(PREPARED UNDER RULE 12 OF DRAFT MINOR MINERAL CONSERVATION AND DEVELOPMENT RULES, 2010 & AS PER AMENDMENT OF TAMILNADU MINOR MINERAL CONCESSION RULES, 1959) (Lease period = Sixty days) IN LOCATION OF THE QUARRY LEASE APPLIED AREA EXTENT : 3.15.00 Ha, S.F.NO : 1 (P), VILLAGE : REDHILLS, TALUK : MADHAVARAM, DISTRICT : TIRUVALLUR, STATE : TAMIL NADU FOR PREPARED BY A.Jagannathan BE.,F.C.C.,M.M.E.A., Recognized Qualified Person RQP/MAS/019/87/A Valid upto -17.11.2021 No. 95/1, Kailash Nagar, Brindavan Road, 4 th Cross East, Fairlands, Salem - 16. Cell: 94422 90429, 99424 86796. Email: [email protected]. Thiru. V. G. Sathish Babu, S/o. R. Govardhanan, 16B, 4th Cross Street, Kumaran Naga (East), Avadi, Chennai – 71.

Thiru. V. G. Sathish Babu, - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/District/approvedminplan/... · for Thiru.V.G.Sathish Babu, S/o. R.Govardhanan, 16B, 4th

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

(PREPARED UNDER RULE 12 OF DRAFT MINOR MINERAL CONSERVATION AND DEVELOPMENT RULES, 2010 & AS

PER AMENDMENT OF TAMILNADU MINOR MINERAL CONCESSION RULES, 1959) (Lease period = Sixty days)

IN LOCATION OF THE QUARRY LEASE APPLIED AREA

EXTENT : 3.15.00 Ha,

S.F.NO : 1 (P),

VILLAGE : REDHILLS,

TALUK : MADHAVARAM,

DISTRICT : TIRUVALLUR,

STATE : TAMIL NADU

FOR

PREPARED BY

A.Jagannathan BE.,F.C.C.,M.M.E.A., Recognized Qualified Person

RQP/MAS/019/87/A

Valid upto -17.11.2021

No. 95/1, Kailash Nagar, Brindavan Road,

4th Cross East, Fairlands, Salem - 16. Cell: 94422 90429, 99424 86796.

Email: [email protected].

Thiru. V. G. Sathish Babu,S/o. R. Govardhanan,

16B, 4th Cross Street,

Kumaran Naga (East),

Avadi, Chennai – 71.

V.G.Sathish Babu,

S/o. R.Govardhanan,

16B, 4th Cross Street,

Kumaran Nagar (East), Avadi, Chenai-71.

CONSENT LETTER FROM APPLICANT

The Mining Plan in respect of Gravel Quarry Lease Applied Area over

an extent of 3.15.00Ha Government land (Puzhal Eri) in S.F.No. 1(P) in

Red Hills Village, Madhavaram Taluk, Tiruvallur District and Tamilnadu State

has been prepared by

A.Jagannathan BE.,F.C.C.,M.M.E.A., RQP/MAS/019/87/A I request the District Collector, Tiruvallur to make further

correspondence regarding the modification of the Mining Plan with the said

recognized qualified person at his following address.

A.Jagannathan BE.,F.C.C.,M.M.E.A.,

No.220/3, Srinagar colony,

Opp.Dhivyam Jewels,

Omalur main Road, Alagapuram

Salem – 636 004.

Cell; 94422 90429, 99424 86796.

I hereby undertake that all the modifications, if any made in the

mining plan by the Recognized qualified person may be deemed to have

been made with my knowledge and consent and shall be acceptable to me

and binding on me in all respects.

Signature of Applicant

V.G.Sathish Babu

Place: Tiruvallur

Date: 17.03.2015

V.G.Sathish Babu,

S/o. R.Govardhanan,

16B, 4th Cross Street,

Kumaran Nagar (East), Avadi, Chenai-71.

DECLARATION OF APPLICANT

The Mining Plan in respect of Gravel Quarry Lease Applied Area

over an extent of 3.15.00Ha Government land (Puzhal Eri) in S.F.No. 1(P)

in Red Hills Village, Madhavaram Taluk, Tiruvallur District and Tamilnadu State

has been prepared in full consultation with me.

A.Jagannathan BE.,F.C.C.,M.M.E.A.,

95/1, Kailash Nagar,

Brindhavan Road,

4th Cross East, Fairlands,

Salem-16.

Cell; 94422 90429, 99424 86796.

I have understood its contents and agree to implement the same

in accordance with Laws applicable to Quarry.

Signature of Applicant

V.G.Sathish Babu

Place: Tiruvallur

Date: 17.03.2015

A.Jagannathan BE.,F.C.C.,M.M.E.A.,

95/1, Kailash Nagar,

Brindhavan Road,

4th Cross East, Fairlands,

Salem-16.

CERTIFICATE FROM THE RECOGNIZED QUALIFIED PERSON

This is to certify that the Provisions of Rule 12 of Draft Minor Mineral

Conservation and Development Rules, 2010 & as per Amendment Rules of

Tamilnadu Minor Mineral Concession Rules, 1959 have been observed in the

preparation of Mining Plan for Gravel Quarry Lease Applied Area over an

extent of 3.15.00Ha Government land (Puzhal Eri) in S.F.No. 1 (P) in Red

Hils village, Madhavaram Taluk, Tiruvallur District and Tamilnadu State

has been prepared for

Thiru. V.G.Sathish Babu,

S/o. R.Govardhanan,

16B, 4th Cross Street,

Kumaran Nagar (East),

Avadi, Chenai-71.

Whenever specific permissions/exemptions/ relaxations and

approvals are required, the applicant will approach the concerned authorities

of the district Collectorate, Tiruvallur, Tamilnadu for such

permissions/exemptions/relaxations and approvals.

It is also certified that information furnished in the above Mining plan

are true and correct to the best of my knowledge.

RQP SIGNATURE

A.Jagannathan BE.,F.C.C.,M.M.E.A., RQP/MAS/019/87/A

Place: Salem

Date: 18.03.2015

Mining Plan Redhills Gravel Quarry

1

MINING PLAN FOR GRAVEL OVER AN EXTENT OF 3.15.0HA IN REDHILLS VILLAGE,

MADHAVARAM TALUK, TIRUVALLUR DISTRICT, TAMILNADU.

(Prepared Under Rule 12 of Draft Minor Mineral Conservation and Development Rules, 2010

and as per Amendment Under Tamilnadu Minor Mineral Concession Rules, 1959)

GENERAL INFORMATION AND EXECUTIVE SUMMARY

The present Mining plan & Environmental Management plan is prepared

for Thiru.V.G.Sathish Babu, S/o. R.Govardhanan, 16B, 4th Cross Street, Kumaran Nagar (East),

Avadi, Chenai-71.

The applicant applied to quarry Gravel in Red Hills PWD tank (Puzhal Eri), survey field

No. 1 (P), Red Hills Village, Madhavaram Taluk, Tiruvallur District for a period of Sixty

Days only.

The area lies on Red hills PWD tank in S.F.No. 1 (P), the excavated Gravel is used for

filling and leveling of low lying areas.

The application was meritoriously processed by the District Collector, Tiruvallur and passed

an order vide Notice Rc. No. 738/2014/G&M-1 dated 17.03.2015 to obtain an approved mining

plan and Environmental Clearance from the State Level Environment Impact Assessment

Authority, Tamil Nadu as per the order of the Hon’ble Supreme Court of India in I.A.No 12-

13/2011 in S.L.P.No. 19628-19629 of 2009 etc., dt. 27.02.2012 the Ministry of Environment

and Forest office Memorandum Dt 18.05.2012.

All the conditions stipulated in the precise area communication letter have been

considered for preparing this mining plan.

The area applied for lease is a Government land in Survey Field No. 1 (P) in Red Hills

village of Madhavaram Taluk, Tiruvallur District.

a. Village Panchayat - Red Hills

b. Panchayat Union - Madhavaram

c. The proposed total mineable reserves = 28,350m3 of Gravel.

d. The proposed quantity of reserves(level of production)

to be mined = 28,350m3 of Gravel for a

period of Sixty days.

a. Total extent of the area = 3.15.00Ha

b. Period of mining = Sixty days.

c. Depth of mining = 0.90m below the existing profile of PWD tank.

d. Method of mining (level of mechanization)

Opencast Semi mechanized method without drilling and blasting.

e. Type of machineries used in the quarry = Machineries like excavators are

proposed for quarrying operation.

Mining Plan Redhills Gravel Quarry

2

f. Quantity of diesel consumption = 4730Ltrs of HSD will be utilized for entire

project life.

g. No trees are uprooted due to this quarrying operations.

h. There is No Export or imports of Gravel.

i. Toposketch covering an 1Km radius around the proposed area with markings of

habitations, water bodies including streams, rivers, roads, major structure like

bridges, wells, archeological importance, places of worships is marked and enclosed

as Annexure No. IA.

j. The Geographical co-ordinates with distance for the applied area

Red Hills village (Toposheet No 57- P/13)

Boundaries/Corners Co-Ordinates Distance between

Boundaries/ Corners

1 13°09'43"N 80°09'46"E 1-2 = 315m

2 13°09'49"N 80° 09'55"E 2-3 = 100m

3 13°09'47"N 80° 09'58"E 3-4 = 315m

4 13°09'40"N 80°09'48"E 4-1 = 100m

k. The diagram of proposed mining area showing the dimensions of the pit, its proposed

depth of mining, proposed extent of area are marked enclosed as Plate No. III.

l. The area applied for lease is 10Km away from the interstate boundary, protected

area, under wild life protection ACT 1972, critically polluted areas as identified by

CPCB and notified Eco sensitive areas.

m. No wastages are anticipated in the lease applied area, hence waste dump is not

proposed.

n. Around 9 employees are proposed to be deployed for the quarrying operation.

o. Total cost of the project is about Rs. 5,42,000/-

This mining plan and Environment Management plan is prepared by incorporating the

conditions stipulated in the precise area communication and by considering all the

parameters required for the safe and systematic quarrying operations in order to excavate

28,350m3 of Gravel for a period of Sixty days only.

Gravel is composed of consolidated felsic compound Silica and Feldspar. The applicant

intends to use this Gravel especially for leveling and filling of low lying areas for Road projects

and other infrastructure development works.

The applicant intends to use this Gravel especially for leveling and filling of low lying

areas for public and private sector projects in and around the district.

Mining Plan Redhills Gravel Quarry

3

1.0 General Information

1.1 a) Name of the applicant Thiru. V.G.Sathish Babu

b) Address of the applicant

(with phone No. & e-mail)

Address : S/o. R.Govardhanan,

16 B, 4th Cross Street,

Kumaran Nagar (East),

Avadi,

Chennai-71. State : Tamil Nadu

Mobile : 9566661808

c) Status of the applicant

(Individual / Company /

Firm)

The applicant is an Individual.

1.2 a) Mineral which the

applicant intend to mine

The applicant intends to quarry Gravel only.

b) Precise area

communication letter

details received from the

Government

The District collector, Tiruvallur passed an order

vide Rc. No. 738/2014/G&M-1 dated 17.03.2015

to obtain an approved mining plan and

Environmental Clearance from the State Level

Environment Impact Assessment Authority, Tamil

Nadu.

c) Period of permission /

lease to be granted

The applicant has applied for permission for the

period of Sixty Days.

d) Name and address of the

RQP / Authorized person

preparing the mining plan

Name :A.Jagannathan BE.,F.C.C.,M.M.E.A.,

Address : No.220/3, Srinagar colony,

Opp.Dhivyam Jewels,

Omalur main Road, Alagapuram

Salem – 636 004.

Cell : 94422 90429, 99424 86796.

Registration No : RQP/MAS/019/87/A

Valid up to : 17.11.2021

Email : [email protected]

2.0 LOCATION

a) Details of the area (with

location map)

The quarry lease applied area falls in the

Redhillls PWD Tank.

The applied area for quarrying lease

bounded by following villages,

Redhills 3.0km (NE), Attanthangal 2.0Km (NW), Kolathur 1.0Km (SE), Oragadam 1.0Km (SW).

i) District, Taluk and

village

Tiruvallur District, MadhavaramTaluk and

Redhills Village.

ii) Survey Number 1 (P)

iii) Extent(in hectares) 3.15.00 Ha.

Mining Plan Redhills Gravel Quarry

4

b) Classification of the area

(Ryotwari/ Poramboke /

others)

It is a Government Land.

c) Ownership / Occupancy of

the applied area (surface

right)

It’s a Government Land, Maintained by PWD

Tamilnadu.

d) Toposheet No. with

latitude and longitude

Topo sheet No - 57 P/13

Latitude between 13°09'40"N to 13°09'49"N

Longitude between 80°09'46"E to 80°09'58"E

e) Existence of public road /

Railway line, if any nearby

and approximate distance

There is a metal road on the south eastern side

of the area this road connecting in the Pothur-

Pammadukulam Village road at a distance of

1Km.

The road from the quarry to main road Is already

existing, no other patta land roads are

encountered for the haulage of Gravel.

The Nearest Railway line is Chennai – Tiruvallur

which is about 6Km on the Southern side of the

area.

PART – A

2.1 GEOLOGY AND MINERAL RESERVES

3.1 Brief description of the

Topography and general Geology

of the area (with plans)

The area is almost plain terrain covered with

Gravel which does not sustain any type of

vegetation. The attitude of the area is 18m

(Maximum) from MSL, the slope of the area is

gentle towards North Western side. Please refer

the Topography, Geological plan and sections

(Plate No –II).

3.2 Details of exploration already

carried out if any

No exploration was carried out. The Gravel

formation is found right from the surface and

proposed to excavate upto a depth of 0.90m only.

3.3 Estimation of reserves The Geological plans demarcating the

commercially viable Gravel body have been

prepared in 1:1000 scales (Plate No.II).

Two sections have been drawn, one along

the Length wise as (X-Y) horizontally, and another

section along the width wise as (A-B) vertically, to

choose the maximum area cover under the lease

in the Horizontal 1:1000 and Vertical 1: 100

(please refer Plate No- II).

Mining Plan Redhills Gravel Quarry

5

The cross sectional area for the proved

depth persistence of 0.90m has been worked out

for the section.

The cross sectional area multiplied by its length of

influence on the longer axis gives the volume

(insitu) in the cross sectional area.

The sum total of the insitu reserves available

within the individual cross sectional area gives the

geological reserves of the lease applied area.

As the recoverable of Gravel in the terms of

cubic meter. The Geological Resource, Mineable

Reserves are given only in terms of Cubic meter.

The Details of estimation of Geological

Resource and Mineable Reserves with reference to

Topography, Geological Plan and Section shown in

(Plate No. II).

a) Geological reserves with

geological sections on a scale of

1:1000.

The quarrying is restricted up to a depth of

0.90m only. Availability of Resources is given

below.

Geological Resources

(Please refer Plate No-II)

Section L

(m)

W

(m)

D

(m)

(Avg)

Volume

(Cbm)

ROM

(Cbm)

XY-AB 315 100 0.90 28,350 28,350

Total 28,350

Total ROM = 28,350m3

Total Geological Resource upto a depth of 0.90m

= 28,350m3

b) Recoverable reserves There is no wastages is anticipated

Geological Resources is calculated as Mineable

Reserves.

Mineable (Recoverable) Reserves

(Please refer Plate No-II)

Section L (m) W

(m)

D

(m)

(Avg)

Volume

(Cbm)

ROM

(Cbm)

XY-AB 315 100 0.90 28,350 28,350

Total 28,350

Total Recoverable Reserves

upto 0.90m = 28,350m3

Mining Plan Redhills Gravel Quarry

6

One lorry load = 5.66m3

Hence 28,350/ 6m3 = 4725 Lorry loads.

The ROM is proposed to excavate = 28,350m3

for a period of Sixty days only.

4.0 MINING

4.1 Method of mining (opencast /

underground)

Opencast method of shallow mining

is proposed, Machineries like excavators are

proposed for quarrying Gravel upto 0.90m depth.

No drilling or blasting is proposed for this

type of Gravel quarrying, it is a conventional

eco friendly quarrying operation.

The quarrying is proposed to carry out by

conventional Eco friendly open cast mining method.

The Gravel will be loaded directly to the

trucks / Lorries for transportation to the destination

site. The depth of quarry is proposed to be

restricted upto a depth of 0.90m.

4.2 Mode of working (mechanized,

semi mechanized, manual)

It’s a conventional opencast quarrying operation

without drilling and blasting.

4.3 Proposed bench height & width 0.90m height, 100m width.

4.4 Indicate the overburden / mineral

production expected pit wise as

detailed below (composite plan

and section showing pit layout,

dumps, disposal of waste if any

etc.)

There is no overburden and the Gravel is to

exploit only to a depth of 0.90mright from the

surface, and proposed to excavate for a period of

Sixty days.

Year wise Production Table

Year Pit

No.(s)

Overburden ROM ore/

Mineral

Saleable ore /

Mineral

Sub grade

ore / mineral

Mineral

rejects

Ore to

overburden ratio

First I Nil 28,350m3 28,350m3 Nil Nil Nil

Second

The applicant has obtain permission to quarry Gravel for a period of Sixty days only. Third

Fourth

Fifth

Mining Plan Redhills Gravel Quarry

7

4.5 Machineries used

a) For mining Excavators 110-150 of 0.90m3 capacity, Diesel Drive.

b) Loading equipment Excavators 110-150 of 0.90m3 capacity, Diesel Drive.

c) Transportation (includes

within the mine and mine to

destination

Hired Tippers 10/20Ts capacity. Diesel Drive. (Only

from quarry to needy customers site)

4.6 Disposal of overburden /

waste

There is no wastage is anticipated during the

quarrying operation the entire Gravel will be used for

filling and leveling of the low lying areas for public and

private sector projects in and around the district.

There is no proposal of disposal of Gravel.

4.7 Brief note on conceptual

mining plan for the entire

lease period base on the

geological, mining and

environmental considerations

Conceptual mining plan is prepared based upon

Topography, Geological plan and section with an object

of Sixty days of systematic development of lay outs,

selection of ultimate pit limit etc.,

The ultimate pit size is designed based on certain

practical parameters such as economical depth of

quarrying & permissible area etc., The ultimate pit

dimensions of the quarry are given below.

Description Section L

(m)

W

(m)

D (m)

(Avg)

Conceptual XY-AB 315 100 0.90

It is a Conventional Eco friendly Quarrying

operation without drilling and Blasting

5. BLASTING

5.1 Blasting pattern

It’s a Conventional Eco friendly quarrying

proposed without drilling and blasting.

5.2 Type of explosives to be used

5.3 Measures proposed to minimize ground

vibration due to blasting

5.4 Storage and safety measures to be

taken while blasting

6. MINE DRAINAGE

6.1 Depth of water table (based on nearby

wells and water bodies)

The water table in this area in 20mts as

observed in nearby Government Boreholes,

Private wells and Boreholes.

6.2 Arrangements and places where the

mine water is finally proposed to be

discharged

There is no such type of activities

anticipated in this quarrying operation.

Mining Plan Redhills Gravel Quarry

8

7. OTHER PERMANENT STRUCTURES (also shown in the map)

7.1 Habitations / village natham There is no habitation within the radius of

500m. Please refer the location of permanent structure

map (Plate No IA).

7.2 Power lines (HT/ LT) There is no HT/LT line within the radius of 500m.

7.3 Water bodies (river, Pond,

lake, odai, channel etc.)

The lease applied area lies on Puzhal Eri, there is no

other major water bodies like river, Lake, Channel

etc.,

7.4 Archaeological / historical

monuments

There is no Archaeological / historical monuments

within 500m radius from the area.

7.5 Road (NH, SH others) The Nearest National Highway (NH 5) Chennai -

Nellore is about 5Km on the North Western side of

the area.

The State Highway (SH 114) Ponneri – Kolathur is

about 2Km on northern side of the area.

7.6 Places of worship There is no place of worships within the Radius of

500m.

7.7 Reserved forest / forest /

social forest / wild life

sanctuary etc.

There are no Reserved forest / social forest / wild life

sanctuary within 500m radius.

8. EMPLOYMENT POTENTIAL & WELFARE MEASURES

8.1 Employment potential

(skilled, semi skilled,

unskilled)

The following man power is proposed for the Gravel

quarrying to carry out the day-to-day quarrying

activities, aimed at the proposed production target and

also to comply with the statutory provisions of the

Government norms.

Skilled :

1. Mines foreman : 1

2. Supervisors : 1

Total : 2 Nos.

Semi-skilled:

Excavators Operators : 2

Co operator : 2

Total : 4 Nos

Un -Skilled:

Watchman : 1

Unskilled – helpers : 2

Total : 9 Nos

Allowing for 10% absenteeism, the No. of men

of roll will be around 8.

Mining Plan Redhills Gravel Quarry

9

The above manpower is adequate to meet out the

production schedule and the machinery strength

envisaged in the mining plan and to comply with the

statutory provisions of the Mines Safety Regulations.

8.2 Welfare measures

a) Drinking water Packaged Drinking water will be brought from the

authorized water suppliers in the Oragadam which is

about 1km on the South western side of the area.

b) Sanitary facilities Hygienic Sanitary facilities will be constructed with in

the quarrying area as semi permanent structure.

c) First Aid facility First aid kits are kept in quarry office room if any

accident happens first aid will be given at site and the

injured person will be taken to the hospital

immediately, Hospital is available at Oragadam which

is about 1km on the South Western side of the area.

The competent statutory foreman will be in charge of

first aid.

d) Labors Health In the conventional Eco friendly opencast quarrying

operation No drilling or blasting is involved only

excavators are used, hence labors health may not

affect in any manner however periodically medical

checkup will be conducted to all the workers in

applicant own cost.

e) Precautionary safety

measures to the labourers

All the quarry workers will be provided with

safety helmets, Mine Goggles, Ear plugs, ear muffs,

Dust mask, reflector jackets and Safety Shoes as

personal protective device as per the specification of

Director of Mine Safety. Besides also conducting

periodically medical checkup for all workers for any

mine health related problems, proper training and

induction will be given to quarrying personal to create

awareness of conventional Eco friendly quarrying

operations.

Mining Plan Redhills Gravel Quarry

10

PART – B

9. ENVIRONMENT MANAGEMENT PLAN

9.1 Existing landuse pattern The land is specifically used for collecting the water

during the rainy season.

9.2 Water Regime Ground water is about 20mt depth from ground level.

The quarrying is restricted up to 0.90m from existing

ground profile, hence the quarry operation will not be

affected by the ground water.

9.3 Flora and fauna The main trees are Julia Flora, Neem, etc., There is no

wild life, bird sanctuary, reserve or social forest near

the area applied for quarrying lease. No flora of

botanical interest nor fauna of zoological interest

noticed.

9.4 Climatic conditions Both the North East and South West monsoon occurs

here and the summer are hot and winter are cools.

During April and May the temperature may shoot upto

40°C and during winter the temperature does not fall

below 25°C. The annual rainfall is around 900mm.

9.5 Human settlement

There are few villages located in 5Km radius from the

lease applied area the details of the areas are given

below.

S.No Name of the Village

Approximate

distance &

Direction from

lease applied area

Approximate

population

1. Redhills 3.0km - NE 3000

2. Attanthangal 2.0 km - NW 800

3. Kolathur 1.0Km - SE 1800

4. Oragadam 1.0Km –SW 2000

9.6 Plan for air, dust suppression In this conventional Eco friendly quarrying

operation only Excavators are proposed without

drilling and blasting, hence the air quality will not

affect due to the quarrying operation, water will be

sprinkled in the haul roads periodically to suppress

dust Ambient Air Quality monitoring will be carried out

to check the Quality of Air in and around the Quarry.

Water for dust suppression will be brought from

nearby tank after obtaining permission from

panchayat authorities. During transportation the

Gravel will be fully covered by Tarpaulin to prevent

dust and spillage.

Mining Plan Redhills Gravel Quarry

11

9.7 Plan for noise level control This Conventional Eco Friendly quarrying

operation does not involve any blasting and drilling

methods, hence noise will be minimal and this is only

due to the movement of Excavators and Trucks.

Periodically Noise level monitoring will be carried out

to check the Noise level in and around the Quarry.

9.8 Environmental impact

assessment statement

describing impact of mining

on the next five years

The life span of the quarry is proposed for the

period of Sixty days only, the Proposed quarrying for a

small production of Gravel does not involve deep hole

drilling and blasting. Such limited mining activity is not

likely to cause any impact adversely on environment

as far as pollution of air, water and noise is concerned.

9.9 Proposal for waste

management

There are no wastages anticipated during the

quarrying operation. The entire Gravel will be

transported to the needy customers site.

9.10 Proposal for reclamation of

land affected during mining

activities and at the end of

mining (refilling / fencing

etc.)

The quarry operation is restricted up to a depth of

0.90m, after removing the Gravel there is no proposal

for backfilling or reclamation. The quarried out land

will be enhance the capacity of the tank. The applicant

ensures to level the floor of the area after quarrying,

The leveling cost would be around Rs.20,000/-.

9.11 Program of afforestation

(indicate extend, number,

name of species to be

afforested)

After the completion of the quarrying operation, the

land will be enhance the Capacity of the PWD Tank.

The applicant ensures to plant native species like

pungam, neem, causirina on the periphery of the tank

bund or nearby villages and village road after

consultation with the panchayat authorities. It is

proposed to plant around 10 trees. The cost estimate

for afforestation is around Rs. 3,000/-

9.12 Proposed financial estimate /

budget for (EMP)

environment management:

The proposed financial estimate budget for EMP is

around Rs. 29,000/- for the period of Sixty days

only.

Mining Plan Redhills Gravel Quarry

12

Project cost / investment

i) Land cost It’s a Government Land hence no cost is involved.

ii) Machinery to be used The excavators of 0.90m3 bucket capacity and

tippers of 10/20Ts capacity will be used.

The quantity of Diesel consumption is based on the

working hours of Excavators (Filling Factor and loading

Cycling), in the open cast quarry project Excavators

are proposed to quarry Gravel. Average Diesel

consumption of Hitachi Excavator model EX 110-150 is

10Ltrs/ Hr.

Total number of Excavator used

for quarrying Gravel = 1No

Average Diesel consumption

Tata Hitachi (Model Ex-110-150) = 10Ltr/Hr

Diesel Prize around = Rs. 60 (At present scenario)

Total Excavator running hours for the project

One excavator will excavate 60Cbm/Hour

= 28,350/60Cbm

= 473 Excavator hours

One Excavator will consume 10Ltrs/ hour

Hence 473 X10 = 4730 Ltrs of HSD will be

utilized for the entire project life.

The hired vehicle charges per hour inclusive of diesel

around Rupees 1000/hour

Total running hours = 473hours

=473 hours x Rs.1000

= Rs. 4,73,000/- for the entire project life.

Cost of the project,

For excavation = Rs. 4,73,000/-

Temporary rest shelter = Rs 20,000/-

Sanitary facilities = Rs. 20,000/-

Leveling after quarrying = Rs 20,000/-

Drinking water = Rs. 2,000/-

Sanitary Arrangements = Rs. 2,000/-

Safety kits = Rs 5,000/-

Total cost of the project = Rs. 5,42,000/-

The cost of the project is about (Rupees five lakhs

forty two thousand)

iii) Refilling / Fencing There is no proposal for Refilling, hence no cost is

involved.

Mining Plan Redhills Gravel Quarry

13

iv) Laborers shed No labours are proposed for quarrying Gravel. The

machine operators are from nearby local villages,

hence no cost is involved. Rest shelter will be

constructed as semi permanent structure at the cost

of Rs.20,000/-

v) Sanitary facility Sanitary facility will be constructed as semi-

permanent structure, the cost will be around

Rs.20,000/-

vi) Others items Leveling after quarrying = Rs. 20,000/-

(a) Expenditure

i) Drinking water facility for

the laborers

9 labours at the rate of Rs 1,000/ month for a period

of Sixty days, the cost will be around Rs.2,000/-

ii) Sanitary arrangement, Sanitary maintenance at the cost of Rs 1,000/ month

the cost will be around Rs.2,000/- for a period of

Sxity days.

iii) Safety kits, Rs.5,000 will be spent for the safety kits such as

Helmet, Goggles, Ear plugs, Ear mask, Safety shoes

and Reflector jackets.

iv) Water sprinkling

(if necessary)

Rs 3000/ month will be spent for sprinkling the water

on haul roads for Dust suppression; the cost will be

around Rs. 6,000/- for a period of Sixty days.

v) Afforestation etc. No Afforestation is proposed on periphery within the

lease applied area, plantation will be carried out in

the nearby village and village roads. The cost

estimate is around Rs.3,000/-

EMP cost

i. Water Sprinkling = Rs. 6,000/-

ii. Afforestation cost = Rs. 3,000/-

iii. Cost towards charity = Rs. 20,000/-

(schools, worship places etc.,)

Total = Rs. 29,000/-

Estimated cost of the project= Rs. 5,42,000/-

Estimated EMP cost = Rs. 29,000/-

Total quarrying Cost

+ EMP cost =Rs. 5,71,000/-

(The Project cost including EMP Cost is about

Rupees Five lakhs seventy one thousand only)

Mining Plan Redhills Gravel Quarry

14

10. MINE CLOSURE PLAN

10.1 Steps proposed for phased restoration,

reclamation of already mined out

areas

It’s a New quarrying project no quarried

out areas within the lease applied area.

10.2 Measures to be under taken on mine

closure as per Act & Rules

This conventional Eco – Friendly quarrying

for a depth of 0.90m does not require any

backfill, Reclamation and Rehabilitation, the

quarried out lands will be enhance the

capacity of the PWD tank, any how the

closure plan will be prepared after

removing the specify quantity.

10.3 Mitigation measure to be undertaken

for safety and restoration /

reclamation of the already mined out

area

This is a fresh Gravel quarry.

Mining Plan Redhills Gravel Quarry

15

11. ANY OTHER DETAILS INTEND TO FURNISH BY THE APPLICANT

This conventional Eco Friendly quarrying operation does not involve any drilling and

Blasting. Only Excavators are proposed to excavate the Gravel for a period of Sixty days

only, care will be taken in all steps to prevent any adverse eventualities. This is the B2

category quarry proposed for a short period of Sixty days only.

STATUTORY PROVISIONS

The mining plan for Gravel is prepared as per the Draft Minor Mineral Conservation

and Development Rules, 2010 and also by the Tamilnadu Minor Mineral Concession Rule,

1959. The provisions of the Mines Act, Rules and Reg ulations and orders made there under

shall be complied with, so that the safety of the mine, machinery and person will be

protected. Permission, relaxation or exemption wherever required for the safe and scientific

quarrying of the deposit will be obtained from the Consent Departments. Any violation

pointed out by the inspecting authorities shall be rectified as per the guidelines of the

Department.

Prepared by

A.Jagannathan BE.,F.C.C.,M.M.E.A., RQP/MAS/019/87/A

Place : Salem

Date : 18.03.2015