4
THIRD SEMESTER B. TECH.(ENGINEERING) DEGREE EXAMINATION, JUNE 2009 1. (a) Sketch a protected type flanged couplingand indicate important proportions. . (15 marks) (b) Show by means of neat and dimensioned sketches,thedifference in profiles of internal and ext.ernal unified threads. Or 2. (a) Sketch any three Nut locking arrangement. 3. (a) The assembled view of Solid bearing is shown in Figure 1 (Page2). Draw the half sectional front and top view. Or 4. (a) Draw the half sectional front view and top view for the Footstep ball bearing shown in Figure 2 (Page 2). (20 marks) (b) Draw two views of following machine parts and mention suitable tolerances/fits at appropriate mating surfaces: cotter-joint for 40 mm diameter rods and pin-joint for 30 mm diameter rods. 5. Details of a stuffing box is shown in Figure3(Page 3). Draw the sectional front and top view of the assembly. Or 6. Draw the sectional front view and top view of the Pipe vice assemblyfor which the part details are given in Figure 4 (Page 4) www.edutalks.org

THIRD SEMESTER B. TECH. (ENGINEERING) … jun09.pdfTHIRD SEMESTER B. TECH. (ENGINEERING) DEGREE EXAMINATION, JUNE 2009 1. (a) Sketch a protected type flanged coupling and indicate

Embed Size (px)

Citation preview

THIRD SEMESTER B. TECH. (ENGINEERING) DEGREEEXAMINATION, JUNE 2009

1. (a) Sketch a protected type flanged coupling and indicate important proportions.

. (15 marks)(b) Show by means of neat and dimensioned sketches, the difference in profiles of internal and

ext.ernal unified threads.

Or

2. (a) Sketch any three Nut locking arrangement.

3. (a) The assembled view of Solid bearing is shown in Figure 1 (Page 2). Draw the half sectionalfront and top view.

Or4. (a) Draw the half sectional front view and top view for the Footstep ball bearing shown in

Figure 2 (Page 2).(20 marks)

(b) Draw two views of following machine parts and mention suitable tolerances/fits atappropriate mating surfaces : cotter-joint for 40 mm diameter rods and pin-joint for 30 mmdiameter rods.

5. Details of a stuffing box is shown in Figure 3 (Page 3). Draw the sectional front and top view of theassembly.

Or

6. Draw the sectional front view and top view of the Pipe vice assembly for which the part detailsare given in Figure 4 (Page 4)

www.edutalks.org

6.HOLES ~6.15 (JEEP 15AND TAP He [JEEP 1(J

¢1C¢JO

ALL JJNHENTlONfD RA/1l1.]

Fig. 2. Footstep BaD Bearing

www.edutalks.org

Po.ts Cist. No •••• Mott Qt,

1 Bodr CIt Glond

J 8usIl, $t'ldS Nut,M12

www.edutalks.org

9~t 9H•...

utt ,e -----

•• ~ "06> .1

t: Qt: '0

r m ~

Sl f{U Bt ::t

~~

~ct~V):::!~• ~I....

q"(

IJl

~t

www.edutalks.org