The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier, Inc. 123 West Front Street Traverse City, Michigan 49684 (231) 946-6874 Prepared by: King & MacGregor Environmental, Inc. 40595 Koppernick Road Canton, Michigan 48187 (734) 354-0594

The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

The Village at Grand Traverse Phase 1

Stormwater Management Recommendations

December 22, 2011

Prepared for: Gourdie-Frasier, Inc. 123 West Front Street

Traverse City, Michigan 49684 (231) 946-6874

Prepared by: King & MacGregor Environmental, Inc.

40595 Koppernick Road Canton, Michigan 48187

(734) 354-0594

Page 2: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

King & MacGregor Environmental, Inc. December 22, 2011 VGT Phase 1 – Stormwater Recommendations 2

INTRODUCTION King & MacGregor Environmental, Inc. was retained by Gourdie-Frasier, Inc. to provide recommendations on how wetland vegetation might be used to increase the ability of stormwater management basins to detain and treat stormwater as part of Phase 1 of The Village at Grand Traverse (VGT) development. Stormwater management is proposed to occur in two locations, with both locations consisting of a series of three tiered basin. One recognized approach to using wetland vegetation in stormwater management can be described as the best management practice (BMP) “constructed wetland use in nonpoint source control” as defined by the Michigan Department of Environmental Quality’s Guidebook of Best Management Practices for Michigan Watersheds. A subset of this BMP is a pond/wetland system. Using the MDEQ’s Guidebook as a framework, we offer the following recommendations for the development of a pond/wetland system at VGT Phase 1. PROJECT GOALS Typical goals in pond/wetland systems are to develop a stand of vigorous wetland vegetation that slows stormwater flow through ponding and meandering flow pathways, provides opportunity for suspended solids to settle out of the stormwater, and uses vegetation growth to take up nutrients and soluble pollutants in the water. CONCEPTUAL DESIGN RECOMMENDATIONS As shown in Figures 1-3, we recommend creating microtopograpraphic features that create a heterogeneous surface along the bottom of the first and second basins. The goal of creating these varying water depths is to establish differences in environmental conditions that can support a greater diversity of vegetation. The different elements are described as follows:

Plunge Pool. This pool dissipates energy and allows for initial settling of suspended

sediments. Under normal conditions (i.e. not during a storm event), this pool would have a minimum water depth of 3 feet.

Low Marsh Zone. Water depths of 3-9 inches under normal conditions.

High Marsh Zone. Water depths of 0-3 inches under normal conditions.

Pond. Water depths greater than 2 feet under normal conditions. The proposed design establishes a sinuous stormwater pathway in the first and second basins within the Low Marsh Zone. This pathway is a way to create a longer treatment train for runoff generated by first-flush and other lower-volume events (first-flush runoff is typically understood to contain a higher concentration of pollutants and therefore in need of maximum treatment). If runoff volumes are sufficient to fill both the first and second basins, the excess water will flow into the final “pond” basin. This pond will provide necessary storage volume in the system while also providing final treatment of any remaining suspended sediments. To aid in the establishment of plants in the first and second tier basins, we recommend spreading six inches of topsoil over the basins and then broadcasting a native wetland seed mix. A suggested planting mix is provided in Figure 4. Our goal is to provide a diverse assemblage of plants that are native to Michigan and recognized in the trade as capable of withstanding the hydrologic conditions anticipated in these basins. Although the proposed wetland plants can withstand inundation, excessive water depths for extended periods of time will reduce their vigor. It is also our understanding that the native soils are very impermeable, thereby making infiltration of stormwater not feasible. Therefore, we recommend placing some engineering constraints on the maximum depths and duration of flooding in the vegetated cells.

Page 3: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

King & MacGregor Environmental, Inc. December 22, 2011 VGT Phase 1 – Stormwater Recommendations 3

We have represented those constraints as slow-release control structures and emergency spillways in the conceptual plans and have developed the planting schemes with a targeted maximum increase in water depth of 12 inches during storm events and a return to “normal” water levels within 72 hours. The proposed basin design also has the potential for the development of public access and educational programs. The berms that divide the individual basins in each series can be maintained as trails, which afford the public the opportunity to walk “into” the system and experience its component parts. Coupled with informational signage, it is possible to use this system as a demonstration that educates the public on how stormwater runoff can affect our natural environment and how BMPs such as this wetland/pond system seek to mitigate those impacts. The conceptual plans identifies possible trail alignments and educational sign locations. MANAGEMENT AND MAINTENANCE RECOMENDATIONS Once constructed, the stormwater basins should be inspected annually and maintained as needed to ensure proper function. Typical inspections should include tasks such as:

Inspections for failures such as eroding banks or undermining of riprap;

An estimation of sediment accumulation in plunge pools and ponds;

An examination of plant establishment and vigor;

An examination of invasive plant species establishment such as purple loosestrife (Lythrum salicaria), giant reed (Phragmites australis) and reed canary grass (Phalaris arundinacea); and

Inspection of the operation of any mechanical structures such as water control structures.

Typical maintenance should occur as warranted by the inspection results and may include such tasks as:

Removal of trash, debris, and excessive sediment deposits;

Mowing of access corridors;

Harvesting of wetland vegetation to promote plant growth and uptake of soluble nutrients and pollutants;

Controlling invasive species using best management practices; and

Reseeding areas of sparse vegetation. WATER QUALITY MONITORING RECOMMENDATIONS The Michigan Department of Environmental Quality has established water quality rules mandating that toxic substances shall not be present in the surface waters of the state at levels that are or may become injurious to the public health, safety, or welfare, plant and animal life, or the designated uses of the waters. Scientific studies suggest that pond/wetland systems such as the one proposed here are effective at reducing the contribution of pollutants from a developed site that may degrade natural systems such as wetlands and streams. Furthermore, stormwater detention systems in general function to reduce spikes in peak flow volume in receiving waters. However, the actual impact of any specific development on adjacent natural systems can only be determined through site specific monitoring. The receiving water for this site is Acme Creek. How stormwater from this development may affect the water quality of Acme Creek could be monitored by establishing a water testing program. Parameters that can be used to judge possible impacts include the composition of the aquatic macroinvertebrate population, dissolved oxygen concentration, water temperature,

Page 4: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

King & MacGregor Environmental, Inc. December 22, 2011 VGT Phase 1 – Stormwater Recommendations 4

specific conductivity, pH, volatile organic compounds, total organic carbon, total dissolved solids, total suspended solids and E. coli, of which have testing methods established by the US Environmental Protection Agency and the Michigan Department of Environmental Quality. Possible changes to the flow regime in Acme Creek can be evaluated by installing and monitoring stream gauges that measure both velocity and water level. To facilitate such a program, we recommend establishing two fixed testing locations with one at the upstream point where the Acme Creek enters the property and one at the downstream point where Acme Creek leaves the property. A recommended monitoring and reporting schedule is as follows:

Monitoring & Reporting Frequency

Study Parameter Baseline Year 1 Years 2-4 Years 5+ Macroinvertebrates Prior

Dissolved Oxygen To Monthly Quarterly Spring/Fall

Water Temperature construction

Specific Conductivity

pH

Volatile Organic Compounds

Total Organic Carbon

Total Dissolved Solids

Total Suspended Solids

Water Velocity & Level

Maintenance Inspection Annually Annually Annually

A comparison of the upstream and downstream values over time can be used by interested parties to develop lessons learned from how this BMP was implemented at VGT Phase 1 and how its use might be improved for other projects in the future. REFERENCES Center for Watershed Protection, National Pollutant Removal Performance Database, version 3. 2007

Michigan Department of Environmental Quality, Guidebook of Best Management Practices for Michigan Watersheds. 1998 Michigan Department of Environmental Quality, Water Bureau, Water Quality Standards.

Administrative Rules filed 200

United States Environmental Protection Agency, Field Operations Manual: Wadeable Streams Assessment. 2004

Page 5: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

11+00

12+00

13+00

Pon

d

Low

Mar

sh(3

-6" w

ater

dep

th)

Hig

h M

arsh

(0-3

" wat

er d

epth

)

Slo

w re

leas

e w

ater

cont

rol s

truct

ure

Mic

ropo

ol

01

Concept Plan ~Western Basins

NO

RTHN

Plu

nge

Poo

l

40'

80'

0

1"=

40'

20'

Em

erge

ncy

over

flow

Pro

ject

Des

crip

tion

Sig

n

Gra

ssed

sw

ale

over

flow

Hab

itat

stru

ctur

e

Page 6: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

22+

0023

+00

24+

0025

+00

26+

0027

+00

Pon

d

02

Concept Plan ~Eastern Basins

NO

RTHN

Ove

rall

Pro

ject

Des

crip

tion

Sig

n

Hig

h M

arsh

(0-3

" wat

erde

pth)

60'

120'

0

1"=

60'

30'

Mic

ropo

ol

Em

erge

ncy

over

flow

Slo

w re

leas

e w

ater

cont

rol s

truct

ure

Low

Mar

sh(3

-6" w

ater

dept

h)

Hik

ing

trail

Plu

nge

Poo

lP

roje

ct D

etai

l Sig

n

Gra

ssed

swal

eov

erflo

w

Hab

itat

Stru

ctur

e

Page 7: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

03

Typical Section

NO

RTHN

Hig

h M

arsh

(0-3

" wat

erde

pth)

Mai

nten

ance

acc

ess

berm

Plu

nge

Poo

lP

ond

Low

Mar

sh(3

-9" w

ater

dept

h) Typi

cal C

ross

Sec

tion

Page 8: The Village at Grand Traverse Phase 1 - Acme · 2017. 1. 26. · The Village at Grand Traverse Phase 1 Stormwater Management Recommendations December 22, 2011 Prepared for: Gourdie-Frasier,

04

Planting Scheme

NO

RTHN

SE

ED

MIX

:FO

RB

SS

PE

CIE

SC

OM

MO

N N

AM

ER

ATE

(PLS

OZ.

/AC

.)Ac

orus

cal

amus

Sw

eet Flag

2.2

Alism

a pl

anta

go-a

quat

ica

Mud Plantain

1.1

Alliu

m c

ernu

umN

odding O

nion

2.2

Anem

one

cana

dens

isCanada Anem

one

0.5

Ange

lica

atro

purp

urea

Angelica

8.0

Ascl

epia

s inc

arna

taSw

am

p M

ilkw

eed

6.0

Aste

r nov

ae-a

nglia

eN

ew

England Aster

2.0

Aste

r um

bella

tus

Flat-topped Aster

0.5

Bolto

nia

aste

roid

esFalse Aster

0.5

Eupa

toriu

m m

acul

atum

Joe Pye W

eed

1.0

Eupa

toriu

m p

erfo

liatu

mBoneset

1.0

Gent

iana

and

rew

siiBottle G

entain

0.6

Hele

nium

aut

umna

leSneezew

eed

1.1

Helio

psis

helia

ntho

ides

Early Sunflow

er

1.1

Iris v

irgin

ica

shre

vei

Southern Blue Flag

4.4

Lobe

lia c

ardi

nalis

Cardinal Flow

er

1.0

Lobe

lia si

phili

tica

Great Blue Lobelia

2.0

Lyco

pus a

mer

ican

usW

ater H

orehound

2.0

Lysim

achi

a qu

adrif

lora

Prairie Loosestrife

0.5

Pycn

anth

emum

virg

inia

num

Mountain M

int

1.1

Rudb

ecki

a hi

rta

Black-eyed Susan

2.2

Solid

ago

ridde

llii

Riddell's G

oldenrod

1.1

Thal

ictr

um d

asyc

arpu

mPurple M

eadow

Rue

3.3

Verb

ena

hast

ata

Blue Vervain

2.0

Vern

onia

fasc

icul

ata

Com

mon Ironw

eed

2.2

Vero

nica

stru

m v

irgin

icum

Culver's Root

0.5

Zizia

aur

eaG

olden Alexanders

4.0

GR

AM

INO

IDS

SP

EC

IES

CO

MM

ON

NA

ME

RA

TE (P

LS O

Z./A

C.)

Andr

opog

on g

arar

dii

Big Bluestem

13.1

Brom

us c

iliat

usFringed Brom

e7.

8Ca

lam

agro

stis

cana

dens

isBlue Joint G

rass

0.5

Care

x be

bbii

Bebb's O

val Sedge

2.2

Care

x co

mos

aBristly Sedge

2.2

Care

x hy

ster

icin

aPorcupine Sedge

2.2

Care

x lu

pulin

aCom

mon H

op Sedge

2.2

Care

x st

ipat

aCom

mon Fox Sedge

2.2

Elym

us c

anad

ensis

Canada W

ild Rye

7.8

Elym

us v

irgin

icus

Virginia W

ild Rye

7.8

Glyc

eria

gra

ndis

Reed M

anna G

rass

2.2

Junc

us c

anad

ensis

Canada Rush

0.5

Pani

cum

virg

atum

Sw

itch G

rass

2.2

Scirp

us a

trov

irens

Dark-green Bulrush

1.1

Scirp

us c

yper

inus

Wool G

rass

0.6

Scirp

us v

alid

usG

reat Bulrush

1.1

Sorg

astr

um n

utan

sIndian G

rass

14.4

Spar

tina

pect

inat

aCord G

rass

2.2

TRE

ES

& S

HR

UB

S:

SP

EC

IES

CO

MM

ON

NA

ME

Ace

r rub

rum

Red

Map

leA

cer s

acch

arum

Sug

ar M

aple

Cel

tis o

ccid

enta

lisH

ackb

erry

Pla

tanu

s oc

cide

ntal

isS

ycam

ore

Pin

us s

trobu

sW

hite

Pin

eA

mel

anch

ier l

aevi

sS

ervi

cebe

rry

Aro

nia

prun

ifolia

Cho

kebe

rry

Cor

nus

stol

onife

raR

ed T

wig

Dog

woo

dP

hyso

carp

us o

pulif

oliu

sN

ineb

ark

Sam

bucu

s ca

nade

nsis

Am

eric

an E

lder

SA

ND

MO

UN

DS

:

WH

OLE

TR

EE

S:

Who

le tr

ees

to b

e in

stal

led

horiz

onta

lly. T

rees

sha

ll be

a m

inim

um o

f 20

feet

long

and

12

inch

es in

dia

met

er a

t bre

ast h

eigh

t (db

h). D

o no

t trim

dow

n fin

e st

ruct

ure

of li

mbs

. At l

east

50%

of e

ntire

stru

ctur

e sh

all e

xten

d 6

inch

es a

bove

pro

ject

ed h

igh

wat

er le

vel.

San

d pi

led

a m

inim

um o

f 18

inch

es in

dep

th a

nd p

lace

d so

that

they

are

sur

roun

ded

by a

min

imum

of 3

0 fe

et o

f wat

er m

easu

ring

at le

ast 1

8 in

ches

in d

epth

. The

san

d m

ound

sha

llha

ve a

t lea

st a

200

squ

are

foot

are

a th

at is

18

inch

es a

bove

the

proj

ecte

d no

rmal

wat

er le

vel.

HA

BIT

AT

STR

UC

TUR

ES

: