Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Thermal Power&
Conference & Awards 2020
th5EDITION
Theme: Strategies for Superior Performance
Organiser
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Taj Palace - New Delhi April202030
Objectives
Ü Provide a platform for the Indian power sector for continuous interaction on technical aspects related to performance improvement.
Ü Disseminate the information about latest retrofit technologies and techniques
Ü Share the Best Practices
Focus Areas
Ü Latest trends & technologies for improving the performance of thermal power plant
Ü Services offered by Indian & International service providers
Ü Best O&M practices and case studies from leading Indian thermal power plants
Technical Sessions:
Boiler & combustion technologies Boiler accessories
Turbine & GeneratorTurbine accessories & diagnostics systemsPlant performance
improvement through operation & maintenance Retrofitting &
up gradation Environment management
Target Audience:
About 200 participants are expected to participate
O&M personnel from leading Indian thermal power plants
State Electricity BoardsIndependent power producersCaptive thermal power plants
Benefits:
Exposure to the state of the art technologies, services available for performance improvement in
thermal power plantsLearning about latest
techniques for efficiency and overall improvement in their plants Sharing of experience
with operating and maintenance personnel from the best performing power plants
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Thermal Power&
Conference & Awards 2020th5
EDITION
The good O&M practices at thermal power stations have significance not only in terms of achieving high levels of performance parameters but also for ensuring the good health of the equipment at the power stations. Over the years, the power stations show deterioration in their performance due to ageing factor. The conditions of such power plants get further deteriorated if proper O&M practices are not followed in their operation. Improved O&M practices are also needed to sustain performance of rehabilitated power plants. Improving performance through interventions aimed at strengthening of O&M practices coupled with required R&M interventions is the quick and least cost alternative for augmenting the availability of power. This requires multiple interventions across various aspects including people, technology, process and infrastructure etc
Most of the state sector power utilities display a wide spectrum of operational practices in India having critical gaps in several key operational areas heading to reduce plant performance including efficiency, generation and availability. There is significant scope for improving overall performance of the underperforming State run power plants through strengthening of their O&M practices. Such O&M strengthening practices include various aspects like technology, O&M planning, conditional monitoring, preventive maintenance, O&M procedure, enhancement in technical and managerial skills of O&M personnel and infrastructure / facilities improvement.
In India, the overall efficiency of coal-based power plants ranges from 28 per cent to 35 per cent, depending on factors like plant size, operational practices used and the capacity utilisation factor. For optimum performance, the upkeep of all components and equipment should be strictly in compliance with the operations and maintenance (O&M) manuals and guidelines provided by the original equipment manufacturer (OEM). However, when plants have operated machines for as long as they have in India, they develop their own experience and exposure, which they use with future equipment.
Over the years, without proper O&M practices, power plant equipment and performance has deteriorated. Therefore, the adoption of effective O&M practices has become particularly relevant for sustaining the performance of rehabilitated power plants.
AN OVERVIEW
ConclusionAll state utilities operating TPPs have adopted their own set of standards and practices over the past many decades, each of which has resulted in varying degrees of efficiency. Going forward, they need very individual and specific recommendations to find the optimal O&M process that will enhance the life of plant machinery and equipment...
Operational practices vary widely among utilities, with the better managed ones exhibiting superior systems and procedures, and others facing critical gaps in many areas, resulting in lower availability, generation and energy efficiency.
This also leads to increased oil/coal and auxiliary power consumption. Most utilities still do not pay the required attention to energy efficiency. Energy audits are not carried out, and heat rate and specific oil consumption targets for the stations are not monitored. As such, unit-wise energy efficiency parameters are not identified and addressed. Auxiliary power consumption is not measured on an actual basis and is generally computed by deducting sent out energy from the total energy generated. In the absence of any proper analysis, measures for improvement cannot be identified.
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Thermal Power O&M - 2020 shall outline O&M best practices that enhance asset management and can protect the life of power plant equipment to the desired life-cycle of 30 years.
Presentations from best O&M practices include following well-established operating procedures, minimising frequent cold start-ups, reducing prolonged period of operating the unit with low load and
operating the unit beyond the design limit, cycling the unit per OEM´s recommendation, following condition-based monitoring, introducing online monitoring system, periodic condition assessment -
NDE, maintaining proper water chemistry, utilising proper spares, operating controllable parameters per OEM´s guidelines and staying well within the O&M budgeted cost shall be delivered during the
two day interactive sessions.
The discussion shall also include implementation of proper cycle chemistry to prevent boiler tube failures without causing significant loss to the company, annual plant audit, implement preventive
maintenance program, and reduce forced outages, RLA assessment and comprehensive cost analysis study performed including damaging cost on annual basis.
Mission Energy Foundation take privilege to announce the 5th Edition of Thermal Power O&M – Conference – Awards that is scheduled on 30 April 2020 at Taj Palace - New Delhi; which is again expected to attract participants worldwide focusing on O&M best practices that enhance asset management and can protect the life of power plant equipment to the desired life-cycle of 30 years. A day of 360 degree technical discussions will be packed with multiple networking opportunities among regional and international guests.
The objective of TPP O&M 2020 is to review of experience in strengthening of O&M practices in thermal power stations in India has been one of the core activities of the above project to highlight the benefits and experiences in the interventions by the concerned power utilities for strengthening of their O&M practices.
History of Thermal Power O&M Conferences...
th4EDITION
Thermal Power&
Conference & Awards 2019
28 June 2019, Dwarka - New Delhi
THE PURPOSE
th th24 & 25 September 2014, Navi Mumbai
Cost Reduction Strategies in
Thermal Power
&Thermal PowerO&M ConclaveThermal PowerO&M Conclave
st21 April 2016Mumbai
st21 April 2016MumbaiThermal Power
&
07 - 08 June 2018, New Delhi
CONFERENCE - EXPO - AWARDS
rd3EDITION
YEAR - 2019 YEAR - 2018 YEAR - 2016 YEAR - 2014
4 3 2 1
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Draft Agenda
Tme Session & Speakers
09.30 Hrs Registration & Welcome Tea
10.00 Hrs – 10.30 Hrs
Inaugural Function
Chief Guest Opening Remarks
Special Guest Welcome Address
Introduction to Thermal Power O&M - 2020
Shri Ashwinkumar Khatri, DG - Mission Energy Foundation
10.30 Hrs – 11.30 Hrs
Panel Discussion – O&M Challenges & Way Forward for Increasing PLF
An open house discussion among the expert panel and participants with cross-question-answer debates ensuring knowledge sharing among all.
12.00 Hrs – 13.30 Hrs
Integrated O&M Practices
O&M practices at varied thermal power stations shall be significantly discussed not only in terms of achieving high levels of performance parameters but also for ensuring the good health of the equipment at the power stations that includes Boiler, Turbine, CHP & AHP Optimisation & Balance of Plants
14.30 Hrs – 16.00 Hrs
Performance & Shutdown Monitoring
The session shall review O&M issues and plant performance, monitoring and comparison with historical data & other similar auxiliaries to be discussed in the presence of various station head along maintenance team
16.30 Hrs – 18.00 Hrs
Best O&M Practices at Power Stations (Case Studies)
The session shall review some of the best O&M practices that have been adopted by thermal power plants (TPPs) that have consistently met the country’s growing energy requirements.
18.00 Hrs – 18.30 Hrs
Power Stations Performance Awards 2020 – The Ceremony
Power Plant Performance Awards – 2020 in its present form will foster the competitive spirit amongst various power stations so as to encourage them to improve performance in all spheres of their working. The Awards would also help in evolving benchmarks for various performance indices..
18.30 Hrs – 19.30 Hrs
Networking Cocktail – Proposed*
Our aim is to deliver you an event that exceeds your expectations, thus becoming an
integrated part of your annual marketing program.
Sponsoring this will make your company stand out as a leader in this Thermal Power O&M - 2020burgeoning industry and will leave a strong impression of your brand in key decision makers minds. Sponsors have an incredible amount of presence and it will not only give your company optimum exposure but also the opportunity for delegates to meet you and your executives to find out more about your role and business opportunities in the sector.
Ÿ Gain PUBLICITY with our advertising and promotional campaigns
Ÿ Obtain DIRECT ACCESS to potential clients during and after with our meticulously prepared confidential delegate list
Ÿ Receive a KEY SPEAKING POSITION to address an audience of top executives and decision makers from the industry
Ÿ Create PERMANENT REMINDERS of your product or services in conference documentation
Ÿ Profile yourself as INDUSTRIAL LEADER, as your corporate logo and profile will be featured prominently in event marketing collaterals
Ÿ NETWORKING with the industries leading Government Officials, Senior Level Delegates and Experts
Ÿ Achieve GREATER EXPOSURE and BRAND BUILDING through our partners and much more
PRINCIPAL SPONSOR
INR 645000 / USD 9950
POWERING SPONSOR ASSOCIATE SPONSORSUPPORTING SPONSOR
For Details Contact:
Shri. S Dalvi, President Partnerships & Legal [email protected]
+919769310944
Sponsor Now!
KNOWLEDGE SPONSOR
INR 545000 / USD 8950 INR 445000 / USD 6950 INR 345000 / USD 5950 INR 245000 / USD 3950
7 Delegate Passes
Logo on Brochure Cover Page
Logo on Brochure Inside Page
Logo on Conference Backdrop
Logo on Registration Desk Backdrop
Logo on Conference Website (Hyperlinked)
Corporate Banner in Networking Area (6X3 Ft.)
Merchandise Distribution to attendees
Screening of Company Film
Circulation of Company Literature
Announcements - Thanking Sponsors
Speaking Opportunity - Day 1
Panel Discussion Moderator
5 Delegate Passes
Logo on Brochure Cover Page
Logo on Brochure Inside Page
Logo on Conference Backdrop
Logo on Registration Desk Backdrop
Logo on Conference Website (Hyperlinked)
Corporate Banner in Networking Area (6X3 Ft.)
Merchandise Distribution to attendees
Screening of Company Film
Circulation of Company Literature
Announcements - Thanking Sponsors
Speaking Opportunity - Day 2
Panel Discussion Panelist
3 Delegate Passes
Logo on Brochure Cover Page
Logo on Conference Backdrop
Logo on Conference Website (Hyperlinked)
Circulation of Company Literature
Announcements - Thanking Sponsors
Panel Discussion Panelist
1 Delegate Passes
Logo on Brochure Cover Page
Logo on Conference Backdrop
Logo on Conference Website (Hyperlinked)
Circulation of Company Literature
Announcements - Thanking Sponsors
Logo on Brochure Cover Page
Logo on Conference Website (Hyperlinked)
Circulation of Company Literature
Announcements - Thanking Sponsors
Why SPONSOR?
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Power Plant Performance Awards – 2020
Award Categories
01 FEB2020
1100 HrsNomination Opens
07 APR2020
30 APR2020
1700 HrsNomination Closes
1630 HrsWinners Shall be
awarded
‘Power Plant Performance Awards – 2020’ in its present form is intended to foster the competitive spirit amongst various power stations so as to encourage them to improve performance in all
spheres of their working. The Awards would also help inevolving benchmarks for various performance indices..
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer ≤ 500 MW –
LIGNITE
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer ≥ 500 MW –
LIGNITE
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer ≤ 500 MW – CCGT
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer ≥ 500 MW – CCGT
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer 2020 ≥ 500 MW COAL
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer 2020 ≤ 500 MW COAL
Power PlantPERFORMANCE
AWARD
20202020
Service Provider– O&M
Power PlantPERFORMANCE
AWARD
20202020
Service Provider
– Technology
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer – CCGT (CPP)
Power PlantPERFORMANCE
AWARD
20202020
Power Plant
Performer – COAL (CPP)
Power PlantPERFORMANCE
AWARD
20202020
Service Provider - Design
& Engg
Power PlantPERFORMANCE
AWARD
20202020
Life Time Achievement
Award
KEY DATES TO REMEMBER
Submit Power Point Presentation in form of CASE STUDY showcasing the work done in the selected category of award nomination that have helped you to achieve better results to [email protected] within 10 days
of your nomination.
The Winners of Power Stations Performance Awards - 2020 shall be honoured on the day of the conference i.e., 30 April 2020.
OBJECTIVE
Power PlantPERFORMANCE
AWARD
20202020
Power Plant Performance Awards - 2020 has been developed with a view to accord recognition to utilities
based on their all round performance by integrating the operational parameters like Peaking Plant Load Factor,
Secondary Oil Consumption, Auxiliary Power Consumption and Station Heat Rate. Design station heat rate would be
considered for evaluation.
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Past Sponsors
Power Plant Performance AwardsPast Winners
Thermal Power&
Conference & Awards 2020th5
EDITION
Taj Palace - New Delhi April202030
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
An ISO 9001 : 2008 Certified Company
Past Participating Companies
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Mission EnergyF O U N D A T I O N(A No t - fo r -Pro f i t Organ isa t ion )
Organiser
Mission Energy Foundation is a persistent, private, not-for-profit endeavour based in Mumbai, India.
We are a micro-enterprise initiative that strives to spread knowledge in the globalising energy sector. We educate and spread technology awareness through ongoing contacts and discussions with the public and industry concerning what the future of the growing energy sector should be.
The beginning: A single man army with its mission to build platforms of discussion, exchange knowledge among industry professionals on core issues pertaining to growing energy sector.
Today: A human asset working together as one endeavour that expertise in organising and delivering successful international summits involving who's who from Entrepreneurs to Academicians to Government Authorities to Technology Providers to Consultants to Industry Professionals from the growing energy sector globally.
Mission Energy Foundation (A not-for-profit Organisation)
003, B-16, Sector 1, Shanti Nagar, Mira Road, Thane, Maharashtra - 401107
http://tpp2020.missionenergy.org [email protected]+91 98560 98360
Thermal Power&
Conference & Awards 2020th5
EDITION
DELEGATE DETAILS
Company:____________________________________________________________________
Address:___________________________________________________________________
____________________________________________________________________________
City:______________________Pincode: _____________________ State: ________________
Kindly Provide Your Organisation GSTIN: ___________________________________________
Delegate Nomination Filled By: (Liason Officer for Co-ordinates)
Name: ______________________________________ Job Title:________________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
Conference Attendee Details
Delegate (1): ______________________________________ Job Title:___________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
Delegate (2): ______________________________________ Job Title:___________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
Delegate (3): ______________________________________ Job Title:___________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
>3 Delegates 5%
>7 Delegates 10%
Group Discount
Way to Register
Mission Energy Foundation recognises the value of learning in terms. Group bookings at the same time from the same company receive discount:
This offer is exclusive of the early bird discount. Call us for a special discount rate for terms of 10 and above (Not applicable to clinic(s) only bookings).
Payment Methods
Helpline: +91 98560 98360
Post: 003, B-16, Sector 1 Shanti Nagar, Mira Road (East) Thane, Maharashtra – 401107
Online:
Email: [email protected]
By Check/Bank Draft :
All instruments to in favor of “Mission Energy Foundation” (payable at Mumbai)and send to, Mission Energy Foundation003, B-16, Sector 1, Shanti Nagar, Mira Road (East)Thane, Maharashtra 401107 | Helpline: 98560 98360
Organisation Details :
Organisation: Mission Energy FoundationCIN: U74120MH2012NPL233716PAN: AAICM0818MService Tax: AAICM0818MSD002GSTIN: 27AAICM0818M1Z7
By Direct Transfer :
Bank Name: Kotak Mahindra BankAccount Name: Mission Energy FoundationAccount Number: 0111221660Account Type: Current AccountBranch Name: Mira Road (East)Branch Address: E-Wing, Latif Park,
Mira Bhayandar Road, Mira Road (E), Thane - 401107
Branch Telephone: +91 22 28120740 / 48 / 49MIRC Code: 400485051IFSC / RTGS: KKBK0000649SWIFT Code: KKBKINBB
All bank charges to be borne by payer. Please ensurethat our bank receives the full invoiced amount.
Delegate Fee
Indian Delegate: INR 14500 Per Delegate + 18% GST¨Overseas Delegate:USD 350 Per Delegate¨
Venue
Payment is required within 10 working days on receipt of invoice. If a booking is received 10 working days before the conference a credit card number will be taken to confirm your place, likewise if full payment has not been received before the conference date.
NOTE: Ÿ Kindly fill the registration form completelyŸ Kindly provide with a valid email id for correspondenceŸ A confirmation of the registration will be sent via email after receipt of the paymentŸ No refund will be made in case of no-show / no-attendanceŸ Registration fee is exclusive of service tax as applicableŸ Registration fee include lunch, refreshment and conference document/material at the venue. Ÿ It does not include cost of accommodation and travel
Cancellation Policy: Should a delegate be unable to attend, a substitute delegate from the company is always welcome at no extra charge. Alternatively, for any cancellations, the following rules shall applyŸ 70% refund of registration fee if cancellation is done on or before 20 working days of the scheduleŸ 50% refund of registration fee if cancellation is done on or before 15 working days of the scheduleŸ Thereafter, no refunds can be made
Important note: Please quote the name of the participant and event title on the advice when remitting payment. Bank charges to be deducted from the participation organisation's own accounts. Attendance will only be permitted upon receipt of full payment. It may be necessary for reasons beyond the control of the organisor to alter the content or the event date or location or the identity of the speaker/s.
Payment Terms
(For more than 3 delegates kindly make copies of the registration form)
Taj Palace - New Delhi April202030
Delegate RegistrationForm
Taj Palace - New Delhi
http://tpp2020.missionenergy.org
Thermal Power&
Conference & Awards 2020th5
EDITION AWARD NominationForm
Company :___________________________________________________________________
Address : ___________________________________________________________________
____________________________________________________________________________
City:______________________Pincode: _____________________ State: ________________
Kindly Provide Your Organisation GSTIN: ________________________________________
Award Nomination Filled By: (Liason Officer for Technical / Other Co-ordinates)
Name: ____________________________________Job Title:___________________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
Conference Attendee Details (Complimentary)
Name: ____________________________________Job Title:___________________________
Tel: _______________________ Mobile: _______________________ Fax: _______________
Email: ____________________________________ Alt Email: __________________________
¨ Indian Company: INR 26500 + 18% GST¨ Overseas Company: USD 750
(per Nomination per Selected Category)
Award Nomination Fee
Payment is required within 10 working days on receipt of invoice. If a booking is received 10 working days before the conference a credit card number will be taken to confirm your place, likewise if full payment has not been received before the conference date.
NOTE: Ÿ Kindly fill the registration form completelyŸ Kindly provide with a valid email id for correspondenceŸ A confirmation of the registration will be sent via email after receipt of the paymentŸ No refund will be made in case of no-show / no-attendanceŸ Registration fee is exclusive of service tax as applicableŸ Registration fee include lunch, refreshment and conference document/material at the venue. Ÿ It does not include cost of accommodation and travel
Cancellation Policy: Should a delegate be unable to attend, a substitute delegate from the company is always welcome at no extra charge. Alternatively, for any cancellations, the following rules shall applyŸ 70% refund of registration fee if cancellation is done on or before 20 working days of the scheduleŸ 50% refund of registration fee if cancellation is done on or before 15 working days of the scheduleŸ Thereafter, no refunds can be made
Important note: Please quote the name of the participant and event title on the advice when remitting payment. Bank charges to be deducted from the participation organisation's own accounts. Attendance will only be permitted upon receipt of full payment. It may be necessary for reasons beyond the control of the organisor to alter the content or the event date or location or the identity of the speaker/s.
Payment Terms
We apply for below category of Award:
¨ Power Plant Performer 2020 ≤ 500 MW – COAL
¨ Power Plant Performer 2020 ≥ 500 MW – COAL
¨ Power Plant Performer 2020 ≤ 500 MW – Lignite
¨ Power Plant Performer 2020 ≥ 500 MW– Lignite
¨ Power Plant Performer 2020 ≤ 500 MW – CCGT
¨ Power Plant Performer 2020 ≥ 500 MW – CCGT
¨ Power Plant Performer 2020 – COAL (CPP)
¨ Power Plant Performer 2020 – CCGT (CPP)
¨ Service Provider of the Year – Technology
¨ Service Provider of the Year – O&M
¨ Service Provider of the Year – Design & Engineering
¨ Life Time Achievement Award
>2 Category 5%
>5 Category 10%
Group Discount
Way to Register
Mission Energy Foundation recognises the value of learning in terms. Group bookings at the same time from the same company receive discount:
This offer is exclusive of the early bird discount. Call us for a special discount rate for terms of 10 and above (Not applicable to clinic(s) only bookings).
By Check/Bank Draft :
All instruments to in favor of “Mission Energy Foundation” (payable at Mumbai)and send to, Mission Energy Foundation003, B-16, Sector 1, Shanti Nagar, Mira Road (East)Thane, Maharashtra 401107 | Helpline: 98560 98360
Organisation Details :
Organisation: Mission Energy FoundationCIN: U74120MH2012NPL233716PAN: AAICM0818MService Tax: AAICM0818MSD002GSTIN: 27AAICM0818M1Z7
By Direct Transfer :
Bank Name: Kotak Mahindra BankAccount Name: Mission Energy FoundationAccount Number: 0111221660Account Type: Current AccountBranch Name: Mira Road (East)Branch Address: E-Wing, Latif Park, Mira Bhayandar Road, Mira Road (E), Thane - 401107Branch Telephone: +91 22 28120740 / 48 / 49MIRC Code: 400485051IFSC / RTGS: KKBK0000649SWIFT Code: KKBKINBB
All bank charges to be borne by payer. Please ensurethat our bank receives the full invoiced amount.
Payment Methods
Venue
Helpline: +91 98560 98360
Post: 003, B-16, Sector 1 Shanti Nagar, Mira Road (East) Thane, Maharashtra – 401107
Online:
Email: [email protected]
http://tpp2020.missionenergy.org
Taj Palace - New Delhi
Taj Palace - New Delhi April202030