17

THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection
Page 2: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

THE TOTAL HIGH ENERGY SYSTEM BUILT FROM THE FLOOR UP... FOR TODAY’S METAL FINISHING

Fremont, the leader in metal pretreatment chemicals is proud to present another breakthrough for metal finishing.

A totalpackage source for: high performance equipment custom designed for the metal finishing industry and ... performance matched phosphatizing chemicals.

Finally, one source that has the capabilities and knowledge to produce asystem designed for the demands of the metal finisher

Fremont, long the leader in metal pretreatment chemicals is proud to present another breakthrough for our industry.

A machine designed from the floor up to meet the rigorous demands of the metal pretreatment industry. A machine that is unmatched for efficiency, dependability, and pedorma nce.

These units bristle with quality features that virtually obsolete equipment as we now know it. Features like stainless steei combustion chambers for maximum fuel efficiency and extended service life, or easy access panels so that service when it is needed, is easy and efficient.

Eiectronic ignition for safe and dependable burner operation.

~ e a ~ ~ ~ r resistant electrical enciosur2.s to ensure continuous and dependable operation. These units are designed for our in d u st r y , with specialy S uilt ail stainless steel fixed ratio chemical injectors; producing precise metering of chemical, no chemical adjusting necessary. This feature allows consistent operation with no chemical waste and provides uniform quality without second .g uessin g the operator’s desires for more foam. The fixed orifices save chemical, assure dependable operation, and eliminate field adjustment problems. Each machine has three separate injectors ystems to handle all facets of pretreatment: 1,3, & 5 stage application.

PATENT PENDING

Page 3: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

A COUPLE OF WORDS ON SMALL PARTS. . .

PHOS-MATE The Fremont High Energy Concept is a fast effective way to clean large parts. We cannot unleash this high energy concept on small parts unless we have a way of containing them. The PHOS-MATE is just the tool for this application.

The stainless steel cabinet washer attaches to the Models 1100 and 1600 Fremont Phosphatizing Systems and utilizes the pressure, heat, and high performance chemical injection features of the Fremont System to clean up to 240 pounds of parts per cycle.

A unique and effective way to get a quality pretreatment on small parts. The system includes six nozzles delivering spray at three different angles, the parts basket rotates at 12 RPM so in just a couple of minutes your parts have been barraged from dozens of different angles for thorough cleaning .

Page 4: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

RUST Severe rust as shown at the left causes certain paint failure.

Heavy rust on the bottom of parts is caused by water sitting on flat or cupped areas of the part. To correct the problem; 1) drain water from flat and cupped surface areas after washing by tipping parts; 2) make sure that parts dry completely a few minutes after washing.

Page 5: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

CLEANING AND PHOSPHATING TROUBLESHOOTING:

SOLUTION STRENGTH

Soap, (above) must be coming out of the line to clean and phosphate. Parts cannot be properly washed with solution as shown in the picture below.

WHITE POWDER White powder on parts shown at the right will cause paint failure. This normally indicates excessive chemical residue caused by using too strong of a chemical solution, poor rinsing, or washing parts too long. To correct the problems; 1) make sure your chemical solution is at the right operating strength, 2) rinse parts better and longer, or 3) wash parts faster.

Page 6: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

A JOB WELL DONE:

Parts that are properly cleaned and phosphated provide good adhesion to keep paint from chipping or peeling. Parts also look better.

The first step to getting a satisfied customer is the quality of your paint finish ... because the first thing a customer notices when your product is delivered to him is the quality of the paint job.

Everybody can see the difference between a good paint finish and a bad one. When he sees a good looking product, he is pleased. He knows that your product will give him what he wanted; reliable, long and useful service.

Selection Suggestion:

Model 1100

A5GPM, 1000PSl,200°F machine for cleaning heavier metals such as construction and agriculture equipment. The 550,000 BTU burner provides enough heat to assure good quality phosphate coatings even on heavy castings or structural beams and rails. Both gun and wand are insulated to protect operator and assure maximum efficiency .

Selection Suggestion:

Model 1600

Many applications require some sand-blasting of weldments, etc. prior to phosphatizing. The 1600 sandblasts at 2000 PSI then quickly converts to a 1500 PSI phosphate system to finish even the toughest phosphatizing applications in cost slashing time.

Page 7: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

IS THE PART PHOSPHATED: I

Page 8: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

IS THE PART CLEAN:

It is important to take enough time to wash each part properly and thoroughly ... whether the part is large or small.

Washing a part too fast just won’t get it clean. It is impossible to get good phosphate on a dirty part. Paint won’t stick to a part without good phosphate. If parts are washed too fast the first time around, chances are they will come back as paint rejects and you’ll have to do them over again.

Page 9: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

SAFETY

DISPOSAL All Fremont personnel are kept up to date on an ongoing basis as to the latest requirements and technology concerning this vitally important issue. Fremont is proud of its reputation as a technological leader in providing education, products, and services to help us all protect the environment.

Your Fremont representative can be available to meet with your waste management personnel to make certain there are no waste disposal problems.

DISCHARGE NEUTRALIZING SYSTEM Part #2165: To be ordered with machine only. All Fremont phosphatizing chemicals are biodegradable and compatible with our environment , however some situations require a neutral (pH7) solution right at the source. This device automatically dispenses a caustic solution to the cleaning booth drain to neutralize phosphatizing solutions right at the source. The system includes an LMI fully adjustable metering pump that is prewired to the phosphatizing system to meter precisely the amount of chemical needed for neutralization only during those times the operator is actually using the acid phosphatize r.

Page 10: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

WHATEVER YOUR PRETREATMENT REQUIREMENTS ARE ...

ONE STAGE

Saves time, energy and water. A highly efficient single step product to clean, phosphatize and seal all in one dynamic step. Reduces time to prepare a part by 22% over conventional three stage process.

This process uses less water due to shorter process time and no rinsing being required.

Fremont has several specially formulated one step cleaner phosphates to meet your specific requirements.

THREE STAGE

Each Fremont system has two precisely calibrated stainless high pressure injectors. This contribution allows your operator to 1) Apply a heavy duty combination cleaner/ phosphatizer. 2) Rinse the part. 3) Apply a non-chrome seal rinse for ultimate uniform and complete phosphate coating. Fremont Industries has four different cleaner phosphate and three seal rinse products to be sure we meet or exceed the requirements of your application.

FIVE STAGE

In some cases, it might be necessary to utilize a five stage process. Sometimes just to meet a specification, whether or not it’s needed to clean and phosphate, a company must use a five stage process. Each Fremont system has the capability to deliver the five stages of conventional phosphatizing. Whether or not you use it, it’s certainly prudent to have that capability in any system you select.

Fremont Industries is the only company that can supply your total phosphatizing needs of chemical, equipment and the latest technology in the metal pretreatment industry.

Page 11: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

PHOSPHATIZING EQUIPMENT, CHEMICALS, COMMITMENT

Page 12: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

Heavy Duty Nema Standard Industrial Motors With Thermal Protection

Electronic Motor Starters /

Stainless Steel High Pressure Swivel

Y

Heavy Duty V-Belt Drive / Calibrated Flow

Heavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers

- Zero Pressure Unloader

-Lighted Diagnostic Control Panel

- High Pressure Soap Injection

Automatic Time Delay Shut Off

- Stainless Steel Float Tank

Heavy Duty Tubular Frame, Phosphatized With Chromate Prime and Acrylic Top Coat

Page 13: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

Performance Matched Draft Diverter (not shown)

Adjustable Temperature Controller With Hi-Limit Cutout (140-200OF) \ Hour Meter

Coil Assembly Easily Removed For Services

Double Protected Safety Relief System

Unique 2 Coil Design Capable of 21 OOWat

High Efficiency

Heavy Duty Schedule 80 Coil

Extended Service Life

All Stainless Steel Fixed Injector System

Stainless Combustion Chamber -

Natural Aspirated Gas Burner - Electronic Ignition

Easy Access Stainless Steel Panels

All Stainless Steel Insulated Dual Wand With Chemical On/Off Operation

High Pressure Wire Braid Hose - With Stainless Steel Ends

Page 14: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

A LOW INVESTMENT CONCEPT THAT CAN PRODUCE 5 STAGE PHOSPHATIZING RESULTS

Page 15: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

Model

H.P.

Electrical

Amps

Connection

GPM

Pressure: Max. Phosphatize

Burner Input

Gas Connection

Fuel Requirements: Natural Gas

L.P.

Stack Size

Water Connection

Dimensions: Length Width Height

Weight: Dry Shipping

Options Available

900

4

230 V-1 Phase

20

3 wire through junction box

4

1600 800

440,000 B.T.U.

3/4” N .P.T

7-9” W.C.

11 ” W.C.

10“

Standard Garden Hose-Female Swivel

58” 29” 47”

600# 800#

Chemical Neutralizing System

1100

6

230 V-3 Phase

25

4 wire through junction box

5

1800 1000

550,000 B.T.U.

3/4” N . P .T .

7-9” W.C.

11 ” W.C.

12”

Same as 900

64” 28” 58”

800# 1 OOO#

Chemical N eu t ralizi ng System Wet Sandblast Attachment Phos-Mate Small Parts Cabinet

1600

230 V-3 Phase

25

4 wire through junction box

5

2200 1400

550,000 B.T.U.

314” N. P.T

7-9” W.C.

11” W.C.

12”

Same as 900

64” 28” 58”

900# 1 1 OO#

Chemical Neutralizing System Wet Sandblast Attachment Phos-Mate Small Parts Cabinet

Page 16: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection
Page 17: THE TOTAL HIGH ENERGY SYSTEM - P2 InfoHouseHeavy Duty Triplex Oil Bath 'Pump With Ceramic Plungers - Zero Pressure Unloader -Lighted Diagnostic Control Panel - High Pressure Soap Injection

WARRANTY We warranty each new machine sold by us to be free from manufacturing defects in normal service for a period of one (1) year commencing with delivery of the machine to the original owner:'

'Some restrictions apply.

FREMONT INDUSTRIES, INC. 4400 Valley Industrial Blvd. N. Shakopee, MN 55379 Phone: (612) 445-4121 Fax: (612) 496-3027