The Tulsa Metropolitan Area
Path Forward Action Plan
for
Ozone Advance
A N O D E Q - I N C O G P A R T N E R S H I P
2013
OK Department of Environmental Quality Air Quality Division
P.O. Box 1677 Oklahoma City, OK 73101-1677
Phone 405-123-4567 www.DEQ.State.OK.US
INCOG 2 W 2ND Street, Suite 800
Tulsa, OK 74103 Phone 918-584-7526 www.INCOG.Org
Table of Contents
1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1. Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
2. Agency Partnerships and Public/Stakeholder Participation . . . . . . . . . . . . . . . . . . 2
3. Geographic Coverage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4. Current Monitoring Status and Trend . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
5. Plan Duration and Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
2.0 Path Forward– Planning Measures and Emission Reduction Strategies . . . . . . . . . . . . . . . . . . . . . 8
1. Enhanced Public Outreach and Education Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. Energy Efficiency Strategies and Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
3. Compressed Natural Gas (CNG)/Alternative Fueled Vehicle and
Infrastructure Strategies and Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4. Transportation System Strategies and Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
5. Department of Environmental Quality Programs and Rulemakings . . . . . . . . 28
6. Major Tulsa Area Facility Industrial Retrofits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
3.0 Tulsa Area Ozone Advance Emission Reductions Projects Table. . . . . . . . . . . . . . . . . . . . . . . . . . 31
4.0 Path Forward Reduction Projects - Action Plan Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
1
1.0 Introduction
1. Executive Summary
The future of the Tulsa metropolitan area holds new business opportunities, existing business
expansion, economic prosperity and excellent quality of life for our community. Economic growth
however, is joined with the challenge of maintaining clean air quality.
The Tulsa area has a long proven history of air quality improvement at the regional level. In 1991,
shortly after the revision to the Clean Air Act and Tulsa’s regaining attainment, area ozone monitors
began to register exceedances of the ozone standard. Faced with the prospect of going back into
nonattainment, area officials turned to the Indian Nations Council of Governments (INCOG) who
formed an Air Quality Committee composed of local public agencies, the business community,
environmental interest groups, and interested citizens. In just two weeks’ time, the Air Quality
Committee developed and implemented the first voluntary episodic ozone prevention program of its
kind – Tulsa’s Ozone Alert! Program. This exemplary coalition of local stakeholders committed to
improving air quality and maintaining the ozone standard remains strong today.
Since the early 1990’s, ozone levels in the Tulsa area have dramatically improved. Voluntary and
common-sense initiatives through exemplary business and community partnership are foundational to
our air quality success. The Tulsa region with the Oklahoma Department of Environmental Quality
(ODEQ) has participated in the Flexible Attainment Region Program, the 1-hour Ozone Flex
Program, the Early Action Compact initiative and the 8-hour Ozone Flex Program.
Tulsa’s ozone improvement trend however has been interrupted by the two record-breaking summers
of 2011 and 2012 and we are now in the precarious position of having technically violated the ozone
standard. With continued and active determination, the Tulsa region remains committed to identify
and implement further emission reduction strategies to reduce precursors to ozone and improve air
quality.
Ozone Advance is a voluntary local approach providing a structure and framework for local actions to
improve air quality by reducing ozone forming emissions and thus maintain the 8-hour ozone National
Ambient Air Quality Standard (NAAQS). EPA issued Ozone Advance guidance in April 2012
Section
1
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
2
providing a recommended framework for participating areas. Soon thereafter, the INCOG Air Quality
Committee with regional stakeholders determined participation in Ozone Advance and authorized
ODEQ as the program’s lead agency. By letter of intent to EPA on October 30, 2012, ODEQ initiated
the Tulsa area’s participation in Ozone Advance.
This document is the Tulsa Metropolitan Area’s Path Forward Action Plan for Ozone Advance. It
includes a carefully developed mix of programs and strategies, identified through collaborative
stakeholder efforts, to expeditiously reduce ozone precursor emissions and improve air quality in the
Tulsa area.
2. Agency Partnerships and Public/Stakeholder Participation
The coordination of this plan essentially began twenty-three years ago with the establishment of the
first INCOG Air Quality Committee. Since that time, the stakeholder group has grown stronger,
added technical support groups, a public relations committee and many public and business partners.
The 2013 INCOG Air Quality Stakeholder core membership list is provided on the following page.
In early January, 2013, the INCOG Air Quality Chairman initiated a letter of participation and
invitation to the Ozone Advance Program planning process. In addition to the well-established
stakeholder group, invitation was sent to several hundred locally permitted industries, interested
parties, local businesses and the media. This initial and all subsequent Ozone Advance planning
meetings were open to the public, with posted meeting times and locations, and the plan’s drafting
process provided sufficient opportunities for participation and comment from all interested
stakeholders.
All components throughout the planning and development of this Action Plan advocated a consensus
of support and partnership. The collaborative development process incorporated input from many and
diverse air quality stakeholders – long and newly established.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
3
INCOG Air Quality Committee
2013 Stakeholder Membership
*Chairman
Isaac Akem, Federal Highway Administration
Nadine Barton, CASE
Mike Bednar, GRDA
Chris Benge, Tulsa Regional Chamber, Chairman*
Julia Bevers, OG & E
Rich Brierre, INCOG
Bill Cartwright, MTTA
Laura Chaney, Oklahoma Department of Transportation
Montelle Clark, ODEQ Air Quality Council
Gary Collins, Terra Nitrogen, LP
Bill Guebelle, ConocoPhillips
Michael Graves, Hall Estill Law Firm
Howard Ground, AEP-PSO
Andrew Haar, HollyFrontier Corporation
Bruce Heine, Magellan Midstream Partners, L.P.
Michael Henk, Environmental Citizen
Jeff Mulder, Tulsa Airport Authority
Mike Neal, Tulsa Regional Chamber
Lee Paden, Paden Law Firm
Michael Patton, M.e.t.
Steve Piltz, National Weather Service
Bill Potter, University of Tulsa
Don Pugh, American Airlines, Inc.
Ken Ruffin, AEP
David Streb, Oklahoma Department of Transportation
Eddie Terrill, Oklahoma Department of Environmental Quality
Mike Thornbrugh, QuikTrip Corporation
Barbara VanHanken, Sierra Club
Bob Wright, American Lung Association
Dewey Bartlett, Mayor, City of Tulsa
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
4
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
5
3. Geographic Coverage
The Tulsa Transportation Management Area (TTMA), which comprises all of Tulsa County and
portions of Creek, Osage, Rogers and Wagoner Counties is the minimum area covered by the Ozone
Advance Action Plan. The TTMA is viewed as the boundary most appropriate, supported by the
density of development and commuting patterns. The TTMA has been the area used by ODEQ and
INCOG for numerous air pollution control planning activities including all prior voluntary agreements
with the EPA. The Tulsa Air Shed and the TTMA are used interchangeably in this document. The
map below identifies the TTMA in relation to the MSA and the state.
The Tulsa Air Shed
Within the Tulsa Metropolitan Statistical Area
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
6
4. Current Monitoring Status and Trend
0.059
0.063
0.067
0.071
0.075
0.079
0.083
0.087
0.091
0.095
Ozo
ne
De
sig
n V
alu
e (
PP
M)
Years
Tulsa Area Ground-Level Ozone Plotting the 3-Yr Ozone Design Value
(the 3-yr average of the 4th highest ozone level each year) TULSA AREA OZONE TREND
.075 ppmCURRENT2008 EPA8-hr OzoneStandard
.084 PPM PREVIOUS EPA 8-HR OZONE STANDARD
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
7
5. Plan Duration and Reporting
The Ozone Advance Path Forward Action Plan is a local, proactive approach to ensure ozone
improvement, attainment of the ozone NAAQS, and to protect human health. Importantly, this
Plan is a ‘living document’, designed to evolve, grow and even change. As suggested in the EPA
Ozone Advance Guidance, this plan has captured designated control measures and strategies
over the next 5 years. Some are ongoing indefinitely, and are identified as such. When possible,
projects have implementation dates defined. At a minimum of annually, ODEQ with the Tulsa
area stakeholders will provide to EPA an update to this Action Plan.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
8
2.0 Ozone Advance - Planning
Measures and Emission Reduction
Strategies
INCOG and local entities in the Tulsa area have joined with the ODEQ to create a plan that
improves air quality using a common-sense approach. Ozone Advance makes it possible to
design significant and practical mobile, business, industrial and public emission reduction
strategies through local partnership efforts while protecting the region’s economy. This plan is
designed to provide for the continued reduction of ozone precursor and particulate emissions
using accelerated and reasonable control measures developed at the regional level.
This Ozone Advance Path Forward Action Plan is a starting point from which ongoing and
dynamic initiatives are launched. The Tulsa area is committed to continued air quality
improvement. These and other programs and initiatives will ensure continued protection of our
citizens’ health and quality of life.
Building on the strength and partnerships already established in the Tulsa Area, the projects and
strategies put forth in this Path Forward Action Plan are organized in the following manner:
1. Enhanced Public Outreach and Education Programs
2. Energy Efficiency Strategies and Programs
3. Compressed Natural Gas (CNG)/ Alternative Fueled Vehicle and Infrastructure
Strategies and Projects
4. Transportation System Strategies and Projects
5. Department of Environmental Quality Programs and Rulemakings
6. Major Tulsa Area Facility Industrial Retrofits
As suggested in the guidance, a table in the final section identifies each measure and program to
be implemented with description, key responsible agency, and implementation schedule.
Section
2
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
9
1. ENHANCED PUBLIC OUTREACH AND EDUCATION PROGRAMS
A. Tulsa Transportation Resource Center - The Transportation Resource Center (TRC)
is a dynamic and newly launched program designed to connect people to available
transportation options. The website, TulsaTRC.Org, highlights resources for biking,
walking and riding (both transit and rideshare). News and events are displayed
prominently on the homepage, and there is a special section for providers and partners to
learn about upcoming meetings and funding opportunities. Previously transit, carpool,
bicycle and pedestrian information was buried deep within the INCOG website.
Transportation Resource Center outreach efforts will include working at community
events, local company partnership and training, organizational meetings to present
information, and more.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
10
B. Tulsa Area Ozone Alert! Program - The Ozone Alert! Program takes a voluntary,
episodic approach to ozone pollution reduction. Twenty-three years strong, Tulsa’s
unique and regionally-supported program continues to expand in partnership, programs
and public awareness. Governments, businesses, industries and individuals are urged to
take voluntary action to reduce emissions of ozone. The OzoneAlert.Com website is the
hub of the program that during the summer months, extends throughout all major media
outlets, weather and news, the Tulsa World, and area communities. The email and text
Alert! systems provide awareness to many thousands of subscribers, local news and
meteorologist mobile apps send alerts, and ODOT’s highway message signs alert
commuters.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
11
Tulsa’s Ozone Alert! Program won the Henry Bellmon 2012 Award for Quality of Life for All (http://youtu.be/YgjdSp1_e9E)
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
12
C. Tulsa Area Clean Cities - Tulsa Area Clean Cities (TACC) is a local
government-industry partnership tasked to reduce petroleum consumption in the
transportation sector by advancing the use of alternative fuels and vehicles, idle
reduction strategies, hybrid and electric vehicles, and fuel economy measures.
TACC’s vision is to engage Northeastern Oklahoma municipal, county and state
fleet managers, as well as private industry fleet managers to build on Oklahoma’s
rich history of oil production by harnessing the power of other abundant natural
resources in our great state; natural gas, vast crop land, wind, and sun to create
new energy for a new tomorrow. Designated in 1997, the Tulsa Area Clean Cities
Coalition consists of 120 local partners and stakeholders today.
The TACC 2012 annual survey of stakeholder fleets showed a reduction of
2,020,201 equivalent gallons of petroleum fuel. The survey indicated that 85% of
the recorded gasoline reduction can be attributed to alternative fuel vehicles.
The TACC’s goals and objectives as solidified in the 2013 TACC Annual
Operating Plan, directly enhance and benefit Tulsa’s Ozone Advance efforts to
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
13
improve air quality. The coalition’s alternative fuel vehicle and infrastructure
development implementation goals include:
Fleet Adoptions - One Year Goals
Promote idle reduction technologies especially to utility and police
fleets
Develop Oklahoma’s tax credits to allow school districts and
municipalities to take full advantage of the funds
Target specialized fleets such as pharmaceutical, medical
deliveries, and trade organizations
Work with small business organizations to convert well-
established local small fleets
Continue to build relationship with tribal governments for
conversion of their fleets
Continue to build relationships with Pelivan Transit and KI BOIS
Area Transit, two rural transit systems in the process of converting
to CNG
Fleet Adoptions - Five Year Goals
Get ten new fleets to commit to converting 50% of their fleet to
AFVs
Assist municipal fleets with their goals of 5% of their fleets to be
alternative fuel vehicles
Infrastructure Development - One Year Goals
Electric Vehicle Supply Equipment (EVSE) installations around
the Tulsa area and in Stroud, OK. Stroud is the halfway point
between Tulsa and Oklahoma City. A level 3 charging station at
the travel stop in Stroud would allow cars like the Nissan Leaf to
travel between the two cities.
Get 3 new CNG stations built in our region.
Build stronger relationships with local gas and electric utilities to
have them more involved and engaged as alternative fueling
infrastructure grows.
Continue to educate the region about the need for infrastructure.
Continue to research and seek funding opportunities toward our
long term goals.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
14
Continue to be a resource for private/public partnerships towards
building infrastructure.
Infrastructure Development - Five Year Goals
Rural CNG station development in areas with an emerging demand
and along corridors from Tulsa to other cities such as Dallas, TX
and Wichita, KS, and Kansas City.
Increase alternative fuel infrastructure by 15%
Create a continuous funding source for public/private partnerships
to utilize.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
15
2. ENERGY EFFICIENCY STRATEGIES AND PROGRAMS
A. Statewide Efficiency Measures
a. Oklahoma State Mandated Energy Efficiency Requirements – H.B. 3394/61
Okl. St. § 213 requires new construction or substantial renovation of buildings
that receive 50% or more of their funding from the State of Oklahoma to meet the
guidelines of the LEED system or the Green Globes rating system.
b. The Oklahoma Energy Security Act – H.B. 3028 set state wide goals for
alternative and domestically produced energy, including: 15% of energy from
renewables by 2015, and CNG fueling stations every 100 miles by 2015 and every
50 miles by 2025.
c. Oklahoma First Energy Plan – This plan lays out policy guidance for a
diverse energy portfolio that includes energy efficiency and encourages efficiency
technologies such as CHP and geothermal. This plan is in line with the Oklahoma
Energy Security Act’s target of 15% statewide renewable energy use by 2015.
d. Oklahoma State Facilities Energy Conservation Program – S.B. 1096
established the Oklahoma State facilities Energy Conservation Program. The
program directs all state agencies and higher education institutions to achieve an
energy and conservation improvement target of at least 20% by 2020.
B. Tulsa Region Efficiency Programs
a. City of Tulsa Energy Efficiency Conservation Block Grant (EECBG) – The
Energy Efficiency Conservation Block Grant (EECBG) program is administered
by the U.S. Dept. of Energy. The City of Tulsa has received over $3.8 million in
EECBG funding for programs that increase energy efficiency, reduce dependence
on foreign energy and create or retain jobs. Below are some of the City’s
identified EECBG projects.
Long Term Energy & Sustainability Plan Development – The City
of Tulsa used EECBG funds to develop an over-arching energy
efficiency and sustainability plan. Produced in the fall of 2011, the
City of Tulsa’s Sustainability Plan identified methods for tracking
internal and external GHG emissions, developing, implementing
and quantifying the success of a broad based sustainability
education plan, tracking cost and energy savings over time and
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
16
measuring progress toward other sustainability goals. Many areas
and projects within the plan have begun implementation and will
be incorporated into the Ozone Advance Plan, including the
Energy Management and Fleet Management portions.
OSU Medical Center Retrofit Project – The OSU Medical Center
Retrofit project will allow for selection and replacement of specific
medical and building facility equipment (as part of an existing
retrofit project) to increase energy efficiency and reduce costs.
Brady Village Geothermal Project – The Brady Village
Geothermal Project will develop and implement a shared
geothermal system within a revitalized section of downtown Tulsa.
This project was begun by an award from the Oklahoma State
Energy Program and private funds. The energy produced will be
made available to surrounding businesses and residences, and will
help in the larger effort to attract investment in this area. The
project will have the capacity to produce over 400 tons of heating
and cooling capacity, which will allow the conditioning of between
3,000,000 and 4,800,000 sq. ft. of space at about 60% of the cost
of operating the most efficient air cooled units.
City of Tulsa Building LED lighting upgrades – The City of Tulsa
maintains some 230 buildings. The City plans to use EECBG
funding to implement LED lighting efficiencies determined by
energy audits on the City’s 5 most energy consumptive facilities.
Implementation of these improvements is estimated to reduce
energy consumption in the identified facilities by 25%.
Energy Efficient LED Traffic and Pedestrian Lighting – In order to
reduce operation and maintenance costs associated with traffic
signals and pedestrian lighting, the City of Tulsa will replace much
of the existing system lights with more energy efficient, LED
technology.
b. Tulsa City-County Library Efficiency Measures - The Tulsa City-County
Library system’s main downtown library has begun a two-year renovation, aimed
at creating improving functionality, safety and energy efficiency. The new
building is expected to reduce energy consumption by ~40%, enough energy to
power 56 Oklahoma homes, and reduce water consumption by 91,000 gallons.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
17
The final building is expected to meet LEED Silver certification. Planned
improvements include:
HVAC system - New high-efficiency, state-of-the-art boilers &
chillers, chilled beam induction HVAC system, reuse of current
cooling tower and cold-plate heat exchanger.
Electrical system- New main distribution panels and subpanels to
replace obsolete original equipment, new high-efficiency
florescent and LED lighting, lighting controls integrated into
building management system, use of daylight harvesting and
occupancy sensors, raised-floor access system for electrical and
data distribution to offer better flexibility of spaces.
Other Systems - Rainwater harvesting/storage system for use in
lawn irrigation, new building energy management system, modern
fire alarm system, low water consumption restroom fixtures, new
windows featuring insulated glass and thermally broken aluminum
frames, additional roof insulation and new roof.
c. Tulsa County Energy Efficiency and Conservation Block Grants – Tulsa
County, with the assistance of INCOG, has created an integrated energy strategy
to provide actions that will reduce annual energy consumption by 15-25%. This
energy strategy will utilize funds from a Department of Energy Block grant. The
following completed projects are examples of this successful and ongoing grant
program:
Chandler Park Solar Project – Tulsa County installed a rooftop solar
array on the Chandler Park Community Center, reducing the buildings
operating cost by approximately $10,000 annually.
Led Lighting Replacement – Tulsa County installed an energy efficient
LED lighting system in the county’s Emergency Shelter, reducing the
shelter’s energy consumption by approximately 20%.
d. Public Service Company of Oklahoma’s Demand Response Energy
Performance Reduction Program – Residential and Commercial -PSO’s Power
Forward energy efficiency and demand-response is a multi-faceted program
providing significant and targeted incentives to business and residential customers
for reducing their energy usage. Numerous programs provide diverse resources
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
18
and incentives to encourage upgrading the energy efficiency of appliances,
industrial processes and equipment, and existing structures. The innovative Peak
Performer Program provides incentives for business and industries to reduce
electric usage for brief peak usage periods during the summer ozone season. Over
the next three years, PSO’s Energy Efficiency/Demand Response Program is
expected to reduce energy consumption by 191 gigawatt hours, and achieve 244
megawatts of demand savings.
e. Oklahoma Natural Gas (ONG) Energy Efficiency Program – ONG’s Energy
Efficiency Program provides robust rebate incentives for residential and
commercial customers. The program encourages and awards new energy-efficient
natural gas appliances choices and even provides a homeowner rebate for having
their gas heating system checked and tuned-up.
ONG offers homeowners up to $1,950 in rebates for upgrading heating systems;
up to $850 for adding energy-efficient natural gas water heaters; $750 for building
a home that follows ONG energy efficiency guidelines; $680 for natural gas
clothes dryers; and $30 for a furnace inspection.
f. Oklahoma Gas & Electric Energy Efficiency Program - OG & E offers a
comprehensive portfolio of Demand-Side Management Programs targeting
residential and commercial energy efficiency. Programs include:
• Home Energy Efficiency (HEEP)
• Weatherization Residential Assistance Program
• Commercial Lighting Program
• Positive Energy-New Home Construction
• Geothermal Heating, Cooling and Water Heating Program
• Commercial Energy Efficiency Program
• Education Programs
• Industrial Energy Efficiency Program
O G & E’s Energy Efficiency portfolio targets 371 GWh of energy savings by
2015. Additionally, a ‘SmartHours’ Demand Response program and a new
voltage control program are projected to achieve approximately 9,603 MWh of
energy savings, also by 2015.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
19
3. COMPRESSED NATURAL GAS (CNG)/ ALTERNATIVE FUELED VEHICLE AND
INFRASTRUCTURE PROJECTS AND STRATEGIES
A. Statewide CNG Strategies, Projects and Incentives
a. Oklahoma Leadership- Oklahoma has a proven track record in energy
innovation and is leading the way as a model for other states and the nation in
practical and affordable energy policy. This Oklahoma initiative is especially true
regarding Compressed Natural Gas (CNG) as a transportation fuel. The third
largest CNG producer in the nation, Oklahoma leads the way in legislative policy
and significant state tax incentives and loan programs promoting and supporting
alternative fueled vehicles (AFV) and infrastructure.
Alternative Fuel Vehicle (AFV) Tax Credit – For tax years beginning
before January 1, 2015, a one-time income tax credit is available for
50% of the incremental cost of purchasing a new original equipment
manufacturer AFV or converting a vehicle to operate on an alternative
fuel. The state also provides a tax credit for 10% of the total vehicle
cost, up to $1,500, if the incremental cost of a new AFV cannot be
determined or when an AFV is resold, as long as a tax credit has not
been previously taken on the vehicle. Equipment used for conversions
must be new and must not have been previously used to modify or
retrofit any vehicle. The alternative fuels eligible for the credit are
compressed natural gas, liquefied natural gas, hydrogen, and liquefied
petroleum gas (propane). Tax credits may be carried forward for up to
five years. (68 O.S. §2357.22)
Alternative Fueling Infrastructure Tax Credit – For tax years
beginning before January 1, 2015, a tax credit is available for up to
75% of the cost of alternative fueling infrastructure. Eligible
alternative fuels include compressed natural gas (CNG), liquefied
natural gas, liquefied petroleum gas (propane), hydrogen, and
electricity. The infrastructure must be new and must not have been
previously installed or used to fuel alternative fuel vehicles. A tax
credit is also available for up to 50% of the cost of installing a
residential CNG fueling system, for up to $2,500. The tax credit may
be carried forward for up to five years. (68 O.S. §2357.22).
Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans The
Oklahoma Department of Central Services’ Alternative Fuels
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
20
Conversion Loan program provides 0% interest loans to government
fleets for converting vehicles to operate on alternative fuels, the
construction of AFV fueling infrastructure, and the incremental cost
associated with the purchase of an original equipment manufacturer
AFV. The program provides up to $10,000 per converted or newly
purchased AFV and up to $300,000 for the development or installation
of fueling infrastructure. The borrower must repay the loan within a
seven-year period. Repayment is collected through a surcharge on
alternative fuel the borrower purchased in the amount equivalent to the
per gallon fuel cost savings from using an alternative fuel. If the price
of the alternative fuel does not remain below the price of the
conventional fuel that it replaced, repayment is suspended. Eligible
applicants include state and county agencies and divisions,
municipalities, school districts, mass transit authorities, and public
trust authorities. (74 O.S. §§130.4 through -130.5)
Alternative Fuel Vehicle (AFV) Loans – Oklahoma has a private loan
program with a 3% interest rate for the cost of converting private fleets
to operate on alternative fuels, for the incremental cost of purchasing
an original equipment manufacturer AFV, and for the installation of
AFV fueling infrastructure. The repayment of the loan has a maximum
six year period.
In 2010, the Oklahoma legislature passed a resolution to encourage
development of CNG refueling stations – “It shall be the goal to have
at least one public CNG fueling station located approximately every
one hundred (100) miles along the entire interstate highway system in
the state by the year 2015. The goal shall increase to at least one public
CNG fueling station approximately every fifty (50) miles by the year
2025.” (74-78f O.S.)
b. Oklahoma Department of Transportation - ODOT has added 160 CNG
vehicles to its fleet since October 2012 and plans to replace more than 90 percent
of the ODOT and Oklahoma Turnpike Authority fleet with CNG vehicles in the
next three years.
c. Oklahoma Natural Gas Company – ONG currently offers rebates of $1,000
for the purchase of a dedicated CNG vehicle, $500 for the purchase of a bi-fueled
vehicle and $1,000 for the purchase of a residential home-fueling system. This
program is expected to continue, with no set cut-off or termination date.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
21
B. Tulsa Region CNG/Alternative Fueled Vehicle and Infrastructure Projects
a. Metropolitan Tulsa Transit Authority (MTTA) CNG Fleet Conversion -
MTTA maintains a fleet of approximately 100 vehicles. These include full size
fixed route passenger and smaller lift program buses. In 2011, MTTA made the
commitment to move toward a 100% CNG fleet and began a concentrated effort
to locate and secure funding to do so. In 2012, they completed a $1.7 million
dollar CNG filling station on the property and to date have 71% of their 52 lift
program buses running on dedicated CNG and approximately 44% of their fixed
route fleet. Within the next several years, funding is being sought to complete the
fixed route transition and fully be running on CNG.
b. City of Owasso - The City of Owasso is located within Tulsa’s air shed just
north of the City of Tulsa. A community of approximately 30,000, in 2010
Owasso determined to move toward CNG vehicles in their city fleet. By 2011,
they had opened their first public-private CNG station in their downtown area and
are well on the way to convert the fleet.
c. Tulsa Public Schools - Tulsa Public School District (TPS) is the largest in the
state of Oklahoma serving over 40,000 students. TPS has been committed to
cleaner burning and more economical CNG fuel since the 1980’s. Currently, 140
of the 300 full-size school bus fleet are dedicated engines running 100% CNG. 8
new 2013 BlueBird dedicated engines are funded and ordered and the district
continues to seek funding to upgrade their four compressor filling stations and to
convert 100% of their bus and car fleet running by 2020. TPS has also invested in
anti-idling technology and most of the fleet is equipped with devices
automatically powering-down and turning off the engine after 5 minutes of idling.
d. City of Tulsa Refuse Haulers - The Tulsa Authority for the Recovery of
Energy (TARE) is the agency responsible for establishing and contracting the
City of Tulsa’s residential refuse. Tulsa’s former refuse contract allowed for
haulers to operate vehicles without discretion to the vehicle’s age, fuel type or
emissions throughout the air shed. For more than 20 years, this fully
economically driven contract resulted in Tulsa’s haulers operating the very old
and polluting trash trucks that were not authorized in many nonattainment/ near
nonattainment areas. The City of Tulsa, home to nearly 400,000 citizens, requires
approximately 50 refuse trucks operating daily through city streets.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
22
In 2012, TARE established and awarded a 10-year refuse hauler contract which
required 50% of the vehicles to be fueled by CNG upon startup and required
100% of Tulsa’s trash trucks to be CNG fueled by the summer of 2013.
e. Tulsa Area Clean Cities Vehicle and Infrastructure Grant Program - The
Public Fleet Conversion grant program, funded through a Congestion Mitigation
and Air Quality (CMAQ) grant through INCOG, encourages programs that
promote the conversion of vehicles to alternative fuel vehicles, the purchase of
original equipment manufacturer (OEM) alternative fuel vehicles, and
development of the alternative fuel vehicle infrastructure within the Tulsa area.
CMAQ grants help ensure expansion of AFVs in the Tulsa area as well as provide
incentives, visibility and recognition for public fleets adopting a clean vehicle
philosophy in support of the Tulsa Area Clean Cities program. In the last four
years, this program has awarded over $500,000 in grants to area governments.
Annually or as funds are available, INCOG awards federal CMAQ funds to public
entities for clean projects meeting criteria within the following three categories:
Projects that promote the conversion of vehicles to Alternative Fuel
Vehicles (AFVs)
Projects that promote the acquisition of AFVs in fleets
Projects that promote the AFV Refueling Infrastructure Development
Over the next five years, INCOG anticipates this grant program will award
approximately $875,000 in project funding for Clean Vehicle and Infrastructure
projects in the Tulsa area.
f. Tulsa Area Clean Cities I-40 Grant Projects - In conjunction with partners at
Arkansas Clean Cities, INCOG was awarded a grant by the United States
Department of Energy titled the I-40 Collaboration. Projects undertaken by the I-
40 grant will help to displace the use of imported oil, by addressing barriers in the
Oklahoma alternative fuels market. Specifically, the projects funded by this grant
will help reduce ozone levels in the Tulsa area by advancing the use of cleaner
burning alternative fuels, facilitating the construction of alternative fuel stations,
and promoting safety in the alternative fuel market.
Advancing the use of alternative fuels:
o The Oklahoma Department of Commerce will be researching and creating
a case study explaining how it may be possible to include alternative
fueling stations on highway signs similar to that of gasoline stations.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
23
Alerting consumers to the availability of alternative fuels will provide
confidence that the will be able to refuels alternative fuel vehicles in their
area.
o Revolving Loan Fund Research—in conjunction with the City of Tulsa,
TACC will be researching the feasibility of using Qualified Energy
Conservation Bonds (QECBs) to fund a loan program for businesses
wanting to convert fleets to operate on alternative fuels.
Facilitating Alternative Fuel Station Construction:
o Developing CNG Station Building Codes—INCOG has contracted the
development of a best practices plan for constructing alternative fueling
stations with the City of Tulsa. Upon the completion of the best practices
plan for the safe and streamlined construction of alternative fueling
stations, Tulsa Area Clean Cities and the City of Tulsa will present the
report to parties involved in CNG and EV station construction.
Promoting Safety in the Alternative Fuels Market:
o Alternative Fuels Mechanics Licensure Outreach—INCOG has contracted
the Oklahoma Division of Capital Assets Management to perform
workshops targeted at fleet managers and industry groups to help explain
the current regulations and safety practices surrounding alternative fuel
vehicles.
o CNG Conversion Video—To address the high prevalence of non-EPA
certified kits for CNG conversions, TACC will create a video highlighting
the dangers of non-EPA certified CNG conversion kits.
o Fire Safety Training—To provide fire inspectors with the training they
need to competently inspect alternative fueling stations, INCOG is
contracting for the development and instruction of a training curriculum
for evaluating CNG stations for compliance with state, federal, and
municipal codes.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
24
4. TRANSPORTATION SYSTEM STRATEGIES AND PROJECTS
A. Peoria Ave. Bus Rapid Transit - The Metropolitan Tulsa Transit Authority's board of
trustees voted unanimously on February 26, 2013 to recommend implementation of a
plan to replace regular bus service along a 15-mile stretch of Peoria Avenue with rapid
transit bus service. Bus Rapid Transit systems make fewer stops than traditional local bus
systems but stop more frequently at the locations they do serve. The rapid transit system
would replace Tulsa Transit's 105 Route, which accounts for 15 percent of the
organization's passenger trips. The proposed change calls for reducing the number of bus
stops from Peoria Avenue and 38th Street North to Lewis Avenue and 81st Street from
approximately 100 to 19. It would decrease wait times from 30 minutes to 15 minutes and
reduce the time it takes to travel the entire route from 70 minutes to 50 minutes. The new
service also would run to the downtown bus station on Denver Avenue. Stations would
be approximately one-half mile apart - except for the bus stops at 33rd Place and 21st
Street, which are slightly more than a mile apart.
The $18.8 million price tag would cover the cost of seven dedicated CNG buses equipped
with GPS technology to change traffic signals when the buses are behind schedule. Most
of the funding would be spent on major improvements to the bus stops. The Peoria
corridor runs within a half-mile of 20 percent of the jobs in the city and one in seven
Tulsans lives within a half mile of the corridor. Funding for the project will be before
Tulsa voters in November 2013. Expected implementation: 2016. More information at
http://www.fastforwardplan.org/Peoria
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
25
Peoria Ave Bus Rapid Transit Plan
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
26
B. Tulsa Region Bicycle/Pedestrian Master Plan - The Indian Nations Council of
Governments (INCOG) is working to prepare a Bicycle and Pedestrian Master Plan for
the Tulsa Region. INCOG proposes developing and delivering a transportation
assessment process that will identify and evaluate short-, medium- and long-term
transportation system needs to enhance bicycle and pedestrian mobility while considering
automobile and bus transit operations. All existing and proposed connecting pedestrian
and bicycle paths, transit stops/routes, and activity centers such as schools, businesses
and parks/open space should be considered to transform the region’s transportation
network that balances the needs of all modes and is sensitive to evolving land use and
development plans. The Plan also should consider all planning documents created for this
area, proposed development, and traffic/transportation studies. Alternative improvement
design concepts should be evaluated and high visibility pedestrian safety treatments will
be identified. The Plan area will include the municipalities of Bixby, Broken Arrow,
Catoosa, Claremore, Collinsville, Glenpool, Jenks, Owasso, Sand Springs, Skiatook, and
Tulsa. Expected study completion: 2014
C. Bikeshare Feasibility Study - INCOG has committed to fund a feasibility study and
business plan for a comprehensive downtown focused bikeshare system. Using
Congestion Mitigation & Air Quality (CMAQ) funding, a consultant will be retained to
determine the long-term feasibility of a bikeshare program and implementation plan.
Funding options and liability will be focus areas of the plan. Expected study completion:
2014
D. ODOT OKC – Tulsa Commuter Rail
Program Initiative- The Tulsa-Oklahoma City
Corridor Investment Plan will identify and
evaluate a full range of alternatives to meet the
region's long-term transportation needs. The
study will provide sufficient information to
support an FRA decision to fund and
implement a major investment, or investment
in a series of projects, in a passenger rail corridor. The study has two major components:
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
27
A Service Development Plan (SDP) that articulates the overall scope and
quantifies the specific benefits and costs for proposed intercity, commuter and
freight rail alternatives, and
An Environmental Impact Statement (EIS) that addresses the broad
environmental effects for the entire corridor along the route of the proposed
service.
Together, these components form a Passenger Rail Corridor Investment Plan (PRCIP), in
accordance with the guidelines established by the Passenger Rail Investment and
Improvement Act of 2008 (PRIIA). The PRCIP is a foundation for future project
development including engineering design, environmental permitting and construction.
E. Other Transportation Management System Considerations – Within the next five
years, the Tulsa Transportation Management Area will research, analyze, select and
implement a variety of TSM projects. These may include expressway on-ramp
congestion traffic flow system projects, intersection improvement projects, signal
improvements, signal coordination efforts, Intelligent Transportation System (ITS)
enhancements and more. TSM improves traffic flow, reduces congestion and thereby
reduces emissions. As these projects take place, they will be described in our annual
Ozone Advance documentation.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
28
5. DEPARTMENT OF ENVIRONMENTAL QUALITY PROGRAMS AND
RULEMAKINGS
The Oklahoma Department of Environmental Quality, Air Quality Division has undertaken a
series of rulemakings and programs that will help to reduce ozone precursors in the Tulsa MSA
and throughout the state. Among these are state rule proposals/changes, public outreach
initiatives and educational programs.
A. DEQ has amended OAC 252:100-13, Open Burning, to require the use of an “air
curtain incinerator” or “ACIs” (also known as “air curtain destructors” and “open-pit
incinerators”) in place of open burning for the purpose of disposing of clean wood waste.
Air curtain incinerators are combustion units that operate by forcefully projecting a
curtain of air across an open, integrated combustion chamber (firebox) or open pit or
trench in which the combustion occurs. These units significantly reduce the amount of
ozone precursors and particulate matter generated by the burning of wood waste, with an
approximate 90% reduction in total air pollutants. The rule requires land clearing
operations in current and former nonattainment areas (Tulsa and Oklahoma Counties) and
all counties in the Oklahoma City and Tulsa Metropolitan Statistical Areas (MSAs) to use
ACIs. The Oklahoma City MSA is comprised of Canadian, Cleveland, Grady, Lincoln,
Logan, McClain, and Oklahoma Counties, and the Tulsa MSA is comprised of Creek,
Okmulgee, Osage, Pawnee, Rogers, Wagoner and Tulsa Counties. Additionally, the rule
prohibits open burning in areas under an Ozone or PM Watch.
B. DEQ is currently reviewing OAC 252:100-33, Control of Emission of Nitrogen
Oxides, to determine the feasibility of switching from an input-based emission standard
to an output-based emission standard for nitrogen oxides (NOx). This measure will
provide facilities more technological options for compliance with emission limits and
will encourage the use of more efficient processes and equipment. The existing rule
requires units to meet specific 3-hour emission averages for glass-melting furnaces and
fuel-burning equipment, constructed after 1972 or 1977 depending on unit type, with a
heat input greater than or equal to 50 mmBTU/hr. Future amendments would likely
transition to a 30-day rolling average for NOx emissions and set an output-based
emission standard comparable to the current input-based standard in subchapter 33. This
proposal is in the early stages of review/development with no definite date for next
action.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
29
C. The Department has updated its permitting rules to include an Oil and Gas permit by
rule (O&NG PBR). The primary focus of this rule is to streamline the permitting process
and reduce associated permitting fees for the numerous small oil and gas production sites
in the state; however, this measure will also provide more detailed emissions data about
the oil and natural gas production sector which will be analyzed to develop future air
quality policy and strategies.
D. The Department participates in multiple public outreach and education programs,
which emphasize the importance of informing individuals about the effects of ozone on
citizen health. This includes producing/supplying ozone education materials, creating
online videos encouraging home efficiency and issuing ozone watches for the Tulsa
MSA.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
30
6. MAJOR TULSA AREA FACILITY INDUSTRIAL RETROFITS
A number of Tulsa area facilities have performed major retrofits, resulting in significant
reductions of ozone precursors. These projects include the following:
A. PSO Northeastern Power Plant - Low-NOx burners installed on units 2, 3, &4 during
2012-2013. Further NOx reductions are expected through 2017.
Year 2011 2012 2013 2014 2015 2016 2017
Annual NOx
Reduction 0% 45.6% 54.9% 65.1% 64.2% 79.2% 78.9%
* Note that the NOx reductions beginning with calendar year 2013 are based on projections of future electric
generation demand. Demand is subject to change based on a number of factors, including adverse weather and other circumstances.
B. OG&E Muskogee, Sooner and Seminole Power Plants –Muskogee power plant will
have low NOx burners installed on units 4 & 5 in 2013-2014. Sooner Power Plant
will have low NOx burners installed on units 1 &2 in 2013-2014. Seminole Power
Plant will have low NOx burners installed on units 1, 2 &3between 2015-2017.
D. Grand River Dam Authority (GRDA) Chouteau Power Plant –Low NOx burner install
on both units, voluntary completion in 2013. Major reduction in NOx emissions to
be achieved by replacement of coal fired generating Unit 1 with natural gas combined
cycle unit in 2017 and additional wind generation.
E. Holly Refining and Marketing – Tulsa LLC - Replacement of two older boilers will
result in NOx reductions.
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
31
3.0 Tulsa Area Ozone Advance
Emission Reduction Projects Table
Section
3
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
32
Ozo
ne
Ad
van
ce E
mis
sio
n R
edu
ctio
n P
roje
cts
- Tu
lsa
MSA
Imp
lem
enta
tio
n
Sch
ed
ule
an
d -
/o
r C
om
ple
tio
n D
ate
20
13
- C
on
tin
uo
us
19
91
- C
on
tin
uo
us
19
97
- C
on
tin
uo
us
20
08
- C
on
tin
uo
us
20
10
- 2
02
5
20
11
- 2
01
5
20
12
- 2
02
0
20
10
- 2
01
3
Stat
us
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
De
scri
pti
on
The
Tran
spo
rtat
ion
Res
ou
rce
Cen
ter
(TR
C)
is a
dyn
amic
an
d n
ewly
lau
nch
ed
pro
gram
d
esig
ned
to
co
nn
ect
peo
ple
to
ava
ilab
le t
ran
spo
rtat
ion
op
tio
ns.
Th
e w
ebsi
te, TulsaTR
C.Org
, h
igh
ligh
ts r
eso
urc
es f
or
Tuls
a M
etro
Are
a b
ikin
g, w
alki
ng,
rid
ing
(tra
nsi
t an
d r
ides
har
e).
TR
C
ou
trea
ch e
ffo
rts
incl
ud
e w
ork
ing
at c
om
mu
nit
y ev
ents
, lo
cal c
om
pan
y p
artn
ersh
ip a
nd
tr
ain
ing,
org
aniz
atio
nal
mee
tin
gs t
o p
rese
nt
info
rmat
ion
, an
d m
ore
.
The
Ozo
ne
Ale
rt!
Pro
gram
tak
es a
vo
lun
tary
ep
iso
dic
ap
pro
ach
to
ozo
ne
po
lluti
on
red
uct
ion
an
d h
ealt
hy
air
qu
alit
y. T
wen
ty-t
hre
e y
ears
str
on
g, T
uls
a u
niq
ue
and
reg
ion
ally
-su
pp
ort
ed
pro
gram
co
nti
nu
es t
o e
xpan
d in
par
tner
ship
, pro
gram
s an
d p
ub
lic a
war
enes
s. O
zon
e A
lert
! D
ay f
ore
cast
ing
occ
urs
th
rou
gh p
artn
ersh
ip w
ith
th
e O
DEQ
an
d t
he
NW
S -
and
th
e IN
CO
G
regi
on
tak
es a
ctio
n.
Are
a go
vern
men
ts, b
usi
nes
ses,
ind
ivid
ual
s, T
V, R
adio
an
d P
rin
t
new
s/w
eath
er m
edia
all
rece
ive
no
tifi
cati
on
th
rou
gh E
-Mai
l, Te
xt, S
cree
n w
idge
t an
d o
ther
ve
nu
es -
an
d t
he
no
tifi
cati
on
is p
asse
d o
n t
hro
ugh
ou
t IN
CO
G's
70
0,0
00
+ Tu
lsa
Tran
spo
rtat
ion
Man
agem
ent
Are
a p
op
ula
tio
n. T
he
awar
d-w
inin
g w
ebsi
te, O
zoneA
lert.Com
, co
nti
nu
es t
o
pro
vid
e h
ou
rly
ozo
ne
dat
a, A
QI i
nfo
rmat
ion
, dai
ly a
llerg
y re
po
rtin
g, a
nd
mu
ch m
ore
info
rmat
ion
- w
ith
new
tra
ffic
vo
lum
e in
th
e th
ou
san
ds
per
day
du
rin
g th
e o
zon
e se
aso
n.
Cle
an C
itie
s m
issi
on
is t
o a
dva
nce
th
e e
ner
gy, e
con
om
ic, a
nd
en
viro
nm
enta
l sec
uri
ty o
f th
e U
nit
ed S
tate
s b
y su
pp
ort
ing
loca
l de
cisi
on
s to
ad
op
t p
ract
ices
th
at r
edu
ce t
he
use
of
pet
role
um
in t
he
tran
spo
rtat
ion
sec
tor.
Des
ign
ated
in 1
99
7, t
he
Tuls
a A
rea
Cle
an C
itie
s C
oal
itio
n w
ork
s w
ith
loca
l bu
sin
esse
s an
d g
ove
rnm
ents
th
rou
gh o
utr
each
an
d e
du
cati
on
, to
pro
mo
te a
lter
nat
ive
fuel
veh
icle
s. T
uls
a C
lean
Cit
ies
wo
rks
to
ad
van
ce a
lte
rnat
ive
fuel
s, id
le
red
uct
ion
, an
d t
o p
rom
ote
th
e ed
uca
tio
n o
f al
tern
ativ
e fu
el f
lee
ts, v
ehic
le a
vaila
bili
ty, a
nd
refu
elin
g o
pti
on
s. www.TulsaCleanCities.Org
H.B
. 33
94/
61
Okl
. St.
§ 2
13
req
uir
es n
ew c
on
stru
ctio
n o
r su
bst
anti
al r
eno
vati
on
of
bu
ildin
gs
that
rec
eiv
e 5
0%
or
mo
re o
f th
eir
fun
din
g fr
om
th
e St
ate
of
Okl
aho
ma
to m
eet
the
guid
elin
es
of
the
LEED
sys
tem
or
the
Gre
en G
lob
es r
atin
g sy
stem
.
H.B
. 30
28
set
sta
te w
ide
goal
s fo
r al
tern
ativ
e an
d d
om
esti
cally
pro
du
ced
en
ergy
, in
clu
din
g:
15
% o
f en
ergy
fro
m r
enew
able
s b
y 2
01
5, a
nd
CN
G f
uel
ing
stat
ion
s ev
ery
10
0 m
iles
by
20
15
an
d e
very
50
mile
s b
y 2
02
5.
This
pla
n la
ys o
ut
po
licy
guid
ance
fo
r a
div
erse
en
ergy
po
rtfo
lio t
hat
incl
ud
es e
ner
gy
effi
cien
cy a
nd
en
cou
rage
s ef
fici
ency
tec
hn
olo
gies
su
ch a
s C
HP
an
d g
eoth
erm
al. T
his
pla
n is
in
line
wit
h t
he
Okl
aho
ma
Ener
gy S
ecu
rity
Act
’s t
arge
t o
f 1
5%
sta
tew
ide
ren
ew
able
en
ergy
use
b
y 2
01
5.
S.B
. 10
96
est
ablis
hed
th
e O
klah
om
a St
ate
faci
litie
s En
ergy
Co
nse
rvat
ion
Pro
gram
. Th
e p
rogr
am d
irec
ts a
ll st
ate
agen
cie
s an
d h
igh
er e
du
cati
on
inst
itu
tio
ns
to a
chie
ve a
n e
ner
gy a
nd
con
serv
atio
n im
pro
vem
ent
targ
et o
f at
leas
t 2
0%
by
20
20
.
The
Ener
gy E
ffic
ien
cy C
on
serv
atio
n B
lock
Gra
nt
(EEC
BG
) p
rogr
am is
ad
min
iste
red
by
the
U.S
. D
ept.
of
Ener
gy.
The
Cit
y o
f Tu
lsa
has
rec
eive
d o
ver
$3
.8 m
illio
n in
EEC
BG
fu
nd
ing
for
pro
gram
s th
at in
crea
se e
ner
gy e
ffic
ien
cy, r
edu
ce d
epen
den
ce o
n f
ore
ign
en
ergy
an
d c
reat
e o
r re
tain
job
s. P
roje
cts
incl
ud
e, lo
ng
term
en
ergy
& s
ust
ain
abili
ty p
lan
dev
elo
pm
ent,
OSU
m
edic
al c
ente
r re
tro
fit
pro
ject
, Bra
dy
Vill
age
geo
ther
mal
pro
ject
, bu
ildin
g LE
D li
ghti
ng
up
grad
es, a
nd
en
ergy
eff
icie
nt
LED
tra
ffic
an
d p
edes
tria
n li
ghti
ng.
Enti
ty
INC
OG
INC
OG
Tuls
a A
rea
Cle
an C
itie
s
Pro
gram
/
INC
OG
Stat
e o
f O
klah
om
a
Stat
e o
f
Okl
aho
ma
Stat
e o
f
Okl
aho
ma
Stat
e o
f
Okl
aho
ma
Cit
y o
f Tu
lsa
Emis
sio
n R
ed
uct
ion
Pro
ject
Tuls
a Tr
ansp
ort
atio
n
Re
sou
rce
Ce
nte
r
Tuls
a A
rea
Ozo
ne
Ale
rt!
Pro
gram
Tuls
a A
rea
Cle
an C
itie
s P
rogr
am
Man
dat
ed
En
erg
y
Effi
cie
ncy
Re
qu
irem
en
ts
The
Okl
aho
ma
Ener
gy
Secu
rity
Act
Okl
aho
ma
Firs
t En
ergy
P
lan
Okl
aho
ma
Stat
e F
acili
tie
s En
erg
y C
on
serv
atio
n
Pro
gram
Cit
y o
f Tu
lsa
Ene
rgy
Effi
cie
ncy
Co
nse
rvat
ion
Blo
ck G
ran
t (E
ECB
G)
Pat
h F
orw
ard
Act
ion
Pla
n
Cat
ego
ry
Enh
ance
d P
ub
lic
Ou
tre
ach
an
d
Edu
cati
on
Pro
gram
s
Ene
rgy
Effi
cie
ncy
Stra
tegi
es
and
P
rogr
ams
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
33
Ozo
ne
Ad
van
ce E
mis
sio
n R
edu
ctio
n P
roje
cts
- Tu
lsa
MSA
Imp
lem
enta
tio
n
Sch
ed
ule
an
d -
/o
r
Co
mp
leti
on
Dat
e
20
10
- 2
01
4
20
11
-
20
12
-
20
12
-
20
13
- 2
01
5
19
90
-
19
90
-
19
90
-
20
10
-20
13
Stat
us
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
De
scri
pti
on
The
Tuls
a C
ity-
Co
un
ty L
ibra
ry s
yste
m’s
mai
n d
ow
nto
wn
lib
rary
has
beg
un
a t
wo
-yea
r
ren
ova
tio
n, t
o im
pro
ve f
un
ctio
nal
ity,
saf
ety
and
en
ergy
eff
icie
ncy
. Th
e n
ew b
uild
ing
is
exp
ecte
d t
o r
edu
ce e
ner
gy c
on
sum
pti
on
by
~40
%, e
no
ugh
en
ergy
to
po
we
r 5
6 O
klah
om
a
ho
mes
, an
d r
edu
ce w
ater
co
nsu
mp
tio
n b
y 9
1,0
00
gal
lon
s. T
he
fin
al b
uild
ing
is e
xpec
ted
to
m
eet
LEED
Silv
er c
erti
fica
tio
n.
Tuls
a C
ou
nty
, wit
h t
he
assi
stan
ce o
f IN
CO
G, h
as c
reat
ed a
n in
tegr
ated
en
erg
y st
rate
gy t
o
pro
vid
e ac
tio
ns
that
will
red
uce
an
nu
al e
ner
gy c
on
sum
pti
on
by
15
-25
%. T
his
en
ergy
str
ateg
y
will
uti
lize
fun
ds
fro
m a
Dep
artm
ent
of
Ener
gy B
lock
gra
nt.
PSO
’s P
ow
er F
orw
ard
en
ergy
eff
icie
ncy
an
d d
eman
d-r
esp
on
se is
a m
ult
i-fa
cete
d p
rogr
am
pro
vid
ing
sign
ific
ant
and
tar
gete
d in
cen
tive
s to
bu
sin
ess
an
d r
esid
enti
al c
ust
om
ers
for
red
uci
ng
thei
r en
ergy
usa
ge. O
ver
the
nex
t th
ree
year
s, P
SO’s
En
ergy
Eff
icie
ncy
/Dem
and
R
esp
on
se P
rogr
am is
exp
ecte
d t
o r
edu
ce e
ner
gy c
on
sum
pti
on
by
19
1 G
Wh
ho
urs
, an
d
ach
ieve
24
4 M
W o
f d
eman
d s
avin
gs.
ON
G's
en
ergy
eff
icie
ncy
pro
gram
s p
rovi
de
ince
nti
ves
for
resi
den
tial
an
d c
om
mer
cial
cu
sto
mer
s en
cou
ragi
ng
new
en
ergy
-eff
icie
nt
nat
ura
l gas
ap
plia
nce
ch
oic
es,
incl
ud
ing
ho
meo
wn
er r
ebat
es f
or
gas-
hea
tin
g sy
stem
insp
ecti
on
s an
d t
un
ed
-up
s.
OG
& E
off
ers
a co
mp
reh
ensi
ve p
ort
folio
of
Dem
and
-Sid
e M
anag
emen
t En
ergy
Eff
icie
ncy
P
rogr
ams
that
are
an
tici
pat
ed t
o s
ave
37
1 G
Wh
of
ener
gy b
y 2
01
5.
Ad
dit
ion
ally
, a
‘Sm
artH
ou
rs’ D
eman
d R
esp
on
se p
rogr
am a
nd
a n
ew v
olt
age
con
tro
l pro
gram
is p
roje
cted
to
ac
hie
ve a
pp
roxi
mat
ely
9,6
03
MW
h o
f en
ergy
sav
ings
, als
o b
y 2
01
5.
For
tax
year
s b
egin
nin
g b
efo
re J
anu
ary
1, 2
01
5, a
on
e-ti
me
inco
me
tax
cred
it is
ava
ilab
le f
or
50
% o
f th
e in
crem
enta
l co
st o
f a
new
AFV
or
con
vert
ing
a ve
hic
le t
o o
per
ate
on
an
alt
ern
ativ
e
fuel
. Ad
dit
ion
ally
, a t
ax c
red
it f
or
10
% o
f th
e to
tal v
ehic
le c
ost
, up
to
$1
,50
0, i
f th
e in
crem
enta
l co
st o
f a
new
AFV
can
no
t b
e d
ete
rmin
ed o
r w
hen
an
AFV
is r
eso
ld, g
iven
no
tax
cr
edit
pre
vio
usl
y ta
ken
on
th
e ve
hic
le. T
ax c
red
its
may
be
carr
ied
fo
rwar
d f
or
up
to
fiv
e ye
ars.
(68
O.S
. §2
35
7.2
2)
For
tax
year
s b
egin
nin
g b
efo
re J
anu
ary
1, 2
01
5, a
tax
cre
dit
is a
vaila
ble
fo
r u
p t
o 7
5%
of
the
cost
of
alte
rnat
ive
fuel
ing
infr
astr
uct
ure
. A t
ax c
red
it is
als
o a
vaila
ble
fo
r u
p t
o 5
0%
of
the
cost
o
f in
stal
ling
a re
sid
enti
al C
NG
fu
elin
g sy
stem
, fo
r u
p t
o $
2,5
00
. Th
e ta
x cr
edit
may
be
carr
ied
forw
ard
fo
r u
p t
o f
ive
year
s. (
68
O.S
. §2
35
7.2
2)
The
Okl
aho
ma
Dep
artm
ent
of
Cen
tral
Ser
vice
s' A
lter
nat
ive
Fuel
s C
on
vers
ion
Lo
an p
rogr
am
pro
vid
es 0
% in
tere
st lo
ans
to g
ove
rnm
ent
flee
ts f
or
con
vert
ing
veh
icle
s to
op
erat
e o
n
alte
rnat
ive
fue
ls, t
he
con
stru
ctio
n o
f A
FV f
uel
ing
infr
astr
uct
ure
, an
d t
he
incr
emen
tal c
ost
as
soci
ated
wit
h t
he
pu
rch
ase
of
an O
EM A
FV. T
he
pro
gram
pro
vid
es u
p t
o $
10
,000
per
con
vert
ed o
r n
ewly
pu
rch
ased
AFV
an
d u
p t
o $
30
0,0
00
fo
r th
e d
evel
op
me
nt
or
inst
alla
tio
n o
f fu
elin
g in
fras
tru
ctu
re.
Pri
vate
loan
pro
gram
wit
h a
3%
inte
rest
rat
e fo
r th
e co
st o
f co
nve
rtin
g p
riva
te f
leet
s to
op
erat
e o
n a
lter
nat
ive
fuel
s, f
or
the
cost
of
pu
rch
asin
g an
ori
gin
al e
qu
ipm
ent
man
ufa
ctu
rer
AFV
, an
d f
or
the
inst
alla
tio
n o
f A
FV f
uel
ing
infr
astr
uct
ure
. Max
imu
m r
epay
men
t si
x-ye
ars.
Enti
ty
Tuls
a C
ity-
Co
un
ty
Lib
rary
Tuls
a C
ou
nty
Pu
blic
Ser
vice
C
om
pan
y o
f O
klah
om
a
Okl
aho
ma
Nat
ura
l Gas
OG
& E
Stat
e o
f
Okl
aho
ma
Stat
e o
f O
klah
om
a
Stat
e o
f O
klah
om
a
Stat
e o
f O
klah
om
a
Emis
sio
n R
ed
uct
ion
P
roje
ct
Bu
ildin
g Ef
fici
en
cy
Imp
rove
me
nts
Ene
rgy
Effi
cie
ncy
an
d
Co
nse
rvat
ion
Blo
ck
Gra
nts
De
man
d R
esp
on
se
Ene
rgy
Pe
rfo
rman
ce
Re
du
ctio
n P
rogr
am –
R
esi
de
nti
al a
nd
Co
mm
erc
ial
Okl
aho
ma
Nat
ura
l Gas
(O
NG
) En
erg
y Ef
fici
en
cy
Pro
gram
Okl
aho
ma
Gas
an
d
Ele
ctri
c En
erg
y Ef
fici
en
cy
Pro
gram
Alt
ern
ativ
e F
ue
l Ve
hic
le
(AFV
) Ta
x C
red
it
Alt
ern
ativ
e F
ue
ling
Infr
astr
uct
ure
Tax
Cre
dit
Alt
ern
ativ
e F
ue
l Ve
hic
le
(AFV
) an
d F
ue
ling
Infr
astr
uct
ure
Lo
ans
Pri
vate
Alt
ern
ativ
e F
ue
l
Ve
hic
le (
AFV
) Lo
ans
Pat
h F
orw
ard
A
ctio
n P
lan
Cat
ego
ry
CN
G/A
lter
nat
ive
Fu
ele
d V
ehic
le &
Infr
astr
uct
ure
P
roje
cts
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
34
Ozo
ne
Ad
van
ce E
mis
sio
n R
edu
ctio
n P
roje
cts
- Tu
lsa
MSA
Imp
lem
enta
tio
n
Sch
ed
ule
an
d -
/o
r
Co
mp
leti
on
Dat
e
20
10
-20
13
20
13
-2
01
6
20
12
-
20
11
-
20
10
-
19
88
- 2
02
0
20
12
- 2
01
3
19
97
- C
on
tin
uo
us
20
12
- 2
01
6
Stat
us
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
Co
mp
lete
On
goin
g
On
goin
g
De
scri
pti
on
Pri
vate
loan
pro
gram
wit
h a
3%
inte
rest
rat
e fo
r th
e co
st o
f co
nve
rtin
g p
riva
te f
leet
s to
o
per
ate
on
alt
ern
ativ
e fu
els,
fo
r th
e co
st o
f p
urc
has
ing
an o
rigi
nal
eq
uip
men
t m
anu
fact
ure
r
AFV
, an
d f
or
the
inst
alla
tio
n o
f A
FV f
uel
ing
infr
astr
uct
ure
. Max
imu
m r
epay
men
t si
x-ye
ars.
OD
OT
will
be
rep
laci
ng
mo
re t
han
90
per
cen
t o
f th
e fl
eet
at O
DO
T an
d t
he
Okl
aho
ma
Turn
pik
e A
uth
ori
ty w
ith
CN
G v
ehic
les
in t
he
nex
t th
ree
year
s.
ON
G is
cu
rren
tly
off
erin
g re
bat
es o
f $
1,0
00
fo
r th
e p
urc
has
e o
f a
ded
icat
ed C
NG
veh
icle
, $5
00
fo
r th
e p
urc
has
e o
f a
bi-
fuel
ed v
ehic
le a
nd
$1
,00
0 f
or
the
pu
rch
ase
of
a re
sid
enti
al h
om
e-
fuel
ing
syst
em. T
his
pro
gram
is e
xpec
ted
to
co
nti
nu
e, w
ith
no
set
cu
t-o
ff o
r te
rmin
atio
n d
ate.
MTT
A m
ain
tain
s a
flee
t o
f ap
pro
xim
atel
y 1
00
veh
icle
s. T
hes
e in
clu
de
full
size
fix
ed r
ou
te
pas
sen
ger
and
sm
alle
r lif
t p
rogr
am b
uss
es. I
n 2
01
1, M
TTA
mad
e th
e co
mm
itm
ent
to m
ove
to
war
d a
10
0%
CN
G f
leet
an
d b
egan
a c
on
cen
trat
ed e
ffo
rt t
o lo
cate
an
d s
ecu
re f
un
din
g to
do
so.
In 2
01
2, t
hey
co
mp
lete
d a
$1
.7 m
illio
n d
olla
r C
NG
fill
ing
stat
ion
on
th
e p
rop
erty
an
d t
o
dat
e h
ave
71
% o
f th
eir
52
lift
pro
gram
bu
sses
ru
nn
ing
on
ded
icat
ed C
NG
an
d a
pp
roxi
mat
ely
44
% o
f th
eir
fixe
d r
ou
te f
leet
. W
ith
in t
he
nex
t se
vera
l yea
rs, f
un
din
g is
be
ing
sou
ght
to
com
ple
te t
he
fixe
d r
ou
te t
ran
siti
on
to
10
0%
CN
G.
In 2
01
0, t
he
city
of
Ow
asso
ch
ose
to
inco
rpo
rate
CN
G v
ehic
les
in t
hei
r ci
ty f
leet
. B
y 2
01
1,
they
had
op
ened
th
eir
firs
t p
ub
lic-p
riva
te C
NG
sta
tio
n in
th
eir
do
wn
tow
n a
rea
and
are
wel
l on
th
e w
ay t
o c
on
vert
th
e fl
eet.
Cu
rren
tly,
14
0 o
f th
e 3
00
fu
ll-si
ze s
cho
ol b
us
flee
t ar
e o
per
atin
g o
n 1
00
% C
NG
fu
el.
8 n
ew
20
13
Blu
eBir
d C
NG
bu
sses
hav
e b
een
ord
ered
an
d t
he
dis
tric
t co
nti
nu
es t
o s
eek
fun
din
g to
u
pgr
ade
thei
r fo
ur
com
pre
sso
r fi
llin
g st
atio
ns.
Tu
lsa
Pu
blic
Sch
oo
ls p
lan
s to
co
nve
rt 1
00
% o
f th
eir
bu
s an
d c
ar f
leet
to
CN
G p
ow
er b
y 2
02
0.
The
Tuls
a A
uth
ori
ty f
or
the
Rec
ove
ry o
f En
ergy
(TA
RE)
is t
he
agen
cy r
esp
on
sib
le f
or
esta
blis
hin
g an
d c
on
trac
tin
g th
e C
ity
of
Tuls
a’s
resi
den
tial
ref
use
. Th
e C
ity
of
Tuls
a, h
om
e to
n
earl
y 4
00
,00
0 c
itiz
ens,
req
uir
es a
pp
roxi
mat
ely
50
ref
use
tru
cks
op
erat
ing
dai
ly t
hro
ugh
cit
y
stre
ets.
In
20
12
, TA
RE
esta
blis
hed
an
d a
war
ded
a 1
0-y
ear
refu
se h
aule
r co
ntr
act
wh
ich
re
qu
ired
50
% o
f th
e ve
hic
les
to b
e fu
eled
by
CN
G u
po
n s
tart
up
an
d 1
00
% o
f Tu
lsa’
s tr
ash
tru
cks
to b
e C
NG
fu
ele
d b
y th
e su
mm
er o
f 2
01
3.
The
Pu
blic
Fle
et C
on
vers
ion
gra
nt
pro
gram
, fu
nd
ed t
hro
ugh
a C
MA
Q g
ran
t fo
r co
nve
rsio
n o
f ve
hic
les
to a
lter
nat
ive
fue
l veh
icle
s, t
he
pu
rch
ase
of
ori
gin
al e
qu
ipm
ent
man
ufa
ctu
rer
(OEM
)
alte
rnat
ive
fue
l veh
icle
s, a
nd
dev
elo
pm
ent
of
alte
rnat
ive
fuel
veh
icle
infr
astr
uct
ure
wit
hin
th
e Tu
lsa
area
. Ove
r th
e n
ext
five
yea
rs, T
AC
C a
nti
cip
ates
th
is g
ran
t p
rogr
am w
ill a
war
d
app
roxi
mat
ely
$8
75
,00
0 in
pro
ject
fu
nd
ing
for
Cle
an V
ehic
le a
nd
Infr
astr
uct
ure
Pro
ject
s in
th
e
Tuls
a ar
ea.
In c
on
jun
ctio
n w
ith
par
tner
s at
Ark
ansa
s C
lean
Cit
ies,
Tu
lsa
Are
a C
lean
Cit
ies
(TA
CC
) w
as
awar
ded
a g
ran
t b
y th
e U
nit
ed S
tate
s D
epar
tmen
t o
f En
ergy
tit
led
th
e I-
40
Co
llab
ora
tio
n.
Pro
ject
s u
nd
erta
ken
by
the
I-4
0 g
ran
t w
ill h
elp
to
dis
pla
ce t
he
use
of
imp
ort
ed o
il, b
y
add
ress
ing
bar
rie
rs in
th
e O
klah
om
a al
tern
ativ
e fu
els
mar
ket.
Sp
ecif
ical
ly, t
he
pro
ject
s fu
nd
ed
by
this
gra
nt
will
hel
p r
edu
ce o
zon
e le
vels
in T
uls
a b
y ad
van
cin
g th
e u
se o
f cl
ean
er b
urn
ing
alte
rnat
ive
fue
ls, f
acili
tati
ng
the
con
stru
ctio
n o
f al
tern
ativ
e fu
el s
tati
on
s, a
nd
pro
mo
tin
g
safe
ty in
th
e al
tern
ativ
e fu
el m
arke
t.
Enti
ty
Stat
e o
f O
klah
om
a
OD
OT
Okl
aho
ma
Nat
ura
l Gas
C
om
pan
y
Met
rop
olit
an
Tuls
a Tr
ansi
t A
uth
ori
ty
(MTT
A)
Cit
y o
f
Ow
asso
Tuls
a P
ub
lic
Sch
oo
ls
Tuls
a
Au
tho
rity
fo
r th
e R
eco
very
o
f En
ergy
(TA
RE)
Tuls
a C
lean
C
itie
s/ IN
CO
G
Tuls
a C
lean
C
itie
s/ IN
CO
G
Emis
sio
n R
ed
uct
ion
P
roje
ct
Pri
vate
Alt
ern
ativ
e F
ue
l V
eh
icle
(A
FV)
Loan
s
CN
G F
lee
t C
on
vers
ion
Alt
ern
ativ
e F
ue
ls
Ince
nti
ve
CN
G F
lee
t C
on
vers
ion
CN
G F
lee
t C
on
vers
ion
CN
G F
lee
t C
on
vers
ion
CN
G F
lee
t C
on
vers
ion
Tuls
a A
rea
Cle
an C
itie
s V
eh
icle
an
d
Infr
astr
uct
ure
Gra
nt
Pro
gram
Tuls
a A
rea
Cle
an C
itie
s I-
40
Gra
nt
Pro
ject
s
Pat
h F
orw
ard
A
ctio
n P
lan
Cat
ego
ry
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
35
Ozo
ne
Ad
van
ce E
mis
sio
n R
edu
ctio
n P
roje
cts
- Tu
lsa
MSA
Imp
lem
enta
tio
n
Sch
ed
ule
an
d -
/o
r C
om
ple
tio
n D
ate
20
16
20
14
20
14
20
13
-
20
13
- 2
01
8
20
13
-
Stat
us
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
On
goin
g
De
scri
pti
on
The
MTT
A's
bo
ard
of
tru
ste
es v
ote
d F
ebru
ary
26
, 20
13
to
rec
om
men
d im
ple
men
tati
on
of
a
pla
n t
o r
epla
ce r
egu
lar
bu
s se
rvic
e al
on
g a
15
-mile
str
etch
of
Peo
ria
Ave
nu
e w
ith
rap
id t
ran
sit
bu
s se
rvic
e. T
he
rap
id t
ran
sit
syst
em w
ou
ld r
epla
ce T
uls
a Tr
ansi
t's
10
5 R
ou
te, w
hic
h a
cco
un
ts
for
15
per
cen
t o
f th
e o
rgan
izat
ion
's p
asse
nge
r tr
ips.
Th
e $
18
.8 m
illio
n p
rice
tag
wo
uld
co
ver
the
cost
of
seve
n d
edic
ated
CN
G b
use
s eq
uip
ped
wit
h G
PS
tech
no
logy
to
ch
ange
tra
ffic
sign
als
wh
en t
he
bu
ses
are
beh
ind
sch
edu
le. F
un
din
g fo
r th
e p
roje
ct w
ill b
e b
efo
re T
uls
a vo
ters
in N
ove
mb
er 2
01
3. E
xpec
ted
imp
lem
enta
tio
n: 2
01
6
INC
OG
is w
ork
ing
to p
rep
are
a B
icyc
le a
nd
Ped
estr
ian
Mas
ter
Pla
n f
or
the
Tuls
a
Reg
ion
. IN
CO
G p
rop
ose
s d
eve
lop
ing
and
del
iver
ing
a tr
ansp
ort
atio
n a
sses
smen
t p
roce
ss t
hat
w
ill id
enti
fy a
nd
eva
luat
e s
ho
rt-,
med
ium
- an
d lo
ng-
term
tra
nsp
ort
atio
n s
yste
m n
eed
s to
enh
ance
bic
ycle
an
d p
edes
tria
n m
ob
ility
wh
ile c
on
sid
erin
g au
tom
ob
ile a
nd
bu
s tr
ansi
t o
per
atio
ns.
Th
e P
lan
are
a w
ill in
clu
de
th
e m
un
icip
alit
ies
of
Bix
by,
Bro
ken
Arr
ow
, Cat
oo
sa,
Cla
rem
ore
, Co
llin
svill
e, C
ow
eta,
Gle
np
oo
l, Je
nks
, Ow
asso
, San
d S
pri
ngs
, Sap
ulp
a, S
kiat
oo
k,
and
Tu
lsa.
Exp
ecte
d s
tud
y co
mp
leti
on
: 20
14
INC
OG
has
co
mm
itte
d t
o f
un
d a
fea
sib
ility
stu
dy
and
bu
sin
ess
pla
n f
or
a co
mp
reh
ensi
ve
do
wn
tow
n f
ocu
sed
bik
e sh
are
syst
em. U
sin
g C
on
gest
ion
Mit
igat
ion
& A
ir Q
ual
ity
(CM
AQ
) fu
nd
ing,
a c
on
sult
ant
will
be
reta
ined
to
det
erm
ine
the
lon
g-te
rm f
easi
bili
ty o
f a
bik
e sh
are
pro
gram
an
d im
ple
men
tati
on
pla
n. F
un
din
g o
pti
on
s an
d li
abili
ty w
ill b
e fo
cus
area
s o
f th
e p
lan
. Exp
ecte
d s
tud
y co
mp
leti
on
: 20
14
The
Tuls
a-O
klah
om
a C
ity
Co
rrid
or
Inve
stm
ent
Pla
n w
ill id
enti
fy a
nd
eva
luat
e a
full
ran
ge o
f al
tern
ativ
es t
o m
eet
the
regi
on
's lo
ng-
term
tra
nsp
ort
atio
n n
eed
s. T
he
stu
dy
will
pro
vid
e
suff
icie
nt
info
rmat
ion
to
su
pp
ort
an
FR
A d
ecis
ion
to
fu
nd
an
d im
ple
men
t a
maj
or
inve
stm
ent,
o
r in
vest
men
t in
a s
erie
s o
f p
roje
cts,
in a
pas
sen
ger
rail
corr
ido
r.
Ove
r th
e n
ext
five
yea
rs, t
he
Tuls
a Tr
ansp
ort
atio
n M
anag
emen
t A
rea
will
res
earc
h, a
nal
yze,
se
lect
an
d im
ple
men
t a
vari
ety
of
TSM
pro
ject
s. T
hes
e m
ay in
clu
de
exp
ress
way
on
-ram
p
con
gest
ion
tra
ffic
flo
w s
yste
m p
roje
cts,
inte
rsec
tio
n im
pro
vem
ent
pro
ject
s, s
ign
al
imp
rove
men
ts, s
ign
al c
oo
rdin
atio
n e
ffo
rts,
Inte
llige
nt
Tran
spo
rtat
ion
Sys
tem
(IT
S)
enh
ance
men
ts a
nd
mo
re.
TSM
imp
rove
s tr
affi
c fl
ow
, red
uce
s co
nge
stio
n a
nd
th
ereb
y re
du
ces
emis
sio
ns.
As
thes
e p
roje
cts
take
pla
ce, t
hey
will
be
des
crib
ed in
ou
r an
nu
al O
zon
e A
dva
nce
do
cum
enta
tio
n.
OD
EQ w
ill b
e re
pla
cin
g u
p t
o 1
2 g
aso
line
fuel
ed v
ehic
les
wit
h C
NG
fu
eled
veh
icle
s o
n a
ro
llin
g
bas
is.
Enti
ty
INC
OG
INC
OG
INC
OG
OD
OT
INC
OG
OD
EQ
Emis
sio
n R
ed
uct
ion
Pro
ject
Pe
ori
a A
ve. B
us
Rap
id
Tran
sit
Tuls
a R
egio
n
Bic
ycle
/Pe
de
stri
an
Mas
ter
Pla
n
Bik
e s
har
e F
eas
ibili
ty
Stu
dy
OK
C –
Tu
lsa
Co
mm
ute
r R
ail P
rogr
am In
itia
tive
Tran
spo
rtat
ion
M
anag
eme
nt
Syst
em
Co
nsi
de
rati
on
s
CN
G F
lee
t A
dd
itio
n
Pat
h F
orw
ard
Act
ion
Pla
n
Cat
ego
ry
Tran
spo
rtat
ion
Syst
em
Str
ateg
ies
and
Pro
ject
s
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
36
Ozo
ne
Ad
van
ce E
mis
sio
n R
edu
ctio
n P
roje
cts
- Tu
lsa
MSA
Imp
lem
enta
tio
n
Sch
ed
ule
an
d -
/o
r C
om
ple
tio
n D
ate
Effe
ctiv
e Ju
ly 2
01
3
20
13
-
Sep
t. 2
01
3
20
13
- C
on
tin
uo
us
20
12
- 2
01
7
20
13
- 2
01
7
20
13
20
17
20
12
-
Stat
us
Co
mp
lete
Pla
nn
ed
Co
mp
lete
On
goin
g
Pla
nn
ed
Pla
nn
ed
Pla
nn
ed
Pla
nn
ed
On
goin
g
De
scri
pti
on
This
ru
le w
ill r
edu
ce P
M, V
OC
an
d N
Ox
emis
sio
ns
wit
hin
th
e Tu
lsa
and
Okl
aho
ma
Cit
y
Met
rop
olit
an S
tati
stic
al A
reas
(M
SAs)
by
req
uir
ing
the
use
of
an a
ir c
urt
ain
inci
ner
ato
r in
p
lace
of
op
en b
urn
ing.
Th
is w
ill s
ign
ific
antl
y re
du
ce t
he
am
ou
nt
of
ozo
ne
pre
curs
ors
gen
erat
ed b
y th
e b
urn
ing
of
wo
od
was
te, w
ith
an
ap
pro
xim
ate
90
% r
edu
ctio
n in
to
tal a
ir
po
lluta
nts
. Ad
dit
ion
ally
, th
is r
ule
pro
hib
its
op
en b
urn
ing
of
was
te in
are
as f
or
wh
ich
an
ozo
ne
or
PM
Ale
rt is
in e
ffec
t.
DEQ
is c
urr
entl
y re
view
ing
OA
C 2
52
:10
0-3
3, C
on
tro
l of
Emis
sio
n o
f N
itro
gen
Oxi
des
, to
d
eter
min
e th
e fe
asib
ility
of
swit
chin
g fr
om
an
inp
ut-
bas
ed e
mis
sio
n s
tan
dar
d t
o a
n o
utp
ut-
bas
ed e
mis
sio
n s
tan
dar
d f
or
nit
roge
n o
xid
es (
NO
x). T
his
mea
sure
will
pro
vid
e fa
cilit
ies
mo
re
tech
no
logi
cal o
pti
on
s fo
r co
mp
lian
ce w
ith
em
issi
on
lim
its
and
will
en
cou
rage
th
e u
se o
f m
ore
effi
cien
t p
roce
sses
an
d e
qu
ipm
ent.
Th
is p
rop
osa
l is
in t
he
earl
y st
ages
of
revi
ew/d
evel
op
men
t w
ith
no
def
init
e d
ate
for
nex
t ac
tio
n.
The
O&
NG
PB
R s
trea
mlin
es t
he
pe
rmit
tin
g p
roce
ss a
nd
red
uce
s as
soci
ated
per
mit
tin
g fe
es f
or
the
nu
mer
ou
s sm
all o
il an
d g
as p
rod
uct
ion
sit
es in
th
e st
ate;
ho
wev
er, t
his
mea
sure
will
als
o
pro
vid
e a
mo
re d
eta
iled
em
issi
on
s in
ven
tory
fo
r th
e o
il an
d n
atu
ral g
as p
rod
uct
ion
sec
tor
wh
ich
will
be
anal
yzed
to
dev
elo
p f
utu
re a
ir q
ual
ity
po
licy
and
str
ateg
ies.
The
Dep
artm
ent
par
tici
pat
es in
mu
ltip
le p
ub
lic o
utr
each
an
d e
du
cati
on
pro
gram
s, w
hic
h
emp
has
ize
the
imp
ort
ance
of
info
rmin
g in
div
idu
als
abo
ut
the
eff
ects
of
ozo
ne
on
cit
izen
h
ealt
h. T
his
incl
ud
es p
rod
uci
ng/
sup
ply
ing
ozo
ne
edu
cati
on
mat
eria
ls, c
reat
ing
on
line
vid
eo
s
enco
ura
gin
g h
om
e ef
fici
ency
an
d is
suin
g o
zon
e w
atch
es f
or
the
Tuls
a M
SA.
PSO
No
rth
east
ern
Po
wer
Pla
nt
- Lo
w-N
Ox
bu
rner
s in
stal
led
on
un
its
2, 3
, &4
du
rin
g 2
01
2-
20
13
. Fu
rth
er N
Ox
red
uct
ion
s ar
e ex
pec
ted
th
rou
gh 2
01
7.
Mu
sko
gee
po
wer
pla
nt
will
hav
e lo
w N
Ox
bu
rner
s in
stal
led
on
un
its
4 &
5 in
20
13
-20
14
. So
on
er P
ow
er P
lan
t w
ill h
ave
low
NO
x b
urn
ers
inst
alle
d o
n u
nit
s 1
&2
in 2
01
3-2
01
4. S
emin
ole
Po
wer
Pla
nt
will
hav
e lo
w N
Ox
bu
rne
rs in
stal
led
on
un
its
1, 2
&3
bet
wee
n 2
01
5-2
01
7.
Low
NO
x b
urn
er in
stal
l on
bo
th u
nit
s, v
olu
nta
ry c
om
ple
tio
n in
20
13
. Maj
or
red
uct
ion
in N
Ox
emis
sio
ns
to b
e ac
hie
ved
by
rep
lace
men
t o
f co
al f
ired
gen
erat
ing
Un
it 1
wit
h n
atu
ral
gas
com
bin
ed c
ycle
un
it in
20
17
an
d a
dd
itio
nal
win
d g
ener
atio
n.
GR
DA
Ch
ou
teau
Po
wer
Pla
nt
– R
edu
ced
Co
al G
ener
atio
n m
ajo
r re
du
ctio
n in
NO
x em
issi
on
s b
y
rep
lace
men
t o
f co
al f
ired
gen
erat
ing
Un
it 1
wit
h n
atu
ral g
as c
om
bin
ed c
ycle
un
it; a
nd
ad
dit
ion
al w
ind
gen
erat
ion
.
Rep
lace
men
t o
f tw
o o
lde
r b
oile
rs w
ill r
esu
lt in
NO
x re
du
ctio
ns.
Enti
ty
OD
EQ
OD
EQ
OD
EQ
OD
EQ
Pu
blic
Ser
vice
Co
mp
any
of
Okl
aho
ma
Okl
aho
ma
Gas
an
d
Elec
tric
Gra
nd
Riv
er
Dam
Au
tho
rity
Gra
nd
Riv
er
Dam
A
uth
ori
ty
Ho
lly R
efin
ing
and
Mar
keti
ng
– Tu
lsa
LLC
Emis
sio
n R
ed
uct
ion
Pro
ject
Op
en
Bu
rnin
g R
ule
Ou
tpu
t b
ased
NO
x Em
issi
on
s st
and
ard
O&
NG
PB
R
Pu
blic
Ou
tre
ach
Low
NO
x B
urn
er In
stal
l
Low
NO
x B
urn
er In
stal
l
Low
NO
x B
urn
er In
stal
l
Re
du
ced
Co
al G
ene
rati
on
NO
x R
ed
uct
ion
Equ
ipm
en
t R
ep
lace
me
nt
Pat
h F
orw
ard
Act
ion
Pla
n
Cat
ego
ry
De
par
tme
nt
of
Envi
ron
me
nta
l
Qu
alit
y P
rogr
ams
and
Ru
lem
akin
gs
Maj
or
Tuls
a A
rea
Faci
lity
Ind
ust
rial
Re
tro
fits
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
37
4.0 Path Forward Reduction
Projects - Action Plan Summary
Section
4
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
38
TULSA AREA OZONE ADVANCE PLAN OCTOBER 2013
39
PATH FORWARD PROJECT SUMMARY
1. ENHANCED PUBLIC OUTREACH AND EDUCATION PROGRAMS A. Tulsa Transportation Resource Center
B. Tulsa Area Ozone Alert!
C. Tulsa Area Clean Cities
2. ENERGY EFFICIENCY STRATEGIES AND PROGRAMS A. Statewide Efficiency Measures – OK First Energy Plan Strategies
a. Oklahoma State Mandated Energy Efficiency Requirements
b. The Oklahoma Energy Security Act
c. Oklahoma First Energy Plan
d. Oklahoma State Facilities Energy Conservation Program
B. Tulsa Region Efficiency Programs
a. City of Tulsa Energy Efficiency Conservation Block Grant Projects
b. Tulsa City-County Library Efficiency Measures
c. Tulsa County Energy Efficiency and Conservation Block Grant Projects
d. Public Service Company of Oklahoma’s Demand Response Energy Performance
Reduction Program
e. Oklahoma Natural Gas (ONG) Energy Efficiency Program
f. OG & E Energy Efficiency Program
3. COMPRESSED NATURAL GAS (CNG) VEHICLE AND INFRASTRUCTURE
PROJECTS
A. Statewide CNG Projects – OK First Energy Plan Strategies
a. Oklahoma Leadership
b. Oklahoma Department of Transportation
c. Oklahoma Natural Gas Company
B. Tulsa Region CNG/Alternative Fueled Vehicle and Infrastructure Projects
a. Metropolitan Tulsa Transit Authority Dedicated CNG Fleet Plan
b. City of Owasso
c. Tulsa Public Schools
d. City of Tulsa Refuse Haulers
e. Tulsa Area Clean Cities Vehicle and Infrastructure Grant Program
f. Tulsa Area Clean Cities I-40 Grant Projects
4. TRANSPORTATION SYSTEM STRATEGIES AND PROJECTS
A. Peoria Avenue Bus Rapid Transit
B. Regional Bicycle/Pedestrian Master Plan
C. Bikeshare Feasibility Study
D. ODOT OKC – Tulsa Commuter Rail Program Initiative
E. Other Considerations - Expressway Onramp Congestion Traffic Flow System
5. DEPARTMENT OF ENVIRONMENTAL QUALITY PROGRAMS AND
RULEMAKINGS
6. MAJOR TULSA AREA FACILITY INDUSTRIAL RETROFITS