OBSERVATION OF THIRD PARTY INSPECTION
During the Third Party Inspection on 15thFebruary at our Site, its being found that one of the Double Sheave Rope Pulley has failed during the TEST LOAD applied. A SWL Indicated on Pulley was 2.5 TON, but during the Test Load Reached at 3 TON, A Threaded portion of hook got elongated and its failed.Other Details as Below; Placed By: M/s HARI OM INDUSTRIES Delivery Note No: 306 at 01/10/2010 P/O: DO5300/EPR00141