DESCRIPTION
THE SYSTEM DEVELOPMENT LIFE CYCLE(SDLC). CIS 10, Group # 2 May 2 0, 2006 C . X . A . L . K. H . A. V. L . C. introduction. Six steps of SDLC Preliminary investigation Documentation: feasibility report. -->>. - PowerPoint PPT Presentation
Citation preview
THE SYSTEM DEVELOPMENT LIFE CYCLE(SDLC)
CIS 10, Group #2 May 20, 2006
C. X.A. L.K. H.A. V. L. C.
introduction
Six steps of SDLC
Preliminary investigation
Documentation: feasibility report.
-->>-->>
System development project typically contains six steps or phases
Preliminary investigationSystem analysisSystem designSystem acquisitionSystem implementationSystem maintenance
THE SYSTEM DEVELOPMENT LIFE CYCLE(SDLC)
FeasibilityReport.
CompletedProjectFolder.
ImplementationSchedule,Test data,& results.
Data flowDiagrams,DecisionTables orTrees, &
Checklists.
SystemSpecifications.
RFPs, RFQs,& vendor
EvaluationMaterials.
4. System cquisition
6. System maintenance
5. System implementation
1. Preliminary investigation
2. System analysis
3. System design
.
.
THE SYSTEM DEVELOPMENT LIFE CYCLE(SDLC)
SDLC describes the development of a system from the time it is first studied until the time it is put into use. It can be used to both a large corporation or a home office PC.
Each step results in some type of documentation that move on to the next step.These six steps do not always follow one another in a strict sequence.
Ex: the analysis and design are interwoven and modified and skipped along with the process development
Preliminary investigation
DOCUMENTATION: FEASIBILITY REPORT
The main output of the preliminary investigation.
Includes : The systems analyst’s findings on the status of the existing system. The benefits and feasibility of changing to a new system.
Measuring feasibility: Using a few different perspectives. Personnel needed to implement the new system.
Feasibility report also contains the systems analyst’s recommendations.
Conclusion
what make up the SDLC
system analyst
THE END