5
N O T I C E THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. ALTHOUGH IT IS RECOGNIZED THAT CERTAIN PORTIONS ARE ILLEGIBLE, IT IS BEING RELEASED IN THE INTEREST OF MAKING AVAILABLE AS MUCH INFORMATION AS POSSIBLE https://ntrs.nasa.gov/search.jsp?R=19820011746 2020-05-25T13:31:49+00:00Z

THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

N O T I C E

THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. ALTHOUGH IT IS RECOGNIZED THAT

CERTAIN PORTIONS ARE ILLEGIBLE, IT IS BEING RELEASED IN THE INTEREST OF MAKING AVAILABLE AS MUCH

INFORMATION AS POSSIBLE

https://ntrs.nasa.gov/search.jsp?R=19820011746 2020-05-25T13:31:49+00:00Z

Page 2: THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

G"Mjje ul"" r t;rl^A s^crosr^rafilI(I VIC If.} rn^} V

OS^

(''.la

(III.

Plc,;(acs St,r"ey

i,at,uitytur jrl/ Use ITI;iJu ht:;vol""

i:.ur;':

f FOURTH QUARTERLY REPORT

FOR

MAGSAT SCIENCE INVESTIGATIONS

Contract NAS 5-26328

0

^ J For the periodP

6/1/81 - 8/30/81

submitted to_zV :J ►aH r'- 4 Jt4 jj _4 n

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION-4n

^'v GODDARD SPACE FLIGHTT CENTER

y n GREENBELT, MARYLAND 20771s r.4 ^ n

AJ 1 ron U.^ . ..1^ ^ r-' o

by0 7 --4

ON r- 3d ^n %

Aj ° BUSINESS AND TECHNOLOGICAL SYSTEMS,, INC.

AEROSPACE BUILDING, SUITE 440y G ^C

.^ b ro 10210 GREENBELT ROADLngr

v SEABROOK, MARYLAND 20706o--4'A

y^'J RECEIVED-4w 4ao b y43 1 19?^

^^zv

W- 027'j/ PF 7t_

Page 3: THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

Hr.r^F..^. r^nT^:rH^^ ►r ► M.rcu. ^^..rew., l^r.

1.0 WORK ACCOMPLISHED DURING REPORT PERIOD

Mayhew traveled to Edinburgh to the IAGA meetings, presented a paper

on the Magsat anomaly studies to date, chaired the evening Magsat session, and

participated in the Mag:,at investigators meetings.

The BTS group plans to submit several man,.scripts for Langel's spe-

cial issue of Geophysical Research Letters. Included will be papers on

1) magnetization modeling results for several parts of the world, 2) Magsat

anomaly data set characteristics and the problem of modeling magnetization

directions, and 3) large-scale crustal magnetization ( with Wasilewski).

During this period we have determined the optimal source spacing for

the computed delta-B data set from the intermediate attitude tapes, and are

preparintl a new U.S. magnetization map based on this rer•ult.

Computed delta-B from the fine-attitude tapes has been found to be

unexpectedly noisy; the reason for this is being sought.

Page 4: THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

l^

2.0 WORK PLANNED FOR NEXT REPORTING PERIOD

1. Complete study of source direction modeling and prepare manuscript.

2. Resolve question of excessive noise in fine-attitude delta-B.

3. Produce new U.S. magnetization map.

4. Produce magnetization maps of other regions and prepare manuscript.

5. Complete crustal magnetization review.

Page 5: THIS DOCUMENT HAS BEEN REPRODUCED FROM MICROFICHE. … · 2013-08-31 · 6/1/81 - 8/30/81 _ submitted to z v :j a h r'- 4 j t4 jj _4 n national aeronautics and space administration-4n

l^Ni •INf.,% on D.1 11N g 1w,IC 11. S1.rvils, hr_

3.0 FISCAL AND PLANNING DATA

Contract Price $89,685.00

Prior Expenditure 52,197.00

Expenditure this Quarter 14,002.00

Total Expenditure to Date 66,199.00

Amount Remaining 23,486.00

Total Hours Expended 1,845

Amount Next Quarter (Estimate) 13,500.00

Amount Required to Complete Work 23,486.00