=
=
%
%
MPH
ADT
ADT
% *
FUNC CLASS =
LOCAL
SUBREGIONAL TIER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
K
0
0
0
PROFILE (HORIZONTAL)
17BP.12.R.19 PE
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
09/08/99
17BP.12.R.19DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
07-J
AN-2018 16:3
6\
Road
way\
Proj\540012
7_rdy
_tsh.d
gn
HN
TB CO
NT
RA
CT:
TIP P
ROJE
CT:17
BP.12.R.19
AR
TM
E
N
N
A
S
O H
DE
P
TOF TRA
SPO
RT
TIO
N
TA
TE
OFN RT
CA
RO
LIN
A
Prepared in the Office of:
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
MONICA J. DUVAL
NCDOT CONTACT
-L- POC STA 10+50.00BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00END TIP PROJECT 17BP.12.R.19
SR 1199 (TRINITY CHURCH ROAD)
-L-
ROADREEPSVILLETO
TO
HW
Y 10
VALE
SQUARECAT
1113
1199
11231125
1002
1210
1209
1207
1113
1199
LINCO
LN CO
UNTY
CATAW
BA CO
UNTY
STEVE RACKLEY, PE
LIMITSPROJECT
60
HO
WARD
SCREEK
100
%
SU
BMIT
TA
L
17BP.12.R.19 ROW/UTIL
TOTAL LENGTH OF PROJECT 17BP.12.R.19
LENGTH OF STRUCTURE PROJECT 17BP.12.R.19
LENGTH OF ROADWAY PROJECT 17BP.12.R.19
0.085 MILES
0.006 MILES
0.079 MILES
=
=
=
2013
2033
190
360
**
**
10
60
6
* TTST =2% DUAL 4%
JUNE 22, 2017
3. DESIGN EXCEPTION NEEDED FOR HORIZONTAL CURVE (167.15'), HORIZONTAL SSD (200'), VERTICAL SAG (K = 40) AND VERTICAL SSD (305')
2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
NOTES:
DOUGLAS M. WHEATLEY, PE
17BP.12.R.19 CONST.
N
ORTH ROLIN
A
DO
U
GLAS M.WH
EA
TEY
L
AC
P
ESSIONAL
FOR
NEERNGI
E
SEAL36786
EE
R
FES ONAL
NGR
N
N
PO
SI
INE
ORT
H CAROLI
A
SEAL
15764
J A M E S A.
B Y R
D
See Sheet 1B-1 for Symbology SheetSee Sheet 1A-1 For Index of Sheets
DESIGN EXCEPTION APPROVED FOR HORIZONTAL CURVE (167.15'), HORIZONTAL SSD (200'), VERTICAL SAG (K = 40) AND VERTICAL SSD (305')
NOTES:DL00017
0
2018 STANDARD SPECIFICATIONS
MARCH 13, 2018
10.0' S
OIL
HO
WA
RD
S
CR
EE
K
TRIB. 7
LC 2 @ 15'-0" x 6'-6" RCBC
-L- STA 12+79.36
NSRS 2007
NA
D 83/
DocuSign Envelope ID: 0B5E53A8-E872-4E7F-8A32-A341B4E5CDEF
1/8/2018
1/8/2018
INDEX OF SHEETS
SHEET
TITLE SHEET
INDEX OF SHEETS, GENERAL NOTES & LIST OF STANDARDS
SYMBOLOGY SHEET
TYPICAL SECTION SHEET
PLAN & PROFILE SHEET
TRAFFIC CONTROL PLANS
SHEET NUMBER
1
4
EFF. 01-16-2018
2018 ROADWAY ENGLISH STANDARD DRAWINGS
The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design Branch -
N. C. Department of Transportation - Raleigh, N. C., Dated January, 2018 are applicable to this project
and by reference hereby are considered a part of these plans:
STD.NO. TITLE
DIVISION 2 - EARTHWORK
225.02 Guide for Grading Subgrade - Secondary and Local
225.04 Method of Obtaining Superelevation - Two Lane Pavement
DIVISION 3 - PIPE CULVERTS
DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
DIVISION 8 - INCIDENTALS
876.02 Guide for Rip Rap at Pipe Outlets
GENERAL NOTES: 2018 SPECIFICATIONS
EFFECTIVE: 01-16-2018
GRADE LINE:
FUTRUE SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES
ENGINEER IN ORDER TO SECURE A PROPER TIE-IN.
CLEARING:
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
SUPERELEVATION:
SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL
SECTIONS.
SHOULDER CONSTRUCTION:
ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SIDE ROADS:
THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE
SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT.
THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS
INVOLVED.
GUARDRAIL:
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
SUBSURFACE PLANS:
UTILITIES:
UTILITY OWNERS ON THIS PROJECT ARE
TMP-1 THRU TMP-2
EROSION CONTROL PLANS
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01
876.01 Rip Rap in Channels
2A-1
3B-1
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ENGINEER
SHEET NO.PROJECT REFERENCE NO.
09-F
EB-2018 09:2
1\
Road
way\
Proj\5400127_rdy_gen.d
gn
HN
TB
8/17/99
ROADWAY DESIGN
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
EC-1 THRU EC-6
X-1 THRU X-3
U0-1 THRU UO-2
310.10 Driveway Pipe Construction
CROSS SECTION SHEETS
UTILITIES BY OTHER PLANS
METHOD II.
200.02 Method of Clearing - Method II
ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY OTHERS.
RIGHT-OF-WAY MARKERS:
STRUCTURE SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT.
17BP.12.R.19
REVISED:
GRADING:
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED OR
MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE
ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH
STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS.
300.01 Method of Pipe Installation
862.01 Guardrail Placement
862.02 Guardrail Installation
862.03 Structure Anchor Units
N
ORTH ROLIN
A
DO
U
GLAS M.WH
EA
TEY
L
AC
P
ESSIONAL
FOR
NEERNGI
E
SEAL36786
CULVERT PLANS
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS.
PHONE - AT&T
WATER - LINCOLN COUNTY
ROW SUMMARY, & DRAINAGE SUMMARY SHEETEARTHWORK, PAVEMENT REMOVAL, GUARDRAIL SUMMARY,
S1-1 THRU S1-8
1A
1B
1A
1C-1 EXISTING CENTERLINE ALIGNMENT
1D-1 PROPOSED ALIGNMENT CONTROL SHEET
1E-1 RIGHT OF WAY CONTROL SHEET
RW-1 RIGHT OF WAY EASEMENTS AND PROPERTY TITLE SHEET
RW-4 RIGHT OF WAY EASEMENTS AND PROPERTY
DocuSign Envelope ID: 8D6A86B6-B8E9-4C82-BF4E-6182C91CA42A
2/9/2018
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
C
F
Existing Easement Line
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
KProposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I]
GAS:
Gas Valve
Gas Meter n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G Water
Above Ground Gas LineA/G Gas
Above Ground Water Line
Above Ground Sanitary SewerA/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole OF
S3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
*S.U.E. = Subsurface Utility Engineering
WLB
EIP
B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
SHEET NO.PROJECT REFERENCE NO.
1B17BP.12.R.19
Abandoned According to Utility Records
WLB
EAB
EPB
RW
RW
RW
CA
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
TUE
DUE
AUE
CRProposed Curb Ramp
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
CA
HPBExisting Historic Property Boundary
U/G Power Line LOS B (S.U.E.*)
U/G Power Line LOS C (S.U.E.*)
U/G Power Line LOS D (S.U.E.*)
P
U/G Telephone Cable LOS B (S.U.E.*)
U/G Telephone Cable LOS C (S.U.E.*)
U/G Telephone Cable LOS D (S.U.E.*)
T
U/G Telephone Conduit LOS B (S.U.E.*)
U/G Telephone Conduit LOS C (S.U.E.*)
U/G Telephone Conduit LOS D (S.U.E.*)
TC
U/G Fiber Optics Cable LOS B (S.U.E.*)
U/G Fiber Optics Cable LOS C (S.U.E.*)
U/G Fiber Optics Cable LOS D (S.U.E.*)
T FO
U/G Water Line LOS B (S.U.E*)
U/G Water Line LOS C (S.U.E*)
U/G Water Line LOS D (S.U.E*)
W
U/G TV Cable LOS B (S.U.E.*)
U/G TV Cable LOS C (S.U.E.*)
U/G TV Cable LOS D (S.U.E.*)
TV
U/G Fiber Optic Cable LOS B (S.U.E.*)
U/G Fiber Optic Cable LOS C (S.U.E.*)
U/G Fiber Optic Cable LOS D (S.U.E.*)
TV FO
U/G Gas Line LOS B (S.U.E.*)
U/G Gas Line LOS C (S.U.E.*)
U/G Gas Line LOS D (S.U.E.*)
G
SS Forced Main Line LOS B (S.U.E.*)
SS Forced Main Line LOS C (S.U.E.*)
SS Forced Main Line LOS D (S.U.E.*)
FSS
Utility Unknown U/G Line LOS B (S.U.E.*)
U/G Test Hole LOS A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contaminated Site: Known or Potential
Known Contamination Area: Soil
Potential Contamination Area: Soil
Known Contamination Area: Water
Potential Contamination Area: Water
Primary Horiz Control Point
Primary Horiz and Vert Control Point
Secondary Horiz and Vert Control Point
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap
Vertical Benchmark
New Right of Way Line
Concrete or Granite R/W Marker
New Right of Way Line with
Concrete C/A Marker
New Control of Access Line with
New Control of Access
New Temporary Construction Easement
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement
12/2/2016
Computed Property CornerRIGHT OF WAY & PROJECT CONTROL:
New Right of Way Line with Pin and Cap
TO REEPSVILLE ROAD
TO H
WY 10
SHEET NO.PROJECT REFERENCE NO.
1/10/18
09-F
EB-2018 09:3
6\
Files
Received\2018-02-09 survey control sheets\540127_ls_1C-1.d
gn
HN
TB
Location and Surveys
W/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION
SURVEY CONTROL SHEET 17BP.12.R.19 1C-1
NOTES:
AND SURVEYS UNIT.
FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION
2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF
1. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM.
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "54-0127-1"
WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF
NORTHING: 662925.178(ft) EASTING: 1285234.796(ft)
ELEVATION: 940.60(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.999845995
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"54-0127-1" TO -L- STATION 10+00.00 IS
S 25°08'29.6" E 86.79'
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
POT
PC
PC
C
PC
C
PT
PO
T
45.0
3
326.14 -EL-
SR 1199 TRINITY CHURCH ROAD
TRIB. 7
HO
WA
RD
S C
REEK
54-0127-1
54-0127-2
BL-3
BM#1
3 BL-3 662485.5359 1285889.3367 936.13
2 54-0127-2 662661.3220 1285440.7430 928.72
1 54-0127-1 662925.1780 1285234.7960 940.60
------------ ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION
BL EL
POINT N E BEARING DIST DELTA D L T RPOT 662846.608 1285271.670
LINE S 17°49'27.7" E 45.03
PC 662803.741 1285285.454
CURVE S 29°02'09.4" E 66.11 22°25'23.5"(LT) 33°42'12.2" 66.53 33.70 170.00
PCC 662745.942 1285317.539
CURVE S 47°28'30.6" E 31.45 14°27'18.9"(LT) 45°50'11.8" 31.54 15.85 125.00
PCC 662724.683 1285340.720
CURVE S 61°13'45.8" E 66.00 13°03'11.5"(LT) 19°44'03.4" 66.14 33.22 290.34
PT 662692.916 1285398.574
LINE S 67°45'21.5" E 326.14
POT 662569.455 1285700.443
****************************************
TREE ON THE EAST BANK OF CREEK
R/R SPIKE SET IN BASE OF 18" BLACKWALNUT
N 662477 E 1285505
BM1 ELEVATION = 928.24
****************************************
NC G
RID
NAD
83/N
SRS
2007
L
TYPE STATION NORTH EASTPOT 10+00.00 662846.6082 1285271.6703
PC 10+45.29 662803.4922 1285285.5336
PT 11+90.96 662699.9461 1285381.3853
POT 15+35.67 662569.4552 1285700.4425
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
1/10/18
09-F
EB-2018 09:3
8\
Files
Received\2018-02-09 survey control sheets\540127_ls_1D-1.d
gn
HN
TB
Location and Surveys
NOTES:
PROPOSED ALIGNMENT CONTROL SHEET17BP.12.R.19 1D-1
THE LOCATION AND SURVEYS UNIT.
SOURCES. IF FURTHER INFORMATINO REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT
2. THE PROPOSED ALIGNMENT CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS
1. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM.
Permanent Easement Marker Iron Pin & Cap
ALIGN STATION OFFSET NORTH EASTL 11+90.96 29.46 662672.6773 1285370.2327
L 12+35.00 -50.00 662729.5523 1285441.0788
L 12+35.00 -30.00 662711.0407 1285433.5078
L 12+75.00 60.00 662612.5964 1285436.4613
L 12+95.00 -50.00 662706.8391 1285496.6136
L 13+20.00 60.00 662595.5615 1285478.1124
L 13+50.00 30.00 662611.9724 1285517.2364
L 14+00.00 -30.00 662648.5796 1285586.2285
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
1/10/18
09-F
EB-2018 09:4
0\
Files
Received\2018-02-09 survey control sheets\540127_ls_1E-1.d
gn
HN
TB
Location and Surveys
SURVEYORPROJECT
NOTES:
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL
2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM.
RIGHT OF WAY CONTROL SHEET17BP.12.R.19 1E-1
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
25 50 10050
25 50 10050
5 10 2010
D
T
V
=
=
=
=
=
=
%
%
MPH
ADT
ADT
% *
FUNC CLASS =
LOCAL
SUBREGIONAL TIER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
K
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTHDESIGN DATAGRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
17BP.12.R.19
0
00
CO
NT
RA
CT:
60 TOTAL LENGTH OF PROJECT 17BP.12.R.19
LENGTH OF STRUCTURE PROJECT 17BP.12.R.19
LENGTH OF ROADWAY PROJECT 17BP.12.R.19
0.085 MILES
0.006 MILES
0.079 MILES
=
=
=
2013
2033
190
360
**
10
60
6
* TTST =2% DUAL 4%
JUNE 22, 2017
4
-L- POC STA 10+50.00BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00END TIP PROJECT 17BP.12.R.19
SR 1199 (TRINITY CHURCH ROAD)
-L-
ROADREEPSVILLETO
TO
HW
Y 10
10.0' S
OIL
HO
WA
RD
S
CR
EE
K
TRIB. 7
DL0017
0
MARCH 13, 2018
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO. NO.TOTALSHEETS
SHEET
Prepared in the Office of:
SIGNATURE:
DIVISION OF HIGHWAYS
LOCATION:
TYPE OF WORK:
09/08/99
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
09-F
EB-2018 10:3
7\
Files
Receiv
ed\2018-02-09 surve
y co
ntrol sheets\54012
7_ls
_r
w-1.dgn
HN
TB
1000 Birch Ridge Dr., Raleigh NC, 27610
TIP P
ROJE
CT:
LINCOLN COUNTY
AND PROPERTY TIESRIGHT OF WAY, EASEMENTS
SURVEYOR
PROFESSIONAL LAND
AR
TM
E
N
N
A
S
O H
DE
P
TOF TRA
SPO
RT
TIO
N
TA
TE
OFN RT
CA
RO
LIN
A
ON SR 1199 (TRINITY CHURCH ROAD)REPLACE BRIDGE NO. 127 OVER HOWARDS CREEK
GRADING, DRAINAGE, PAVING AND CULVERT
17B
P.12.R.19
2018 STANDARD SPECIFICATIONS
RW-1N.C.
NSRS 2007
NA
D 83/
NA
D 83/ N
A 2011
-L- POC STA 10+50.00
BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00
END TIP PROJECT 17BP.12.R.19
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
33.4
5+22.0
633.4
5+22.0
6
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
1/10/18
09-F
EB-2018 09:5
0\
Files
Received\2018-02-09 survey control sheets\540127_ls_r
w-4.d
gn
HN
TB
Location and Surveys
SURVEYORPROJECT
NOTES:
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL
2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM.
17BP.12.R.19 RW-4
-L- POT Sta. 10+
00.00
-L- PC
Sta. 10+
45.29
PI Sta 11+23.11
D
L = 145.67'
T = 77.82'
-L-
-L-
PT
Sta. 11+90.9
6
-L-
PO
T
Sta. 15
+35.6
7
-L-
R = 167.15' (25 MPH)
EXISTING R/W
EXISTING R/W
GENE B SAIN
DB 705 PG 193
CRISMAN LIFE EST
WALTER NELSON
DB 2126 PG 403
CRISMAN LIFE EST
WALTER NELSONGENE B SAIN
DB 705 PG 193DB 2126 PG 403
60.0
0'
N 04°0
0'0
0" W
106.3
3'
N 72°0
0'0
0" E
82.50'
N 89
°10'0
0" E
189.50'
N 22°30'0
0" W
676.50'
S 04°0
0'0
0" E 467.7
8'
40.00' LT
+90.96 -L-
1
1
2
2
40.00'
+00.00 -L-
40.00'
+50.00 -L-
EX. R/W
40.00' LT
+50.00 -L-
71.00' LT
+60.00 -L-
R/W
50.00' LT
+20.00 -L-
NOTES:
PAVEMENT SCHEDULE
E1PROP. APPROX. 5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,
AT AN AVERAGE RATE OF 570 LBS. PER SQ. YARD.
E3PROP. VARIABLE DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER INCH. DEPTH TO BE PLACED
ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE
T EARTH MATERIAL
IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 5.5" IN DEPTH.
C1
T
C -L-L
0.08 0.08
GRADE TO THIS LINET
ORIGINAL GROUND
GRADEPOINT
E1
5'-0"
* 6'-0"
2'-0"
5'-0"
8"
C2
C3 AT AN AVERAGE RATE OF 112 LBS. PER SQ. YARD PER INCH. DEPTH TO BE PLACEDIN LAYERS NOT LESS THAN 1.5" IN DEPTH OR GREATER THAN 2" IN DEPTH.
3:1
2:1
10'-0" 10'-0"
2A-1
6'-0"
2:1
1:1 1:1
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.SHEET NO.PROJECT REFERENCE NO.
ROADWAY DESIGNENGINEER
6/2/99
08-J
AN-2018 13:2
8\
Road
way\
Proj\5400127_rdy_typ.d
gn
HN
TB
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TYPICAL SECTION NO. 2
USE TYPICAL SECTION NO. 2 FROM:
*6'-0"
2'-0"
MIN.
U
MIN.
Detail Showing Method of Wedging
C SURVEY L
USE TYPICAL SECTION NO. 1 FROM:
T
C -L-L
0.08 0.08
GRADE TO THIS LINE
T
ORIGINAL GROUND
TYPICAL SECTION NO. 1
GRADEPOINT
E2
5'-0"
2'-0"
5'-0"
2'-0"
C1
10'-0" 10'-0"
.02.02
2:1 2:1
EXISTING EXISTING
E2WU
1:1 1:1
3" 3"
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD IN EACH OF TWO LAYERS.C2
PROP. APPROX. 1 1/2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD.
E2
-L- STA 13+50.00 TO STA 15+00.00-L- STA 10+50.00 TO STA 12+00.00
PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,
AT AN AVERAGE RATE OF 342 LBS. PER SQ. YARD IN EACH OF TWO LAYERS.
7.5 "
C3C1 C1E3E3
PROP. VARIABLE DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B
*3'-0" *3'-0"
*6'-0" *6'-0"
*3'-0" *3'-0"
.02 .02
-L- STA 12+00.00 TO STA 13+50.00
* INCREASED PAVED AND GRASS SHOULDERS TO ACCOMMODATE GUARDRAIL PLACEMENT.
17BP.12.R.19
T
C -L-L
0.08
T
ORIGINAL GROUND
GRADEPOINT
W
C2
10'-0" 10'-0"
1:11:1
3'-0" 3'-0"
.005
CULVERT DETAIL
0.08.020
W
U
WEDGING (SEE DETAIL)
EXISTING PAVEMENT
(FINAL)
(USE WITH TYPICAL SECTION NO. 1)
N
ORTH ROLIN
A
DO
U
GLAS M.WH
EA
TEY
L
AC
P
ESSIONAL
FOR
NEERNGI
E
SEAL36786
CENTERLINE CULVERT -L- STA 12+79.36 (SEE CULVERT PLANS)
12" - Foundation conditioning Material (See culvert plans)
DocuSign Envelope ID: F7317B1B-8487-49F4-8BC5-E3C389D6F59C
1/8/2018
GUARDRAIL SUMMARY
"N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL.
TOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT.
FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL.
W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL.
LENGTH
SHOP
CURVED
DOUBLE
FACED
WARRANT POINT
APPROACH
END
TRAILING
END
DIST.
FROM
E.O.L.
TOTAL
SHOUL.
WIDTH
FLARE LENGTH
APPROACH TRAILING APPROACH TRAILING
END END END END
W ANCHORS
REMARKS
"N"
STRAIGHT
SURVEY
LINEBEG. STA. END STA. LOCATION
XIM-350 XIII VI
MODBICCAT-1
12/06/07
AT-1
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
TYPE 350
ATTENUATOR
IMPACT
GUARDRAIL
FACED
SINGLE
GUARDRAIL
EXISTING
REMOVE
GUARDRAIL
EXISTING
STOCKPILE
AND
REMOVE
EA G NG
G = GATING IMPACT ATTENUATOR TYPE 350
NG = NON-GATING IMPACT ATTENUATOR TYPE 350
COMPUTED BY:
CHECKED BY: DATE:
DATE: SHEET NO.PROJECT REFERENCE NO.
12-
DE
C-2017 07:11
\Road
way\
Proj\5400127_
RD
Y_S
UM.d
gn
HN
TB
STATION
SUMMARY OF EARTHWORK
STATIONEXCAV.UNCL.
+%EMBANK. BORROW WASTE
SAY:
GRAND TOTALS:
PROJECT TOTALS:
SUBTOTALS:
STATIONSTATION
SAY:
LINESURVEY
2
YD
PAVEMENT REMOVAL SUMMARY
LT/ RT/ CLLOCATION
TOTAL:
PERM.
DRAIN.
EASE.
PROPERTY OWNERS NAMES
NO.
PARCEL
ROW AREA DATA SUMMARY
17BP.R.12.19 3B-1
MOD IIITYPE
SUBTOTAL:
ANCHOR DEDUCTIONS:
GRAU 350: 3@50'
TYPE AT-1:[email protected]'
TOTAL:
SAY:
5 ADDITIONAL POST
05/25/17
11/29/17
D.I. STD. 840.14
OR STD. 840.15
G.D.I. TYPE "A" STD. 8
40.17
OR 840.2
6
G.D.I. TYPE "B" STD. 8
40.18
OR 840.2
7
G.D.I. TYPE "D" STD. 8
40.19
OR 840.2
8
J.B. STD. 840.3
1 O
R 840.3
2
G.D.I. FR
AM
E
WIT
H
GR
ATE STD. 840.2
2
G.D.I. FR
AM
E
WIT
H
TW
O
GR
ATES STD. 840.2
2
G.D.I. (N.S.) F
RA
ME
WIT
H
GR
ATE STD. 840.2
4
G.D.I. (N.S.) F
RA
ME
WIT
H
TW
O
GR
ATES STD. 840.2
4
D.I. FR
AM
E
&
GR
ATE STD. 840.16
PIP
E RE
MO
VA
L LIN.F
T.
CO
NC.
CO
LLA
RS C
L. "B" C.Y. STD 840.7
2
CO
NC.
&
BRIC
K PIP
E PLU
G,
C.Y. STD. 840.7
1
SIZE A B
QU
AN
TITIE
S
FO
R
DR
AIN
AG
E
STR
UC
TU
RES
ENDWALLS
STATION
STR
UC
TU
RE
NO.
R.C.P.
C.S.P.
.109
.079
.109
.064
.064
.064
.064
.079
PER E
AC
H (0' TH
RU 5.0')
5.0' TH
RU 10.0'
10.0'
AN
D
AB
OVE
* TO
TA
L L.F. FO
R P
AY
QU
AN
TIT
Y S
HA
LL BE C
OL.
'A' + (1.3
X C
OL.'
B')
FR
OM
TO
TYPE OF GRATE
FE GC.B. STD. 840.0
1
OR STD. 840.0
2
ABBREVIATIONS
LO
CA
TIO
N (L
T,R
T,
OR C
L)
REMARKS
12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48"
STANDARD 840.03
AND HOOD
FRAME, GRATES
18" SID
E
DR
AIN
PIP
E CU. YDS.
15" SID
E
DR
AIN
PIP
E
24" SID
E
DR
AIN
PIP
E
OR GAUGE
THICKNESS
*FT.
LIN.
TO
P ELE
VA
TIO
N
INVERT ELE
VA
TIO
N
INVERT ELE
VA
TIO
N
SLO
PE C
RITIC
AL
LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48" & UNDER)
C.B.
N.D.I.
D.I.
J.B.
M.H.
CATCH BASIN
NARROW DROP INLET
DROP INLET
JUNCTION BOX
MANHOLE
TRAFFIC BEARING DROP INLETT.B.D.I.
T.B.J.B. TRAFFIC BEARING JUNCTION BOX
STD. 838.80
OR
STD. 838.11
STD. 838.01,
OTHERWISE)
NOTED
(UNLESS
G.D.I. GRATED DROP INLET
G.D.I. (N.S.)(NARROW SLOT)GRATED DROP INLET
(UNLESS NOTED OTHERWISE)
BITUMINOUS COATED C.S. PIPE TYPE B
12" 15" 18" 24" 30" 36" 42" 48"
HDPE PIPE, TYPE S OR D
OR
ALUMINIZED C.S. PIPE, TYPE IR
OR
CLASS III R.C. PIPE
TB
GR
ATE
D
D.I., T
YPE 'B' STD. 840.3
5
T.B.D.I. (N.S.) F
RA
ME
AN
D
TW
O
GR
ATES STD. 840.2
9
TOTAL
EASE.
CONST.PERM.
UTILITY EASE.
DRAINAGE
PERM.
EASE.
UTILTIY
CAAP
.064
.079
.109
Earthwork quantities are calculated by the Roadway Design Unit. These earthwork quantities are
based in part on subsurface data provided by the Geotechnical Engineering Unit.
MONICA DUVAL
1
2
GREU
TL-3
-L- STA 10+50.00 214 45 169
-L- STA 15+00.00 238 411
452 456 169
452 456 169
WASTE IN LIEU OF BORROW -169 -169
452 456 4
462
-L- 12+00.00 12+75.87 CL
CL13+00.22 13+50.00
257
270
GENE B. SAIN 3999.88 S.F. 1436.32 S.F.
WALTER NELSON CRISMAN LIFE EST 1325.92 S.F.
-L- STA 11+62.50 STA 13+62.50 RT 200.00' 3' 6' 50' 1' 2
STA 12+29.30 STA 14+15.38 LT 162.50' 37.50' STA 12+88 CULVERT
STA 12+70 CULVERT
3' 6' 50' 1' 1 1
37.50'362.50'
-150'
-6.25'
206.25'
212.50'
37.50'
50'
3 1
3 1
-L- 12+47.48 LT REMOVE 21' OF 18" RCP
-L-
-L-
1363.63 S.F.
TEMPORARY
DRAIN.
EASE.
83.87 S.F.
BEGIN CULVERT-L- STA 12+61.84
END CULVERT-L- STA 12+79.36
21
21
156
101
will be paid for at the contract lump sum price for "Grading." Clearing and Grubbing, and Removal of Existing Pavement
Note: Approximate quantities only. Unclassified Excavation, Borrow, Fine Grading,
173
173
173
0
10
DOUGLAS M. WHEATLEY, PE
40
40
REMOVE
SEE DETAIL 2
SPECIAL LAT. 'V' DITCH
SEE DETAIL 4
CULVERT CHANNEL IMPROVEMENTS
SEE DETAIL 5
CULVERT CHANNEL IMPROVEMENTS
EST. 9 TONS
EST. 11 SYGF
SEE DETAIL 3
RIP RAP AT EMBANKMENT
SEE DETAIL 2
SPECIAL LAT. 'V' DITCH
EST. 8 TONS
EST. 9 SYGF
SEE DETAIL 3
RIP RAP AT EMBANKMENT
RETAIN
RETAIN
EST. 11 TONS
EST. 13 SYGF
SEE DETAIL 3
RIP RAP AT EMBANKMENT
EST. 5 TONS
EST. 6 SYGF
SEE DETAIL 3
RIP RAP AT EMBANKMENT
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
Slope
FillSlope
Fill
SEE DETAIL 2
DITCH
SPECIAL LAT. 'V'
18"
Grade
Ditch?
GEOTEXTILE
RE
VISIO
NS
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
8/17/99
12-
DE
C-2017 07:15
\Road
way\
Proj\5400127_rdy_psh4.d
gn
HN
TB
910
920
930
940
10+00 11+00 12+00 13+00 14+00 15+00
910
920
930
940
17BP.12.R.19 4
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
NA
D 83/ N
A 2011
ELEV. = 928.24RR SPIKE IN BASE OF 18" BLACK WALNUT TREEBM #1
-L-
-L- POC STA 10+50.00
BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00
END TIP PROJECT 17BP.12.R.19
**
**
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
= 1300
= 25
= 928.6
= 2265
= 100
= 929.2
= 900
=
TRAFFIC CONTROL DESIGN ENGINEERJ. A. PHILLIPS
R. B. EARLY, PE TRAFFIC CONTROL PROJECT ENGINEER
SEAL
NO
RTH CAROL
INA
RH
ON
DA B. EA
R
LY
PR
OFE
SSION
AL
ENGINEE
R
023521
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Ste 200
HNTB NORTH CAROLINA, P.C.
STATE OF NORTH CAROLINADIVISION OF HIGHWAYS TMP-1
SHEET NO.
HN
TB
...\
TC
P\
BR12
7_tc_t
mp_01_title.d
gn
1/5/2018
TIP P
ROJE
CT:
INDEX OF SHEETS
SHEET NO. TITLE
TRANSPORTATION MANAGEMENT PLAN
APPROVED:
DATE:
SEAL
17B
P.12.R.19
LOCATION:
ROADWAY STANDARD DRAWINGS
TITLE
PART OF THESE PLANS:
TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A
TRANSPORTATION - RALEIGH, N.C. DATED JAN 2018 ARE APPLICABLE
STANDARD DRAWINGS" PROJECT SERVICES UNIT - N.C. DEPARTMENT OF
THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY
1101.03 TEMPORARY ROAD CLOSURES
1101.11 TRAFFIC CONTROL DESIGN TABLES
1110.01 STATIONARY WORK ZONE SIGNS
1145.01 BARRICADES
1205.01 PAVEMENT MARKINGS - LINE TYPES & OFFSETS
1205.02 PAVEMENT MARKINGS - 2 LANE & MULTILANE ROADWAYS
STD. NO.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
1250.01 RAISED PAVEMENT MARKERS - INSTALLATION SPACING
1251.01 RAISED PAVEMENT MARKERS - PERMANENT AND TEMPORARY
LINCOLN COUNTY
REPLACE BRIDGE NO. 127 OVER HOWARDS CREEK
ON SR 1199 (TRINITY CHURCH ROAD)
DE
PA
RT
ME
NT
OF TRANSP
O
RT
ATIO
N
ST
A
TE
OFNORTH
CA
RO
LIN
A
NCDOT CONTACTS:
Jimmy Hamrick, PE
Byron Engle, PE DIVISION 12 - DIVISION TRAFFIC ENGINEER
DIVISION 12 - REGIONAL TRAFFIC ENGINEER
GENERAL NOTES, PHASING AND DETOUR SIGNINGTMP-2
DRAWINGS
AND LIST OF APPLICABLE ROADWAY STANDARD
TITLE SHEET, VICINITY, INDEX OF SHEETSTMP-1
VICINITY MAP
OFFSITE DETOUR
TIP P
ROJE
CT:17
BP.12.R.19
VALE
SQUARECAT
1113
1199
11231125
1002
1210
1209
1207
1113
1199
LINCO
LN CO
UNTY
CATAW
BA CO
UNTY
LIMITSPROJECT
HO
WARD
SCREEK
100
%
SU
BMIT
TA
L
3. DESIGN EXCEPTION NEEDED FOR HORIZONTAL CURVE (167.15'), HORIZONTAL SSD (200'), VERTICAL SAG (K = 40) AND VERTICAL SSD (305')
2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
NOTES:
See Sheet 1B-1 for Symbology SheetSee Sheet 1A-1 For Index of Sheets
DocuSign Envelope ID: 63AE28C3-BC05-486A-BF7A-7059A7E2B3ED
1/5/2018
PAVEMENT MARKING
SEE INSET FOR
INSET
OTHERWISE NOTED IN THE PLAN OR DIRECTED BY THE ENGINEER.
THE DURATION OF THE CONSTRUCTION PROJECT EXCEPT WHEN
THE FOLLOWING GENERAL NOTES APPLY AT ALL THE TIMES FOR
DIRECTED BY THE ENGINEER.
SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS
OF DEVICES. MODIFICATIONS MAY INCLUDE: MOVING,
OR RESULT IN THE DUPLICATE OR UNDESIRED OVERLAPPING
DETAILS ARE NOT ATTAINABLE TO MEET FIELD CONDITIONS
THE DETAIL DRAWINGS, STANDARD DETAILS AND ROADWAY
CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN
GENERAL NOTES PHASING
BY THE ENGINEER.
WHEN A LANE CLOSURE IS NO LONGER NEEDED OR AS DIRECTED
IS NOT BEING PERFORMED BEHIND THE LANE CLOSURE OR
A) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK
LANE AND SHOULDER CLOSURE REQUIREMENTS
PRIOR TO ANY TRAFFIC PATTERN ALTERATION.
B) NOTIFY THE ENGINEER TWENTY ONE (21) CALENDAR DAYS
TRAFFIC PATTERN ALTERATIONS
ROADWAY.
R11-2 ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE
F) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN
TRAFFIC CONTROL DEVICES
ROAD
CLOSED
R11-2
48'' x 30''
TYPE III BARRICADE
DETOUR
END
24'' X 18''
M4-8 A
M6-1
21'' X 15''21'' X 15''
M6-1 L
M4-8
24'' X 12''
DETOUR M4-824'' X 12''
DETOUR
AB
C
1 2
3
M4-10R
R11-4
60'' x 30''
DETOUR 48" x 18"
ROAD CLOSED
THRU TRAFFIC
TO
TYPE III BARRICADE
TMP-2
M4-10L
R11-4
60'' x 30''
DETOUR 48" x 18"
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III BARRICADE
ALTERING ANY TRAFFIC PATTERN.
E) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO
DETOUR WHEN THE DETOUR IS NOT IN OPERATION.
COVER OR REMOVE ALL SIGNS REQUIRED FOR THE OFF-SITE
THE ROAD WHEN ROAD CLOSURE IS NOT IN OPERATION.
D) COVER OR REMOVE ALL SIGNS AND DEVICES REQUIRED TO CLOSE
AS SHOWN ON THIS SHEET.
PROVIDE SIGNING REQUIRED FOR THE OFF-SITE DETOUR ROUTE
CONTROL PLANS.
ACCORDING TO THE ROADWAY STANDARD DRAWINGS AND TRAFFIC
C) PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE THE ROAD
SIGNING
1
1
2
2
3
3
B
C
A
AND DETOUR SIGNING
PHASING
GENERAL NOTES,
APPROVED BY THE ENGINEER.
J) PASSING ZONE WILL BE DETERMINED IN THE FIELD AND MUST BE
I) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS.
MARKING LINES.
H) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT
SR 1199 (TRINITY CHURCH RD) PAINT SNOWPLOWABLE
ROAD NAME MARKING MARKERS
G) INSTALL PAVEMENT MARKINGS ON THE FINAL SURFACE AS FOLLOWS:
PAVEMENT MARKING AND MARKERS
THE ROAD FOR DETOUR INSTALLATION.
CONTACT PHIL EAKER AT 980-552-4122 TWO WEEKS PRIOR TO CLOSING
WILL INSTALL MARKINGS AND MARKERS ON THE FINISHED PROJECT.
AND TYPE III BARRICADES AT THE PROJECT LIMITS. STATE FORCES
K) STATE FORCES WILL INSTALL AND MAINTAIN THE PROJECT DETOUR
TRINITY CHURCH RD) TO TRAFFIC.
REMOVE BARRICADES AND DETOUR SIGNS AND OPEN -L- (SR 1199 /
RSD 1205.01, 1205.02, 1205.12, 1250.01 AND 1251.01.
PAVEMENT MARKINGS AND MARKERS IN ACCORDANCE WITH
UPON COMPLETION OF CULVERT AND ROADWAY, PLACE FINAL
PHASE III
THE PROJECT LIMITS.
OF SURFACE COURSE. MAINTAIN ACCESS TO DRIVEWAYS WITHIN
CULVERT AND ROADWAY UP TO AND INCLUDING THE FINAL LAYER
(SR 1199 /TRINITY CHURCH RD) TO TRAFFIC AND CONSTRUCT
USING OFF-SITE DETOUR, UNCOVER DETOUR SIGNS, CLOSE -L-
PHASE II
RSD 1101.03 (SHEET 1 OF 9).
OFF-SITE DETOUR SIGNS AS SHOWN AND IN ACCORDANCE WITH
PRIOR TO ANY CONSTRUCTION OPERATIONS, PLACE AND COVER
PHASE I
LINCO
LN CO
UNTY
CATAW
BA CO
UNTY
-L- STA 10+50+/-
-L- STA 15+00+/-
D
R11-4
60'' x 30''
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III BARRICADE
D
A
A
17BP.12.R.19
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
48'' X 48''MEDIUM TEXT LARGE TEXTSMALL TEXT
CONDITIONS. (SEE TSD-2)
MOTORIST TO NEW INTERSECTION
DEVICES AND MARKINGS TO ALERT
USE ADDITIONAL TRAFFIC MANAGEMENT
SE
E
SH
EE
T
TM
P-
XX
-L-
ST
A
XX
+00
+/-
MA
TC
HLI
NE
SURRETT DR
SEAL
NO
RTH CAROL
INA
RH
ON
DA B. EA
R
LY
PR
OFE
SSION
AL
ENGINEE
R
023521
NOTE: ALL LANE WIDTHS ARE 11' UNLESS OTHERWISE SHOWN.
REMOVE CONFLICTING PAVEMENT MARKING.
REFER TO SHEETS TMP-XX & TMP-XX FOR CUT SECTION(S).
MEDIUM TEXT
LARGE TEXT
HN
TB
...\
TC
P\
BR12
7_tc_t
mp_02_deto
ur.d
gn
1/5/2018
SHEET NO.PROJ. REFERENCE NO.
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
MANAGEMENT PLAN
TRANSPORTATION
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
DE
PA
RT
ME
NT
OF TRANSP
O
RT
ATIO
N
ST
A
TE
OFNORTH
CA
RO
LIN
A
VICINITY MAP
OFFSITE DETOUR
TIP P
ROJE
CT:17
BP.12.R.19
100
%
SU
BMIT
TA
L
See Sheet 1B-1 for Symbology SheetSee Sheet 1A-1 For Index of Sheets
(TRINITY CHURCH RD)
SR 1199
(REE
PSVI
LLE
RD)
SR 1
113
(S
AI
N
MI
LLI
NG
RD)
SR 1209
(HOUSER RD)
SR 1125
(Z
UR LE
ON
AR
D
RD)
SR 1123
(CAT SQUARE RD)
SR 1002
(TRINITY CHURCH RD)
SR 1199
CENTERLINE
4" DOUBLE YELLOW
EDGELINE
4" WHITE
(L
EA
TH
ER
MA
N
RD)
SR 1207
(PLATEAU RD)
SR 1210
(GILBERT SAIN
RD)SR 1210
PHASE II
DocuSign Envelope ID: 63AE28C3-BC05-486A-BF7A-7059A7E2B3ED
1/5/2018
4
VICINITY MAP
OFFSITE DETOUR
LINCOLN COUNTY
REPLACE BRIDGE NO. 127 OVER HOWARDS CREEK
ON SR 1199 (TRINITY CHURCH ROAD)
GRADING, DRAINAGE, PAVING AND CULVERT
25 50 10050
25 50 10050
5 10 2010
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:
09/08/99
17BP.12.R.19DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
11/30/2017
...\
540012
7_hy
d_
EC_tsh.d
gn
HN
TB CO
NT
RA
CT:
TIP P
ROJE
CT:17
BP.12.R.19
Prepared in the Office of:
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
-L- POC STA 10+50.00BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00END TIP PROJECT 17BP.12.R.19
SR 1199 (TRINITY CHURCH ROAD)
-L-
ROADREEPSVILLETO
TO
HW
Y 10
VALE
SQUARECAT
1113
1199
11231125
1002
1210
1209
1207
1113
1199
LINCO
LN CO
UNTY
CATAW
BA CO
UNTY
LIMITSPROJECT
**3. DESIGN EXCEPTION NEEDED FOR HORIZONTAL CURVE (167.15') AND VERTICAL SAG (K = 40)
2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
NOTES:
HO
WARD
SCREEK
CERTIFICATION #3633
LEVEL III
EROSION CONTROL
ALLEN HODGES, E.I.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
ROADSIDE ENVIRONMENTAL UNIT
WATER QUALITY.DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OFPERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA REGULATIONS SET FORTH BY THE NCG-010000 GENERAL CONSTRUCTIONTHESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH THE
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
1634.01
1634.02
1635.01
1605.01
1630.01
1606.01
1622.01
1635.02
1604.01
1607.01
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
1630.05
1630.04
1630.03
1630.02
1630.06
1631.01
1632.02
1632.01
1632.03
1633.01
1633.02
1640.01
1645.01
Railroad Erosion Control Detail
Temporary Silt Fence
Special Sediment Control Fence
Gravel Construction Entrance
Temporary Berms and Slope Drains
Riser Basin
Silt Basin Type B
Temporary Silt Ditch
Stilling Basin
Temporary Diversion
Special Stilling Basin
Matting Installation
Rock Inlet Sediment Trap Type A
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type C
Temporary Rock Silt Check Type A
Temporary Rock Silt Check Type B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type BRock Pipe Inlet Sediment Trap Type A
Rock Pipe Inlet Sediment Trap Type B
Coir Fiber Baffle
Temporary Stream Crossing
EROSION AND SEDIMENT CONTROL MEASURESTemporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
TSD
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-ATemporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. # Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.031630.051605.01
1622.01
1633.01
1634.011634.021635.011635.021630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-ARock Pipe Inlet Sediment Trap Type-B
1606.01 Special Sediment Control Fence
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A withMatting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattlewith Polyacrylamide (PAM)
EC-1
HIGHWAY EROSION CONTROLPLAN FOR PROPOSED
2018 STANDARD SPECIFICATIONS
10.0' S
OIL
15" RCP
15" RCP
HO
WA
RD
S
CR
EE
K
TRIB. 7
LC 2 @ 15'-0" x 6'-6" RCBC
-L- STA 12+79.36
NSRS 2007
NA
D 83/
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
ISOMETRIC VIEW
A
A
MATERIAL
FILL
OF FILL
TOE
FILL SLOPE
A
A
FENCE
SILT
GRADE
ROAD
WATTLE
SILT FENCE
2 FT.
SILT FENCE POSTPOST
SILT FENCE
STAKE
2' WOODEN
2"
10"-11"
SIDE VIEW
STAPLE
9 FT.
VIEW FROM SLOPE
DOWNSLOPE STAKE
UPSLOPE STAKE
SEE INSET A
12" WATTLE
12" WATTLE
1"-2" TRENCH
INSET A
SILT FENCE COIR FIBER WATTLE BREAK DETAIL
STANDARD SPECIFICATIONS.
INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE
WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED.
WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF
U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
ANGLE TO WEDGE WATTLE TO GROUND.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
DO NOT PLACE WATTLE ON TOE OF SLOPE.
EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED.
LENGTH OF 10 FT.
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE AND
NOTES:
1'
4 FT.
17BP.12.R.19 EC-2
FLOW
A A
WIDTH
PLAN
SECTION A-ASECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
12"
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIORCLASS B STONE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
NOT TO SCALE
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
H = 2' MIN
1' MIN
1' MIN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
NOTES:
EC-2A17BP.12.R.19
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP12.R.19 EC-2B
ELEVATION VIEW
NATURAL GROUND
NATURAL GROUND
FLOW
1' MIN.
1' MIN.
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
12" MIN.
SILT BASINOPTIONAL TYPE "B" 4'-6"
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVE
MENT
SHLD.
DITCH CHECKTEMP. STONE
SLOPEBACK
SLOPE
DITCH
TRAPSEDIMENT12"
STRUCTURAL STONE
BASE OF DITCH
TEMPORARY ROCK SILT CHECK TYPE 'B' DETAIL
GRADE LESS THAN 3%.
ONE (1) ACRE DRAINAGE AREA AND A DITCH
CLASS "A" STONE FOR SITES HAVING LESS THAN
THE ENGINEER MAY DIRECT THE OPTION OF
STRUCTURAL STONE.
USE CLASS 'B' EROSION CONTROL STONE FOR
NOTES:
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.12.R.19 EC-2C
NATURAL GROUND
NATURAL GROUND
FLOW
2'(MAX.)
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVE
MENT
SHLD.
SLOPEBACK
SLOPE
DITCH
STAKE2' UPSLOPE
MATTING
STAKE2' DOWNSLOPE
STAKE2' UPSLOPE
MATTING
STAKE2' DOWNSLOPE
TOP VIEW
6'(MIN.)
12"(MIN.)
STAKEUPSLOPE
STAKEDOWNSLOPE
MATTING
MATTING
See Inset C
INSET C
See Inset B
INSET B
STAPLES
VAR.
2'(MIN.)
2 IN.
See Inset A
INSET A
STAKES
PAM
PAM(1 OZ.)
(1 OZ.)
POLYACRYLAMIDE (PAM) DETAILCOIR FIBER WATTLE WITH
PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN.
WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY
INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE
TO BE APPLIED TO EACH WATTLE.
LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS.
AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE
U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
TO WEDGE WATTLE TO BOTTOM OF DITCH.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE
WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE.
NOTES:
COIR FIBER WATTLE
FLOW
PAM(2 OZ.)
PAM(1 OZ.)
PAM(1 OZ.)
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-2D
NATURAL GROUND
NATURAL GROUND
FLOW
2'(MAX.)
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVE
MENT
SHLD.
SLOPEBACK
SLOPE
DITCH
STAKE2' UPSLOPE
MATTING
STAKE2' DOWNSLOPE
STAKE2' UPSLOPE
MATTING
STAKE2' DOWNSLOPE
TOP VIEW
6'(MIN.)
12"(MIN.)
STAKEUPSLOPE
STAKEDOWNSLOPE
MATTING
MATTING
See Inset B
INSET B
STAPLES
VAR.
2'(MIN.)
2 IN.
See Inset A
INSET A
STAKES
17BP.12.R.19
COIR FIBER WATTLE DETAIL
STANDARD SPECIFICATIONS.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT
CROSS SECTION.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE.
NOTES:
COIR FIBER WATTLE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
ISOMETRIC VIEW
17BP.12.R.19
A MATERIAL
FILL
OF FILL
TOE
A
GRADE
ROAD
WATTLE
2 FT.
UPSLOPE STAKE
FRONT VIEW
STAKE
2' WOODEN
2"
15"-16"
TOP VIEW
EC-2E
DOWNSLOPE STAKE
TOE OF FILL
18" WATTLE
18" WATTLESEE INSET A
2"-3" TRENCH
INSET A
FILL SLOPE
COIR FIBER WATTLE BARRIER DETAIL
FOR BREAKS ALONG LARGE SLOPES, USE MAXIMUM SPACING OF 25 FT.
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
CROSS SECTION.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
DO NOT PLACE WATTLES ON TOE OF SLOPE.
EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED.
WATTLE AND LENGTH OF 10 FT.
USE MINIMUM 18 IN. NOMINAL DIAMETER COIR FIBER (COCONUT)
NOTES:
1'
4 FT.
SHEET NO.PROJECT REFERENCE NO.
EC-3
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
4
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
TOTAL
SAY
SIDESTATION
TO
STATION
FROM LINE
SHEET NO.
CONSTESTIMATE (SY) STATION
TOSIDESTATION
FROM LINE
SHEET NO.
CONSTESTIMATE (SY)
MATTING FOR EROSION CONTROL PERMANENT SOIL REINFORCEMENT MAT
11+50 12+85 RT 85
1560
1800
1800
17BP.12.R.19
4 15+00 RT
-L-
-L- 155
240
12+80
SUBTOTAL
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
17BP.12.R.19
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYSIF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3A
920
920
920
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
935
935
935
935
935
935
935
935
935
935
935
935
935
935
935
935
935
940
940
940
940
940
940
940
940
940
940
940
940
940
940
940
940
945
945
945
945
945
945
945
945
945
945
945
945
945
945
950
950
950
950
950
950
950
950
950
950
950
950
955
955955
955
955
955
955
955
955
955
960
960
960
965
965
TRINITY CHURCH ROAD (SR 1199)
TO REEPSVILLE ROAD
TO H
WY 10
18" RCP
INV=9
29.66'
INV=9
29.05'
INV=925.49'
INV=925.80' SEAT=927.12'
SEAT=927.29'
SEAT=926.80'
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
927.07'
SEAT=
19.0' BST
10.0' S
OIL
15" RCP
BM #1
EXISTING R/W
EXISTING R/W
60.0
0'
GENE B SAIN
DB 705 PG 193
CRISMAN LIFE EST
WALTER NELSON
DB 2126 PG 403
CRISMAN LIFE EST
WALTER NELSONGENE B SAIN
DB 705 PG 193DB 2126 PG 403
15" RCP
TO
B
TO
B
TO
B
TO
B
CERTIFICATION #3633
LEVEL III
EROSION CONTROL
ALLEN HODGES, E.I.
17BP.12.R.19
NOTES: 1. THE CONTRACTOR SHALL INSTALL SPECIAL SEDIMENT CONTORL FENCE OR
WATTLES IN LOW AREAS OF SILT FENCE AND UNDER THE BRIDGE,
AS NEEDED OR DIRECTED BY THE ENGINEER.
2. THE OUTSIDE BUFFER, WETLAND OR WATER BOUNDARY SHALL BE CLEARLY
MARKED BY HIGHLY VISIBLE FENCING (ORANGE SAFETY FENCE).
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
EC-4/CONST.4
RE
VISIO
NS
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
8/17/99
11/30/2017
...\
5400127_hyd_
EC_psh4.d
gn
HN
TB
910
920
930
940
10+00 11+00 12+00 13+00 14+00 15+00
910
920
930
940
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
NA
D 83/ N
A 2011
ELEV. = 928.24RR SPIKE IN BASE OF 18" BLACK WALNUT TREEBM #1
-L-
-L- POC STA 10+50.00
BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00
END TIP PROJECT 17BP.12.R.19
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
= 1300
= 25
= 928.6
= 2265
= 100
= 929.2
= 900
=
919
919
920
920
920
920
921
921
921
921
921
921
921
921
922
922
922
922
922
922
922
922
922
922
922
922
922
923
923
923
923
923
923
923
923
923923
923
923
923
923
923
923
923
923
923
923
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926926
926
926
926
926
926
926
926
926
926
926
926
926
927
927
927
927
927
927
927
927 927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
928
928
928
928
928
9289
28
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929 92
9
929
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
93093
0
931
931
931
931
931
931
931
932
932
932
932
932
932
932
933
933
933
933
933
933
933
934
934
934
934
934
934
935
935
935
935
935
935
935
935
935
935
936
936
936
936
936
936
937
937
937
937
937
938
938
938
938
938
939
939
939
939
940
940
940
940
940
940
940
940
941
941
941
941
942
942
942
942
943
943
943
943
943
944
944
944
945
945
945
945
945
946
946
947
947
948
948
949
950
950
951
952
953
954
955
955
956
957
958
960
961
962
966
919
919
920
920
920
920
921
921
921
921
921
921
921
921
922
922
922
922
922
922
922
922
922
922
922
922
922
922
923
923
923
923
923
923
923
923
923923
923
923
923
923
923
923
923
923
923
923
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
924
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
925
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926
926926
926
926
926
926
926
926
926
926
926
926
926
926
927
927
927
927
927
927
927
927 927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
927
928
928
928
928
928
9289
28
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
928
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929
929 92
9
929
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
930
93093
0
931
931
931
931
931
931
931
932
932
932
932
932
932
932
933
933
933
933
933
933
933
934
934
934
934
934
934
935
935
935
935
935
935
935
935
935
935
936
936
936
936
936
936
937
937
937
937
937
938
938
938
938
938
939
939
939
939
940
940
940
940
940
940
940
940
941
941
941
941
942
942
942
942
943
943
943
943
943
944
944
944
945
945
945
945
945
946
946
947
947
948
948
949
950
950
951
952
953
954
955
955
956
957
958
960
961
962
966
18" RCP
15" RCP
EXISTING R/W
EXISTING R/W
15" RCP
HO
WA
RD
S
CR
EE
K
TRIB. 7
18" RCP
15" RCP
EXISTING R/W
EXISTING R/W
15" RCP
HO
WA
RD
S
CR
EE
K
TRIB. 7
NA
D 83/ N
A 2011
NA
D 83/ N
A 2011
TOB
TOB
TOB
TOB
TOB
TOB
TOB
TOB
DIKE A
IMPERVIOUS
DIKE A
IMPERVIOUS
DIKE B
IMPERVIOUS
DIKE B
IMPERVIOUS
3. CONSTRUCT PORTION OF UPSTREAM AND DOWNSTREAM CHANNEL IMPROVEMENTS FOR THE WESTERN BARREL.
1. INSTALL IMPERVIOUS DIKE A AND DEWATER CONSTRUCTION AREA INTO SPECIAL STILLING BASIN(S) AS NEEDED.
2. CONSTRUCT WESTERN BARREL OF THE PROPOSED CULVERT.2. CONSTRUCT THE EASTERN BARREL OF THE PROPOSED CULVERT.
3. CONSTRUCT THE REMAINDER OF THE UPSTREAM AND DOWNSTREAM CHANNEL IMPROVEMENTS.
1. REMOVE IMPERVIOUS DIKE A AND INSTALL IMPERVIOUS DIKE B. DIVERT FLOW TO NEWLY
CONSTRUCTED WESTERN BARREL.
4. REMOVE IMPERVIOUS DIKE B AND ALLOW FLOW THROUGH CULVERT.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
PHASE I PHASE II
CULVERT CONSTRUCTION SEQUENCE STA. 12+79.36 -L-
17BP.12.R.19 EC-5/CONST.4
TRINITY CHURCH ROAD (SR 1199)
TO REEPSVILLE ROAD
TO H
WY 10
18" RCP
INV=9
29.66'
INV=9
29.05'
INV=925.49'
INV=925.80' SEAT=927.12'
SEAT=927.29'
SEAT=926.80'
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
927.07'
SEAT=
19.0' BST
10.0' S
OIL
15" RCP
BM #1
EXISTING R/W
EXISTING R/W
60.0
0'
GENE B SAIN
DB 705 PG 193
CRISMAN LIFE EST
WALTER NELSON
DB 2126 PG 403
CRISMAN LIFE EST
WALTER NELSONGENE B SAIN
DB 705 PG 193DB 2126 PG 403
15" RCP
TO
B
TO
B
TO
B
TO
B
CERTIFICATION #3633
LEVEL III
EROSION CONTROL
ALLEN HODGES, E.I.
17BP.12.R.19
NOTES: 1. THE CONTRACTOR SHALL INSTALL SPECIAL SEDIMENT CONTORL FENCE OR
WATTLES IN LOW AREAS OF SILT FENCE AND UNDER THE BRIDGE,
AS NEEDED OR DIRECTED BY THE ENGINEER.
2. THE OUTSIDE BUFFER, WETLAND OR WATER BOUNDARY SHALL BE CLEARLY
MARKED BY HIGHLY VISIBLE FENCING (ORANGE SAFETY FENCE).
EC-6/CONST.4
RE
VISIO
NS
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
8/17/99
11/30/2017
...\
5400127_hyd_
EC_psh4.d
gn
HN
TB
910
920
930
940
10+00 11+00 12+00 13+00 14+00 15+00
910
920
930
940
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
NA
D 83/ N
A 2011
ELEV. = 928.24RR SPIKE IN BASE OF 18" BLACK WALNUT TREEBM #1
-L-
-L- POC STA 10+50.00
BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00
END TIP PROJECT 17BP.12.R.19
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
= 1300
= 25
= 928.6
= 2265
= 100
= 929.2
= 900
=
HO
WA
RD
S
CR
EE
K
10.0’ S
OIL
VICINITY MAP
OFFSITE DETOUR
-L- POC STA 10+50.00BEGIN TIP PROJECT 17BP.12.R.19
-L- POT STA 15+00.00END TIP PROJECT 17BP.12.R.19
SR 1199 (TRINITY CHURCH ROAD)
-L-
ROADREEPSVILLETO
TO
HW
Y 10
VALE
SQUARECAT
1113
1199
11231125
1002
1210
1209
1207
1113
1199
LINCO
LN CO
UNTY
CATAW
BA CO
UNTY
NSRS 2007
NA
D 83/
LIMITSPROJECT
HO
WARD
SCREEK
09/08/99
12/12/2017
P:\
JO
BS\0696\025\10
800_
Lin
coln
BR-12
7\
Road
way\
UB
O\540012
7_uo
_tsh.d
gn
7:5
2:2
4
AM
INDEX OF SHEETS
SHEET NO.
17BP.12.R.19 UO-1STATE OF NORTH CAROLINADIVISION OF HIGHWAYS
T.I.P. NO.
CREEK ON SR 1199 (TRINITY CHURCH ROAD)
LOCATION: REPLACE BRIDGE NO. 127 OVER HOWARDS
TYPE OF WORK: UTILITY RELOCATION
LINCOLN COUNTY
UTILITIES BY OTHERS PLANS
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
50 50
50 50
2010510
25 100
25 100
XXDE
PA
RT
M
ENT OF TRAN
SPO
RT
ATI
ON
ST
ATE
OF
NORTH CAR
OLI
NA
STEVE RACKLEY, P.E.
WEBB WHITE
WARREN ANDERSON
UTILITY OWNERS WITH CONFLICTSDIVISION OF HIGHWAYS
PREPARED IN THE OFFICE OF:
(A) FIBER OPTIC - AT&T
UBO PLAN SHEET
TITLE SHEET
DESCRIPTION:
UO-2
UO-1
SHEET NO.:
UTILITY PROJECT MANAGER
PROJECT UTILITY COORDINATOR
SHOWN ON THIS SHEET.
THE CONTRACTOR FOR UTILITY WORK
NO PAYMENT WILL BE MADE TO
SHEET IS DONE BY OTHERS.
ALL UTILITY WORK SHOWN ON THIS
NOTE:
TIP P
ROJE
CT: 17
BP.12.R.19
DIVISION 12
SHELBY NC 28151-00471710 E. MARION STPO BOX 47DIV ADDRESS
BRIDGE MANAGERDIVISION 12
UO-2
LC 2 @ 15’-0" x 6’-6" RCBC
-L- STA 12+79.36
HO
WA
RD
S
CR
EE
K
TRINITY CHURCH ROAD (SR 1199)
TO REEPSVILLE ROAD
TO H
WY 10
18" RCP
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
19.0’ BST
10.0’ S
OIL
15" RCP
EXISTING R/W
EXISTING R/W
60.0
0’
GENE B SAIN
DB 705 PG 193CRISMAN LIFE EST
WALTER NELSON
DB 2126 PG 403
CRISMAN LIFE EST
WALTER NELSONGENE B SAIN
DB 705 PG 193 DB 2126 PG 403
15" RCP
9/15/2017
P:\
JO
BS\0696\025\10800_
Lincoln
BR-127\
Road
way\
UB
O\5400127_uo_psh2.d
gn
9:2
6:1
5
AM
8/17/99 SHEET NO.PROJECT REFERENCE NO.
UTILITIES BY OTHERS
SHEET.
FOR PROPOSED UTILITY WORK SHOWN ON THIS
PAYMENT WILL BE MADE TO THE CONTRACTOR
SHEET WILL BE DONE BY OTHERS. NO
ALL PROPOSED UTILITY WORK SHOWN ON THIS
NOTE:
704.617.6525
STEVE MODE
AT&T TO PERFORM HDD ACROSS HOWARDS CREEK
17BP.12.R.19 UO-2
10
15
-L- POT Sta. 10+
00.00
-L- PC
Sta. 10+
45.29
PI Sta 11+23.11
D
L = 145.67’
T = 77.82’
-L-
-L-
PT
Sta. 11+90.9
6
-L-
PO
T
Sta. 15
+35.6
7
-L-
R = 167.15’ (25 MPH)
F
F
C
F
C
F
C
C
C
C
C
F
CF
C
F
1
12
2
ABANDON
ABANDON
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
15015012-
DE
C-2017 08:3
1\
Road
way\
Corridor
Modeling\5400127_rdy_xpl_l.d
gn
HN
TB
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
940 940
950 950
930 93010+00.00
930 930
940 940
950 950
920 920
10+50.00
930 930
940 940
920 92011+00.00
930 930
940 940
920 92011+50.00
X-117BP.12.R.19
-L-
5 10
-L- STA 10+50.00BEGIN GRADE
lump sum price for "Grading."Grubbing, and Removal of Existing Pavement will be paid for at the contract
Note: Approximate quantities only. Unclassified Excavation, Fine Grading, Clearing and
935.50
932.99
3:10.0700.070
EXIS
T.
R/W
EXIS
T.
R/W
3:1
930.79
2:1
3:1
3:1
0.0700.070
927.26
EXIS
T.
R/W
EXIS
T.
R/W
929.38
2:1
3:1
3:1
0.0700.070
925.80EXIS
T.
R/W
EXIS
T.
R/W
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
15015012-
DE
C-2017 08:3
1\
Road
way\
Corridor
Modeling\5400127_rdy_xpl_l.d
gn
HN
TB
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
930 930
940 940
920 92012+00.00
930 930
940 940
920 92012+50.00
920 920
930 930
940 940
910 910
12+79.36
920 920
930 930
940 940
910 910
13+00.00
X-217BP.12.R.19
-L-
5 10
-L- STA 12+61.84BEGIN CULVERT
-L- STA 12+96.88END CULVERT
928.68
2:1 2:13:1
3:1
0.0410.041
926.38925.30E
XIS
T.
R/W
EXIS
T.
R/W
928.732:1 2
:13:1
0.0120.020
925.38924.86
EXIS
T.
R/W
EXIS
T.
R/W
VAR.
921.88
0.016 0.009
925.98
2:12:1
0.0170.020
EXIS
T.
R/W
EXIS
T.
R/W
VAR.
924.13
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
15015012-
DE
C-2017 08:3
2\
Road
way\
Corridor
Modeling\5400127_rdy_xpl_l.d
gn
HN
TB
PROJ. REFERENCE NO. SHEET NO.0
6/23/16
930 930
940 940
920 92013+50.00
930 930
940 940
920 92014+00.00
930 930
940 940
920 92014+50.00
930 930
940 940
920 92015+00.00
930 930
940 940
920 92015+25.00
X-317BP.12.R.19
-L-
5 10
-L- STA 15+00.00END GRADE
928.13
2:1 2:13:1
0.0200.020
926.28
EXIS
T.
R/W
EXIS
T.
R/W
924.63
VAR.
927.39
2:13:13:1
0.0200.020
925.13EXIS
T.
R/W
EXIS
T.
R/W
927.68
2:13:13:1
0.0200.020
925.63
EXIS
T.
R/W
EXIS
T.
R/W
928.47
VAR.
0.0200.010
EXIS
T.
R/W
EXIS
T.
R/W
928.95
EXIS
T.
R/W
EXIS
T.
R/W
SHEET NO.
DWG. NO. CHECKED BY DATE
DRAWN BY DATE
DATEBYNO.
REVISIONS
3
42
1
NO. BY DATE
SHEETS
TOTAL
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATIONRALEIGH
STATION:
COUNTY
PROJECT NO.
343 E. Six Forks Rd., Suite 200, Raleigh, N.C. 27609
HNTB NORTH CAROLINA, P.C.NC License No. C-1554
SIGNATURES COMPLETED
FINAL UNLESS ALL
DOCUMENT NOT CONSIDERED
LINCOLN
12+79.36 -L-
17BP.12.R.19
2"
6" 6"
6" 6"
2"
2"
15'-0" 15'-0"
RIGHT ANGLE SECTION OF BARREL
CL.
3"
CL.
(B.B.) @ 4'-0" CTS.
2" CL.
2" CL.
CL.
CL.
2" CL.
2" CL.4" TYP.
2" HIGH BEAM BOLSTERS
* ALL CONTINUOUS
HIGH CHAIR UPPER
( C.H.C.U. ) @ 3'-0"
CTS.
CONST. JT.
PERMITTED
3" ~ WEEP HOLES
4"
32'-3"
6'-
6"
9" 9" 9"
1'-
7"
1'-
3"
9'-
4"
* 13•" HIGH C.H.C.U.
* 8‚" HIGH C.H.C.U.
@ 5•" CTS.
#5 A1 BARS
@ 11" CTS.
#5 B1 BARS
@ 5•" CTS.
#5 B2 BARS
@ 5•" CTS.
#5 "A" BARS
@ 5•" CTS.
#5 "A" BARS
@ 5•" CTS.
#5 "A" BARS
@ 5•" CTS.
#6 "A" BARS
2"
1'-0"
WA
LL)
(TY
P.
EA.
CO
NS
T. J
T.
@ 5•" CTS.
#5 A2 BARS
MIN. SPLICE
#5 "A" BAR
3'-0"
MIN. SPLICE
#6 "A" BAR
2'-9"
JT.
CONST.
STAGE II
14'-9"
STAGE I
17'-6"
"9
"9 9"
@ 11" CTS.
#4 B3 BARS
(EA
CH F
AC
E)
1'-
0"
CT
S.
= 5'-
0"
6-#4
C1 B
AR
S
@
9"
4"
TY
P.
15-#4 C1 BARS @ 1'-0" CTS. = 14'-0" (TOP & BOT.)
15-#4 C1 BARS @ 1'-0" CTS. = 14'-0" (TOP & BOT.)
-
EA
CH
EX
TE
RI
OR
WA
LL)
CT
S.
= 5'-
0" (E
AC
H F
AC
E
6-#4
C1 B
AR
S
@
1'-
0"
(LOOKING DOWNSTREAM)THERE ARE 174 ``C'' BARS IN SECTION OF BARREL.
LOCATION SKETCH NOTES
M. WRIGHT1
11/17
43'-0
"
21'-6
"
21'-6
"
ROADWAY SLOPES 2:1 (MAX.)
BED ELEVATION @ STA. 12+79.36 = 919.38
GRADE POINT ELEV. @ STA. 12+79.36 = 928.20
EPLACES BRIDGE NO. 127R
PROFILE ALONG { CULVERT
HOWARDS CREEK TRIB. 7
SR 1199 OVER
CONCRETE BOX CULVERT
15'-0" FT. x 6'-6" FT.
SECT. FOR DOUBLE
LOCATION SKETCH/BARREL
11/17P. BARBER 8
C-1
ARE AS-BUILT PLANS
I HEREBY CERTIFY THESE PLANS
R
O
AN
AU
J.L
BA
O OEF O
P
N
12916
GEN EEIN
R
SEAL
R
P
R
CT
H AR
SSI
E
B
N
R
A
L
IL
SPECIAL PROVISIONS.
SEE UTILITY PLANS AND
FOR UTILITY INFORMATION,
2 CELLS @ 15'-0"X6'-6"
CONCRETE BOX CULVERT
PROPOSED REINFORCED
POT STA. 12+79.36 -L-
S 67°-45'-
22"
E
-L-
67°-00'-00"
(ZU
R
LE
ON
AR
D
RD)
TO
SR 1123
(TRI
NI
TY
CH
UR
CH
RD)
SR 1199
{ CU
LVER
T
ELEV. 928.24 NAVD 88
N=662477.25, E=1285505.37
OFFSET 159.19' RT -L- STA. 13+90.01,
BM1: R/R SPIKE IN BASE OF 18' BLACK WALNUT TREE,
HOWARDS
CREE