27
CIRIA C753 London, 2015 The SuDS Manual B Woods Ballard HR Wallingford S Wilson The Environmental Protection Group H Udale-Clarke HR Wallingford S Illman Illman Young Landscape Design T Scott Grant Associates R Ashley Ecofutures/University of Sheffield R Kellagher HR Wallingford Griffin Court, 15 Long Lane, London, EC1A 9PN Tel: 020 7549 3300 Fax: 020 7549 3349 Email: [email protected] Website: www.ciria.org

The SuDS Manual - CIRIA

  • Upload
    others

  • View
    171

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The SuDS Manual - CIRIA

CIRIA C753 London, 2015

The SuDS Manual

B Woods Ballard HR WallingfordS Wilson The Environmental Protection Group

H Udale-Clarke HR WallingfordS Illman Illman Young Landscape Design

T Scott Grant AssociatesR Ashley Ecofutures/University of Sheffield

R Kellagher HR Wallingford

Griffin Court, 15 Long Lane, London, EC1A 9PNTel: 020 7549 3300 Fax: 020 7549 3349Email: [email protected] Website: www.ciria.org

Page 2: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

The SuDS Manualii

The SuDS Manual

Woods Ballard, B, Wilson, Udale-Clarke, H, Illman, S, Scott, T, Ashley, R, Kellagher, R

CIRIA

C753 © CIRIA 2015 RP992 ISBN: 978-0-86017-760-9

Version 5 including errata 2016

British Library Cataloguing in Publication Data

A catalogue record is available for this book from the British Library

Keywords

Sustainable drainage, flood risk management, water quality, amenity, biodiversity, environmental good practice, sustainable construction, urban hydrogeology, rivers and waterways

Reader interest

Sustainable drainage systems (SuDS) are designed to maximise the opportunities and benefits we obtain from surface water management. SuDS can deliver four main benefits by improving the way we manage water quantity, water quality, amenity and biodiversity

Classification

Availability Unrestricted

Content Technical guidance

Status Committee-guided

User Developers, landscape architects, architects, consulting engineers, planners, local authorities, lead local flood authorities, highway authorities, environmental regulators, sewerage undertakers and other organisations involved in the provision and maintenance of surface water drainage to new and existing developments

Published by CIRIA, Griffin Court, 15 Long Lane, London, EC1A 9PN, UK

This publication is designed to provide accurate and authoritative information on the subject matter covered. It is sold and/or distributed with the understanding that neither the authors nor the publisher is thereby engaged in rendering a specific legal or any other professional service. While every effort has been made to ensure the accuracy and completeness of the publication, no warranty or fitness is provided or implied, and the authors and publisher shall have neither liability nor responsibility to any person or entity with respect to any loss or damage arising from its use.

All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder, application for which should be addressed to the publisher. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature.

If you would like to reproduce any of the figures, text or technical information from this or any other CIRIA publication for use in other documents or publications, please contact CIRIA publishing for more details on copyright terms and charges at: [email protected] or tel: 020 7549 3300.

Page 3: The SuDS Manual - CIRIA

iiiThe SuDS Manual

CIRIA SuDS Manual 2015

Summary

This guidance covers the planning, design, construction and maintenance of Sustainable Drainage Systems (SuDS) to assist with their effective implementation within both new and existing developments. It looks at how to maximise amenity and biodiversity benefits, and deliver the key objectives of managing flood risk and water quality. There is also supporting information covering topics such as materials, landscape design, maintenance, community engagement and costs and benefits.

The information presented in this publication is a compendium of good practice, based on existing guidance and research both in the UK and internationally, and the practical experience of the authors, project steering group and industry.

This guidance provides the framework for designing SuDS with confidence and to maximise benefits. Its contents are relevant for a wide-range of professions and roles and it highlights that through engagement and collaboration SuDS can be integrated into the design of urban areas, to create high quality places for future generations.

The key message is that SuDS should be designed to maximise the opportunities and benefits that can be secured from surface water management.

Page 4: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

iv The SuDS Manual

Foreword

When the first SuDS Manual was published in 2007, SuDS was still in its infancy in the UK. Technical advice on design and construction was sparse and spread across many separate publications. For the first time the original SuDS Manual placed this information in one place, making it a valuable resource for anyone engaged in SuDS delivery. Yet for guidance and examples we still had to rely a great deal on schemes from other countries where the implementation of SuDS was far more advanced. Since that time SuDS implementation has moved on a great deal in the UK. There are now plenty of examples from all the UK nations that demonstrate the benefits to be gained from SuDS and these offer reliable and detailed recommendations for their planning, design, construction, maintenance and operation. The world of SuDS has indeed moved on. So it is timely that a new edition of the SuDS Manual is now available. Not only does this new edition update the extensive technical information, it includes new guidance on SuDS components and the delivery of SuDS in a variety of situations.

It should be clear from the engaging examples in this Manual that SuDS provide real benefits to society and to the environment, moving surface water from a problem to a valuable resource. For the first time the guidance includes how to plan for and manage extreme rain events so that communities can be more resilient to flooding. There are some excellent examples that demonstrate how good design can deliver far more appealing places in which to live and work, and this, in time, should lead to properties that have improved value and are easier to insure. Provided that drainage is considered early enough in the outline design of a new development then there is no reason why SuDS should not become the norm everywhere.

The Manual is primarily aimed at UK applications, though it will be of interest to all engaged in drainage work globally. It recognises the need for better information and engagement for those involved in the development process, from planners, landscape architects, designers, engineers, architects and in some instances the community. It is structured in a way that allows easy access whether it be for high level appreciation of the concepts only, or for detailed design guidance.

I am grateful to the members of the project steering group who reviewed and contributed to this important work, and to the energy and effectiveness of the project team. They have delivered a master-piece of technical guidance that will last for many years. I thoroughly recommend it to you.

David BalmforthChairman, project steering group

Page 5: The SuDS Manual - CIRIA

vThe SuDS Manual

CIRIA SuDS Manual 2015

Acknowledgements

This publication is the result of CIRIA Research Project (RP)992.

AuthorsBridget Woods Ballard MA MSc CEng MICEBridget Woods Ballard is a principal engineer at HR Wallingford. She has more than 20 years’ experience in hydrology and sustainable flood risk management and has been a key contributor to research on SuDS costs, maintenance, performance and liabilities for regulators, the water industry and other private sector organisations. She was the principal author of the previous SuDS Manual (CIRIA C697) and since then has drafted BS 8582:2013, and has advised English and Welsh governments during the development of their national standards and associated guidance.

Steve Wilson MSc BEng CEng MICE CEnv CSci CWEM MCIWEM FGSSteve is technical director of the Environmental Protection Group Limited. He is a UK registered ground engineering adviser and has had a wide ranging career in geotechnical and environmental engineering. Steve has demonstrated that SuDS can be used on any site in the UK to provide cost-effective surface water drainage systems. Steve also undertakes research and development work that helps to dispel a lot of the myths that surround the use of SuDS. Most recently Steve has been busy helping landscape architects successfully design retrofit schemes in a number of different locations.

Helen Udale-Clarke BEng(Hons) MPhilHelen is a principal engineer at HR Wallingford. She has more than 20 years’ experience in drainage, flood and climate change risk assessments, with a particular interest in the development of guidance and working with stakeholders.

Sue Illman BA DipLA GradDipCons(AA) PPLI Hon FSE Hon Fellow (UoG)Sue is managing director of Illman Young, a landscape architectural practice based in Cheltenham, and was president of the Landscape Institute from 2012–2014. Sue’s practice works across most planning and development sectors, but she is probably best known for her advocacy work promoting integrated water management and SuDS through inter-professional collaboration. The integration of grey, green and blue in urban landscapes has never been more relevant, and is a subject that Sue continues to promote. In addition to her current role, she is a champion for flood mitigation and resilience on behalf of the Construction Industry Council (CIC).

Tamasine Scott MA (Hons) LArch CMLITamasine is a landscape architect and senior associate of Grant Associates. She has led a variety of large and small projects, from cooled conservatories and university campuses in Singapore to secondary schools in the UK and urban parks in Spain. SuDS has become second nature in her design process, integrating the functional requirements of water management within playful and thriving landscapes. Tamsine is fascinated by using SuDS in the design process to integrate landscape, architecture and engineering, thereby achieving diverse landscapes that ultimately enrich experience.

Richard Ashley BSc MPhil CEng MICERichard is a civil engineer with 50 years’ urban drainage experience in practice and as an academic. He is Emeritus professor of urban water, University of Sheffield, adjunct professor, Lulea Technical University

Page 6: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

vi The SuDS Manual

and professor of flood resilience at UNESCO IHE, Delft. He was also recipient of the (IWA/IAHR) Joint Committee on Urban Drainage triennial career achievement award in 2014 and for research into sustainable water systems in 2008. Richard has worked on over 500 publications, advising governments and international institutions on urban water, flooding and water sensitive urban design.

Richard Kellagher BEng MSc CEng MICE MCIWEMRichard Kellagher is a technical director at HR Wallingford. He has been involved in drainage and SuDS research and has produced a number of guidance documents on drainage-related issues for both CIRIA and HR Wallingford. Richard’s experience in drainage includes research projects for UKWIR, sewerage modelling, expert witness work on flooding incidents, master plans for cities overseas and leading or participating in a number of European research projects.

Project steering groupFollowing CIRIA’s usual practice, the project was guided by a project steering group (PSG) that comprised:

Deonie Allen* Heriot Watt UniversityDavid Balmforth (chair) MWH GlobalAndy Bailey Highways EnglandAdam Baylis Environment AgencyDavid Bliss Environment AgencySally Boorer National House Building CouncilSimon Boots Campbell ReithJo Bradley* Environment AgencyBob Bray Robert Bray AssociatesSimon Bunn Cambridgeshire City CouncilBronwyn Buntine Kent County CouncilPhil Chatfield Llywodraeth Cymru Welsh GovernmentPeter Close Northern Ireland Environment AgencyStuart Crisp Concrete Pipeline Systems AssociationOwen Davies Royal Borough Greenwich (formerly London Borough Lambeth)/London

Drainage Engineering GroupPaul Davies* ArupPeter Dawson Essex County CouncilChristopher Digman* MWH GlobalAlison Duffy* University of AbertayMartin Fairley ACOGrant Gahagan Department for Environment, Food and Rural AffairsJonathan Glerum Anglian WaterRod Green Environmental Protection Group (formerly Polypipe)Andrew Hemingway* Scottish Environment Protection AgencyMike Henderson AecomIan Holt London Borough of HaringeyPhilip Hulme Environment AgencyJeremy Jones Atkins (formerly Dŵr Cymru Welsh Water)Andrew Leadbetter Peterborough City CouncilLian Lundy* University of MiddlesexPeter Martin Black & Veatch

Page 7: The SuDS Manual - CIRIA

viiThe SuDS Manual

CIRIA SuDS Manual 2015

Netsanet Mebrate XP SolutionsAnthony McCloy McCloy ConsultingHelen McHollan Illman Young Landscape DesignBrian Morrow* Independent (formerly United Utilities)Stuart Nelmes BWB ConsultingRoger Nowell Sheffield City CouncilFola Ogunyoye Royal HaskoningDHVJohn Oldfield Bedford Group of Internal Drainage BoardsChris Patmore WSP Parsons BrinckerhoffWarren Peppard Lincolnshire County CouncilDavid Porter* DARD Rivers Agency Northern IrelandJudith Puckmayr Robert Bray Associates (formerly Illman Young Landscape Design)Neill Robinson-Welsh Stormwater ManagementBrian Smith Yorkshire WaterJason Shingleton PolypipeAmy Shoesmith Dŵr Cymru Welsh WaterDavid Singleton DSA Environment & DesignAlex Stephenson Hydro InternationalKevin Tidy Bracknell ForestChryse Tinsley* Leicester City CouncilZorica Todorovic* AtkinsPhil Tomlinson PermavoidMichael Vout Telford and Wrekin CouncilDavid Watkins Cornwall County CouncilLes Watson Scottish Environment Protection Agency*corresponding members

CIRIA Project managersPaul Shaffer Project directorSuzanne Simmons Project managerSirio D’Aleo Project assistantPaul Beverley EditorClare Drake Publications manager

Project fundersACOCampbell ReithConcrete Pipeline System AssociationDARD Rivers Agency Northern IrelandDepartment for Environment, Food and Rural AffairsDŵr Cymru Welsh WaterEnvironment AgencyHighways EnglandHydro International

Llywodraeth Cymru Welsh GovernmentLondon Drainage Engineering GroupNHBC FoundationNorthern Ireland Environment AgencyPermavoidPolypipeScottish Environment Protection AgencyStormwater ManagementWSP Parsons BrinckerhoffXP Solutions

Page 8: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

viii The SuDS Manual

Other contributorsAs well as recognising the significant additional contributions from the project team of HR Wallingford, The Environmental Protection Group, Illman Young Landscape Design, Grant Associates and Ecofutures, CIRIA would like to recognise the contributions and support from:

Bob Allen Aggregate IndustriesJulia Baker Parsons BrinckerhoffAlan Bamforth ABGJessica Bastock London Borough of Lambeth (formerly London Borough of Tower Hamlets)Victoria Boorman London Borough of HillingdonVictoria Brayshaw Dudleys Consulting Engineers (formerly Redrow)Tom Butterworth Natural EnglandBrian D’Arcy University of AbertaySamantha Davenport Natural EnglandLuke Engleback Studio EnglebackDuncan Faulkener JBA ConsultingDusty Gedge Green Roof ConsultancyMartina Girvan Arcadis (formerly Aecom)Gary Grant Green Roof ConsultancyKeith Harvey Aggregate IndustriesPaul Hlinovsky BMT WBMGordon Hunt Oxfordshire County CouncilAnne Jaluzot Trees and Design Action GroupSue James Trees and Design Action GroupKirsten Johnstone Environment AgencyDavid Jones Llywodraeth Cymru Welsh GovernmentLian Lundy Middlesex UniversityGordon Mitchell University of LeedsMartin Moss Natural EnglandTerry Nash UK Rainwater Management AssociationKeith Oldham ACO (formerly ABG)Helen O’Brien Leicester City CouncilTim O’Hare Tim O’Hare AssociatesMartin Osborne MouchelKevin Reid Greater London AuthorityMike Revitt University of MiddlesexSanti Santhalingam Highways EnglandRuth Thorp Grant AssociatesTony Weber BMT WBMMike Whitehead Highways EnglandPeter Worrall Penny Anderson Associates

Page 9: The SuDS Manual - CIRIA

ixThe SuDS Manual

CIRIA SuDS Manual 2015

Contents

Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v

Part A Introduction to the SuDS Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Executive summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Introduction to the SuDS Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

Part B Philosophy and approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

1 The philosophy of SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .181.1 Delivering multiple benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .191.2 Managing surface water runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .211.3 Delivering resilience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .241.4 Making developments more sustainable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .261.5 Complying with legislation and regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .261.6 The SuDS design philosophy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .271.7 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30

2 Introducing the SuDS design approach. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .322.1 The principle and objectives of SuDS design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .332.2 SuDS design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .342.3 The role of the designer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .352.4 Assessing and approving SuDS schemes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35

3 Designing for water quantity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .363.1 Water quantity design objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .373.2 Water quantity design criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .393.3 Water quantity design standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .443.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48

4 Designing for water quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .504.1 Water quality design objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .514.2 Water quality design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .564.3 Water quality design standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .594.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .64

5 Designing for amenity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .665.1 Amenity design objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .675.2 Amenity design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .705.3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .78

6 Designing for biodiversity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .806.1 Biodiversity design objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .816.2 Biodiversity design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .836.3 SuDS design characteristics to support biodiversity . . . . . . . . . . . . . . . . . . . . . . . . . . .896.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .91

Part C Applying the approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

7 The SuDS design process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .947.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .957.2 SuDS and the planning system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .967.3 SuDS design and stakeholder engagement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .997.4 Stage 1: Setting strategic SWM objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .997.5 Stage 2: Conceptual design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1007.6 Stage 3: Outline design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118

Page 10: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

x The SuDS Manual

7.7 Stage 4: Detailed design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1237.8 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126

8 Designing for specific site conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1268.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1298.2 Contaminated soils or groundwater below the site . . . . . . . . . . . . . . . . . . . . . . . . . . 1298.3 High groundwater levels below the site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1328.4 Sloping sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1348.5 Very flat sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1378.6 Sites with potentially unstable subsurface rocks or soil workings . . . . . . . . . . . . . . 1398.7 Sites with very deep backfill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1398.8 SuDS on floodplains. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1408.9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .141

9 Designing for roads and highways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1429.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1439.2 Approval and adoption of SuDS in or adjacent to roads. . . . . . . . . . . . . . . . . . . . . . . 1439.3 Interface with buried utility services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1449.4 Connections between features below roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1449.5 Application of SuDS for road drainage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1449.6 Allowing water to infiltrate in close proximity to the road pavement . . . . . . . . . . . . . .1479.7 Filter drains for road drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1489.8 Swales for road drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1499.9 Roads for exceedance flow management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1519.10 Treating road runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1519.11 Designing safe SuDS adjacent to roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1529.12 Retrofitting SuDS for roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1529.13 The maintenance of SuDS adjacent to roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1539.14 Additional guidance relevant for SuDS draining roads . . . . . . . . . . . . . . . . . . . . . . . . 153

9.15 References. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15410 Designing for urban areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156

10.1 Objectives for surface water management in the urban environment . . . . . . . . . . . .15710.2 Delivering the SuDS design criteria within urban areas . . . . . . . . . . . . . . . . . . . . . . . .16510.3 Different urban development typologies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17410.4 Case studies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19610.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202

Part D Technical detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204

11 Rainwater harvesting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20611.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20711.2 Selection and siting of RWH systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21111.3 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21211.4 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22611.5 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22711.6 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22711.7 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22711.8 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22711.9 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22811.10 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22811.11 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22811.12 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 230

12 Green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23212.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23312.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23612.3 Selection and siting of green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23712.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23812.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24012.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24112.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .242

Page 11: The SuDS Manual - CIRIA

xiThe SuDS Manual

CIRIA SuDS Manual 2015

12.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24512.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24712.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24912.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25012.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25112.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253

13 Infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25613.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25713.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26013.3 Selection and siting of infiltration components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26113.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26213.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26313.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26313.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26313.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26413.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26413.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26513.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26513.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26613.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 269

14 Proprietary treatment systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27014.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27114.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27114.3 Selection and siting of proprietary treatment systems . . . . . . . . . . . . . . . . . . . . . . . .28114.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28214.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28214.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28414.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28414.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28414.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28514.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28514.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28514.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28614.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 288

15 Filter strips . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29015.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29115.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29215.3 Selection and siting of filter strips . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29315.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29315.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29415.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29515.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29515.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29615.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29615.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29615.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29715.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29815.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 300

16 Filter drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30216.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30316.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30416.3 Selection and siting of filter drains. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30516.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30616.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30716.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30816.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30816.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308

Page 12: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xii The SuDS Manual

16.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30816.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30816.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30916.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30916.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .311

17 Swales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31217.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31317.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31617.3 Selection and siting of swales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31717.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31817.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32117.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32217.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32317.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32317.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32417.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32617.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32617.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32717.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 330

18 Bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33218.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33318.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33918.3 Selection and siting of bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34018.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34118.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34318.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34518.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34518.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34518.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35018.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35218.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35418.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35518.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .357

19 Trees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36019.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36119.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36419.3 Selection and siting of trees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36919.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37019.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37219.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37319.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37419.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37419.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37619.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38019.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38119.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38219.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 383

20 Pervious pavements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38620.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38720.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39320.3 Selection and siting of pervious pavements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39520.4 Overall design requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39720.5 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40020.6 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40620.7 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40720.8 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40720.9 Structural design (pavement engineering) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 408

Page 13: The SuDS Manual - CIRIA

xiiiThe SuDS Manual

CIRIA SuDS Manual 2015

20.10 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42020.11 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42220.12 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42520.13 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42620.14 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42920.15 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .431

21 Attenuation storage tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43621.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43721.2 Selection and siting of attenuation tank systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . 44621.3 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44721.4 Structural design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44721.5 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45721.6 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45921.7 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45921.8 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45921.9 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46021.10 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46321.11 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46421.12 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46421.13 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46721.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 468

22 Detention basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47222.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47322.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47422.3 Selection and siting of detention basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47522.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47622.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47722.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47822.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47922.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47922.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48022.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48022.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48122.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48122.13 Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 483

23 Ponds and wetlands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48423.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48523.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48923.3 Selection and siting of ponds or wetlands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49023.4 Hydraulic design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49123.5 Treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49223.6 Amenity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49323.7 Biodiversity design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49423.8 Physical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49523.9 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49723.10 Landscape design and planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49823.11 Construction requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50023.12 Operation and maintenance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50023.13 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 503

Part E Supporting guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 504

24 Hydrology and hydraulics: design methods and calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . 50624.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50724.2 Runoff estimation methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50824.3 Greenfield sites: peak runoff rate estimation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51024.4 Greenfield sites: runoff volume estimation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51624.5 Previously developed sites: peak runoff rate and runoff volume estimation. . . . . . .518

Page 14: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xiv The SuDS Manual

24.6 The proposed development site: peak runoff rate and runoff volume estimation . . . .51924.7 Climate change and urban creep allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52624.8 Designing for Interception. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52724.9 Designing for attenuation storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53024.10 Designing for long-term storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53324.11 Conveyance design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53724.12 Exceedance design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53824.13 Surface water pumping station design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53924.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 539

25 Infiltration: design methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54225.1 General concepts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54325.2 Evaluating potential constraints to the use of infiltration . . . . . . . . . . . . . . . . . . . . . 54425.3 Infiltration testing methods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54925.4 The impacts of siltation on infiltration system performance . . . . . . . . . . . . . . . . . . . 55025.5 Reuse of existing soakaways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55125.6 Infiltration system hydraulic design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55125.7 Emptying time checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55725.8 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 558

26 Water quality management: design methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56026.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56126.2 Protecting surface waters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56126.3 Protecting groundwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56226.4 The level of pollution in surface water runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56326.5 Treatment processes within SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56326.6 Evidence relating to managing water quality risks . . . . . . . . . . . . . . . . . . . . . . . . . . . 56326.7 Methods for managing pollution risks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56526.8 Designing a treatment system using a SuDS Management Train . . . . . . . . . . . . . . . .57426.9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .576Annex 1 Contaminants in urban runoff and their potential toxicity . . . . . . . . . . . . . . . . . . . . . .579Annex 2 Types of pollutant removal mechanisms in SuDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . 585Annex 3 SuDS performance data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .587Annex 4 Groundwater protection evidence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 589Annex 5 Ellis et al, 2012 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .591

27 Pollution prevention strategies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59627.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59727.2 Avoid polluting materials and activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59827.3 Minimise polluting materials or activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59827.4 Prevent pollutants mixing with rainfall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59927.5 Provide education and training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60027.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602

28 Inlets, outlets and flow control systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60428.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60528.2 General design considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60628.3 Inlet and outlet layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60728.4 Inlet systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60828.5 Outlet structure (outlets and flow control systems) . . . . . . . . . . . . . . . . . . . . . . . . . . .61628.6 Flow measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62828.7 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 629

29 Landscape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63029.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63129.2 Landscape character. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63329.3 Site considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63429.4 Bioengineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63729.5 Topsoils, ameliorants and mulches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63929.6 Choosing the right plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64229.7 Grass. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .64729.8 Designing for maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 650

Page 15: The SuDS Manual - CIRIA

xvThe SuDS Manual

CIRIA SuDS Manual 2015

29.9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65230 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 654

30.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65530.2 Standards and certification schemes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65630.3 Generic approaches to materials specification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65730.4 Soils and aggregates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65830.5 Geosynthetics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66030.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .670

31 Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67431.1 Construction best practice for SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67531.2 Construction programming for SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67731.3 Construction method statements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67931.4 Erosion control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68131.5 Sediment control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68331.6 Pollution control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68431.7 SuDS construction inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68631.8 Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68731.9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 688

32 Operation and maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69032.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69132.2 Operation and maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69232.3 Level of operation and maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69332.4 Operation and maintenance activity categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69432.5 Health and safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69532.6 Regular maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69632.7 Occasional maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69932.8 Remedial maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70332.9 Frequency of maintenance tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70432.10 Applying the principles of landscape management . . . . . . . . . . . . . . . . . . . . . . . . . . .70532.11 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .706

33 Waste management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70833.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70933.2 Waste management requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70933.3 Sediment characterisation and disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71233.4 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714

34 Community engagement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71634.1 Introduction – what is Community Engagement? . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71734.2 The benefits of successful engagement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71834.3 Developing an engagement plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71934.4 Delivering engagement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72234.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .732

35 Costs and benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73435.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73535.2 Key concepts for assessing costs and benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73835.3 Estimating costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74135.4 Assessing benefits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74835.5 Comparing costs and benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75135.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .756

36 Health and safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75836.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75936.2 SuDS health and safety: the context . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .76036.3 Effective health and safety risk management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .76136.4 Health and safety risk assessment requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .76936.5 Health and safety legislation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .77236.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .773

Appendices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 776

A Glossary and abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .778

Page 16: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xvi The SuDS Manual

Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .779Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .794

B Checklists. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 802B.1 SuDS design and land use planning submissions . . . . . . . . . . . . . . . . . . . . . . . . . . . 803B.2 Scheme design checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .811B.3 SuDS health and safety risk assessment checklist . . . . . . . . . . . . . . . . . . . . . . . . . . .816B.4 Infiltration assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 822B.5 SuDS component design checklists. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .826B.6 Construction method statements and assessment checklists. . . . . . . . . . . . . . . . . 854B.7 Construction specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 859B.8 Maintenance Plan and checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 865B.9 Adoption handover checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 883B.10 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 885

C Design example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 888C.1 Site description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 889C.2 Stage 1: Strategic surface water management objectives . . . . . . . . . . . . . . . . . . . . 889C.3 Stage 2: Conceptual design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 890C.4 Stage 3: Outline design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 903C.5 Stage 4: Detailed design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 908C.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .937

BoxesBox 1.1 Benefits of SuDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Box 1.2 The SuDS approach to managing surface water runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21Box 1.3 Functions of SuDS components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Box 3.1 Return periods, probability of occurrence and critical durations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44Box 4.1 Factors influencing pollution levels in urban runoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52Box 4.2 Pollutant concentrations and loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54Box 4.3 Good practice for SuDS treatment design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Box 4.4 UK regulations for discharges to groundwaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62Box 5.1 Amenity, place-making and liveability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67Box 6.1 Useful definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82Box 6.2 The importance of grasslands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90Box 11.1 Rainwater harvesting for schools, Essex . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209Box 11.2 Runoff yield calculation (intermediate method: water supply only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219Box 11.3 Non-potable water demand calculation (intermediate method: water supply only) . . . . . . . . . . . . . . . . 220Box 11.4 Tank storage volume calculation: simple method, water conservation + surface water

management, passive control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 221Box 11.5 Tank storage volume calculation: intermediate method, water conservation + surface water

management, passive control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222Box 11.6 Tank storage volume calculation: detailed method, water conservation + surface water

management, passive control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223Box 12.1 Reported evidence of Interception delivered by green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239Box 18.1 Example specification for a bioretention filter medium . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350Box 19.1 Trees and runoff volume reduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363Box 19.2 Performance of trees in removing phosphorous and nitrogen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 373Box 19.3 Example specification for soil to provide rooting environment in modular structures and rafts . . . . . . 377Box 19.4 Example specification for structural soil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 379Box 19.5 Testing and approval of tree soils and structural soils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 381Box 20.1 Units used for infiltration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 397Box 21.1 The use of BBA and other certification schemes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 460Box 24.1 A summary of the approach to modelling paved surfaces using the UKWIR UK runoff model. . . . . . . . 525Box 24.2 A summary of the approach to modelling pervious surfaces using the UKWIR runoff model . . . . . . . . 526Box 24.3 Simple approaches to Interception delivery and compliance assessment . . . . . . . . . . . . . . . . . . . . . . . 528Box 26.1 Generic findings regarding the removal of TSS and metals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 564Box 26.2 Steps of the simple index approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567Box 28.1 Structural trash screen design criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 628Box 30.1 Geomembranes and construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 665Box 30.2 Independent verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 667Box 31.1 General construction issues relating to SuDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 675Box 35.1 Examples of methods for quantifying benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 749

Page 17: The SuDS Manual - CIRIA

xviiThe SuDS Manual

CIRIA SuDS Manual 2015

Box B.1 An example SuDS specification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 862Box B.2 Example SuDS Maintenance Plan for Robinswood Primary School . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 873

Case studiesCase study 1.1 The Circle, Uptown Normal, Illinois . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Case study 1.2 Fair Street vertical rain garden, London. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Case study 5.1 The Triangle, Swindon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Case study 6.1 Manor Park, Sheffield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83Case study 6.2 Green roof at Horniman Museum, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84Case study 6.3 Gosforth Valley wetlands, Dronfield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86Case study 6.4 Watercolour, Redhill, Surrey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88Case study 7.1 Singleton Hill, Ashford, Kent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103Case study 10.1 Hunter Avenue, Kent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159Case study 10.2 Bristol Harbourside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 196Case study 10.3 Derbyshire Street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197Case study 10.4 Rathbone Market . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 198Case study 10.5 Tanner Springs Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 199Case study 10.6 Augustenborg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200Case study 10.7 Benthemplein Water Square . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 201Case study 12.1 Kanes Food, Evesham . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241Case study 12.2 Abbey Hive, Camden, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244Case study 12.3 Sharrow School, Sheffield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244Case study 34.1 Upton – large-scale housing estate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 725Case study 34.2 Priors Farm, Oakley – small-scale retrofit demonstration project. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 728Case study 35.1 Herne Hill and Dulwich flood alleviation scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 736Case study 35.2 Application of the BeST tool to compare the benefits of different drainage options. . . . . . . . . . . . . . . . 752

EquationsEquation 15.1 Manning’s equation for filter strip design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 295Equation 18.1 Calculating required bioretention surface area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 342Equation 18.2 Forebay design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347Equation 20.1 Equation to estimate outfall pipe spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 404Equation 20.2 Darcy’s law to calculate sub-base flow. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 404Equation 23.1 Water quality treatment volume calculation using variable rainfall depths (for Scotland) . . . . . . . . . . . 492Equation 24.1 Estimating the flow frequency curve using the FEH statistical method . . . . . . . . . . . . . . . . . . . . . . . . . . 511Equation 24.2 FEH statistical method: catchment descriptor equation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 512Equation 24.3 IH124: Catchment descriptor equation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 513Equation 24.4 Fixed percentage runoff model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 517Equation 24.5 Modified rational method equation to determine peak flow rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 520Equation 24.6 Fixed UK runoff model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 521Equation 24.7 Variable UK runoff model. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 522Equation 24.8 The UKWIR UK runoff model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 523Equation 24.9 Integration of storage volume from depth/area relationship. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 532Equation 24.10 Estimating the extra runoff volume from a development site compared to the greenfield equivalent . 534Equation 24.11 Estimating the extra runoff volume from a proposed development site compared to the previously

developed site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 536Equation 24.12 Manning’s conveyance equation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 537Equation 25.1 Determination of maximum depth of water for plane infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . 553Equation 25.2 Procedure for design of plane infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 554Equation 25.3 Procedure to determine the base area required for a given maximum depth . . . . . . . . . . . . . . . . . . . . . 555Equation 25.4 Determination of maximum depth of water for 3D infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . 555Equation 25.5 Procedure for design of 3D infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 556Equation 25.6 Equations to calculate the time to empty an infiltration system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 558Equation 28.1 Standard orifice equation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 618Equation 28.2 Total flow capacity of a perforated riser. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 619Equation 35.1 Calculating present value and net present value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 740

FiguresFigure 1.1 The Circle in Uptown Normal, Illinois, USA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Figure 1.2 Impacts of urbanisation on a catchment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Figure 1.3 SuDS using natural processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Figure 1.4 SuDS providing urban cooling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Figure 1.5 Fair Street vertical rain garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Figure 1.6 Examples of commonly used SuDS for different development types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Page 18: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xviii The SuDS Manual

Figure 2.1 The four pillars of SuDS design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33Figure 3.1 Example of a runoff hydrograph . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38Figure 3.2 Controlling runoff rates using attenuation storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38Figure 3.3 Example of the combined effect of multiple attenuation systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Figure 4.1 Example of flow, pollutant concentration and pollutant load build-up during a rainfall event . . . . . . . . . 54Figure 5.1 The green . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Figure 5.2 Play pump (a) and hand pump (b) in the kitchen garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Figure 5.3 Orange Park, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71Figure 5.4 Examples of bioretention systems providing traffic calming measures, Llanelli . . . . . . . . . . . . . . . . . . . . .72Figure 5.5 Rain garden, Ribblesdale Road, Nottingham. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72Figure 5.7 Greenwich University vegetable growing plot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73Figure 5.8 Portland City Council edible garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73Figure 5.9 Canalside living, Redhill, Surrey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73Figure 5.10 SuDS and play. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74Figure 5.11 Alcester Primary Care Centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75Figure 5.12 Planted canal, Stamford . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75Figure 5.13 Inlet, Heriot Watt Science Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75Figure 5.14 Signage and todder-proof fencing at a supermarket site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .76Figure 5.15 Pond dipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77Figure 5.16 Shared learning at Stebonheath. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77Figure 5.17 SuDS outreach project, Portland . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .78Figure 5.18 Planting at Coppetts Wood Primary School . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .78Figure 6.1 View over the park showing the SuDS working as predicted following heavy rain in 2007 . . . . . . . . . . . 83Figure 6.2 Pond dipping as part of an educational programme for schools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83Figure 6.3 Green roof at Horniman Museum, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84Figure 6.4 The wetlands and example of activities by the volunteers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86Figure 6.5 Green corridors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .87Figure 6.6 Watercolour, Redhill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88Figure 6.7 Pond and grassland habitat mosaic, Moreton-In-Marsh Community Hospital, Gloucestershire . . . . . . . 89Figure 6.8 Infiltration basin with wildflower turf and grass seeding, Victoria Park Health Centre, Leicester . . . . . . .91Figure 6.9 Wetland with marginal aquatics, grasses, sedges, rushes and wildflower grass seed mix, Kington,

Herefordshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .91Figure 7.1 The four stages of SuDS design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95Figure 7.2 The drainage system design process: links with land use planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .97Figure 7.3 The conceptual design process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101Figure 7.4 Characterising flow routes and discharge points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103Figure 7.5 Singleton Hill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103Figure 7.6 Defining surface water sub-catchments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110Figure 7.7 Defining parks, open spaces and corridors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111Figure 7.8 Defining the road network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112Figure 7.9 SuDS component selection process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114Figure 7.10 Defining exceedance routes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117Figure 7.11 The outline design process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119Figure 7.12 Site and sub-catchment scale component sizing for outline design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121Figure 7.13 The detailed design process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123Figure 8.1 Contaminated land and SuDS: typical capping layers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131Figure 8.2 Unlined permeable pavement on a contaminated site, Stamford, Lincolnshire . . . . . . . . . . . . . . . . . . . 131Figure 8.3 Locating infiltration systems beneath layers of contamination and/or removal of contaminated soils

from around soakaways. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132Figure 8.4 Lined permeable pavement constructed over a former landfill site, Portsmouth . . . . . . . . . . . . . . . . . . 132Figure 8.5 Shallow swale on a site with shallow groundwater, Witney, Oxfordshire . . . . . . . . . . . . . . . . . . . . . . . . . 133Figure 8.6 Cross-section showing example SuDS on a sloping site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135Figure 8.7 Retaining wall and waterfall (a) and planted pool with overflow to play basin (b), Springhill Co-housing, Stroud. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135Figure 8.8a Check dams in a swale, Oxfordshire. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136Figure 8.8b Check dam in a swale during construction, Lincoln . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136Figure 8.8c Check dams can be combined with road/pedestrian crossings, Upton, Northamptonshire . . . . . . . . . 136Figure 8.9 Impact of geology on water flows from infiltration drainage on sloping sites. . . . . . . . . . . . . . . . . . . . . . 136Figure 8.10 Example comparison of piped drainage system to a SuDS scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138Figure 9.1 Concrete block permeable paving used for a residential road, Cambridge . . . . . . . . . . . . . . . . . . . . . . . 145Figure 9.2 Concrete grid grass reinforcement along tramlines, Switzerland . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145Figure 9.3 Swale and wetland systems with reinforced grass used in less trafficked areas such as laybys

and field access points, A16, Lincolnshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145

Page 19: The SuDS Manual - CIRIA

xixThe SuDS Manual

CIRIA SuDS Manual 2015

Figure 9.4 Swale on a steeply sloping road, Oxfordshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146Figure 9.5 Swale and wetland system, A16, Lincolnshire. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146Figure 9.6 Filter drain, A7, Dumfries and Galloway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146Figure 9.7 Detention basin draining a rural road, Oxfordshire. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146Figure 9.8 Wetland draining a complex traffic island, M4 junction 11, Reading . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147Figure 9.9 Bioretention system, inner ring road around Ashford town centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147Figure 9.10 Installation of vortex separator, M25 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147Figure 9.11 Geocellular storage below roundabout, A595 Parton to Lillyhall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147Figure 9.12 Detail of a bioretention system designed to prevent water ingress into adjacent sub-base . . . . . . . . . 148Figure 9.13 Water flows from shallow swales acting as edge drains for the road sub-base. . . . . . . . . . . . . . . . . . . . 148Figure 9.14 Filter drain details for cuttings – combined surface water and groundwater drainage . . . . . . . . . . . . . 149Figure 9.15 Swale detail. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150Figure 9.16 Kerb drains and channel connected to swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150Figure 9.17 Outlet from kerb drain into swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150Figure 9.18 Swale set back from road, Elvetham Heath. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150Figure 9.19 Highway acting as a flood pathway in an exceedance event . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151Figure 10.1 Hunter Avenue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159Figure 10.2 Pervious surfaces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161Figure 10.3 Kerb drainage, rills and channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161Figure 10.4 Planted channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161Figure 10.5 Bioretention systems and rain gardens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162Figure 10.6 Swales and linear wetlands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162Figure 10.7 On-plot SuDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162Figure 10.8 Green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163Figure 10.9 Public spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163Figure 10.10 Playful and informative elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163Figure 10.11 Example of a bioretention system upstream of an existing gully . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165Figure 10.12 Communal space using runoff as a resource . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167Figure 10.13 Rain garden with weirs to control flows on sloping site in Ashford, Kent . . . . . . . . . . . . . . . . . . . . . . . . . 168Figure 10.14 Multi-functional civic space. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169Figure 10.15 Benthemplein Water Square, Rotterdam. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 170Figure 10.16 Multi-functional streetscape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .171Figure 10.17 Multi-functional use of elevated spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172Figure 10.18 Roadside rills, Cambridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172Figure 10.19 Typologies within the urban landscape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175Figure 10.20 Typology 1 – Small residential infill. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 179Figure 10.21 Typology 2 – Medium residential infill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181Figure 10.22 Typology 3 – Mixed use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183Figure 10.23 Typology 4 – Destination public realm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185Figure 10.24 Typology 5 – Transitional public realm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187Figure 10.25 Typology 6 – Elevated spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 189Figure 10.26 Typology 7 – Neighbourhood street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 191Figure 10.27 Typology 8 – Civic street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 193Figure 10.28 Typology 9 – Greenway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195Figure 11.1 Rainwater harvesting storage tanks for domestic and commercial application . . . . . . . . . . . . . . . . . . . 207Figure 11.2 Columbus School and College. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209Figure 11.3 A conceptual gravity-fed RWH system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 210Figure 11.4 A conceptual pumped rainwater harvesting system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 211Figure 11.5 1 in 100 year, 6-hour rainfall depths for the UK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214Figure 11.6 Average annual rainfall for the UK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215Figure 11.7 The simple method for sizing RWH tanks – for water conservation only . . . . . . . . . . . . . . . . . . . . . . . . . 218Figure 11.8 The simple look-up approach for sizing RWH tanks – aggregated for various occupancy rates . . . . . . 219Figure 11.9 Additional storage volume VSC required for surface water management, over and above the

storage needed for water conservation, simple approach. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222Figure 11.10 Rainwater harvesting tanks with active control for surface water management. . . . . . . . . . . . . . . . . . . 225Figure 11.11 Rainwater harvesting storage tanks during construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228Figure 12.1 Section showing typical extensive green roof components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 234Figure 12.2 The Savill Garden extensive green roof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235Figure 12.3 British Horse Society sedum blanket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235Figure 12.4 Examples of accessible green roof with intensive and extensive planting, Bishops Square, London. . 235Figure 12.5 Domestic green roofing, Swansea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237Figure 12.6 Distribution of runoff response (0% imperviousness means no runoff) . . . . . . . . . . . . . . . . . . . . . . . . . 239

Page 20: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xx The SuDS Manual

Figure 12.7 Green roof bus stop, Dundee City Centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241Figure 12.8 Green roof bike shelter at Six Acres Estate, Islington, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241Figure 12.9 Kanes Food wildflower green roof. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241Figure 12.10 Biodiverse green roof with varied substrate depths. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243Figure 12.11 Biodiverse green roof, Unicorn Grocery, Manchester . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243Figure 12.12 Abbey Hive biodiverse roof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244Figure 12.13 Sharrow School green roof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244Figure 12.14 Example details of outlet from a green roof – subsurface outlet (top), and open outlet (bottom). . . . . 247Figure 12.15 Installing a green roof outlet with surface overflow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 248Figure 13.1 Soakaway details (including a pre-treatment system) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258Figure 13.2 Soakaway details – concrete ring soakaway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258Figure 13.3 Infiltration trench . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259Figure 13.4 Plan view of infiltration basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259Figure 13.5 Elevation of infiltration basin. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260Figure 13.6 Large infiltration basins, Ipswich . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260Figure 13.7 Small infiltration basin, Cambourne . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260Figure 14.1 Schematic of a commonly used treatment channel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .274Figure 14.2 Treatment channel installations showing discrete 1 m sections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .274Figure 14.3 Treatment channels with filter medium inserts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .274Figure 14.4 Simplified flow pattern in a vortex separator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 275Figure 14.5 Hydrodynamic separator with a separate external bypass . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 275Figure 14.6 Hydrodynamic separator with an internal (or integral) bypass . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 276Figure 14.7 Typical schematic of a hydrodynamic separator unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 277Figure 14.8 Schematic of a vortex-enhanced sedimentation and media filtration system. . . . . . . . . . . . . . . . . . . . . 278Figure 14.9 Large oil separator under construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 279Figure 14.10 Outline diagram of a prefabricated, single chamber, full retention, Class 1 separator . . . . . . . . . . . . . 280Figure 14.11 Outline diagram of a prefabricated, multi-chamber, full retention, Class 1 separator . . . . . . . . . . . . . . 281Figure 14.12 Multi-process system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 281Figure 15.1 Filter strip at motorway ervices draining to filter drain, Hopwood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 291Figure 15.2 Filter strip schematic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292Figure 16.1 Examples of filter drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304Figure 16.2 Filter drain schematic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304Figure 16.3 Filter drain with exceedance event managed within play area, Exwick, Devon . . . . . . . . . . . . . . . . . . . . 307Figure 16.4 Filter drain with planting, Exwick, Devon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308Figure 17.1 Typical conveyance/attenuation swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 314Figure 17.2 Typical dry swale. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 314Figure 17.3 Typical wet swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 315Figure 17.4 Examples of different swale types and designs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 315Figure 17.5 Typical plan view of a swale. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 316Figure 17.6 Swale with vertical side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 317Figure 17.7 Impact of flow depth on hydraulic roughness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 319Figure 17.8 Dry swale with overlying flow control, Upton, Northamptonshire. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 319Figure 17.9 Examples of swales providing a vegetated corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322Figure 17.10 School children in a shallow swale designed for play, Worcestershire . . . . . . . . . . . . . . . . . . . . . . . . . . . 323Figure 17.11 Linear wet swale, Junction 4 M8, West Lothian . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 323Figure 17.12 Check dam wall using local materials, Sheffield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324Figure 17.13 Typical check dam details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 325Figure 17.14 Roadside swale with granular check dams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 325Figure 17.15 Timber check dams, Rednock School, Gloucestershire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 325Figure 17.16 Swale during construction showing coir matting used to protect soils from erosion before the

establishment of vegetation, University of York . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 327Figure 17.17 Grass cutting of roadside swale, Stirlingshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 328Figure 18.1 Components of a bioretention system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334Figure 18.2 Section through a simple rain garden with outlet pipe. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336Figure 18.3 Examples of rain gardens under construction and planted, Cheltenham . . . . . . . . . . . . . . . . . . . . . . . . 336Figure 18.4 Raised planter at Hollickwood School, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337Figure 18.5 Section through a raised planter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337Figure 18.6 Bioretention tree pits, Portland, Oregon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 338Figure 18.7 Bioretention swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 338Figure 18.8 Anaerobic bioretention system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337Figure 18.9 Partially raised rain gardens on sloping sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 338Figure 18.10 Inlets to a bioretention system as used in Lambeth, London . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344

Page 21: The SuDS Manual - CIRIA

xxiThe SuDS Manual

CIRIA SuDS Manual 2015

Figure 18.11 Example of a bioretention system with a simple sediment forebay, Nottingham . . . . . . . . . . . . . . . . . . 344Figure 18.12 Bioretention system inundated during heavy rain, showing submerged forebay (front left),

Portland, Oregon. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344Figure 18.13 Example of inlets for bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344Figure 18.14 Shaping the bottom of a system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 346Figure 18.15 Outfall from simple rain garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 346Figure 18.16 Inlet and overflow outlet configuration (small scale). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347Figure 18.17 Inlet and overflow outlet configuration (medium/large scale) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347Figure 18.18 Example of a simple rain garden overflow, Portland. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347Figure 18.19 Example planting schemes for bioretention systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351Figure 18.20 Typical planting layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352Figure 19.1 How trees can enhance an urban street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 360Figure 19.2 Percival Triangle, Islington. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 360Figure 19.3 Collection of surface water runoff for trees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 361Figure 19.4 Trees used to enhance swales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362Figure 19.5 Properties of a tree system draining surface water from a road highway . . . . . . . . . . . . . . . . . . . . . . . . 363Figure 19.6 Tree pit in Bourke Street, Melbourne . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363Figure 19.7 The use of structural growing media in retrofitting (a) and new-build (b) . . . . . . . . . . . . . . . . . . . . . . . . . 364Figure 19.8 Placement of modular structures in a tree pit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 365Figure 19.9 Pinning out of cellular confinement system and aggregate infill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 365Figure 19.10 Geocellular systems for trees, showing filling of geocellular rafts with structural growing medium . . . 366Figure 19.11 Tree planters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 366Figure 19.12 Integrated system of trees and green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 369Figure 19.13 Linear tree pit, Leicester . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 370Figure 19.14 Popular benches around trees in Norwich. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 372Figure 19.15 Key details of tree structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 373Figure 19.16 Examples of inlets to allow surface water runoff to infiltrate into tree pits . . . . . . . . . . . . . . . . . . . . . . . .374Figure 19.17 Planting beds protect existing mature trees and provide seating, Islington, London . . . . . . . . . . . . . . . 375Figure 20.1 Park and ride scheme on the outskirts of Cambridge using concrete block permeable paving . . . . . . 386Figure 20.2 Private driveway using natural stone as permeable paving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 386Figure 20.3 Car park at East Midlands Airport with porous asphalt surfacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387Figure 20.4 Plastic grids at Lake Garda, Italy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387Figure 20.5 Concrete grids in a park and ride overflow car park, Gwynedd . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387Figure 20.6 Construction of pavement using resin bound post consumer recycled glass aggregate . . . . . . . . . . . . 388Figure 20.7 Retail development car park with porous concrete, High Wycombe. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 388Figure 20.8 Macro pervious pavement under construction in the Midlands – kerb drain collector/pollution

trap with connectors before placing diffusers and permeable sub-base to left . . . . . . . . . . . . . . . . . . . 389Figure 20.9 Macro pervious pavement in warehouse yard in north-west England with channel collection/

pollution trap and concrete pavement construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389Figure 20.10 Construction of sports drainage and attenuation layer below school sports pitch in Hull . . . . . . . . . . . 389Figure 20.11 Construction of attenuation and irrigation system used below equestrian surfacing . . . . . . . . . . . . . . 389Figure 20.12 Pervious pavement system types: Type A – total infiltration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 390Figure 20.13 Pervious pavement system types: Type B – partial infiltration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 391Figure 20.14 Pervious pavement system types: Type C – no infiltration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 391Figure 20.15 Example of rainwater harvesting system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 392Figure 20.16 Concrete block permeable paving with geocellular sub-base replacement system . . . . . . . . . . . . . . . . 392Figure 20.17 Soil classification guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 394Figure 20.18 Examples of different block paving finishes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 396Figure 20.19 Pervious pavement design flow chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 397Figure 20.20 Concrete block permeable paving after a 50 mm rainfall event . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400Figure 20.21 Control of water on sloping sites. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 401Figure 20.23 Layers in a road pavement construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 406Figure 20.24 Flow diffuser to distribute roof runoff into permeable sub-base. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 418Figure 20.25 Perforated pipe outlets below sub-base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 419Figure 20.26 Fin drain outlet from pervious surface sub-base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 419Figure 20.27 Landscape detail for pervious pavement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 424Figure 20.28 Hotel car park with grass-reinforced concrete blending into the surrounding landscape,

Cambridgeshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 424Figure 20.29 Layer of protective DBM over sub-base after coring and before laying concrete block

permeable paving. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 427Figure 20.30 Deep cleaning a supermarket car park, Dundee. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 429Figure 21.1 Geocellular storage system under construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 438Figure 21.2 Structural frame being constructed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 439

Page 22: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xxii The SuDS Manual

Figure 21.3 Frame covered by outer skin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 439Figure 21.4 Schematic of 3D system in storage and attenuation mode. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 440Figure 21.5 Man access chambers located within the structure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 440Figure 21.6 Schematic of 2D system in attenuation storage mode (central inlet pipe) . . . . . . . . . . . . . . . . . . . . . . . 441Figure 21.7 Schematics of 2D systems in attenuation storage mode (upflow filling) . . . . . . . . . . . . . . . . . . . . . . . . . 441Figure 21.8 Typical layout of an arched system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 442Figure 21.9 Direct access chamber into concrete pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 442Figure 21.10 Typical layout of concrete pipe system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 443Figure 21.11 Installation of oversized plastic pipe attenuation tanks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 444Figure 21.12 Typical corrugated steel tank under construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 445Figure 21.13 Precast concrete box culvert being installed as part of a SuDS scheme . . . . . . . . . . . . . . . . . . . . . . . . . 445Figure 21.14 Typical layout of hybrid tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 446Figure 21.15 Hybrid tank of reinforced earth and concrete roof panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 446Figure 21.16 Typical loads to be considered in structural design of attenuation tanks . . . . . . . . . . . . . . . . . . . . . . . . 448Figure 21.17 Simplified summary of structural design process for geocellular units . . . . . . . . . . . . . . . . . . . . . . . . . . 449Figure 21.18 Manifold to distribute flows from large pipe into geocellular tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 458Figure 21.19 Some system configurations allow jetting equipment to move within the structure . . . . . . . . . . . . . . . . 463Figure 21.20 Example of sediment forebay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 464Figure 21.21 Flotation and movement caused by rainwater in excavation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 465Figure 22.1 Detention basin with landscape design providing attractive amenity space, Hamilton, Leicester . . . . 473Figure 22.2 Plan and elevation of vegetated detention basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .474Figure 22.3 Detention basin serving a housing estate, Stirling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 476Figure 22.4 Detention basin in a roundabout, DEX, Dunfermline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 476Figure 22.5 Example of urban hard surfaced off-line detention basin with geometric design to enhance

amenity use, Rotterdam, the Netherlands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 478Figure 22.6 Examples of detention basins with easy access for maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 481Figure 23.1 Soft landscaped pond, Elvetham Heath, Hampshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 486Figure 23.2 Hard landscaped planted pond, Springhill, Gloucestershire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 486Figure 23.3 Wetland, Banner Country Park, Upton, Northamptonshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 487Figure 23.4 Plan view and profile of pond details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 487Figure 23.5 Typical planted pond edge details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 488Figure 23.6 Typical non-planted pond edge details. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 488Figure 23.7 Pond with baffles and islands, Augustenborg, Sweden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 489Figure 23.8 Approach to managing risks associated with a steep-sided pond that also adds amenity value,

Upton, Northamptonshire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 490Figure 23.9 Pond dipping platform, Matchborough First School, Worcestershire . . . . . . . . . . . . . . . . . . . . . . . . . . . . 493Figure 23.10 Urban pond, Western Harbour, Malmö, Sweden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 493Figure 23.11 Balancing pond with marginal wetland treatment zone, Hopwood Park motorway services, M42,

Worcestershire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 494Figure 23.12 Energy dissipating inlet channels for ponds, Augustenborg, Sweden. . . . . . . . . . . . . . . . . . . . . . . . . . . . 496Figure 23.13 Details for a typical geosynthetic liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 496Figure 23.14 Details for a typical geomembrane liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 497Figure 23.15 Details for a typical clay liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 498Figure 23.16 Geometric design of pond in an urban area, Malmö, Sweden. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 498Figure 23.17 Examples of different types of planting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 499Figure 24.1 Hydrological areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 514Figure 24.2 UK and Ireland growth curves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 515Figure 24.4 Attenuation storage in dry or wet components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 531Figure 24.5 Examples of attenuation storage locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 531Figure 24.6 On-line vs off-line storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 531Figure 24.7 Example of a stage-storage curve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 532Figure 24.9 Example of a stage discharge curve. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 533Figure 24.10 Difference in runoff volume for developments where all pervious areas are assumed not to drain

to the drainage network. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 535Figure 24.11 Difference in runoff volume for developments where all pervious areas are assumed to drain

to the drainage network. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 535Figure 25.1 Typical surface water management infiltration system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 544Figure 25.2 Soil texture classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 545Figure 25.3 Local soil testing misrepresenting wider soil properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 547Figure 25.4 Decision guide for the use of infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 548Figure 25.5 Example of reduction in infiltration rate with successive tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 549Figure 25.6 Effect of silt on performance of infiltration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 551

Page 23: The SuDS Manual - CIRIA

xxiiiThe SuDS Manual

CIRIA SuDS Manual 2015

Figure 25.7 Hydraulic design process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 552Figure 25.8 Graph to determine maximum depth for 3D infiltration systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 557Figure 27.1 Examples of signage that can be used on public drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 601Figure 27.2 Example of the type of information that can be used in public campaigns . . . . . . . . . . . . . . . . . . . . . . . 602Figure 28.1 Examples of inlet/outlet systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 606Figure 28.2 Examples of poor and improved inlet and outlet configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 607Figure 28.3 Examples of low-flow inlet pipes and channels to SuDS components . . . . . . . . . . . . . . . . . . . . . . . . . . . 610Figure 28.4 Examples of high-flow inlet pipes to SuDS components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 611Figure 28.5 Timber sleeper edging with gaps, University of York. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 611Figure 28.6 Roadside lateral inlets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 612Figure 28.7 Kerb collection system being used to drain a carriageway in conjunction with a swale . . . . . . . . . . . . . 612Figure 28.8 Examples of flow spreading/energy dissipation inlets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 613Figure 28.9 Requirements for flow bypass structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 613Figure 28.10 Simple overflow inlet to detention basin; no restriction on flow passed downstream as shown

but could be combined with a flow control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 614Figure 28.11 Example of landscaped flow splitter structure, River Chelt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 614Figure 28.12 Conceptual design for engineered inlet flow divider . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 615Figure 28.13 Head–discharge relationship for a simple orifice plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 617Figure 28.14 T-piece orifice structure with pipe base providing permanent water level control. . . . . . . . . . . . . . . . . . 617Figure 28.15 Example of screened orifice outfall with T-piece structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 618Figure 28.16 Effective head for orifice discharge calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 618Figure 28.17 Multiple orifice plate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 619Figure 28.19 Conceptual layout of protected perforated riser outlet structure for small pond . . . . . . . . . . . . . . . . . . 620Figure 28.20 Examples of outlet control weir structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 621Figure 28.21 Example of head–discharge relationship for passive devices (vortex flow controls). . . . . . . . . . . . . . . . 622Figure 28.22 Comparison of hydraulic performance for various devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 623Figure 28.23 Examples of varying hydraulic performance for passive (vortex) type devices . . . . . . . . . . . . . . . . . . . . 623Figure 28.24 Example of a “snail” type device. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 624Figure 28.25 Example of a conical type device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 624Figure 28.26 Two passive devices for multiple flow control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 624Figure 28.27 Examples of debris guards over low-flow outlet control structures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 626Figure 28.28 Examples of trash screens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 627Figure 29.1 Examples of soil conditioning equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 637Figure 29.2 Bioengineered slope stabilisation options. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 638Figure 29.3 Bioengineered bank reinforcement options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 639Figure 30.1 Construction of a drainage layer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 659Figure 30.2 Applying pressure to a taped joint to ensure adequate sealing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 666Figure 30.3 Installation of pond liner with protection fleece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 667Figure 30.4 Geocomposite drainage layer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 668Figure 30.5 Geocomposite drainage strips used below permeable paving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 668Figure 30.6 Example of topsoil retention on slope using cellular confinement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 670Figure 30.7 Example of coir matting for a swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 670Figure 30.8 Example of synthetic matting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 670Figure 31.1 Inadvertent compaction of subgrade below pervious surface construction intended to infiltrate

water to ground. Compaction will reduce the infiltration rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 678Figure 31.2 Absence of erosion protection before establishment of vegetation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 678Figure 31.3 Concrete block permeable paving being constructed at the end of the project . . . . . . . . . . . . . . . . . . . 679Figure 31.4 Temporary surface over permeable sub-base in parking bays (geotextile and hardcore) . . . . . . . . . . . 680Figure 32.1 Grass cuttings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 697Figure 32.2 De-silting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 699Figure 32.3 Floating excavator working in small pond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 701Figure 33.1 Sediment categorisation and associated disposal options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 713Figure 34.1 Installing SuDS on the model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 725Figure 34.2 Replacing impermeable surfaces with porous surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 725Figure 34.3 The teachers’ SuDS session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 727Figure 34.4 Banner produced to advertise the SuDS Fair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 727Figure 34.5 Public drop-in session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 728Figure 34.6 Exhibition board for drop-in session. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 728Figure 34.7 Information leaflet showing rain garden design options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 729Figure 34.8 Information leaflet showing rain garden planting options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 730Figure 34.9 A completed rain garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 731Figure 34.10 Priors Farm rain garden roundel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 731

Page 24: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xxiv The SuDS Manual

Figure 34.11 Interpretation board for the public open space. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 731Figure 35.1 Flooding in Turney Road, 2004 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 736Figure 35.2 Dulwich Park geocellular storage tank during construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 736Figure 35.3 Earth bunds integrated into a new play area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 736Figure 35.4 An example SuDS expenditure profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 739Figure 35.5 Impact pathway for assessing the benefits of flood risk reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 748Figure 35.6 Comparison of options: costs vs benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 753Figure 35.7 Process for estimating NPV where all benefits can be directly monetised (a), and where some

benefits cannot be directly monetised (b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 754Figure 36.1 Risk assessment process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 770Figure B.1 Filter strip dimensions (plan). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 829Figure B.2 Adoption process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 883Figure C.1 Site characterisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 892Figure C.2 Development characterisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 894Figure C.3 Main flow routes and discharge points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 896Figure C.4 Overview of proposed SuDS components and Management Train . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 903Figure C.5 Proposed flow controls and exceedance flow routes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 907Figure C.6 Residential soakaway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 910Figure C.7 Residential infiltration permeable block pavement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 913Figure C.8 Civic street infiltration tree pit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 917Figure C.9 Civic street infiltration bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 919Figure C.10 Supermarket roof rainwater harvesting systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 923Figure C.11 Supermarket lined permeable pavement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 925Figure C.12 Supermarket detention basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 926Figure C.13 Filter strip (and downstream filter drain) serving the lorry park. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 927Figure C.14 Lorry park filter drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 929Figure C.15 Industrial site underdrained swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 931Figure C.16 Strategic site conveyance swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 935Figure C.17 Strategic amenity pond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 936

TablesTable 1.1 Types of SuDS components. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29Table 2.1 Design criteria for SuDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34Table 2.2 Generic criteria of a good design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Table 3.1 Water quantity design criteria and example indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40Table 4.1 Sources of pollution from impermeable surfaces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Table 4.2 Water quality design criteria and example indicators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56Table 4.3 Minimum water quality management requirements for discharges to receiving surface waters

and groundwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63Table 5.1 Types of amenity benefits delivered by SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68Table 5.2 Amenity design criteria and example indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70Table 6.1 Biodiversity design criteria and example indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83Table 7.1 SuDS component delivery of design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113Table 8.1 Calculated flow rates through a geomembrane liner with 0.3 m of water ponded on the liner . . . . . . . 134Table 10.1 Summary of SuDS design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166Table 11.1 RWH objectives and design implications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209Table 11.2 Summary of occupancy rates for new market housing in (i) Cherwell District and (ii)

Oxfordshire County. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216Table 11.3 Occupancy by accommodation type and number of bedrooms, England 2004–2007. . . . . . . . . . . . . . 216Table 11.4 Suggested initial runoff coefficients for RWH yield analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 217Table 11.5 Runoff coefficients with initial losses for RWH yield analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 217Table 11.6 Operation and maintenance requirements for RWH systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 229Table 12.1 Comparison of extensive and intensive green roof systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236Table 12.2 Summary of available evidence of performance of green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239Table 12.3 Green roof substrate specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249Table 12.4 Planting for green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 250Table 12.5 Operation and maintenance requirements for green roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253Table 13.1 Operation and maintenance requirements for soakaways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267Table 13.2 Operation and maintenance requirements for infiltration basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268Table 14.1 Proprietary systems classified on basis of main treatment process . . . . . . . . . . . . . . . . . . . . . . . . . . . . 272Table 14.2 An example of operation and maintenance requirements for a proprietary treatment system . . . . . . . 287Table 15.1 Operation and maintenance requirements for filter strips. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 299Table 16.1 Operation and maintenance requirements for filter drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 310

Page 25: The SuDS Manual - CIRIA

xxvThe SuDS Manual

CIRIA SuDS Manual 2015

Table 17.1 Operation and maintenance requirements for swales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 329Table 18.1 Pollution removal for bioretention systems designed to FAWB guidelines. . . . . . . . . . . . . . . . . . . . . . . . 344Table 18.2 Example grading for a bioretention filter medium. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351Table 18.3 Operation and maintenance requirements for bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 357Table 19.1 Specification for soil appropriate for use in modular structures and raft systems . . . . . . . . . . . . . . . . . 378Table 19.2 Example grading for soil appropriate for use in modular structures and raft systems . . . . . . . . . . . . . . 378Table 19.3 Operation and maintenance requirements for trees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 382Table 20.1 Guidance on selection of a pavement system type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 397Table 20.2 Evidence of durability and clogging of the surfaces of pervious pavements . . . . . . . . . . . . . . . . . . . . . . 401Table 20.3 Interception storage provided by pervious pavements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 405Table 20.4 Equilibrium subgrade CBR estimation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 409Table 20.5 Traffic loading categories for pervious pavement design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 411Table 20.6 Stiffness of various materials used in pervious surface construction . . . . . . . . . . . . . . . . . . . . . . . . . . . 413Table 20.7 Typical construction thickness for grass reinforcement and resin bound materials over subgrade

of 5% CBR or greater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 414Table 20.8 Typical construction thickness for porous asphalt over subgrade with 5% CBR or greater . . . . . . . . . . 415Table 20.9 Typical construction thickness for porous concrete over subgrade with 5% CBR or greater . . . . . . . . . 416Table 20.10 Typical construction thickness for modular paving over subgrade with 5% CBR or greater . . . . . . . . . . 418Table 20.11 Properties assumed in generic concrete block permeable paving design in Table 20.10 . . . . . . . . . . . 419Table 20.12 Bedding and jointing layer specification (2/6.3 to BS 7533-13:2009). . . . . . . . . . . . . . . . . . . . . . . . . . . 422Table 20.13 Typical grading requirements for sub-base aggregates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 423Table 20.14 Sub-base aggregate specification requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 424Table 20.15 Operation and maintenance requirements for pervious pavements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 430Table 21.1 Classification and recommended calculations for geocellular systems . . . . . . . . . . . . . . . . . . . . . . . . . . 450Table 21.2 Sediment loading and potential loss of storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 463Table 21.3 Operation and maintenance requirements for attenuation storage tanks. . . . . . . . . . . . . . . . . . . . . . . . 468Table 22.1 Operation and maintenance requirements for detention basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 483Table 23.1 Operation and maintenance requirements for ponds and wetlands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 502Table 24.1 Summary of runoff estimation methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 509Table 24.2 UK and Ireland growth curve factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516Table 24.3 Recommended values of IF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 522Table 24.4 Relationship between SOIL types and decay coefficient C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 522Table 24.5 UKWIR runoff equation: suggested parameter ranges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 524Table 24.6 Interception mechanisms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 529Table 25.1 Typical infiltration coefficients based on soil texture . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 546Table 25.2 Suggested factors of safety, F, for use in hydraulic design of infiltration systems . . . . . . . . . . . . . . . . . 553Table 26.1 Approaches to water quality risk management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 566TAble 26.2 Pollution hazard indices for different land use classifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 568Table 26.3 Indicative SuDS mitigation indices for discharges to surface waters . . . . . . . . . . . . . . . . . . . . . . . . . . . . 569Table 26.4 Indicative SuDS mitigation indices for discharges to groundwater. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 570Table 26.5 Risk matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 572Table 26.6 How to interpret the groundwater risk screening results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 573Table 26.7 Indicative suitability of SuDS components within the Management Train . . . . . . . . . . . . . . . . . . . . . . . . 575Table 26.8 Total suspended solids: summary of a selection of monitoring datasets. . . . . . . . . . . . . . . . . . . . . . . . . 580Table 26.9 Total cadmium: summary of a selection of monitoring datasets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 581Table 26.10 Total copper: summary of a selection of monitoring datasets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 582Table 26.11 Total zinc: summary of a selection of monitoring datasets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 583Table 26.12 Total nickel: summary of a selection of monitoring datasets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 584Table 26.13 Performance of SuDS components in reducing urban runoff contamination . . . . . . . . . . . . . . . . . . . . . 587Table 26.14 Impermeability and pollution indices for different land use types1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 593Table 26.15 Pollution mitigation indices for different SuDS components and conventional pipe drainage . . . . . . . 594Table 28.1 Typical outlet system components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 617Table 29.1 Plant tolerances and constraints in SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 645Table 29.2 Factors and constraints governing grass establishment methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 648Table 29.3 Parameters for grass reinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 651Table 30.1 Common materials used in SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 656Table 30.2 Commonly used specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 657Table 30.3 Materials used as drainage layers or in drainage trenches for SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 659Table 30.4 Most relevant application standards for geosynthetics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 661Table 30.5 Laboratory test methods for geotextiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 662Table 30.6 Test methods for geosynthetic barriers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 662Table 30.7 Geotextile design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 663

Page 26: The SuDS Manual - CIRIA

CIRIA SuDS Manual 2015

xxvi The SuDS Manual

Table 30.8 Design considerations for waterproof barriers in SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 665Table 31.1 Maximum allowable velocities based on soil type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 682Table 31.2 Sediment control system design criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 683Table 31.3 Sources of hydrocarbon pollution on a construction site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 686Table 32.1 Typical key SuDS components operation and maintenance activities . . . . . . . . . . . . . . . . . . . . . . . . . . . 695Table 35.1 Examples of types of benefits from using SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 746Table 35.2 Summary of range of options and associated benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 752Table 36.1 Recommended depths and velocities for SuDS and exceedance flow routes . . . . . . . . . . . . . . . . . . . . . 764Table 36.2 SuDS risk assessment matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 771Table B.1 Suggested pre-application discussion material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 804Table B.2 Conceptual drainage design documentation suggested for submission at outline planning. . . . . . . . . 806Table B.3 Detailed drainage design documentation suggested for submission at full planning . . . . . . . . . . . . . . 809Table B.4 Scheme design assessment checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 812Table B.5 SuDS health and safety risk assessment checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 816Table B.6 Infiltration assessment checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 824Table B.7 Design assessment checklist: proprietary treatment system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 827Table B.8 Minimum design requirements: filter strip. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 829Table B.9 Design assessment checklist: filter strip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 830Table B.10 Minimum design requirements: filter drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 832Table B.11 Design assessment checklist: filter drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 833Table B.12 Minimum design requirements: swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 835Table B.13 Design assessment checklist: swale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 835Table B.14 Minimum design requirements: bioretention systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 839Table B.15 Design assessment checklist: bioretention system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 839Table B.16 Design assessment checklist: pervious pavement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 842Table B.17 Design assessment checklist: attenuation storage tank. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 845Table B.18 Minimum design requirements: basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 847Table B.19 Design assessment checklist: basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 848Table B.20 Minimum design requirements: ponds/wetlands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 851Table B.21 Design assessment checklist: pond/wetland . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 851Table B.22 Construction assessment checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 857Table B.23 Construction specification examples and suitability for SuDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 859Table B.24 Where to find information on maintenance activities and frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . 867Table B.25 SuDS maintenance inspection checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 868Table B.26 SuDS adoption handover checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 883Table C.1 Strategic surface water management objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 890Table C.2 Site characterisation outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 891Table C.3 Development characterisation outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 893Table C.4 SuDS design criteria for the site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 895Table C.5 Selection of SuDS components for residential development (A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 897Table C.6 Selection of SuDS components for civic street (B) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 898Table C.7 Selection of SuDS components for supermarket (C) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 899Table C.8 Selection of SuDS components for industrial area (D) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 901Table C.9 Greenfield runoff rates. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 904Table C.10 Catchment development details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 905Table C.11 Greenfield runoff rates for each of the sub-catchments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 906Table C.12 Sub-catchment attenuation volumes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 907Table C.13 Summary of infiltration test results for residential area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 908Table C.14 Depth of water in the soakaway for different event durations (1:10 year) . . . . . . . . . . . . . . . . . . . . . . . . 910Table C.15 Depth of water in the pavement for different event durations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 912Table C.16 Summary of infiltration test results for civic street area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 915Table C.17 Depth of water in the tree pit for different event durations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 916Table C.18 Design characteristics for bioretention components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 918Table C.19 Depth velocity relationship for bioretention inlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 918Table C.20 Retail area detention basin area:depth profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 925Table C.21 Retail area detention basin depth:flow relationship for water quality. . . . . . . . . . . . . . . . . . . . . . . . . . . . 926Table C.22 Filter strip design data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 927Table C.23 Industrial area filter strip depth:flow relationship for water quality. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 928Table C.24 Industrial site underdrained swale depth: flow relationship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 932Table C.25 Strategic swale depth:flow relationship for above grass flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 934Table C.26 Strategic swale depth:flow relationship for below grass flows. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 934

Page 27: The SuDS Manual - CIRIA

1The SuDS Manual

CIRIA SuDS Manual 2015

The SuDS Manual